Loading...
HomeMy WebLinkAbout06.01.26 CITY OF ST. JOSEPH www.cityofstjoseph.com 75 Callaway Street East | Saint Joseph, Minnesota 56374 Email: cityoffices@cityofstjoseph.com | Phone: 320.363.7201 | Fax 320.363.0342 St. Joseph City Council AMENDED June 1, 2026 6:00 PM Join Zoom Meeting https://us06web.zoom.us/j/83245260280?pwd=VoADHkZdzLS3Xc8Dxe44YpIoaYgvMH.1 Meeting ID: 862 2322 7259 Passcode: 069680 1. Call to order - Pledge of Allegiance 2. Public Comments Up to 3 speakers will be allowed for up to 3 minutes each to address the council with questions/concerns/comments (regarding an item NOT on the agenda). No Council response or action will be given/taken other than possible referral to Administration. 3. Approve Agenda 4. Consent Agenda a. Minutes – Requested Action: Approve the minutes of May 18, 2026. b. Bills Payable – Requested Action: Approve Check Numbers 63634-63648, Payroll & Account Payable EFT #4076-4087; ACH Accounts Payable #2401135 - #2401181; Regular Pay Period 11. c. Special Event Permit, Make A Difference 5K/1K – Requested Action: Approve the Make A Difference 5K/1K on September 12th at Klinefelter Park. d. Performance Measures Survey Results – Requested Action: Accept the results of the May 2026 Performance Measures Survey. e. 2026-2027 Intoxicating Liquor License Renewals – Requested Action: Approve the 2026-2027 intoxicating liquor licenses as presented. 5. BKV Group – Public Safety Campus Proposal 6. Department Reports 7. Mayor and Council Reports/Updates 8. Adjourn May 18, 2026 Page 1 of 1 Pursuant to due call and notice thereof, the City Council for the City of St. Joseph met in a work session on Monday, May 18th, 2026, at 5:00PM in the St. Joseph Government Center. Members Present: Mayor Adam Scepaniak, Councilmembers Adam Schnettler, Andrew Mooney, Kelly Beniek, Kevin Kluesner City Representatives Present: City Administrator David Murphy, Finance Director Lori Bartlett, Public Works Director Ryan Wensmann, Police Chief Dwight Pfannenstein, Community Development Director Nate Keller, City Clerk Kayla Klein, City Attorney Susan Dege Moratorium on Data Centers: City Attorney Dege provided an overview on moratoriums, how they are used, regulations, etc. The maximum amount of time for a moratorium is 12 months. Discussion was had on whether a moratorium is needed, what will be determined over the course of the moratorium and what the city wants to accomplish during and at the end of it. Mayor Scepaniak asked if St. Joseph could wait to see what other cities do and what other ordinances may be developed while the moratorium is in place. Dege noted that the city can do that and with the data center topic being new, it would be a good idea. Council consensus was to move forward with having staff draft a moratorium ordinance to bring back to the June 15th city council meeting. Moratorium on Apartment Complexes: Keller provided an overview of properties that are currently zoned R-3 Multi Family. There are three, with two of those slated for senior housing. Any other properties would have to go through a rezoning process. Beniek is in favor of a moratorium as quite a few apartment buildings have gone up the past couple of years. Beniek believes housing is needed in the city but wants families to buy-in to the city. What can the city do to provide more affordable single-family housing? Keller noted that one of the R-3 zoned lots already has an application submitted for senior housing and the other senior housing developers will be submitting applications soon. A moratorium does not apply to properties that currently have applications submitted to the city. Mooney asked if the moratorium would be political posturing as he didn’t see the value in having a moratorium for a single lot. Scepaniak responded that it could be taken that way; however, believes the moratorium would give the city time to investigate housing needs further throughout the city. Dege added that the city can carve out how they want the moratorium to read. For example, a moratorium could be drafted that puts a hold on apartment complexes, but not on senior living apartment complexes. Staff will draft a moratorium ordinance on apartment complexes to bring back to the June 15th City Council meeting. Adjourn: The work session meeting was adjourned at 5:54PM. Kayla Klein City Clerk May 18, 2026 Page 1 of 2 Pursuant to due call and notice thereof, the City Council for the City of St. Joseph met in regular session on Monday, May 18, 2026, at 6:00PM in the St. Joseph Government Center. Members Present: Mayor Adam Scepaniak, Councilmembers Andrew Mooney, Kelly Beniek, Adam Schnettler, Kevin Kluesner City Representatives Present: City Administrator David Murphy, Finance Director Lori Bartlett, Police Chief Dwight Pfannenstein, City Engineer Randy Sabart, Community Development Director Nate Keller, City Clerk Kayla Klein, Public Works Director Ryan Wensmann Public Comments: None Approve Agenda: Mooney moved to approve the agenda; seconded by Schnettler and passed unanimously. Consent Agenda: Scepaniak moved to approve the consent agenda; seconded by Beniek and passed unanimously. a. Minutes – Requested Action: Approve the minutes of May 4, 2026. b. Bills Payable c. Donations – Requested Action: Approve Resolution 2026-028 accepting donations. d. Financial Reports e. Street Event Request, Rock 4 Alzheimer's – Requested Action: Approve Special Event. f. Planning Commission Appointment - Requested Action: Approve the appointment of Craig Hern to the Planning Commission. Public Hearing – Special Event Request for Rocktoberfest: Klein presented the council with a special event permit request submitted by the St. Joseph Booster Club for Roctoberfest on September 26, 2026. The street closures will be the same as the prior year. Beniek moved to approve the special event permit request as presented including the temporary liquor license; seconded by Mooney and passed unanimously. Special Event Request – White Peony: Klein presented the council with a special event permit request submitted by White Peony Boutique for the Peony Market on June 6, 2026. The event will close a portion of 1st Avenue NW and Ash Street W from 6AM – 2PM. Kluesner moved to approve the special event permit request as presented including the temporary liquor license; seconded by Mooney and passed unanimously. 2025 Audit Presentation: Janel Bitzan, Creative Planning (formerly known as BerganKDV), presented the 2025 Audit findings. As noted in prior audits, one finding reported as a material weakness was lack of segregation of accounting duties. This is due to the limited staffing that are tasked with handling financial duties in the office. Due to costs of hiring enough employees to eliminate this finding, council and staff have agreed to monitor policies and internal controls to mitigate misstatements and misappropriation of city funds. Kluesner asked if Bitzan is on site during the audit. Bitzan responded that staff was on-site 3-4 days and remote one day. Kluesner asked what is in the refuse enterprise fund. Bartlett responded that it includes what we pay to Republic Services for refuse and also what we pay to C&L for the compost site. Kluesner asked how many city employees have city credit cards and whether the statements get reviewed through the audit. Bitzan noted that her staff checks various statements/payments in the audit at random. The ones that are selected, every receipt is checked. Schnettler asked what depreciation means in the enterprise funds. Bitzan explained that when a city purchases an asset a value is assigned to that asset. Each year that asset worth decreases and eventually will be $0. This is the depreciation of that asset. Assigning a depreciation value to an asset helps the city budget for it’s replacement. Mooney recalled a previous work session discussion where a future water tower was discussed and asked if the council should do a one-time higher increase for water rates as opposed to what was approved. Bartlett responded that the loss the council is seeing is due to the cellular water meter purchases as the city purchased 500 meters for 2026 in the fall of 2025 which shows that larger expense. Kluesner asked Bitzan if she had ever been apart of an audit where there was nefarious activity. Bitzan has and it was related to personal purchases using city credit cards. May 18, 2026 Page 2 of 2 Kluesner added he is 100% confident in how Finance Director Bartlett is handling the city’s finances. Kluesner moved to accept the 2025 Audited Financial Statements; seconded by Beniek and passed unanimously. Department Reports: None. Mayor and Council Reports/Updates: Beniek thanked staff for their work. Adjourn: Beniek made a motion to adjourn the meeting at 6:29 PM; seconded by Mooney and passed unanimously. Kayla Klein City Clerk STAFF MEMO Prepared by: Debbie Kulzer, Finance Tech Meeting Date: 6/1/26 ☒Consent Agenda Item ☐Regular Agenda Item Agenda Item # 4b Reviewed by: Item: Council Priority: ☐ Dispensary ☐ Industrial Park Expansion ☐ Housing ☐Public Safety Facility/Safe Crossing of CSAH 75 ☒ N/A ACTION REQUESTED Approve the bills payable as presented. BOARD/COMMISSION/COMMITTEE RECOMMENDATION None PREVIOUS COUNCIL ACTION See below REFERENCE AND BACKGROUND The council approved staff to make the following payments through the payroll contracts, regular monthly invoices with due dates prior to the next scheduled council meeting, or actions taken at previous council meetings. The information here is to provide you with all checks and electronic payments made for verification of the disbursement completeness. BUDGET IMPACT Bills Payable – Checks Mailed Prior to Council Approval Regular Payroll 11 $73,239.07 Payroll & Accounts Payable EFT #4076 - #4087 $75,040.46 ACH Accounts Payable #2401135 - #2401181 $162,587.12 Check Numbers #63634 - #63645 $59,910.15 Total $370,776.80 Bills Payable – Checks Awaiting Council Approval Check Numbers - #63646 - #63648 $896.16 Total $896.16 Total Budget/Fiscal Impact: $371,672.96 Various Funds STAFF RECOMMENDED ACTION Approve the bills payable as presented. SUPPORTING DATA/ATTACHMENTS Bill listing by EFT, paid prior to council approval and awaiting to be paid upon council approval. Bills Payable STAFF MEMO Prepared by: City Clerk Meeting Date: 6/1/26 ☒ Consent Agenda Item ☐ Regular Agenda Item Agenda Item # 4c Reviewed by: Item: Special Event Permit, Make a Difference 5K/1K Council Priority: ☐ Dispensary ☐ Industrial Park Expansion ☐ Housing ☐ Public Safety Facility/Safe Crossing of CSAH 75 ☒ N/A ACTION REQUESTED Approve the Make A Difference 5K/1K special event on September 12th at Klinefelter Park. BOARD/COMMISSION/COMMITTEE RECOMMENDATION N/A PREVIOUS COUNCIL ACTION N/A REFERENCE AND BACKGROUND Make A Difference 5K/1K will be held on September 12, 2026, at Klinefelter Park. Proceeds from the event go to the INDY Foundation and is sponsored by St. Cloud Toyota. The route will begin and end in Klinefelter Park. There won’t be alcohol served this year. Event organizers will work with the Public Works Department on barricades/cones along the route. BUDGET IMPACT STAFF RECOMMENDED ACTION Approve the Make A Difference 5K/1K special event on September 12, 2026. SUPPORTING DATA/ATTACHMENTS Special Event Application Event Information Make A Di erence 5K/1K - Run/Walk City Council Proposal Event Date: Saturday, 9/12/2026 St. Cloud Toyota presents the third annual Make a Di erence 5K/1K Run/Walk! When we decided that we wanted to sponsor a run/walk event, we decided that we wanted to do it a little bit di'erently. There are a lot of companies/foundations raising money for cancer research, which is very important. However, we have been partnering with The INDY Foundation for a few events and it just feels di'erent. INDY raises money for people in our community that are currently on their cancer journey. These are people that live in our community! (INDY stands for I’m Not Done Yet!) What is it that St. Cloud Toyota is doing di'erent? There are several expenses involved in putting together an event like this. From the run timing, venue, beverages, shirts, advertising, and promotions… the list goes on and on. Generally, the event registration fees, and event sponsors must first cover those costs before any money is raised for the cause. We have made the decision to cover all those costs so that the money raised goes straight to INDY. This year, the 1K will start at 10:00 am and will not be timed. The 5K event will start at 10:30 am and will be timed by Pickle Events. The 5K participants will all receive a shirt. The 1K participants will receive a cape, as the 1K will be a superhero theme. We have some commitments already from Leighton Broadcasting, KPower Yoga, and Wandering Cow Ice Cream. Last year, Bad Habit o'ered beer. So, we had the parking lot surrounded by orange snow fence. This year, we have elected to not o'er any alcoholic beverages. Therefore, no snow fencing will be needed. The event will be at Klinefelter Park. We would like to ask for a couple of picnic tables for participants to eat ice cream and hang out before and after the event. www.stcloudtoyota.com/makeadi'erence 5K Route The 1K route is simply around the Klinefelter park trail. Example start/stop threshold: STAFF MEMO Prepared by: Lori Bartlett Meeting Date: 4-6-26 ☒ Consent Agenda Item ☐ Regular Agenda Item Agenda Item # 4d Reviewed by: Item: Performance Measures Survey Results Council Priority: ☐ Dispensary ☐ Industrial Park Expansion ☐ Housing ☐ Public Safety Facility/Safe Crossing of CSAH 75 ☒ N/A ACTION REQUESTED Authorize the Mayor and City Clerk to execute Resolution 2026-029 accepting St. Joseph’s performance measures results and report results to the State Auditor. BOARD/COMMISSION/COMMITTEE RECOMMENDATION none PREVIOUS COUNCIL ACTION Council adopted resolution 2011-014 declaring 10 performance measurements as developed by the State’s Council on Local Results and Innovation. The Council approved the questions for the survey to be conducted in May 2026. The Council accepted the survey results from 2011-2023. REFERENCE AND BACKGROUND The 2010 State Legislature passed Statute §6.91 allowing cities to participate in a standard measures program to provide communication to its citizens on annual basis. The Legislature directed the State Auditor to establish a committee to identify ten (10) standard measurements as the minimum measurements each city should adopt. A copy of the committee’s report can be found on the State Auditor’s website. The City declared the minimum ten (10) performance benchmarks listed in the report prior in 2011 for the City to be eligible for a per capita reimbursement of $0.14 per capita annually. For 2026 report year, the survey was conducted and results received prior to July 1, 2026 to be eligible for the 2026 per capita reimbursement. The results of the May 2026 survey are enclosed and are available on the City’s website. The survey includes comments from 24 respondents. Only city residents were allowed to respond and duplicate responses were not allowed. The State Auditor’s office requires a resolution to accept the results prior to July 1, 2026. BUDGET IMPACT Appx. $1,000 reimbursement, no payable 2027 levy limits STAFF RECOMMENDED ACTION Consider acceptance of the results of the May 2026 performance measures survey. SUPPORTING DATA/ATTACHMENTS Performance Measurement Survey Questions Resolution 2026-029 Accepting St. Joseph’s Performance Measures Survey Results May 2026 Performance Measure Program Survey Results Resolution 2026-029 Accepting St. Joseph’s Performance Measures Survey Results Whereas, pursuant to Minnesota Statute 6.91 the St. Joseph City Council has adopted performance and output measures recommended by the State of Minnesota’s Council on Local Results and Innovation and desires to continue with recommended performance measure guidelines and practices. Now therefore be it resolved, the St. Joseph City Council adopted the following performance measures initiatives: 1. That the City has adopted and implemented the minimum 10 performance measures developed by the Council on Local Results and Innovation. 2. That the City has implemented a local performance measurement system as developed by the Council on Local Results and Innovation. 3. That the City will report the results of the 10 adopted measures to its residents before July 2026 on the City’s Website. 4. That the City has surveyed its residents on the services included in the performance benchmarks and intends to periodically (at least biennially) repeat the survey of its residents to gauge changes in the performance benchmarks. 5. That the City accepting the results of the performance measures survey conducted in May 2026. Adopted this 1st day of June 2026. __________________________________________ Adam Scepaniak, Mayor ___________________________________ David Murphy, City Administrator City of St. Joseph Performance Measures Recommended Survey Questions May 2026 The City will ask the following questions on the 2026 survey: 1. Indicate the number of years you have lived in this city: _______years. 2. Please enter your email address. If you do not have an email simply type “no email”. 3. How would you rate the overall appearance of the city? 4. How would you describe your overall feeling of safety in the city? 5. How would you rate the overall quality of fire protection services in the city? 6. How would you rate the overall condition of city streets? 7. How would you rate the overall quality of snowplowing on city streets? 8. How would you rate the dependability and overall quality of city sanitary sewer services? 9. How would you rate the dependability and overall quality of the city water supply? 10. How would you rate the overall quality of city recreational programs and facilities? 11. How would you rate the overall quality of services provided by the city? 12. How would you rate the fiscal management and health of the city? 13. Comments box. Perf ormanc e M easures ST JOSEPH : 2026 1 / 15 Q1 What city do you live in? Answered: 24 Sk ipped: 0 #RESPONSES DATE 1 Saint Jos peh 5/27/2026 10:20 AM 2 St.J os eph 5/27/2026 9:04 AM 3 Saint Jos eph 5/27/2026 8:16 AM 4 Saint Jos eph 5/27/2026 4:48 AM 5 St J os eph 5/26/2026 10:36 PM 6 St. Joe 5/26/2026 9:32 PM 7 St J os eph 5/26/2026 8:10 PM 8 St joseph 5/26/2026 3:35 PM 9 St J os eph 5/26/2026 1:56 PM 10 St. Jos eph 5/26/2026 12:49 PM 11 St. Jos peh 5/26/2026 12:31 PM 12 St joseph 5/26/2026 11:54 AM 13 Saint Jos eph 5/26/2026 4:25 AM 14 St J os eph 5/22/2026 5:49 PM 15 St. Jos eph 5/22/2026 8:56 AM 16 Saint Jos eph 5/21/2026 12:16 PM 17 St J os eph 5/20/2026 3:39 PM 18 St.joseph 5/19/2026 3:27 PM 19 St J os eph 5/18/2026 10:21 AM 20 Saint Jos eph 5/16/2026 5:01 PM 21 St J os eph 5/15/2026 6:34 AM 22 Saint Jos eph 5/14/2026 7:11 PM 23 Saint Jos eph 5/14/2026 4:29 PM 24 St. Jos eph 5/14/2026 12:41 PM Perf ormanc e M easures ST JOSEPH : 2026 2 / 15 Q2 Please enter your email address. If you do not have email, please just type "none" Answered: 19 Sk ipped: 5 #RESPONSES DATE 1 None 5/27/2026 9:04 AM 2 None 5/27/2026 8:16 AM 3 amy braig1@gmail.com 5/27/2026 4:48 AM 4 Bler9801@hotmail.com 5/26/2026 10:36 PM 5 spencervanbec k @gmail.com 5/26/2026 9:32 PM 6 Hajo33@msn.c om 5/26/2026 8:10 PM 7 Sperry scott@y ahoo.c om 5/26/2026 3:35 PM 8 None 5/26/2026 1:56 PM 9 Meganwagner31@gmail.com 5/26/2026 12:49 PM 10 Nav rat iljakob@gmail.com 5/26/2026 12:31 PM 11 none 5/26/2026 4:25 AM 12 lnp4545@gmail.c om 5/22/2026 5:49 PM 13 amfischer5@gmail.c om 5/21/2026 12:16 PM 14 bdonnay 57@gmail.com 5/20/2026 3:39 PM 15 PCB1122@HOTMAIL.COM 5/19/2026 3:27 PM 16 none 5/18/2026 10:21 AM 17 brianlopau@yahoo.com 5/16/2026 5:01 PM 18 None 5/14/2026 7:11 PM 19 cink es 7777@gmail.com 5/14/2026 4:29 PM Perf ormanc e M easures ST JOSEPH : 2026 3 / 15 17 415 24 Q3 How many years have you lived in this city? Answered: 24 Sk ipped: 0 Total Respondents : 24 #YEARS DATE 1 3 5/27/2026 10:20 AM 2 6 5/27/2026 9:04 AM 3 6 5/27/2026 8:16 AM 4 10 5/27/2026 4:48 AM 5 25 5/26/2026 10:36 PM 6 1 5/26/2026 9:32 PM 7 10 5/26/2026 8:10 PM 8 35 5/26/2026 3:35 PM 9 23 5/26/2026 1:56 PM 10 5 5/26/2026 12:49 PM 11 2 5/26/2026 12:31 PM 12 40 5/26/2026 11:54 AM 13 19 5/26/2026 4:25 AM 14 6 5/22/2026 5:49 PM 15 25 5/22/2026 8:56 AM 16 23 5/21/2026 12:16 PM 17 25 5/20/2026 3:39 PM 18 19 5/19/2026 3:27 PM 19 26 5/18/2026 10:21 AM 20 23 5/16/2026 5:01 PM 0 2 4 6 8 10 12 14 16 1 8 20 Year s ANSWER CHOICES AVERAGE NUMBER TOTAL NUMBER RESPONSES Years Perf ormanc e M easures ST JOSEPH : 2026 4 / 15 21 17 5/15/2026 6:34 AM 22 12 5/14/2026 7:11 PM 23 15 5/14/2026 4:29 PM 24 39 5/14/2026 12:41 PM Perf ormanc e M easures ST JOSEPH : 2026 5 / 15 24 res pons es How would you rate the overall appearance of the city? Q4 Excellent Good Fair Poor Don't k now 0%1 0%20%3 0%40%50%60%70% Perf ormanc e M easures ST JOSEPH : 2026 6 / 15 24 res pons es How would you describe your overall fe eling of safety in the city? Q5 Very safe Somewhat safe Somewhat unsafe Very unsafe Don't know 0%10%20%3 0%40%50% Perf ormanc e M easures ST JOSEPH : 2026 7 / 15 24 res pons es How would you rate the overall quality of fire prote ction services in the city? Q6 Excellent Good Fair Poor Don't k now 0%1 0%20%3 0%40%50%60%70% Perf ormanc e M easures ST JOSEPH : 2026 8 / 15 24 responses How would you rate the overall condition of city stre ets? Q7 Excellent Good Fair Poor Don't k now 0%1 0%20%3 0%40%50%60%70%80% Perf ormanc e M easures ST JOSEPH : 2026 9 / 15 24 res pons es How would you rate the overall quality of s n owplowing on city streets ? Q8 Excellent Good Fair Poor Don't k now 0%10%20%30%40%50% Perf ormanc e M easures ST JOSEPH : 2026 10 / 15 24 res pons es How would you rate the dependability and overall quality of city san itary se we r service? Q9 Excellent Good Fair Poor Don't k now 0%10%20%3 0%40%50%60% Perf ormanc e M easures ST JOSEPH : 2026 11 / 15 24 res ponses How would you rate the dependability and overall quality of the city water supply? Q10 Excellent Good Fair Poor Don't k now 0%10%20%30%40%50% Perf ormanc e M easures ST JOSEPH : 2026 12 / 15 24 responses How would you rate the overall quality of city recreational programs and facilities (e.g. parks, trails , park facilitie s, e tc.)? Q11 Excellent Good Fair Poor Don't k now 0%10%20%3 0%40%50%60% Perf ormanc e M easures ST JOSEPH : 2026 13 / 15 24 responses How would you rate the overall quality of s ervice s provided by the city? Q12 Excellent Good Fair Poor Don't k now 0%1 0%20%3 0%40%50%60%70%80% Perf ormanc e M easures ST JOSEPH : 2026 14 / 15 24 responses How would you rate the fiscal man agement an d health of the city? Q13 Excellent Good Fair Poor Don't k now 0%10%20%30%40%50% Perf ormanc e M easures ST JOSEPH : 2026 15 / 15 Q14 Please share any comments you have: Answered: 13 Sk ipped: 11 #RESPONSES DATE 1 Would like to make sure the new public safety building is built large enough that we dont have to spend money on city buildings for the next 25-50 years 5/27/2026 9:04 AM 2 Add the mis sing sidewalks-identified back in 2016.. review the comprehensive plan and follow thru 5/27/2026 4:48 AM 3 Stop inves ting in rev italiz ing and inv est in y our community. Add more park s (an assortment) and more family friendly options. The city water is brown & smells lik e fart. And pleas e s top inc reas ing tax es ! You're literally pus hing our elderly from their homes ! Please add a 4 way stopsign by the Catholic School entrance, reduc e speed in downtown to 20, and get c ameras at kleinfelter park and on the wabagon. 5/26/2026 3:35 PM 4 Sad to s ee money being s pent on another net police station. And c urbs gett ing ripped out that are perfectly fine at the c orners. J ust t o replace on the corners the same all over again. 5/26/2026 1:56 PM 5 I would like to see a y ard waste pickup offered or somet hing t hat can help thos e that don't have the capability of utilizing the compost s ite, becaus e of the lack of trans porting leaves, branches, grass clippings, etc. Is there something that can be offered by the city for at least leaf removal? This is one of our struggles as we don't have a vehic le to haul y ard waste. I would also like to see a shelter built at the dog park for those that use it that would be a great asset. I personally don't hav e dogs , but my neighbor does and uses t he park regularly. 5/26/2026 12:49 PM 6 -Snow plowing c ity s treets is incons ist ent. Somet imes its the day of , and s ometimes it's a day or two after it s nows that the s treets finally get plowed. -Stop allowing apartment buildings to be built it residential neighborhoods. WHAT A EYESORE! (College av e/ Hill s treet) Why not put in a dog park or a basketball c ourt. Nope the c ity wants more tax rev enge, instead of tak ing care of it's residents. -Why is t he c it y resident s forced to participate in the rec ycling program? I barely fill the c ontainer on a monthly basis . Why res idents doing the work and sorting the recycling products for the garbage c ompany? Resident s just be able to opt out and not be forc ed to rec y c le if they chos e not to. -Why are property tax es k eep going up, when inflation is s o high yet ? SJPD got a 3% rais e, I didn;t. New squads ? Rumor of taking ov er t he old Cas ey gas s tation for Polic e department . More cos ts, nev er enough or satisf ied. 5/26/2026 4:25 AM 7 Still sending out news letters printed single sided thereby using twice the amount of paper. I am dis appointed in t he disregard for c onserv ing paper usage. I want to express my grat itude that the YMCA did not go through. Pleas e do not allow a data center in or near St. Joe 5/21/2026 12:16 PM 8 We are proud of our c ity and proud of its leaders .5/20/2026 3:39 PM 9 Taxes are high.but there high everywhere 5/19/2026 3:27 PM 10 I think our c it y water needs help, it has a nasty chlorine smell. The plowing has been terrible the pas t 3 y ears as well espec ially if y ou're on a quiet street or dead end. 5/18/2026 10:21 AM 11 The city plow drivers need to figure out where the edge of the roads are. Ev ery year they tear up approx 4-5 of my lawn bec ause they run the plow over 5/15/2026 6:34 AM 12 Many homeowners in the city don’t follow codes and regulations. The y ards have vehicles park ed on the lawns, the gras s isn’t cut and debris s pread across yards. When will the city start enforcing our codes and st andards? 5/14/2026 7:11 PM 13 Hav ing marijuana eas ily available in our c ity limits is detrimental to healthy liv ing, (though helpful for medical purposes ). 5/14/2026 4:29 PM STAFF MEMO Prepared by: City Clerk Meeting Date: 6/1/2026 ☒ Consent Agenda Item ☐ Regular Agenda Item Agenda Item # 4e Reviewed by: Police Chief Item: 2026-2027 Intoxicating Liquor Licenses Council Priority: ☐ Dispensary ☐ Industrial Park Expansion ☐ Housing ☐ Public Safety Facility/Safe Crossing of CSAH 75 ☒ N/A ACTION REQUESTED Motion approving the consent agenda will automatically approve this item. If pulled, the following motion is requested. Motion authorizing the City Clerk and Mayor to execute the following liquor license: on/off-sale intoxicating; wine/strong beer; special Sunday; brewer taproom; brewer off-sale; small brewer off-sale – 128 ounces; Sunday growler off-sale; micro distiller off-sale; and cocktail room license for the 2026-2027 licensing period. BOARD/COMMISSION/COMMITTEE RECOMMENDATION N/A PREVIOUS COUNCIL ACTION N/A REFERENCE AND BACKGROUND Annually, the City Council must review and approve the liquor licenses. The intoxicating liquor licensing period is July 1 to June 30. The license hold must complete an application in which the Police Chief and City Clerk are required to sign verifying the information. Once council approves, the licenses are sent to the MN Alcohol & Gambling division, and they review and issue licensing as well. The licensing for non-intoxicating, tobacco, and amusement is renewed on a calendar year, with approval of those being in December. BUDGET IMPACT STAFF RECOMMENDED ACTION Approve the 2026-2027 liquor licenses as presented. SUPPORTING DATA/ATTACHMENTS Listing of liquor licenses up for approval. License Name Trade Name On-Sale Intox Off-Sale Intox Special Sunday Wine/ Strong Beer Brewer Taproom Small Brewer Off Sale Malt License Small Brewer Off Sale Malt License - 128 Ounces Sunday Growler Off Sale Micro Distiller Off Sale Cocktail Room St. Joseph Hospitality Systems LLC American Burger Bar  American Legion Post 328 John Kuebelbeck Post 328  Bad Habit Brewing LLC Bad Habit Brewing  Bello Cucina of St. Joseph, Inc.Bello Cucina  Coborn's, Inc Coborn's Coborn's Store  College of St. Benedict College of St. Benedict  The La, LLC LaPlayette  PWR Enterprises, Inc.St. Joseph Offsale Liquor  BIP, Inc.Sal's Bar & Grill  The Middy LLC The Middy  Krewe Restaurant Krewe Restaurant  Mad Hatter Whiskey LLC Obbink Distilling  Short Stop Restaurants Inc.Custom Catering by Short Stop  The House Food and Tap LLC The House Food and Tap  St. Joseph Baseball Team Inc.St. Joseph Baseball Team  STAFF MEMO Prepared by: Police Chief Meeting Date: 06/01/2026 ☐ Consent Agenda Item ☒ Regular Agenda Item Agenda Item # 5 Reviewed by: Item: BKV Group-Public Safety Campus proposal Council Priority: ☐ Dispensary ☐ Industrial Park Expansion ☐ Housing ☒ Public Safety Facility/Safe Crossing of CSAH 75 ☐ N/A ACTION REQUESTED Approve staff to proceed ahead with BKV Group Public Safety Proposal as presented. BOARD/COMMISSION/COMMITTEE RECOMMENDATION PREVIOUS COUNCIL ACTION REFERENCE AND BACKGROUND The city recently purchased the former Casey’s Gas station site in 2025 with the intention for future Fire Hall expansion, City Fuel station using existing inground tanks, and the new construction of a Police Station. BUDGET IMPACT $13,950 for a Public Safety Master Planning & Programming Study Optional $9,000 Fire Department Facility Condition Assessment study STAFF RECOMMENDED ACTION Recently with the demolition of the former Casey’s Gas Station, Ryan Wensmann brought forward the concept of moving the city refueling station forward. However, without knowing how big of expansion is needed for Fire Hall and build out of Police Station, it is a difficult moving target to know where a fueling station should be constructed on the property to not interfere with future construction. The city owned holding pond adjacent to the Casey’s gas station site was over engineered and most of the service of the pond is for the Fire Hall and Gas Station site. On May 5th, 2026, Fire Chief Taufen, Police Chief Pfannenstein, Deputy Chief Johnson, Public Works Director Wensmann, and City Administrator Murphy met representatives from BKV Group on site. BKV Group specializes in design and regulations in public safety building and design. We did a walk through the current Fire Hall, City Hall, and met on the former gas station site. Pictures were taken and first thoughts and impressions were obtained. It is my understanding that the $13,950 would include a space need study in both Police and Fire. A concept of how big of facility for Police would be identified as well as how big of expansion for the current fire hall. The fire hall was constructed in the mid-1990s and some new rules and regulations have come out since then to include decontamination areas as well as anticipated growth to the department’s size of its fleet of vehicles. This would give us a general idea of the cost of construction as well as size so we can budget for construction and plan for placement of fueling station. The optional cost of $9,000 for the fire hall condition would be a more in depth of the existing structure where the would evaluate things like conditions of steel door frames that are beginning to rust out in corners, and what the building would support for additional build out of decontamination areas, potential office space allocation, truck bays, and not limited to future sleeping area for potential longer staffing in time. SUPPORTING DATA/ATTACHMENTS See attached proposal ARCHITECTURE | INTERIOR DESIGN | URBAN DESIGN & LANDSCAPE ARCHITECTURE ENGINEERING | CONSTRUCTION ADMINISTRATION | BRANDED ENVIRONMENTS | SUSTAINABLE DESIGN PUBLIC SAFETY CAMPUS MASTER PLANNING AND PROGRAMMING SERVICES REQUEST FOR PROPOSAL - ST. JOSEPH, MINNESOTA MAY 13, 2026 PHOTO CREDIT: ST. JOSEPH POLICE DEPARTMENT FACEBOOK 222 North 2nd Street, Suite 101, Minneapolis, MN 55401 | www.bkvgroup.com May 13, 2026 David Murphy, City Administrator The City of St. Joseph 75 Callaway Street East St. Joseph, MN 56374 Dwight Pfannenstein, Chief of Police St. Joseph Police Department 75 Callaway Street East St. Joseph, MN 56374 RE: Public Safety Campus Master Planning & Programming Services Dear Mr. Murphy and Chief Pfannenstein: On behalf of BKV Group, we appreciate the opportunity to submit our proposal to assist the City of St. Joseph with planning for the future of its Police and Fire Department facilities. We recognize the importance of this effort and the opportunity it presents to proactively establish a long-term vision for public safety services, facility investment, and future site development before incremental decisions begin to limit flexibility. This effort represents more than a master planning exercise. The City has a unique opportunity to evaluate how its public safety operations, facilities, and recently acquired property can function together as a coordinated and adaptable public safety campus. The combination of Police Department space limitations, evolving Fire Department operational needs, and acquisition of the former gas station parcel creates an opportunity for thoughtful, long-range planning. We understand the City is seeking a practical and defensible roadmap that balances immediate operational priorities with long-term development opportunities. This includes evaluating future Police Department space needs, opportunities for Fire Department expansion and modernization, integration of fueling operations to support all City vehicles, and establishment of a site framework that preserves flexibility for future phased development. BKV Group is uniquely positioned to support the City through our national public safety planning expertise and extensive experience helping communities evaluate complex civic and operational decisions through collaborative, data-driven master planning processes. We have completed more than 400 public safety project commissions and hundreds of civic planning and study projects nationwide. We understand that successful planning must balance operational efficiency, emergency response functionality, fiscal stewardship, and long-term adaptability. Our approach is collaborative, operationally focused, and implementation-oriented. We work closely with City leadership, Police and Fire personnel, and stakeholders to evaluate operational needs, existing facility conditions, realistic space programs, and long-term site planning strategies. This integration of programming, facility evaluation, conceptual planning, and cost modeling provides clear and actionable framework for future decision-making. To further support long-term planning efforts, BKV Group can involve Kraus-Anderson to also provide an optional Facility Condition Assessment of the existing Fire Department facility. This process would help the City understand deferred maintenance considerations, reinvestment needs, and long-term lifecycle implications associated with future renovation or expansion strategies. BKV Group is energized by the opportunity to partner with the City of St. Joseph to help shape a thoughtful and forward-looking path for the future of its public safety services and facilities. We appreciate your consideration and look forward to discussing the project further. Sincerely, BKV Group Paul Michell, AIA Managing Partner, Government p: 816.405.7585 e: pmichell@bkvgroup.com 1978 YEAR ESTABLISHED 210+ EMPLOYEES 250+ NATIONAL AWARDS 400+ PUBLIC SAFETY PROJECTS 500+ CIVIC PROJECTS NATIONWIDE 60+ LEED PROJECTS TOP 100 Architecture & Engineering Design Firms TOP 25 Public Safety/Justice Facilities Firm We plan and design thoughtful public safety facilities to serve departments and communities for many years to come. FIRM NAME BKV Group YEAR ESTABLISHED 1978 PRACTICE AREAS Police Stations, Public Safety Centers, Fire Stations, EMS Stations, Dispatch/ E911, Emergency Operations Centers, City Halls, and Public Works BKV Group is a holistic design firm providing a full complement of architecture, interior design, engineering, landscape architecture, and construction administration services. Since 1978, our practice has centered on serving municipalities and public sector clients through thoughtful, operationally driven planning and design that strengthens communities and supports long- term public investment. Our core belief is that regardless of project type, design has a profound responsibility to the community. As a multidisciplinary firm, we strive to enhance the economic, aesthetic, social, and environmental context of the communities we help shape. Public safety facilities are among the most visible and enduring civic investments a community can make, and they must support those who serve, function efficiently under demanding operational conditions, and remain adaptable as community needs evolve over time. For communities such as St. Joseph, successful public safety planning requires more than simply accommodating space needs. It requires understanding how Police and Fire operations function individually and together, how facilities support emergency response and daily operations, and how long-term site planning decisions influence future flexibility, implementation, and fiscal stewardship. Proper programming, site organization, and operational planning are essential to creating facilities and campuses that serve communities effectively for decades. Over the last 48 years, BKV Group has grown from a sole proprietorship into a national multidisciplinary partnership with offices in Minneapolis, Kansas City, Chicago, Washington, D.C., Dallas, Pittsburgh, and Orlando. Through our integrated, full-service structure, we provide clients with a single source for planning, design, engineering, and construction administration services while maintaining a highly collaborative and client-centered approach. Today, we provide our government clients with superior service by adopting their goals as our own, enabling transparent decision-making, committing to responsible stewardship of public funds, and remaining passionate about the success of the communities for whom we work. Our team has completed more than 400 public safety project commissions and hundreds of municipal and civic projects nationwide, including police stations, fire stations, public safety campuses, and municipal master planning studies. This experience allows us to bring proven operational insight, national best practices, and practical implementation strategies to each community we serve while tailoring solutions specifically to local operations, priorities, and long-term goals. CAPABILITIES & SERVICES BKV Group, through rigorous continuing education, provides design solutions at the leading edge of innovative technologies. A commitment to integrated design necessitates constant collaboration among all professional disciplines who share a common vision. Our multi-disciplinary approach allows us to serve the unique and diverse needs of each client through a fully-coordinated, single-source team. PROJECT MANAGEMENT +Goals and Objectives +Communication Protocols +Project Budget Management +Project Schedule Management +Quality Assurance PLANNING AND FEASIBILITY +Existing Condition Assessment +Functional Workflow Assessment +Health and Safety Assessment +Capital Improvement Planning +Phased Property Planning +Space Needs Analysis +Space Standard Diagrams +GIS Drive-time Analysis +Land Use and Zoning Analysis +Site Selection Study +Site Feasibility and Planning +Building Planning and Stacking +Project Master Planning +Total Project Cost Estimating +Total Cost of Ownership Analysis ARCHITECTURE +Visioning and Conceptual Design +Construction Documentation +CSI-format Specifications +Building Science/ Forensics +Cost Estimating and Value Engineering +Critical Path Scheduling +Building Information Modeling +Computer Rendering +Immersive 3D Visioning INTERIOR DESIGN +Space Planning +Interior Concept Renderings +Material Finish Selection +Durability Analysis +Infection Control Analysis +Furniture and Equipment Selection +Art & Accessories Staging +FF&E Budgeting and Procurement BRANDED ENVIRONMENTS +Project Discovery +Project Messaging, Positioning & Strategy +Naming +Visual Identity/Logo +Brand Guidelines & Programming Standards +Digital & Print Collateral +Marketing Floor Plans +Promotional Merchandise Design +Environmental Design/Graphics +Visual Identity Systems (Wayfinding Signage) +Social Media Templates +Website Design Concepts STRUCTURAL ENGINEERING +Structural Analysis and Design +Structural System Comparisons +Existing Structure Evaluations +Dynamic Vibration Analysis MECHANICAL ENGINEERING +Energy Use/Conservation Analysis +HVAC System Lifecycle Analysis +Building Commissioning +System Operations and Training +Building Automation Controls Sequencing +Fire Protection Systems +Plumbing & Piping System Design ELECTRICAL ENGINEERING +Photometric Lighting Design +Power Distribution Design +Generator Load Analysis +Photovoltaic Integration +Data and A/V System Design +Security Hardware and Cameras +Fire Alarm System Specification +Alert Notification Design +Power and Systems Commissioning SUSTAINABLE DESIGN +Owners Project Requirements +Simple Box Analysis +Comprehensive Energy Modeling +Basic Commissioning +Daylight Modeling and Calculations +Custom Systems Analysis +Typical Meteorological Year Analysis +ASHRAE Calculations +LEED Project Tracking and Submissions +LEED Construction Phase Oversight +Green Communities Submissions +National Green Building Standard LANDSCAPE ARCHITECTURE +Land-Use and Zoning Analysis +Planting and Hardscape Design +Boundary/Screening Yard Design +Rainwater Collection and Irrigation +Tree Inventory and Analysis +Streetscape Design CONSTRUCTION ADMINISTRATION +Contractor Selection Assistance +Cost Control and Evaluation +Scheduling Oversight +Construction Observation +Quality Control Management +Move-in Coordination +Photography Coordination +Grand Opening Coordination +Eleven-Month Warranty Walk- Through HISTORIC PRESERVATION +Historic Structures Report +Adaptive Reuse Options +Measuring and Documentation 400+ Public Safety Projects Minneapolis Bemidji Duluth Rochester Madison Milwaukee Fargo Bismarck Des Moines Phoenix IN-HOUSE EXPERTISE Project Manager Facility Condition Assessment Strategic Facility PlannerDesign Phase Sustainability Estimators Preconstruction BIM MEP Lean Building Sciences KRAUS-ANDERSON | ONE TEAM, ONE COMPANY, ALL THE EXPERTISE Kraus-Anderson's Facility Condition Assessment (FCA) planning process is built on five steps: Define, Collect, Develop, Refine, and Present. We will leverage two in-house specialized teams to focus on your specific needs. With all the expertise needed to evaluate and build a strategic vision for your fire station under one roof, Kraus-Anderson harnesses the power of collaboration and experience. FIRM CAPABILITIES | FACILITY CONDITION ASSESSMENT The Facility Condition Assessment offers an in-depth analysis for the City of St. Joseph, cataloging the deficiencies of the existing fire station and providing a clear understanding of your asset preservation expenditures over the next decade. Optimizing infrastructure, supporting compliance, and empowering sustainability for the entire life cycle of the City of St. Joseph’s fire station. HISTORY + EXPERTISE Our core purpose at Kraus-Anderson is building enduring relationships and strong communities. Our core values of integri- ty, commitment, valuing people, and teamwork guide everything we do. Established in 1897, Kraus-Anderson is a fami- ly-owned, privately held corporation providing construction management consulting, planning, and general services. KA will work with the City of St. Joseph from our Minneapolis office. KA has worked with BKV Group on over 60 projects. Since 2001: 800 COMPLETED FACILITY ASSESSMENTS 3,000 FACILITIES ASSESSED 300M SQUARE FEET ASSESSED *One icon represents ten employees 10 Offices + 46 States Constructed In 119 PROJECT MANAGERS 120 PROJECT SUPERINTENDENTS 26 PRECONSTRUCTION TEAM 59 TECHNICAL SUPPORT  Madison Rochester  BemidjiDuluth  Minneapolis  Bismarck   Milwaukee Fargo   Phoenix  Des Moines States with KA oces KA Oces States KA Has Worked In Kraus-Anderson, 501 S 8th St, Minneapolis, MN 55404 | 612.332.7281 | krausanderson.com PROJECT UNDERSTANDING & APPROACH The City of St. Joseph has an important opportunity to proactively plan for the future of its public safety services before incremental facility and site decisions begin to limit long-term flexibility. The City’s Police Department currently operates from a joint City Hall and Police facility that has become deficient in operational space and is hampering long-term departmental growth. As operational demands, staffing needs, technology requirements, and community service expectations continue to evolve, the police department has outgrown the functionality and capacity of the existing facility. At the same time, the City’s Fire Department faces operational and facility challenges associated with apparatus storage and growth, equipment and personnel decontamination, operational support space, and evolving firefighter health and safety best practices. While the existing facility continues to serve the community, the City recognizes the importance of evaluating how the station can adapt to support current operations and future departmental needs. The recent acquisition of the adjacent former gas station parcel adjacent to the current fire station creates a timely and unique opportunity to evaluate these needs comprehensively and establish a coordinated long-term vision for a public safety campus. The site introduces important planning considerations, including future Police Department development potential, Fire Department expansion opportunities, emergency response circulation, public and secure access separation, and integration of citywide fueling operations utilizing the existing fuel infrastructure. Decisions related to fueling location, circulation, and site organization must therefore be evaluated carefully to ensure near-term infrastructure investments do not unintentionally constrain future facility development options. We understand this effort is more than a space study. It is a strategic master planning initiative intended to help the City evaluate how its public safety facilities can evolve together as an integrated operational system while establishing a clear and defensible framework for future investment decisions. The study must balance operational functionality, long-term flexibility, fiscal responsibility, and realistic implementation considerations while positioning the City to respond to future growth and evolving service expectations. BKV Group approaches this effort as both an operational planning exercise and a site-responsive master planning process. Our role is not to begin with predetermined conclusions, but rather to work collaboratively with City leadership, Police and Fire personnel, and stakeholders to evaluate opportunities, test ideas, and develop a practical roadmap for future decision-making. The outcome will be a clear and actionable framework that allows the City to move forward with confidence. PHASE 1 - PROJECT ALIGNMENT & DISCOVERY Kickoff & Project Alignment The study will begin with a kickoff meeting involving City leadership, Police and Fire Department representatives, and the project team. This session will: • Confirm project goals, priorities, and success measures • Establish communication protocols and project schedule • Review existing operational concerns and known facility limitations • Confirm decision-making structure and stakeholder involvement • Establish key evaluation criteria that will guide future comparisons and recommendations Establishing alignment early ensures the study remains focused, collaborative, and decision-oriented throughout the process. Existing Information & Data Review Our team will review available background information including: • Existing facility drawings and site information • Staffing and organizational information • Fleet and apparatus inventory • Existing operational challenges and deficiencies • Prior planning or capital improvement discussions • Available utility and infrastructure information associated with the current fire station and former gas station parcels This review allows the team to establish a clear baseline understanding of current operations, facility constraints, and site opportunities before advancing into detailed facility evaluation and programming efforts. Stakeholder Engagement & Operational Discovery Structured workshops and interviews with Police and Fire leadership and staff will focus on understanding: • Current operational workflows • Staffing and future growth expectations • Fleet and apparatus operations • Equipment storage and operational support needs • Public interface and secure access considerations • Training, wellness, and support space needs • Operational challenges associated with existing facilities This engagement process is intended not only to gather information, but also to build alignment and establish shared priorities that guide future planning decisions. Deliverable: Confirmed project work plan, evaluation criteria, and summary of operational priorities and existing conditions. PHASE 2 - EXISTING FIRE STATION FACILITY CONDITION ASSESSMENT (OPTIONAL) As an optional service, BKV Group and Kraus-Anderson will provide a Facility Condition Assessment (FCA) of the existing Fire Department facility to help inform long-term planning and investment decisions. This assessment is intended to provide the City with a clearer understanding of existing building conditions, deferred maintenance considerations, system longevity, and reinvestment implications associated with future renovation or expansion strategies. This effort is not intended to occur independently from the broader master planning process. Rather, the FCA findings will directly support future planning discussions by identifying how existing facility conditions, system upgrades, and deferred maintenance obligations and resulting costs influence long-term investment considerations and project feasibility. Information Gathering & Existing Facility Review Kraus-Anderson will lead an information-gathering effort with Fire Department leadership and City staff focused on understanding known facility conditions, maintenance history, operational limitations, and the age and performance of major building systems and infrastructure. This collaborative process will be paired with detailed facility tours and documentation of observed deficiencies, deferred maintenance items, and operational concerns impacting long-term functionality. Our integrated team will evaluate the existing Fire Department facility and major building systems including: • Building envelope and exterior conditions • Structural systems and overall building integrity • Mechanical, electrical, and plumbing infrastructure • Apparatus bay support systems and operational functionality • General building condition and deferred maintenance items Deficiency Identification & Lifecycle Considerations Assessment findings will be documented in a structured and understandable format, identifying: • Existing deficiencies and operational impacts • Remaining useful life of major building systems • Deferred maintenance considerations • Potential reinvestment priorities • Order-of-magnitude improvement considerations where appropriate The goal is to help the City understand not only current facility conditions, but also how future reinvestment needs may influence long- term decision-making associated with expansion, renovation, or phased implementation strategies. Reporting Tools & Capital Planning Support Findings from the FCA will be organized into a clear and accessible reporting format intended to support both immediate decision- making and long-term capital planning. In addition to summary findings and reinvestment considerations, Kraus-Anderson will provide an interactive web-based reporting platform documenting identified deficiencies, recommended improvement timelines, and associated order-of-magnitude cost considerations. This tool can help support future capital improvement planning efforts by providing the City with an ongoing reference for facility conditions, maintenance priorities, and long-term reinvestment considerations. Integration with Master Planning Unlike assessments conducted in isolation, the FCA findings will directly inform future programming, concept development, and cost discussions throughout the study process. Understanding the condition and reinvestment needs of the existing Fire Department facility provides important context when evaluating: • Renovation versus expansion considerations • Long-term lifecycle impacts • Operational continuity during phased improvements • Relative investment implications between alternatives • Timing and prioritization of future capital improvements This integrated approach ensures that future recommendations are grounded not only in operational needs and site opportunities, but also in realistic facility condition considerations. Deliverable: Existing Fire Station Facility Condition Assessment summary, including system observations, deferred maintenance considerations, and lifecycle implications to support long-term planning discussions. PHASE 3 - PROGRAMMING & SPACE NEEDS ASSESSMENT Police Department Programming BKV Group will conduct a comprehensive programming and space needs assessment for the Police Department focused on both current operations and long-term growth. This effort will evaluate: • Patrol and administrative operations • Investigations and support functions • Evidence and storage requirements • Public lobby and community interface • Staff support and wellness spaces • Fleet and secure vehicle considerations • Technology, security, and operational infrastructure • Future staffing and operational growth capacity Attention will be given to understanding how a future dedicated Police Department facility can improve operational efficiency, security, staff functionality, and long-term adaptability. Fire Department Programming The Fire Department assessment will focus on evaluating how the existing station can better support current operations and future departmental needs. This includes: • Apparatus storage and circulation • Equipment and personnel decontamination spaces • NFPA-informed operational support spaces • Storage and equipment support areas • Operational workflow and response efficiency • Potential firefighter bunk and support space improvements appropriate for the department’s volunteer staffing model • Future growth and flexibility considerations The goal is to establish a practical and operationally driven understanding of both immediate and long-term facility needs. Adjacency & Operational Analysis As part of programming, our team will evaluate operational relationships and adjacencies between departments, including: • Shared site access opportunities • Secure and public circulation • Fleet and apparatus movement • Shared infrastructure opportunities • Campus organization and operational compatibility This step ensures that facility planning and site planning evolve together as part of a cohesive public safety campus strategy. Deliverable: Validated Police and Fire Department space programs including operational narratives, adjacency considerations, and projected future needs. PHASE 4 - SITE MASTER PLANNING & CONCEPT DEVELOPMENT Existing Site & Infrastructure Evaluation The combined public safety campus and adjacent parcels introduce both opportunities and constraints that must be carefully evaluated. Our team will assess: • Existing site circulation and access • Emergency response movement • Public and secure access separation • Utility and infrastructure considerations • Existing fuel infrastructure and operational implications • Potential development and expansion zones • Site constraints impacting future flexibility Attention will be given to understanding how fueling operations can be integrated into the site without limiting future Police Department development or Fire Department expansion opportunities. This includes evaluating potential fueling locations, circulation impacts, operational access, and how fueling infrastructure can support all City vehicles while remaining compatible with future campus growth and phased development. Master Planning & Concept Alternatives Using the validated space programs, FCA findings (if authorized), and site analysis findings, BKV Group will develop conceptual master planning alternatives that evaluate: • Future Police Department siting opportunities • Fire Department renovation and expansion concepts • Campus organization strategies • Site circulation and operational efficiency • Shared infrastructure opportunities • Long-term expansion flexibility • Potential phasing considerations • Fueling integration and long-term operational compatibility Concepts will be developed at a planning level sufficient to evaluate feasibility, operational functionality, and long-term site performance. The intent is not simply to identify where buildings fit on the site, but to establish a long-term framework for how the public safety campus can evolve over time while maintaining operational efficiency and future flexibility. Comparative Evaluation Each concept will be evaluated using consistent criteria including: • Operational performance • Emergency response efficiency • Site functionality and circulation • Flexibility for future expansion • Compatibility with fueling operations • Long-term implementation considerations • Relative construction and infrastructure impacts This comparative process allows the City to clearly understand the advantages, constraints, and tradeoffs associated with each planning direction. Deliverable: Conceptual site master planning alternatives, comparative evaluation matrix, and preliminary planning recommendations. PHASE 5 - COST MODELING & RECOMMENDATIONS Preliminary Cost Modeling For viable planning alternatives, BKV Group will prepare high-level order-of- magnitude cost opinions addressing: • Building improvements and additions • New construction considerations • Site and infrastructure improvements • Utility and fueling impacts • Phasing considerations • Key cost drivers, assumptions, and contingencies • Soft costs such as FF&E, professional fees, testing, etc • Escalation (inflation) costs associated with anticipated construction timelines Where the optional FCA is authorized, deferred maintenance findings, building system deficiencies, and long-term reinvestment considerations identified through the FCA process will be integrated into renovation and expansion cost discussions to ensure the City understands the full lifecycle and capital investment implications associated with each alternative. This approach allows construction costs, operational improvements, facility reinvestment needs, and future capital planning considerations to be evaluated together rather than independently. Final Recommendations & Next Steps The final phase of the study will synthesize findings into a clear and actionable roadmap for the City. Final deliverables will include: • Summary of operational findings • Validated space needs • Site master planning concepts • Comparative evaluation of alternatives • Preliminary cost considerations • FCA findings (if authorized) • Recommended next steps and implementation considerations The completed study will provide the City with a defensible and forward-looking framework for future public safety facility planning and investment decisions. SCHEDULE The City of St. Joseph can anticipate completion of this study within an approximately three- to four-month timeframe. BKV Group is well positioned to meet this schedule through a focused, milestone-based process that aligns operational assessment, facility evaluation, programming, site master planning, and cost analysis in a clear and efficient sequence. Our schedule is structured around key decision points to ensure City leadership, Police and Fire personnel, and stakeholders remain aligned as findings and concepts evolve. Operational discovery, facility assessment, and programming efforts will overlap strategically to accelerate understanding of current conditions while allowing planning concepts and site strategies to develop in real time. This integrated approach reduces rework and allows operational, site, and cost considerations to be evaluated concurrently throughout the study process. Attention will be given to coordinating the Facility Condition Assessment (if authorized), operational programming, and site master planning efforts so that facility reinvestment considerations, fueling integration, and future development flexibility are evaluated together rather than independently. At project initiation, we will confirm a concise meeting and workshop schedule aligned with major milestones and decision points. Targeted workshops and review sessions will be used to gather input, validate findings, refine planning concepts, and confirm direction throughout the process. Between milestones, our team will remain responsive and actively engaged to maintain momentum and advance the work effort efficiently. This disciplined and collaborative approach is designed to deliver clear, defensible, and actionable recommendations that support confident long-term decision-making for the City’s future public safety facilities and campus development. A detailed schedule with confirmed meeting dates and review milestones will be developed upon authorization to proceed to ensure clear and consistent progress from kickoff through final delivery. Phase Key Activities Duration Project Alignment & Discovery Kickoff meeting, confirm project goals and evaluation criteria, review existing information, stakeholder interviews, operational discovery, facility tours, and existing conditions review 2 weeks Facility Condition Assessment (Optional) Existing Fire Department facility assessment, deferred maintenance evaluation, building systems review, reinvestment analysis, FCA reporting tools and CIP integration 2-3 weeks Programming & Space Needs Assessment Operational analysis, staffing and growth evaluation, space programming, adjacency analysis, operational workflow review, and validation of future facility needs 2-3 weeks Site Master Planning & Concept Development Evaluate site circulation, fueling integration, infrastructure considerations, Police Department siting, Fire Department expansion concepts, campus organization strategies, and development of conceptual planning alternatives 4-5 weeks Review & Comparative Evaluation Stakeholder review workshops, comparative evaluation matrix, refinement of concepts, preliminary cost modeling, phasing considerations, and confirmation of preferred direction 2-3 weeks Cost Modeling & Final Deliverables & Recommendations Final report including space needs, FCA summary (if authorized), conceptual master plans, comparative evaluation, costs, implementation recommendations, and next steps 2-3 weeks PROPOSED FEES The BKV Group team’s compensation goals are to establish a fee that is fair, transparent, and directly aligned with the proposed Scope of Services. Our priority is to provide the City of St. Joseph with a comprehensive and defensible public safety master planning study that clearly evaluates operational needs, facility conditions, future space requirements, site development opportunities, and long-term implementation considerations. Our approach integrates assessment, facility programming, site master planning, and cost evaluation into a coordinated planning process intended to support informed long-term decision-making. The study is structured to evaluate how Police and Fire operations, future facility investments, fueling infrastructure, and long-term site development can function together as a cohesive and adaptable public safety campus. Our fee structure is organized to align directly with the proposed project phases and includes all labor, stakeholder workshops, operational discovery sessions, programming activities, conceptual planning efforts, coordination meetings, cost modeling, and preparation of final deliverables associated with the study. The optional Facility Condition Assessment of the existing Fire Department facility has been identified separately to provide flexibility to the City. PROFESSIONAL SERVICE FEES We propose the following lump sum fees for completion of the study services: These fees include routine expenses associated with travel, workshops, meetings, and standard electronic deliverables. Deliverables will be provided electronically to the City. Any requested large-format presentation boards or extensive printed materials would be considered an additional reimbursable expense. Invoices will be submitted monthly for work completed during the billing period. APPROACH TO FEES This proposal is based on our understanding of the project scope, anticipated stakeholder engagement meetings, assessment activities, conceptual site master planning, development of planning alternatives, preliminary cost modeling, and preparation of final deliverables. As described throughout our proposal, our process is workshop-driven, milestone-based, and structured to maintain alignment between operational priorities, facility planning, and long-term implementation considerations. The integrated nature of our approach allows programming, facility evaluation, and site planning activities to inform one another in real time, reducing unnecessary iterations and improving overall project efficiency. Our first step will be to meet with City leadership and project stakeholders to confirm assumptions regarding schedule, workshop cadence, deliverable expectations, and scope alignment. If adjustments are necessary to better reflect City priorities or schedule considerations, we will work collaboratively with the City to refine scope and fee accordingly. Our objective is to provide the City with a thorough, defensible, and actionable study that delivers strong value for investment while establishing a clear and forward-looking framework for future public safety facility and campus planning decisions. Scope Item Fee Public Safety Master Planning & Programming Study $13,950 Optional Fire Department Facility Condition Assessment $9,000 RELEVANT PROJECT EXPERIENCE The city of St. Louis Park has engaged BKV Group study future needs and site feasibility for the police department. The expansion of sworn and civilian personnel, changes to police operations over time, and the condition of the existing facility has resulted in a need to study current and future needs. The project examined the feasibility of renovating and expanding their current facility, constructing a new facility on the current site, or seeking a new site for their department. The study considered all department divisions, including E911/Dispatch and Emergency Operations Center. Once needs were established, conceptual design helped the City and the Police Department understand how a project could be implemented, including costs and timeline. CLIENT City of St. Louis Park, MN SIZE 78,240 SF COMPLETED December 2024 ST. LOUIS PARK POLICE DEPARTMENT STUDY St. Louis Park, Minnesota CLIENT City of Red Wing, MN SIZE 42,000 SF COMPLETED March 2025 The Red Wing Police Department currently shares a building with the Goodhue County Sheriff and is in need of additional operational space as well as wellness functions and training opportunities. Looking to potentially move into their own facility, the BKV team completed an operational space needs analysis to determine the department’s immediate space needs and projected needs in 20 years. The projected space needs for the Red Wing Police Department was identified around 42,000 SF. A feasibility study was completed to review the potential for repurposing an existing city-owned facility currently occupied by the public works department for the police department. BKV developed several planning options exploring ways to reuse the existing city-owned facility as well as planning for an entirely new facility on the same site. Additionally, an alternate concept was explored for a new build adjacent to the city’s fire station. During the course of the initial police study, the city determined it would be beneficial to explore an option for a combined police and public works facility. With each planning option, cost estimates were completed to identify the associated overall project costs and the pros/cons of each option were reviewed to assist the city in making an informed decision on how best to address the needs of the police department. RED WING POLICE & PUBLIC WORKS STUDY & MASTER PLAN Red Wing, Minnesota scale: 1" = 200'-0" 50'-0" 50'-0" 50'-0" FUEL ISLANDCANOPY S P M B S P M B S P M B S P M B S P M B S P M B S P M B 50'-0" 50'-0" 80'-0" CO N D I T I O N E D VEH I C L E STO R A G E 25 22 27'- 0 " 8 8 POL I C ELL PUB L I C WO R K S LL FLE E T MAIN T I N E N C E WAS H BAY PW DIV WO R K SH O P S CON D I T I O N E D VEH I C L E STO R A G E 25 27'- 0 " 8 8 22 50'-0"5055 50'00'-0"0 50'-0" 50'-0" MAIN LEVEL - "OPERATIONAL GRADE" TEST FIT PLAN artment and Public Works S P M B S P M B 50 POL I C EUL PUB L I C WO R K S UL MEZZ A N I N E MEZZ A N I N E MEZZ A N I N E MEZZ A N I N E 50 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 80'-0" 50'-0"5055 50'-0"" 50'00'-0"0 50'-0" UPPER LEVEL - ADMINISTRATIVE LEVEL TEST FIT PLAN MAIN LEVEL - "OPERATIONAL GRADE" TES City of Red Wing - Police Department and Public Works Technology Drive - Site Concept Test Fit Plan NOTES - Not able to fit Brine, Salt Shed, Unconditioned Storage - Only 1 Wash Bay BKV Group was hired by the City of Winona to provide a facility assessment of their existing Public Safety Facilities and planning for a new combined Public Safety and Training facility. The study included conducting a space needs analysis for the Fire and Police Departments, GIS fire response time analysis, and site feasibility studies for several proposed sites. A facility assessment was completed for the City’s aging Central Fire Station and Police Station facilities to identify and document operational, functional, and safety issues. The City’s current facilities do not provide adequate space for today’s operations and equipment, and both facilities are lacking appropriate support spaces to accommodate the ever-changing gender ratios on the departments. Site feasibility studies were completed for seven different sites throughout Winona. The site feasibility studies explored how the proposed building program could be placed and stacked based on the available site area and other site requirements. Site selection and recommendation was largely driven by the GIS fire response time analysis which identified the need for the Fire Station to stay on the eastern side of the City to maintain the department’s current ISO rating. Based on the findings of the initial needs assessment, BKV Group has continued to assist the City of Winona with further evaluation of the selected site and conceptual planning for the Public Safety Facility. The project has advanced into Schematic Design for a consolidated regional public safety facility for police, fire, and emergency management. CLIENT City of Winona, MN SIZE 90,000 SF COMPLETED Study efforts completed in 2025 Design project underway WINONA PUBLIC SAFETY NEEDS ASSESSMENT Winona, Minnesota The City of Waite Park selected BKV Group as their full-service architectural and engineering design firm for the new Public Safety Facility. The project included both design and facility space needs assessment to determine the size of the facility. The Public Safety Facility will include office space for administration, investigations, patrol, evidence processing, evidence storage, vehicle storage garage, parking lot, driveways, site work, and utilities. Fire department components, such as office, storage, equipment/apparatus bay, and living quarters, will be included based on the findings of the ongoing fire study and guidance from the city regarding space requirements. The city emphasizes the importance of considering the impacts and needs of all departments and facilities in the facility space needs assessment. Over the past five years, growth has led to limited operational space in all departments. The city aims to maximize operational efficiency in planning and constructing facilities, potentially through the reuse of vacated departments or departmental consolidation. The goal is to construct a new public safety facility that meets current and future needs while considering the impacts on all operations and overall city costs. CLIENT City of Waite Park, MN SIZE 79,000 SF COMPLETED Ongoing, 2026 WAITE PARK PUBLIC SAFETY FACILITY & CITY HALL Waite Park, Minnesota Building upon a successful fire station study, BKV Group was engaged again to assist the City of Springfield, Ohio to study the needs of their police department. The department is currently located in a shared county-city facility that cannot provide adequate space for current needs, much less accommodate future growth. The existing headquarters facility does not provide the police department with a positive identity or welcome the public to build and foster relationships with the community. The police department also operates special investigations and tactical teams from a remote facility that does not provide enough space for routine operations and tactical vehicle storage. Once needs were established for all department divisions, building configuration options and minimum site areas were established. Understanding that the existing facility and site could not accommodate the identified needs, alternative downtown locations were considered. Maintaining police presence in the City’s downtown core was a high priority to the City and the department. An evaluation of an existing building was also completed to determine if it could be feasible for re-use. It was determined that the existing special operations facility could accommodate growth with a reorganized/renovated interior and a small addition. Since the department was going to lose immediate access to the County’s firing range, planning was completed for both an integrated firing range, as well as a standalone range at the vicinity of the headquarters, or at the remote facility. CLIENT City of Springfield, OH SIZE 63,877 SF COMPLETED January 2025 SPRINGFIELD POLICE DEPARTMENT NEEDS ASSESSMENT STUDY Springfield, Ohio BKV Group was engaged by the City of Bloomington to explore the renovation of their mid- century City Hall and their Police Station. BKV Group met with each user group to understand the current limitations of their workspace and determine future space needs. The team then provided expansion and renovation options for both buildings and a campus-wide phasing plan, using the topography in different ways to manage views of the downtown from approaching vehicles and to provide a backdrop for recreation activities around the detention basins. The police station will need to expand significantly. BKV Group’s structural engineers examined the existing Police Station for vertical expansion capacity and flexibility for interior renovation and provided recommendations. The station will need to approximately double in size to accommodate 270 staff in shifts for 24/7/365 operations. Secure parking will need to accommodate around 150 fleet vehicles and 180 staff spaces, which may occur below the building or as a separate adjacent parking structure. CLIENT City of Bloomington, IL SIZE Police Station: 93,000 SF City Hall Annex: 35,000 SF COMPLETED In Progress BLOOMINGTON POLICE DEPARTMENT & CITY HALL ANNEX STUDY Bloomington, Illinois BKV Group was selected by the City of Menomonie to complete a space needs assessment and site master planning for the Menomonie Police Department. The department is currently leasing a space in the Dunn County Judicial Center, and they have outgrown the space available to them. The Menomonie Police Department is a full-service law enforcement agency which currently has thirty-five (35) employees. The objective of this study was to identify the current and future operational space needs for the Department and to develop planning options and site feasibility studies for addressing the need, along with the associated costs of those options. In addition, BKV Group completed an operational needs assessment of the Department’s current facilities, identifying the operational deficiencies and limitations of the existing facilities based on industry best practices. CLIENT City of Menomonie, WI SIZE 28,680 SF 21 stall garage COMPLETED February 2025 MENOMONIE POLICE DEPARTMENT FACILITY STUDY Menomonie, Wisconsin 19,307 sf 904906908 City of Menomonie - Public Safety Facility Conceptual Site Plan scale: 1" = 80'-0" US-12 890 886 884 888 888 886 900 902 ST O K K E P A R K W A Y ~8.3 ACRES ption 3 EQ U I P M E N T YA R D SHED1,000 SF TR A S H EN C L O S U R E PU B L I C P A R K I N G (40 S T A L L S ) FLEET GARAGE (21 PARKING STALLS) POLICE STATION PUBLIC ENTRYPLAZA ADDITION 30% 9,560 SF PATIO VE H I C L E PR O C E S S I N G GA R A G E SECURED PARKING (44 STALLS) WWW.BKVGROUP.COM CHICAGO 209 South LaSalle Street The Rookery, Suite 920 Chicago, IL 60604 P 312.279.0470 DALLAS 1412 Main Street Adolphus Tower, Suite 700 Dallas, TX 75202 P 469.405.1196 MINNEAPOLIS 222 North Second Street Long & Kees Building, Suite 101 Minneapolis, MN 55401 P 612.339.3752 WASHINGTON, DC 1054 31st Street NW Canal Square, Suite 410 Washington, DC 20007 P 202.595.3173