Loading...
HomeMy WebLinkAbout[04-d] Development AgreementCITI' OF ti7: Jt1tiFi.1'H MEETING DATE: March 19, 2009 Council Agenda Item 4 d AGENDA ITEM: Development Agreement -Requested Action: Authorize the Mayor and Administrator to execute a Development Agreement between the City of St. Joseph and Central MN Federal Credit Union to construct a 7,425 square foot branch facility at 1300 Elm Street East. SUBMITTED BY: Administration BOARD/COMMISSION/COMMITTEE RECOMMENDATION: The Planning Commission reviewed the Development Plan for the Central MN Federal Credit Union (CMFCU) on March 2, 2009. The Planning Commission commended CMFCU for the complete submittal and recommended the City Council execute a Development Agreement to allow the construction of the branch facility. PREVIOUS COUNCIL ACTION: None. BACKGROUND INFORMATION: CMFCU through Hagemeister mack presented a development plan to construct a 7,425 square foot branch facility. The facility will be located on Lot 1 Block 1 Coborn's Realty Plat, north of the Centracare Facility. The proposed project is consistent with the Coborns Realty PUD and the application was complete. The Plan has been reviewed by staff who recommended approval of the Development Plan contingent upon receipt of the final civil engineering. The Planning Commission unanimously recommended that the City Council execute a development agreement to allow the branch facility construction. BUDGET/FISCAL IMPACT: ATTACHMENTS: Extract of Minutes -March 2, 2009, Project Narrative, Site Plan, Development Agreement, Planning Commission Action Form. REQUESTED COUNCIL ACTION: Authorize the Mayor and Administrator to execute a Development Agreement between the City of St. Joseph and Central MN Federal Credit Union to construct a 7,425 square foot branch facility at 1300 Elm Street East Extract of Planning Commission Minutes -March 2, 2009 Site Plan Review -Central MN Federal Credit Union Page 1 of 1 Site Plan Review- Central Minnesota Federal Credit Union: Weyrens advised the Commissioners that they have received an application for a site plan for the new credit union which will be north of the current Centra Care site on the Coborns plat. Tom Peck, Hagemeister Mack Architects, 501 W. St. Germain Street, St. Cloud, approached the Commissioners to speak on behalf of the applicant. He stated that the current site is located just north of City Hall and they are looking to expand in town. The proposed building with be similar to what they have done in other locations. It will be a masonry building with a flat roof and some brick on the sides. The main floor will be approximately 7,500 square feet and they are proposing a 2,500 square foot basement. They plan to mirror the landscaping and lighting of the new Centra Care site. One of the comments made by staff was related to the Trans Corridor Overlay. Weyrens stated that this site does not need to adhere to the Trans Corridor Overlay as County Road 133 is not mentioned as part of that. There are some final engineering items that need to be addressed and the developer is working on them. Peck stated that he spoke with Tom Herkanoff with Boonestroo and they will address them but have not yet had the time. Meyer made a motion to move forward with the Development Agreement as long as the engineering recommendations are addressed. The motion was seconded by Deutz. Discussion: Wick stated that comments by both the Engineer and the Building Inspector should be addressed. McDonald questioned what their schedule is like. Peck stated that they hope to go for bids in the next month and then beginning digging a month or so after. They plan to have the building ready by December/early January. Deutz questioned their plans for the current building. Friederichs stated that they plan to keep both facilities. The motion passed unanimously. ;.,a' ~~ `,:: /::. . il~ (:1~:IilEIStC-l' ilis~l;i; architects February 18, 2009 Re: New Branch,for: Central Minnesota Federal Credit Union St. Joseph, MN Architect's Project No. 0852 Protect Narrative The Central Minnesota Federal Credit Union has had a presence in downtown St. Joseph since 2004. They have outgrown their current location and anticipate constructing a new branch facility on the east edge of town at the intersection of Elm Street and County Road 133. r The new branch facility will be a single story with partial basement building with four drive-up teller lanes. The fourth lade will also include an ATM. The building will be oriented with the main entrance facing east, and the drive-up lanes facing west (and GR 133). The main floor will have an area of 7,425sf, and the basement an area of 2,740sf. The exterior of the building is designed and will be constructed of materials that represent the image preferredrrby the CMFCU. This includes brick, stucco, precast concrete, and metal panels. The predominant material~inrill be brick, which will be of two colors -the predominant cobr will be a red tone wish accents in a tan tong; The stucco will provide an accent band above a cornice, in complimentary tan color to the brick. The precast panels (used as column bases and window sills) will be a complimentary tan color. The metal panels; to be used on the entrance and drive-up canopies, and on the curved feature on the south side of the building, will be apre-finished panel of complimentary color to the other materials used on the exterior. Exterior windows and doors will be an anodized aluminum, either black or dark bronze in color. r Site landscaping will include a variety of trees, shrubs, and grass. Trees along the east-west County Road 133 access road will match the trees being planted by Centra Care on the south side of the road. Other trees on the site will be planted to match ornamental or shade trees provided on the Centra Care site. Further, !ow shrubs and plantings near the building will match the plantings being provided by Centra Care. Site lighting will be a combination of pole mounted parking lot lighting, with bollard lighting along the sidewalk to the east of the building, and decorative lighting on the building. The parking lot and decorative lighting fixtures will match the light fixtures being provided on the Centra Care site, including fixture shape, lamp size and color, and pole height and finish. The refuse enclosure and maintenance structure will be constructed of materials similar to the main building. The structure will have solid walls and doors, and the maintenance structure will include a roof to enclose and secure lawn maintenance equipment. A monument sign will be located on the SW corner of the site, near the access to County Road 133. This sign will be constructed of materials matching the main building, and include the CMFCU's logo as well as an electronic message board. s smaican inslflute of 6~c~ifecls man o soWc~y amcrkan ~nslltutc o~ aRniletls dK'v hagemeister mack architects February 18, 2009 Ms. Judy Weyrens, ministrator City of St. Joseph PO Box 668 St. Joseph, MN 5 374 Re: New Bra ch for: Central Minnesota Federal Credit Union St. Jose h, MN Archite 's Project No. 0852 Dear Judy, As required the City of St. Joseph, for Site Plan Review by the Planning Commission and City Council, enclosed ple se find 3 copies of the following documents: 1. Ap lication for Planning Consideration -Site Plan Review. 2. Pr ject narrative. 3. A irmation of Sufficient Interest. This document is provided by the current property owner, oborns Realty Company, LLC, and acknowledges their consent to the actions being pursued by e CMFCU. The transfer of ownership of the property to the CMFCU is anticipated for 4. Letter of intent from Coborns Realty Company to construct the north-south Elm Street access road. 5. Site and landscape plan, sign plan, floor plans, exterior elevations, refuse enclosure plans and elevations, and exterior building models. 6. Site lighting photometrics and fixture cut sheets. 7. Grading and storm sewer plan, utility plan, and construction details. 8. Storm water management plan. It s our understanding the CMFCU has already delivered a check to the City in the amount of $1,000 for the r quired fee of $250, plus deposit of $750. ith respect to the storm water development fee, it is our understanding that Coborns Realty Company will be submitting documentation separately requesting modifications to the Developer's Agreement. It is our intent to attend the Planning Commission meeting on Monday evening, March 2, 2009 to discuss any questions or concerns of the project and this submittal. Please contact me if you have any questions on the above information. Sincerely, H GEMEISTER AND MACK ARCHITECTS, INC. i Torn eck Enclosures c: Chuck Friederichs -CMFCU members american institute of architects minnesota society american institute of architects 6 Z LO_ yU r ~ a ~ mO O J ~` Q m W J Cf n I~ ~~~ ~~I ~~~ ~~I N ii ~`i !' I 0~~~ ~ ~ -o- ~ y Z ~~ N a 3NVl3ald 3NM13ald v I` I t Z N Z w 0 ~t I~~ I I ...,.~ ~~ I , I III ICI ,,.~ • ° I ( I to rlllll ~ ~ I ~ ~I to .,~ IN ~ I ~ I , I I I ~ I I ,,..~ --- --~I I ~ 1I- NJVB1360LYA1NOtld l1N107Y1B DL I ' I t~ SL'8tiZ - - - - _ I ..~ _ l_ _~ ee ~ ovoa uNnoo a a U Q W F= W o ~o r_+ U L O _~ ~ U ~ LL. N ~ ~ U .~ o M~ ~ ~ 1d.d /~ ~ L t -Fr a ~ o ~ ~ ZU~ y~ ~ r8 p ~ ~ Z ~ .. m m R m 4 ~ Ol z N W N ~ ~ W O O O [~ ~ 4 ~ C N N J ~ 2 ~ U_' ~ 2 ~ ~ ~ r N r Y y~ N O ~~ 5 ~ 0 ~ N ~ ~~~ ~ ~ w ~ ~ ~ ~' o u~ °~ ~ ~ W ~ ypU ~ E~_ ~ R~ ~ o W W ~ O ~ \ ~ p m /LP L W N N U W U ~ W ~~ ~ ~ ~< (~ C !al ~ f ~ FW- LL W W U~ U f ~~~ji ~ ~ Z ~ ~ Z W 0 y~ C~ V O `?` ? K WW, pZ~ ~ WO U C U O w ~ f > ~ yy~ yp~ ~~ ~ E W E O ... ~.. a m U N a V K vi ~ ~~ ?f ~ Q 3 ~ 2 N K > ~ y~ N W~ ~ OVOa SS3~~V 133a1S Wl3 I -----------------~ ~ ~---~ -~----------------- i I - I ~ '`~ . I~I to I ~ ~' ~~~ t ~ II II I I Q~ I I( I I I I ~,, I I ~ I ~~ I I° _I --------------------- I o~ I = I I ~'~ I I I I ~~ I ~ i I ------- -------~ ~-;w I ~;a I I~ ~ I~1 , i ,.i III I ~° w ~ ( I I I( I ~I al CITY OF ST. JOSEPH DEVELOPER AGREEMENT THIS AGREEMENT, made and entered into this day of Mazch 2009, by and between Central Minnesota Federal Credit Union, hereinafter called "Developer" or "CMFCU" and the City of St. Joseph, Minnesota, a municipal corporation, hereinafter called the "City". WITNESSETH: WHEREAS, the Developer is the owner of a certain real property located within the City limits which is legally described as Lot 1, Block 1, Coborns Realty Plat, according to the plat thereof on file with the Stearns County, Minnesota Recorder (the "Property"); and WHEREAS, the Developer has submitted to the City for approval the plans and drawings listed on Exhibit A attached hereto ("Development Plan"), which describes the construction project and related facilities ("Project") the Developer proposes to construct on the Property; and WHEREAS, the City's Code of Ordinances allows the City to require a Development Agreement to provide for inspection and review during the construction of the Project; NOW, THEREFORE, in consideration of the mutual covenants expressed herein, IT IS HEREBY AGREED AS FOLLOWS: 1.0 REQUEST FOR AND CONDITIONS OF THE DEVELOPMENT PLAN APPROVAL 1.1 Request for Development Plan Approval The Developer has asked the City to grant final approval of the Development Plan for the Project to be constructed on the Property. 1.2 Conditions of Development Plan approval: The City, after requisite notice and hearing, has granted final approval of the Development Plan subject to the terms and conditions of this agreement. 1.3 Scope of Agreement. This Agreement, and the terms and conditions hereof, apply only to the Project. This Agreement does not obligate Developer to construct the Project, but Developer must comply with the Agreement if it goes forward with the Project. if Developer elects or is unable to go forward with the Project, or chooses not to rebuild the Project after a fire or casualty, it may propose to the City a new project or development for the property, subject to the regulations then in effect for development approvals, and the Agreement shall not apply in any manner to such new proposal. 2.0 RIGHT TO PROCEED The Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings, until all the following conditions have been satisfied: (1) this Agreement has been fully executed by both parties and filed with the City Administrator; (2) the escrow required in section 3.12 to secure performance of the Developer's landscaping obligations has been received by the City; (3) the City has issued a letter that all conditions have been satisfied and that the Developer may proceed, which letter will not be unreasonably withheld or delayed. 3.0 DEVELOPER CONSTRUCTED IMPROVEMENTS 3.1 DEVELOPMENT PLAN COMPLIANCE: All buildings and accessory structures shall be sited and constructed on the Property as shown on the Utility, Storm Water and Drainage Plan prepared by Bonestroo (referred to in Exhibit A), subject to the provisions of this agreement. Any deviations from the Utility, Storm Water and Drainage Plan shall require prior approval by the City Planning Commission. 3.2 BUILDING STRUCTURE: Branch Financial Facility. The main floor will have an area of 7,425 square feet and the basement an area of 2,740 square feet. 3.3 BUILDING CODE COMPLIANCE. All buildings and accessory structures shall be constructed in accordance with the Minnesota State Building Code as adopted and modified by the St. Joseph City Code. 3.4 SITE PREPARATION: The Developer shall. comply with any erosion control method ordered by the City for the prevention of damage to adjacent property and the control of surface water runoff. As the development progresses, the City may impose additional erosion control requirements if in the opinion of the City Engineer such requirements aze necessary. 3.5 BUILDING ELEVATION: The proposed building(s) will not exceed the building elevations shown. on Exhibit B. 3.6 BUILDING EXTERIOR: The building exterior shall consist of brick, stucco, precast concrete and metal panels. The predominant material will be brick, which will consist of two colors, red and tan. Any changes in the exterior materials shall require final approval by the City Planning Commission. 3.7 INGRESS/EGRESS: Vehicular traffic will access the Property from either Elm Street or CR 133 with the main ingress/egress Elm Street. 3.8 SIGNAGE: A monument sign will be located on the SW corner of the site, near the access to CR 133. The sign will be constructed of materials similar to that the main structure. The monument sign will include a rolling marquee (See Exhibit C). In addition a wall sign consisting of the name of the financial institution shall be placed on the south wall for sign area of approximately 16 square feet. All signs shall meet the requirements of the Zoning Ordinance. 3.9 LIGHTING: The lighting shall not be directed towards County Road 133 or Elm Street and the candle watts must not exceed 0.40 at the property line. 3.10 OFF STREET PARKING AND LOADING: The Developer shall provide at least 41 off street parking spaces, including 2 handicapped spaces. The pazking lot shall be constructed with a hard surface consisting of asphalt or a similaz surface material approved by the City Engineer. 3.11 GRADING/DRAINAGE: The final drainage plans must be approved by the City Engineer. 3.12 LANDSCAPING/FENCING/SCREENING: The property shall be landscaped in accordance with the approved landscape plan attached as Exhibit D. The vegetation shall be planted as shown on the landscape design. All lawn sodding and other landscaping shall be substantially complete by the "Completion Date" (See Sec. 3.20). Developer shall post $2,000 in escrow/letter of credit with the City to ensure compliance with the landscape design requirements under this Section. The escrowed funds shall be released to the Developer when the landscaping has been installed. The HVAC equipment, dumpsters and off-street parking shall be screened from view as shown on Exhibit C. The City may inspect the Project to ensure that all required vegetation, fencing, and screening are installed. 3.13 FIRE HYDRANT: As shown on the Coborns Realty PUD Plan (Exhibit E) 3.14 UTILITY PLAN: As shown on Exhibit A and as approved by the City Engineer. 3.15 ADDITIONAL IMPROVEMENTS: None 3.16 NPDES/CITY OF ST. JOSEPH SWPPP: NPDES II Permit must be submitted at the time of the Building Permit Application. 3.17 FIRE/SAFETY REQUIREMENTS: Project must be constructed to comply with City Code and statutory requirements. 3.18 REQUIREMENTS FOR BUILDING PERMIT: No building permit shall be issued for this Property until the Developer has signed and returned this Development Agreement, obtained any necessary easements and provided the City with a copy of the easement documents, and submitted any additional information as directed by the City Engineer. 3.19 REQUIREMENTS FOR CERTIFICATE OF OCCUPANCY: Per State and City building codes. 3.20 CONSTRUCTION SCHEDULE: The Developer shall apply for a building permit within one year of the execution of this agreement. Failure to apply within the one- year period shall render this agreement null and void. The improvements shall be substantially completed by the first (1St) anniversary of the date of the building permit for the Project has been issued to Developer, and no later than the second anniversary of the execution of this agreement, subject to reasonable extension for delays due to force majeure causes and material supply shortages beyond the control of the Developer (the "Completion Date") 3.21 Water/Sewer Access and Trunk Fees. (For the purpose of this section the fees refer to a specific development and become due and payable with the building permit for each site plan). a. Water (WAC)/Sewer (SAC) Access Fees: The Developer shall pay WAC and SAC charges as provided in Ordinance 44. The WAC/SAC fee for the proposed development shall be $ 17,019. (See Exhibit F for detail) b. Trunk Sewer Fees: The Developer shall pay Trunk Sewer Fees for all development on the Property to be connected to the Sanitary Sewer System. The Trunk Sewer Fee applies to all property utilizing the DBL Lift Station. The fee is based on the total acres of the development and chazged at a rate of $700 per acre. The Trunk Fee for the proposed development is $ 2,002. (See Exhibit F for detail). 4.0 GENERAL TERMS AND CONDITIONS 4.1 Title. The Developer hereby warrants and' represents to the City, that Developer's interest in the Development is fee owner. 4.2 Binding Effect on Parties and Successors. The terms and provisions of this Agreement shall be binding upon and accrue to the benefit of the heirs, representatives, successors and assigns of the parties hereto and shall be binding upon all future owners of all or any part of the Development and shall be deemed covenants running with the land. Reference herein to Developer, if there be more than one, shall mean each and all of them. This Agreement, at the option of the City, shall be placed on record so as to give notice hereof to subsequent purchasers and encumbrances of all or any part of the Property and/or Project and all recording fees shall be paid by the Developer. If the Property and Project are sold or conveyed to a third party, and the third party, in a writing satisfactory to the City, takes and assignment of, and agrees to assume the obligations of the Developer under this Agreement, the prior owner/transferor will, from and after the effective date of the assignment and assumption, be released from any further obligations under this Agreement; provided however, that in no event will the Central Minnesota Federal Credit Union be released from its obligations under this Agreement prior to the City's issuance of a certificate of occupancy for the Project. 4.3 Notice. Any notices permitted or required to be given or made pursuant to this Agreement shall be delivered personally or mailed by United States mail to the addresses set forth in this paragraph, by certified or registered mail. Such notices, demand or payment shall be deemed timely given or made when delivered personally or deposited in the United States mail in accordance with the above. Addresses of the parties hereto are as follows. If to the City at: City Administrator City of St. Joseph P.O. Box 668, St. Joseph, MN 56374 If to the Developer at: Central Minnesota Federal Credit Union 20 South 4th Avenue East PO Box 160 Melrose, MN 56352 4.4 Incorporation of Documents by Reference. All of the Development Plan documents identified in attached Exhibit A, B, C, D, E, and F are incorporated by reference in this Agreement. 4.5 License to Enter Land. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the Property to perform inspections deemed appropriate by the City during the development of the Property. 4.6 Certificate of Compliance. This Agreement shall remain in effect until such time as Developer shall have fully performed all of its duties and obligations under this Agreement. Upon the written request of the Developer and upon the adoption of a resolution by the City Council finding that the Developer has completed performance of all Developer's duties mandated by this Agreement, the City shall issue to the Developer on behalf of the City an appropriate certificate of compliance. The Certificate of Compliance shall be in recordable form and shall constitute prima facie evidence that the Developer has performed its duties and obligations under this Agreement and this agreement is terminated. 4.7 Assi nment. At any time before a Certificate of Compliance has been issued, this Agreement may not be assigned by Developer except upon obtaining the express written consent of the City. 4.8 Integration. This Agreement contains all of the understandings and agreements between the parties. This Agreement may not be amended, changed, or modified without the express, written consent of the parties hereto. 4.9 Execution in Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute one and the same instrument. 4.10 Governed by Minnesota Law. This Agreement shall be interpreted under the laws of the State of Minnesota. 4.11 Representation. Rajkowski Hansmeier Ltd. Represents the City with regard to this Agreement. Developer is hereby advised to seek, and has consulted, an independent legal advisor prior to the execution of this Agreement. 4.12 Additional Terms. The following additional terms are being made a part of this Development Agreement to continue in force and effect as though they were dedications of the Development Plan, unless according to their terms are intended to terminate earlier. 5.0 DEFAULT AND REMEDIES 5.1 Default. Failure by the Developer to observe and perform any covenant, condition, or obligation contained in this Agreement shall be considered a default by the Developer under this Agreement. 5.2 Riaht to Cure. The City shall give the Developer written notice of any default under this Agreement. The Developer shall have 10 days in which to cure the default (or in which to commence good faith efforts to cure if the default is one which cannot reasonably be cured in 10 days). 5.3 Remedies. If an event of default is not cured by the Developer within the applicable cure period, the City may do any, all or any combination of the following: (a) halt all further. approvals regarding improvements or issuance of building permits or occupancy permits relating to the Development Property; (b) seek injunctive relief; (c) take any other action at law or in equity which may be available to the City. Effective as of the day and year first written above. CITY: ATTEST By Judy Weyrens City Administrator CITY OF ST. JOSEPH By Al Rassier Mayor DEVELOPER: STATE OF MINNESOTA ) )ss COUNTY OF STEARNS ) On this day of 2009, before me, a notary public within and for said County, personally appeared AI Rassier and Judy Weyrens, to me personally known, who, being each by me duly sworn did say that they are respectively the Mayor and the City Administrator of the City of St. Joseph, Minnesota, the municipal corporation named in the foregoing instrument, that said instrument was signed on behalf of said municipal corporation by authority of its City Council and said Mayor and City Administrator acknowledged said instrument to be the free act and deed of said corporation. Notary Public STATE OF MINNESOTA_ ) )ss COUNTY OF STEARNS ~ On this day of , 2009, before me, a notary public within and for said County, personally appeared, CEO and CFO the Developer named in the foregoing instrument, and that said instrument was signed on behalf of said company by authority of the Board of Directors and said CEO and CFO acknowledged said instrument to be the free act and deed of said corporation. Notary Public THIS INSTRUMENT WAS DRAFTED BY: Thomas G. Jovanovich - 5284X Rajkowski Hansmeier Ltd. 11 Seventh Avenue North PO Box 1433 St. Cloud MN 56302 Telephone: (320) 251-1055 `=• EXHIBIT A _~, ~_ - - ;~: ~' ~ - ELM STREET ,, s F , ~ o a~ I . i 1 t « m..~„ow 1~J . ~, .,.~~...,~....a _. l I1 .~a~ I; ~ ' ~ ~'f~o ` 4~JU'J ,• II ~~ . i 1 atisEaENT ~ '~ 1.1 N '~• N e 2 ~ ~ i i ,I ~ 7,IY5 S.F orlon' 1 d ~ ! ~ FRt8T FL00R ___ - __'!~ ~d l07 1 ~ / i ti t•~i ~ ' ~ is 1~ i M D Z 1 _ Z.l6 ACRES ~.~ ~ . ~ 1 •~ ~ ~ ~ ~1 ~ ~ 1~ ;' 1 ~ ~'- rT • i 1JS • ~~ 7S+ 1 rWyl _~ .. • ~ _ `-f Y Y _. . r:~.._.-r. ..:..-~.~.i- -~ . L .. - - - -- . . ,;~ ._.._~ .. _ r . ..-.~_. ... _-_.-... ~ - _ ...--~~._ ....~ _..._-___ .-~.-- .. ... w. .. .._ .._ ---...--' -- - - '-- -- .... - _. .A j _..~.... ~. 1 '7 ^'{'-'--CClUW1`l ROAD NO. I~ ACCESS ORIV~-:•~~ - -- ---r-- -j--f------• .. - . _.._.-... ~ p L~~ ~ -'- -1 :. •:. ~ ' t;. Z ~~~i k ~~ i ~~ ~~ 4 _~~~ ~~s~ ~~ 2 WEST ELEVATION 8K•Q fGIC LJ!' • re ~+ na raRnr+nEll r/O New Branch Facility for: Central Minnesota Federal Credit Union st. Jaee~+, ru9rra+ewa oz•»•zooe ~~ hapemslstar crock naMlres em K a.mrM eYM MN. pM aoo at. mw..+~u eoa,aoas ~a . ~E,..,,... ~ . ~,. ~,. ..~+~.eeti..~.~ werie:.w..t.une~avr~ i•rtswreo rwE+~ rJxu MaienMEO ff/K GG+P~Oe~+e r'ril n EAST ELEVATION SKS evJS: »r. ri n SOUTH ELEVATION 8KS arxE: ar.+v e[t +aw+~ nnt+a~eeo fREfN1eMED +$•~L u~ n.~wrn EJFJk nerwnwo rE+JiL raecu aw~oc eo~ae i swwcea~aer ~tw eroas~oaJ+ Hauer wE~ New Branch Facility for: ea,.ie..~w,.:..~.~..~.r.,as ~.~,..>~ ..>m.~,.~,o Central Minnesota Federal Credit Union "`~ie'"`"~e"'°'~°a .,r.~ e~,e~»~.~ L Joseph, Minnesota 02.17-2009 "e"r"'""'Jin1n°~O1A l ~_ NORTH, ELEVATION 8K•6 erke: wr. r~ aEE +swf ron rwnEJtmro ~~` •' DRICK/I•RECAST _ TO MATCN BUILDNG 13'-~• t ___-.~~- -, 4 a• cru O• CTV t_ . - ....... J Q 3 A11 4 I i v ~ MONUMENT SIGN SK•2 ante: ur • ra Au Te•-e• e• ual u3a• BRN]C~ a . I ~ I j --------- i ~------ I ~I I . ~I I' X 6. 1REATED I c O'.A• ~, CEDAR GATEa I 5 r~ L L Ts.R•xaxlln•xsaa• Z- I /\ I YYAIORED ro cdc. a*w EkP. ARCIIOM ~ ~ \ ~ 16• CAiIE BOLT6 ~ ~ i• n TRASH ENCLOSURE /SHED SK•2 aDN.E: U1' • t ~• New Branch Facility for: Central Minnesota Federal Credit Union St. Joseph, Miip3esolB 02.17-2009 EXHIBIT C PRE-FNISNlD I'1ETAL CAP BRICK COLOR 1 ~::~'_: ~"~W„.. ++wji FL45NNG • .. ~~ ~ SOLDIER COURSE aOLDIER COVRaf .. DRK%DOLOR7 DRKX COLOR 7 pRIfJC COLOR 7 LCD D16PLAT BOARD _ I~ 9 ~ BRICK COLOR I NOT TO EXC£EO IOB Sf. SOIDER f.OURSE PNECbT PANlL --PRECAST PANEL TO 1.14TCN BUILDN6 PQaED CONC. FOOTaai""-I I AW iCWDATION ~ y _ - _ - _-_~. s ii i 1; ------1-- - --- -~ I ( I ~I I I ~ 5. .. _._ .._.~__S. _. ~S _~ n ENCLOSURE SHED ELEVATIONS SK•2 aO1Le iB' ~ 3'4 / ha9emeisler mack axialw sot al. y.Rnpa aa.a Waal aodee 700 n BoIA, rNlalrota aa30rJa05 a70.76T•9ra6 ba aIO.76T•aala a•mak Mladl~lwaaNl~om MOaaa: W Ww.haalfJ1m111 ?n Z ~ ~'~}~ ~ ~ W J ~~ ~~ v ~~ /~/~ O L6 ..S a N~.~ ,~ V ~• iii ~~niesl i u i I I I I 1 ~~ I ~ ~ ~' I ~~ ~•I~i < _~ of ` , ~ .,...w ali ~-~1~1 m _ of , I N+ .I ~` - k I I G' I '~ ~ ~ . . I i . ~~ ol~~~ 1 II~~ ;~i a-~-y °i ~ ~ _ I I~ ~ ,w -:~.~: ~ ..~ a 0 I~ i I~ 1 I~ ~~ 1 ,~ I 1j I~ ~i ~, rs ~I, ~ .l t0 ~` ~ ~ ~ FIRE LANE FIRE LANE ~~ NQ ~ ~ r I ~ j 6 ~ Y, ' ~ J ~ I I'SI ~ ~ II~IL., ~ °I ~ Ig ~ aJ l-- -- - ------- i~i - -- - li~~il = iii ~ -------------------- ~+ i I~ ~ 1 1 III I) ~o~~ ~ ~~_~~ 3 ~~, :~ ~. ~ ~ ~~~ ~ ~ 01 Q m O I 11I ~ ~ ,- i~ - - - ~. - ~ ~ - ~ - - ~ _ - - - - - ELM STREET ACCESS ROAD - - _ _ - !~ _ I _ ,~„~ m o Cl m ~ ~ ~ ,'o ~° P v m yi ~ N ~ O 9 ~ yG Z S ~ ~ `Q~ ~ ~ ~ F' ~ ~ m ~ 2 S ~ S ~ ~ ~ .~ ~ ~ ~ s ~ m Z O ~t ~ ~ m ~~ ~5~ ~ ~ ~ ~ o ~ N ~ ~ y5 Q~ ? m ~ - S r' m ~ D r ~ v m ~~ O Z 4 m v rn -v z 1 1 ~ ~I' a i ~ i `, r 1 ._-J ~ t_ EXHIBIT F City of St. Joseph Water /Sewer Access Charge (WAC/SAC) -Non Residential Project Name Project 2009-Ot CMFCU Please check one ~ New Building of the following: ~ Demolition with new use Proposed Occupant Central MN Federal Credit Union Site Address 1300 Elm Street East PrirtFornr (- Alteration (Change in Use) r Addition r Demolition Declaration Only Type of Business Financial Institution Total Square Footage 7425 Calculation of Water Access Charge ~ Applicable, select type of Facility r" Not Applicable Units/ Square Feet Facility Parameter Value Number of Parameters Value of Parameters 6,701 Bank (exclude Vault) 2,400 2.79 11,439 2,400 0 $ 0.00 $ 0.00 Water Access Fee per parameter 4,100 Subtotal 11,439 Calculation of Sewer Access Charge ~ Applicable, select type of Facility ~' Not Applicable Units/ Square Feet Facility Parameter Value Number of Parameters Value of Parameters 6,701 Bank (exclude Vault) 2,400 2.79 $5,580.00 2,400 0 $ 0.00 $ 0.00 Sewer Access Fee per parameter 2,000 Subtotal $5,580.00 T {~ R° Calculation of Trunk Sewer/Water Fees ~' Applicable, select type of Facility r'. Not Applicable U:` N~ IC` F~ E ,. E' S% Name of Lift Station Fee Per Unit/Acre Units / Acres Total Fee Trunk Water Trunk Sewer BL (Industrial Park) -Commercial (Acres) 700 2.86 $2,002.00 Subtotal $2,002.00 CREDITS - If this project includes property that has previously paid WAC/SAC fees, please complete the Application for WAC/SAC credit. Less Credits Total Development Fees 19,021 Determination made by Judy Weyrens Date March 12, 2009 ~ t 7 :__ ~ '.~~ "y ' 4! C.~. r~ 1. .. d .:.. '~ `~ rt ~c "~ ~~ ~ ,. .-. ® 1~:~ 4~~. _; ~, ~~ i ~'"11 / ~ r ~ ^O ~... s-"S ~r is n~ ~~ , r-~ r __. -"a ;;. ft ~ I_i ~ i _ i, - ~ f ~ ~ -~-~.-.i- ^D ~('~; OO i DD (172y Stairway (48) Mechanical Room (321) Restroom (183) _ Vault (724) Deductible Space 7,425 ----- __ . Total Square Footage 6,701 Square footage for WAC/SAC N N c~ z orn~ ~~~ vo ~' ~~ ~~~ ~~ ~ rn -n o ~ ~~ CD o ~~ ~ .. C7 o~ N ~~ N O• 0 ~~ G m r O O z G) z O z m a .~ ~a~ ,.,. ~. ~~~ ,~ m w v, cn a ~ ~ ~ ~ ~ ~ ~ v o ~ = -' ~ (D N~ : N ~~QC~ fD ~ ~ n ~ ~ O 7 ~ N . ~ ~ ~ ~ 3 ~ U1 !D ~ r-r ~ n n N X ~ fD S ~ U1 C~ .. O 3 O W~ N n ~ O ~ .N.. ~ ~ N ~ 1 p _. O N ~ O O m r O O z z 0 z m D C m r O O z O c z m .~ f r~ I X11 P iy M ~~ crrv of ti7:d~nrrrt Planning Commission Agenda Item 5 MEETING DATE: March 2, 2009 AGENDA ITEM: Site Plan Review-Central MN Federal Credit Union SUBMITTED BY: Central MN Federal Credit Union STAFF RECOMMENDATION: Authorize the preparation and execution of a development agreement between the City of St. Joseph and the Central Minnesota Federal Credit Union (CMFCU) to allow the construction of a 7,425 Square Foot banking facility. PREVIOUS PLANNING COMMISSION ACTION: The Planning Commission and City Council reviewed and approved a plat entitled Coborn's Realty. This plat contained three lots with one lot being developed by Centra Care, one a future retail /service facility and one a large retail with gas. The Plat was developed as a Planned Unit Development (PUD). As such the entire plat is defined as far as ingress/egress, number of buildings, types of uses, etc. Both the City Council and Planning Commission approved the PUD and the City Council executed a Development Agreement with Coborn's. BACKGROUND INFORMATION: The site plan submitted by CMFCU is consistent with the overall PUD that was approved by the City Council and Planning Commission. The original plan illustrated an 18,000 square foot facility and the proposed facility is only 7425. There is however, enough space to add another building if so desired. If that were to happen, the Planning Commission and City Council would be required to review a PUD amendment. I have included the approved PUD layout as attached to the development agreement. There is a minor change on the interior street which makes a better design. When the staff met with representatives from the CMFCU we discussed that the development needs to be compatible with the existing structure (CentraCare) and since this is part of a PUD the landscaping needs to be unified. Therefore, they have met with CentraCare and Coborn's so that the trees are the same as is the landscaping. Please note that the Engineer comments include items that need to be addressed with the final grading plans. These modifications must be completed before the building permit is issued. It is typical to submit final plans with the building permit application. As this property is part of a PUD with an executed agreement, staff has reviewed the conditions of the PUD, matching them with the proposed plans. The project will include the installation of a fire hydrant that is not illustrated on the CMFCU site but is required on the PUD. Representatives from Coborn's have agreed to construct the hydrant. It was anticipated that the second building would be Coborn's and the lot being developed at this time was a future speculative building. Therefore there we conditions tied to the issuance of a second building permit. Those items include the balancing of the storm water fee, master sign plan and the north/south extension to Elm Street. Staff will be presenting the City Council with an amendment for the Development Agreement extending the timeline for those items. ATTACHMENTS: Application, Site Plan, Engineer Comments, Building Official Comments, Original Coborn's PUD site plan, B2 Ordinance. REQUESTED PLANNING COMMISSION ACTION: Recommend the Council authorize the drafting of the Development Agreement between the City of St. Joseph and the Central MN Federal Credit Union for the construction of a 7425 square foot banking facility, executing the same.