HomeMy WebLinkAbout[08] Stearns County Mining Operation Registration ApplicationFile No.
STEARNS COUNTY
MINING OPERATION REGISTRATION
Stearns County Environmental Services
705 Courthouse Square, Administration Center Room 343, St. Cloud; MN 56303
s (320) 656 -3613 or 1- 800 -450 -0852 -Fax (320) 656 -6484
1. Property Owner's Name: —lb—is±1 Z. Telephone Number(s):D �.� 3�k•1
3. Address of Property: 0
4. Mailing Address: A.Y VP M L Q5,05r Ald 52FSra
5. Parcel I.D. Number: 3 • d (o y 1 • 00 d 6. Township: a log, 7. Section:
8. Legal Description: X7'41WP lit
All mining sites shall be reclaimed immediately after mining operations cease. Reclamation shall be completed
within one (1) year. The following standards shall apply:
A. Within a period of three (3) months after final termination of a mining operation, or within
three (3) months after abandonment of such operation for a period of six (6) months, or
within three (3) months after expiration of an interim use permit for a mining operation, all
buildings, structures and plants incidental to such operation shall be dismantled and removed
by, and at the expense of, the mining operator last operating such buildings, structures and
plants.
B. The peaks and depressions of the mined area shall be graded and back - filled to a surface
which will result in a gently rolling topography in substantial conformity to the land area
immediately surrounding, and which will minimize erosion due to rainfall. No finished slope
shall exceed 18 percent grade.
C. Reclaimed areas shall be surfaced with soil of a quality at least equal to the topsoil of land
areas immediately surrounding, and to a depth of at least four (4) inches. The topsoil shall be
seeded, sodded or planted.
D. The finished grade shall be such that it will not adversely affect the surrounding land or
future development of the site. The finished plan shall restore the mining site to a condition
whereby it can be utilized for the type of land use proposed to occupy the site after mining
operations cease.
RECEIVED
JUL 0 2 2004
ENVIRONMENTAL SERVICES - 1 -
Proposed Reclamation
Describe proposed reclamation including final slopes, high wall reduction, benching, terracing,
and other structural slope stabilization measures.
5L,0PE5 LES,5 VOW t 0v fil�lq CoVyC2. W
Describe anticipated topography, water impoundments, artificial lakes, and future land use of the
site. 94-
4
Describe plans for the disposition of surface structures, roads, and related facilities after
completion of mining.
/Uv SYR-"C v 12E5 Jnl t l T—,
Describe the methods proposed for the disposal or reclamation of oversize and undersize
materials.
Describe or attach a copy of a seeding plan that includes methods of seed bed preparation, seed
mixtures, seeding rates, mulching, and other techniques needed to accomplish site stabilization.
5400 cY �J G R•9 -mss c,1-
Describe long -term maintenance needed to support reclamation.
Provide an estimate of the reclamation cost of each phase of the project or the entire site if
phasing is not planned.
lo,obo
To the best of my knowledge, I certify that the information provided on this application and
accompanying documents is true and accurate.
Property Owners signature T"Sr
Date I I I b