Loading...
HomeMy WebLinkAbout[03c] 2019 Industrial Park East Improvements Council Agenda Item 3c MEETING DATE: April 6, 2020 AGENDA ITEM:2019 Industrial Park East Improvements SUBMITTED BY: Randy Sabart, PE City Engineer BOARD/COMMISSION/COMMITTEE RECOMMENDATION: PREVIOUS COUNCIL ACTION: Approved Application for Payment No. 4 BACKGROUND INFORMATION: BUDGET/FISCAL IMPACT: $167,437.50 ATTACHMENTS:Application for Payment No. 5 REQUESTED COUNCIL ACTION: Approve Application for Payment No. 5 APPLICATION FOR PAYMENT NO. 5CONTRACTOR FOR:2019 INDUSTRIAL PARK EAST IMPROVEMENTS PROJECT NO.STJOE 148807AGREEMENT DATE: 06/24/19 OWNERCITY OF ST. JOSEPH CONTRACTORR. L. LARSON EXCAVATING, INC.FOR WORK ACCOMPLISHED THROUGH: 03/25/2020 CONTRACTWORK TO DATETHIS PAYMENT DESCRIPTION ITEMUNITUNIT COSTQUANTITYAMOUNTQUANTITYAMOUNTQUANTITYAMOUNT BASE BID GENERAL MOBILIZATION 1LUMP SUM$53,000.001.00$53,000.00$0.000.95$50,350.00 2LUMP SUM$9,600.001.00$9,600.00$0.000.70$6,720.00TRAFFIC CONTROL STREET COMMON EXCAVATION (P) 3CU YD$2.38115,288.00$274,385.44$0.00110,288.00$262,485.44 4ROAD STA$400.0063.00$25,200.00$0.0039.05$15,620.00SUBGRADE PREPARATION 5M GAL$30.00150.00$4,500.00$0.000.00$0.00WATER 6LIN FT$6.0010.00$60.00$0.000.00$0.00SAWING CONCRETE PAVEMENT 7LIN FT$2.001,700.00$3,400.00$0.00256.00$512.00SAWING BITUMINOUS PAVEMENT 8SQ YD$2.502,100.00$5,250.00$0.00780.00$1,950.00REMOVE BITUMINOUS PAVEMENT 9EACH$450.001.00$450.00$0.001.00$450.00REMOVE HYDRANT ASSEMBLY 10LIN FT$2.301,525.00$3,507.50$0.000.00$0.00REMOVE PAVEMENT MARKINGS 11LIN FT$4.00200.00$800.00$0.00195.00$780.00REMOVE CURB & GUTTER 12LIN FT$12.00115.00$1,380.00$0.000.00$0.00REMOVE CULVERT 13EACH$250.001.00$250.00$0.001.00$250.00REMOVE CATCH BASIN 14EACH$150.001.00$150.00$0.000.00$0.00SALVAGE & INSTALL MAILBOX 15CU YD$20.509,455.00$193,827.50$0.005,743.99$117,751.80AGGREGATE BASE CLASS 5, (CV) (P) 16CU YD$13.003,665.00$47,645.00$0.000.00$0.00SELECT GRANULAR BORROW (LV) 17CU YD$13.00500.00$6,500.00$0.000.00$0.00GRANULAR BORROW (LV) 18GAL$0.012,300.00$23.00$0.0090.00$0.90BITUMINOUS MATERIAL FOR TACK COAT 19GAL$5.00150.00$750.00$0.000.00$0.00BITUMINOUS MATERIAL FOR FOG SEAL 20TON$71.003,980.00$282,580.00$0.0072.84$5,171.64TYPE SP 9.5 WEARING COURSE MIXTURE(3,C) 21TON$81.00190.00$15,390.00$0.000.00$0.00TYPE SP 9.5 WEARING COURSE (2,C) MIXTURE 22TON$69.003,980.00$274,620.00$0.001,631.74$112,590.06TYPE SP 12.5 NON WEARING COURSE MIXTURE(3,C) 23SQ YD$61.0050.00$3,050.00$0.000.00$0.008" CONCRETE DRIVEWAY 24SQ FT$8.30545.00$4,523.50$0.000.00$0.006" CONCRETE WALK 25SQ FT$41.00127.00$5,207.00$0.000.00$0.00TRUNCATED DOMES 26LIN FT$12.5011,710.00$146,375.00$0.005,851.00$73,137.50CONCRETE CURB & GUTTER, DESIGN B618 27LIN FT$1.52880.00$1,337.60$0.000.00$0.004" SOLID LINE MULTI COMP GR IN YELLOW 28LIN FT$1.521,620.00$2,462.40$0.000.00$0.004" SOLID LINE MULTI COMP GR IN WHITE 29LIN FT$1.052,540.00$2,667.00$0.000.00$0.004" SOLID LINE MULTI COMP WHITE 30LIN FT$2.10910.00$1,911.00$0.000.00$0.004" DBLE SOLID LINE MULTI COMP 31SQ FT$43.0084.25$3,622.75$0.000.00$0.00F&I SIGN PANELS TYPE C 32SQ FT$56.009.00$504.00$0.000.00$0.00F& I SIGN TYPE SPECIAL 33EACH$260.0010.00$2,600.00$0.000.00$0.00STREET NAME SIGN ASSEMBLIES 34HOUR$130.0010.00$1,300.00$0.000.00$0.00STREET SWEEPING (TYPE WET PICKUP) 35EACH$600.001.00$600.00$0.001.00$600.00 ADJUST FRAME & RING CASTING 36EACH$385.002.00$770.00$0.000.00$0.00PAVEMENT MESSAGE GR IN (LEFT TURN ARROW) 1 APPLICATION FOR PAYMENT NO. 5CONTRACTOR FOR:2019 INDUSTRIAL PARK EAST IMPROVEMENTS PROJECT NO.STJOE 148807AGREEMENT DATE: 06/24/19 OWNERCITY OF ST. JOSEPH CONTRACTORR. L. LARSON EXCAVATING, INC.FOR WORK ACCOMPLISHED THROUGH: 03/25/2020 CONTRACTTHIS PAYMENTWORK TO DATE ITEMDESCRIPTIONUNITUNIT COSTQUANTITYAMOUNTQUANTITYAMOUNTQUANTITYAMOUNT 37PAVEMENT MESSAGE GR IN (RIGHT EACH$385.004.00$1,540.00$0.000.00$0.00 TURN ARROW) 38EACH$300.002.00$600.00$0.000.00$0.00 PAVEMENT MESSAGE (RIGHT TURN ARROW) 39ZEBRA CROSSWALK MARKINGSQ FT$10.00240.00$2,400.00$0.000.00$0.00 40PRIVATE UTILITY TRENCHINGLIN FT$6.00400.00$2,400.00$0.00407.00$2,442.00 SANITARY SEWER 41DEWATERINGLUMP SUM$0.011.00$0.01$0.000.00$0.00 42CONNECT TO EXISTING SANITARY EACH$1,800.001.00$1,800.00$0.001.00$1,800.00 SEWER 43CONNECT TO EXISTING SANITARY EACH$240.001.00$240.00$0.002.00$480.00 SEWER SERVICE 4412" PVC SANITARY SEWER, SDR 35LIN FT$31.00805.00$24,955.00$0.00803.00$24,893.00 4510" PVC SANITARY SEWER, SDR 35LIN FT$24.002,970.00$71,280.00$0.002,953.00$70,872.00 468" PVC SANITARY FORCEMAIN, C900LIN FT$21.00665.00$13,965.00$0.00662.00$13,902.00 476" PVC PIPE SEWER, SDR 26LIN FT$12.001,355.00$16,260.00$0.001,424.00$17,088.00 48CONSTRUCT SANITARY MANHOLEEACH$3,570.0013.00$46,410.00$0.0013.00$46,410.00 49MANHOLE CHIMNEY SEALEACH$245.0013.00$3,185.00$0.004.00$980.00 50MANHOLE EXTRA DEPTH (OVER 10')LIN FT$150.008.05$1,207.50$0.008.01$1,201.50 5110"X6" PVC WYE & BEND, SDR 26EACH$695.0027.00$18,765.00$0.0026.00$18,070.00 52JET CLEAN & TELEVISE SANITARY LIN FT$1.503,770.00$5,655.00$0.003,668.00$5,502.00 SEWER 534" INSULATIONSQ YD$32.00305.00$9,760.00$0.00358.30$11,465.60 54BYPASS PUMPINGLUMP SUM$10,000.001.00$10,000.001.00$10,000.001.00$10,000.00 55DBL LABS PUMP STATION UPGRADESLUMP SUM$175,000.001.00$175,000.000.95$166,250.000.95$166,250.00 WATER MAIN 56CONNECT TO EXISTING WATER MAINEACH$900.002.00$1,800.00$0.002.00$1,800.00 5716" WATER MAIN - DUCT IRON CL 50 LIN FT$53.00825.00$43,725.00$0.00873.00$46,269.00 (SEE ALTERNATE A) 5816" WATERMAIN PIPE, DIRECTIONAL LIN FT$185.00610.00$112,850.00$0.000.00$0.00 DRILL(SEE ALTERNATE A) 5912" WATER MAIN - DUCT IRON CL 50LIN FT$40.001,320.00$52,800.00$0.001,272.00$50,880.00 6010" WATER MAIN - DUCT IRON CL 50LIN FT$34.004,220.00$143,480.00$0.004,185.00$142,290.00 618" WATER MAIN - DUCT IRON CL 50LIN FT$34.0062.00$2,108.00$0.0063.00$2,142.00 626" WATER MAIN - DUCT IRON CL 52LIN FT$26.001,273.00$33,098.00$0.001,393.00$36,218.00 6316" BUTTERFLY VALVE AND BOXEACH$3,140.002.00$6,280.00$0.002.00$6,280.00 6412" GATE VALVE AND BOXEACH$3,275.002.00$6,550.00$0.002.00$6,550.00 6510" GATE VALVE AND BOXEACH$2,760.006.00$16,560.00$0.006.00$16,560.00 668" GATE VALVE AND BOXEACH$1,945.001.00$1,945.00$0.001.00$1,945.00 676" GATE VALVE AND BOXEACH$1,435.0042.00$60,270.00$0.0042.00$60,270.00 68HYDRANTEACH$4,200.0016.00$67,200.00$0.0017.00$71,400.00 69DUCTILE IRON FITTINGSPOUND$5.2512,000.00$63,000.00$0.008,822.00$46,315.50 704" INSULATIONSQ YD$32.0082.00$2,624.00$0.00104.30$3,337.60 2 APPLICATION FOR PAYMENT NO. 5CONTRACTOR FOR:2019 INDUSTRIAL PARK EAST IMPROVEMENTS PROJECT NO.STJOE 148807AGREEMENT DATE: 06/24/19 OWNERCITY OF ST. JOSEPH CONTRACTORR. L. LARSON EXCAVATING, INC.FOR WORK ACCOMPLISHED THROUGH: 03/25/2020 CONTRACTTHIS PAYMENTWORK TO DATE ITEMDESCRIPTIONUNITUNIT COSTQUANTITYAMOUNTQUANTITYAMOUNTQUANTITYAMOUNT STORM SEWER 71EACH$1,000.001.00$1,000.00$0.001.00$1,000.00CONNECT TO EXISTING STORM SEWER MANHOLE 12" PIPE PLUG 72EACH$50.0016.00$800.00$0.0013.00$650.00 73EACH$60.001.00$60.00$0.002.00$120.0015" PIPE PLUG 74EACH$70.001.00$70.00$0.001.00$70.0018" PIPE PLUG 75EACH$1,170.002.00$2,340.00$0.002.00$2,340.0015" RC PIPE APRON 76EACH$1,315.005.00$6,575.00$0.005.00$6,575.0018" RC PIPE APRON 77EACH$1,350.002.00$2,700.00$0.000.00$0.0018" RC PIPE ARCH APRON 78EACH$1,670.001.00$1,670.00$0.001.00$1,670.0021" RC PIPE APRON 79EACH$1,835.001.00$1,835.00$0.001.00$1,835.0024" RC PIPE APRON 80EACH$3,160.001.00$3,160.00$0.001.00$3,160.0033" RC PIPE APRON 81EACH$3,200.001.00$3,200.00$0.001.00$3,200.0036" RC PIPE APRON 82LIN FT$36.001,065.00$38,340.00$0.001,019.00$36,684.0012" RC PIPE SEWER DESIGN 3006 CL V 83LIN FT$43.001,095.00$47,085.00$0.001,083.00$46,569.0015" RC PIPE SEWER DESIGN 3006 CL V 84LIN FT$46.001,285.00$59,110.00$0.001,248.00$57,408.0018" RC PIPE SEWER DESIGN 3006 CL V 85LIN FT$89.00175.00$15,575.00$0.000.00$0.0018" RC ARCH PIPE CULVERT, CL IIA 86LIN FT$56.001,000.00$56,000.00$0.00992.00$55,552.0021" RC PIPE SEWER DESIGN 3006 CL III 87LIN FT$54.00630.00$34,020.00$0.00623.00$33,642.0024" RC PIPE SEWER DESIGN 3006 CL III 88LIN FT$67.00270.00$18,090.00$0.00269.00$18,023.0027" RC PIPE SEWER DESIGN 3006 CL III 89LIN FT$78.001,345.00$104,910.00$0.001,344.00$104,832.0030" RC PIPE SEWER DESIGN 3006 CL III 90LIN FT$104.00230.00$23,920.00$0.00221.00$22,984.0033" RC PIPE SEWER DESIGN 3006 CL III 91LIN FT$107.0053.00$5,671.00$0.0048.00$5,136.0036" RC PIPE SEWER DESIGN 3006 CL III 92EACH$1,890.0013.00$24,570.00$0.0013.00$24,570.00CONSTRUCT DRAINAGE STRUCTURE DES H 93EACH$2,670.0027.00$72,090.00$0.0027.00$72,090.00CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 94EACH$4,990.0012.00$59,880.00$0.0012.00$59,880.00CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 95EACH$6,640.004.00$26,560.00$0.004.00$26,560.00CONSTRUCT DRAINAGE STRUCTURE DESIGN 72-4020 96EACH$5,500.003.00$16,500.00$0.003.00$16,500.00CONSTRUCT POND SKIMMER STRUCTURE 97SQ YD$90.0070.00$6,300.00$0.0064.00$5,760.00ARTICULATED BLOCK MAT OPEN CELL, TYPE C 98CU YD$80.0056.00$4,480.00$0.0040.00$3,200.00RANDOM RIPRAP, CLASS II 99CU YD$80.005.00$400.00$0.0030.00$2,400.00RANDOM RIPRAP, CLASS III TURF RESTORATION 100ACRE$77.0024.00$1,848.00$0.000.00$0.00SEEDING(SEE ALTERNATE A) 101ACRE$76.0024.00$1,824.00$0.000.00$0.00SEEDING (TEMPORARY) 102POUNDS$0.662,400.00$1,584.00$0.000.00$0.00SEED MIX 21-111 103POUNDS$3.50675.00$2,362.50$0.000.00$0.00SEED MIX 25-121 (SEE ALTERNATE A) 104POUNDS$2.902,875.00$8,337.50$0.000.00$0.00SEED MIX 25-151 105POUNDS$115.0030.00$3,450.00$0.000.00$0.00SEED MIXTURE SPECIAL 106POUNDS$0.577,440.00$4,240.80$0.000.00$0.00FERTILIZER(SEE ALTERNATE A) 3 03/30/2020