HomeMy WebLinkAbout[04c] Park EquipmentC-rry OF ST. JCWEPH
MEETING DATE:
Council Agenda Item 4 C
February 18'h 2010
AGENDA ITEM: Park Equipment — Requested Action: Accept the low
quote from Minnesota Playground Equipment in the amount of $ 30,632.00 for the purchase of
playground for Centennial Park.
SUBMITTED BY:
Park Board
BOARD /COMMISSION /COMMITTEE RECOMMENDATION:
PREVIOUS COUNCIL ACTION: Council has previously approved the purchase of play ground
equipment for Centennial Park with % cent sales tax funds
BACKGROUND INFORMATION: On August 6`" the City council approved the use of sales tax money to
purchase play ground equipment for Centennial Park. Staff has received quotes from two vendors as
required and found that Minnesota /Wisconsin Playground was the low bid at 30,632.00.
BUDGET /FISCAL IMPACT: $30,632.00 plus installation costs. Total estimated cost is $
45,000 to $ 67,500.
ATTACHMENTS: Extract of minutes 4(c):2
Minnesota Playground Quote 4(c):3 -6
Cre8play Quote 4(c):7 -10
REQUESTED COUNCIL ACTION: The Park Board is requesting authorization from the City Council to
purchase playground equipment from Minnesota /Wisconsin Playground for $30,632.00.
4(c):1
Extract — City Council Minutes
August 6, 2009
Sales Tax Allocation: Frank stated that this item was pulled for discussion because he only wants to see
routine items on the consent agenda. He stated that he believes this is a good idea, but he is reluctant to
do it at this stage until there is some sense of what will be done with the Sales Tax. Bruce Berghorst
approached the Council on behalf of the Park Board. Frank questioned Berghorst, what if Centennial Park
is not part of the package? Weyrens stated that it was brought to her attention that this park is listed as a
community park rather than a regional park in the Master Park Plan. According to Berghorst, the regional
parks were labeled as community parks. They were labeled as community parks due to the facilities.
Frank suggested that the Council go ahead and allocate $42,500 as some of those are clearly needs that
need to be met as identified by the League of Minnesota Cities. He questioned when this would start.
Berghorst stated that they would try to proceed this fall to be ready for rentals in the spring.
Loso made a motion to authorize the expenditure of up to $67,500 for the purpose of playground
equipment from Minnesota/Wisconsin and to use $42,500 of sales tax proceeds. The motion was
seconded by Symanietz.
Discussion: Symanietz stated that some of the equipment is very old and needs to be replaced
for safety and handicap accessibility. She added that she is in favor of the equipment
replacement. Rassier stated that he respects the Park Board; however, the City is still in the
infancy of how this should be used and not all of the Councilors agree on how these funds should
be allocated. Berghorst stated that last year the Park Board was in the process of doing the
master park plan to start identifying the needs and listing their priorities. They did this knowing
that, in the future, they may have some funds to do the improvements. Based on the
requirements of the half cent sales tax, they felt that they could make those improvements. Frank
stated that some of the sales tax funds were used to fund the master park plan. He then re- stated
that the Council needs to work with the residents via the website, forums, etc to ask what they
think. Berghorst advised Frank that public forums were held during the master park plan process
and the residents saw that the equipment needs to be replaced. Berghorst stated that he asked
the supplier for a bid, but it did not include the border, fill, concrete, it was for assembly only. They
would like to use staff for the assembly. He also advised the Council that some of the equipment
may be moved to Millstream to bring that equipment up to code for LMC standards. There was
some concern about piecing equipment from different parks together at Millstream. Berghorst
stated that the only piece from Centennial to be moved would be the slide.
Bartlett questioned Berghorst as to whether or not he got any additional quotes to which he stated
he had not as they use Game time for most of the equipment in St. Joseph. Frank stated that the
goal is to standardize the equipment in town and Loso added that two companies will not sell the
same products. Rassier suggested that, in the future, the Park Board look at different quotes.
Ayes: Wick, Symanietz, Loso
Nays: Rassier, Frank The motion passed 3:2:0
4(c):2
83' -5'
99' -1'
EARTH BORDER
BY OWNER
251 UN. FT.
f SLIM
f "^' W L
I
I
ACCESS
BY OTHERS
% CG
1
CURYED
275 ZIP SLIDE
WK 18251
CLRIBER ,RJR
PONr
� l�J
` IM7 fATTACNh9Xr 1827
FUNNEL IL'fLtS
17515 BADGE W/
CNAIN LN1( SWUM PALS CUMBER J' e TREE o
Ubdom
18250
a
12Bu
ROOT WAU.
cu1em n
ARCH
(2 OD
O ARCH
3. 12178 18804
SINGLE
BEAT S CJIAML TUB
134�1J "/ mNOlES
aLC
IN
/
r13547 EPPED B1NNGOS POIN NANDIIQUD
12704RNOS
\ \ 2-5
GRUNION BAR
fs SPIRAL SLIDE
M
\ \1
I
DOUBLE
D S
7PTT�IE
`J
EXISTING
BOUNDARY
EXISTING
ACCESS
SAFETY SURFACE
' ENGINEERED
— WOOD F
F
3500 50. O. FT. I
I I i
l SAFETY ZONE L
I
/ 8F1T'SEAT MY SIX EA m 1R 01CIDElD Af �
PACIGOE PACKNIC SW MOIAcE SOO FACmK
tlr O.D. 5 1/2- OD. 2 I1r 0.0. 5 1/2.
I /
I\ PRNE YESwIG PISIINE SRPC
\ MO -A-MY
l
I /
I /I I
I i
I I
42' -0'
A1,1.2
4 -M
J
ACCESSIBILITY KEY ADA REQUIREMENTS FOR STRUCTURE AGES 5 -12 YEARS OLD
AGES 2
-5 YEARS OLD
m TRANSFER ACCESSIBLE = BLUE TOTAL N RMBER of E1FVAim Pur c0EE0lIOFlS M PLAN 14
N FLAN
o
TOTAL EVENTS ACCESSDLF 1M TRANSFER N RAN IJ REOb. 7
TOTAL ALCFSSINE EVFTIIS NA RAW N PLAN 0 1EDb. 0
IN NN1
IN PINT
I
0 REO.O. 0
0 RFQ'D. 0
IREO
TOTAL ACCESSIBLE GROUND IEYFE EViMS N PLAN 7 REOD. S
� ELEVATED NOT ACCESSIBLE = MAGENTA DIFFERENT TYPES OF GROUND Wa EVENTS N PLAN s REQD. J
M PLAN
N PLAN
2 FIS". 0
I -D. 0
® NON PARTICIPATING = BLACK THIS PLAYGROUND MEETS ALL CURRENT ADA REQUIREMENTS ! THE FINAL RULE
(ED RAMP ACCESSIBLE = RED ADM OVAT/NFO 1S APPUEABLE WHEN USING AN ACCESSIBLE SAFETY SURFACE
ACCE`:, COUiE G'4 EN 0 10 20
40
SCALE N FEET
Mfg. By sold a DsmbutedBy. PO Box 27328 - Golden Valley, MN 55427
Centennial Park
763.546.7787 1.800.622.5425
a�rieTime- naTnneso a/WTSCOns�nl FAX 763.546.5050
St. Joseph, Minnesota
l i�1..::X{7 QY (1)
Elrichin ChildhoO V ., Play
9 -- E -Mail info @mnwiplay.com
THIS PRINT IS THE PROPERTY OF MINNESOTA WISCONSIN PLAYGROUND INC. AND IS NOT TO BE USED, COPIED OR REPRODUCED
A1,1.2
4 -M
M (�"i C1 eS C� ta�1�' E S � �3 �1 S � �lh
PLAYGA10- UND.,�
QUOTATION
TO: City of Saint Joseph
P.O. Bos 668
St. Joseph, MN 56374
Attn: Majorie A. Lesnick (Ph. 320 - 363 -7574)
36 5th Avenue NW
St. Joseph, MN 56374
Project: Centennial Park
Plan Drawing D4337J6
Date: 02- Feb -10
Quote No. D4337J6A
Drawing No. D4337J6
Qty
Unit
Description
Price
Extension
1
Lump Sum
PrimeTime 3.5" Steel Post System Playstructure
$23,990.74
$23,990.74
Mfg. By GameTime. See Attached Equipment List and Drawings
Factory Installed Locking System for Easy Installation
Direct Bolt 45.5" & 36" Post Center Formed Steel Deck System
Entry Archways on All Vertical Climbers
1
Lump Sum
Two Bay Swing Set
$2.972.49
$2.972.49
#12583 PrimeTime Swing Frame, 3 1/2" O.D. (Qty. 1)
# 12584 PrimeTime Swing Add -A -Bay, 3 1/2" O.D. (Qty. 1)
#8910 Belt Seat, 3 1/2" O.D. (Qty. 2), #8696 Enclosed Tot Seat, 3 1/2" O.D. (Qty. 2)
1
Lump Sum
Engineered Wood Fiber for 3500 Sq. Ft. at 8" Compressed Depth
$35669.00
$3,669.00
Unless otherwise noted, prices shown are materials only, they DU NOTincluded assembly, installation, edging, safety surfacing, removal o existing equipment, storage of equipment, itisposal ot packaging
materials, excavation, site or surface preparation, landscaping or bonding.
Unless otherwise noted the following applies to the purchased items requiring installation.
Minnesota Playground, Inc. will not be responsible for accepting delivery or storage of equipment, site preparation, unforeseen obstructions (may incur additional charges), or disposal of packaging materials. Owner or
General Contractor shall hold Minnesota Wisconsin Playground, Inc. harmless in the event of injury due to insufficient resilient safety surface. Owner is responsible for direct access to site for large trucks. A Flat dirt
surface should be prepared prior to our arrival. Unless otherwise stated all excavated material is to remain on site and all installation shall be done in one trip. All material is guaranteed specified. All works is to be completed
in a workmanlike manner according to standard practice. Any alteration or division from above specifications involving extra costs must be executed upon written orders and will become an extra charge over and above
the purchase agreement. All Agreements are contingent upon strikes, accidents or delays beyond our control. Owner is to carry fire, tornado and other necessary insurance.
Prices Good For 30 Days
Shipping / Installation Date: 4 - 6 Weeks A.R.O.
Prices Based on Wages Without Prevailing Wage Adjustments
Signed By:
Accepted By:
John Elder
With Acceptance -Terms of Sale -Payment is Due Upon Receipt of Order
Sub Total
$30,632.23
Freight
Included
Installation
Not Included
Tax
Included
Total $30,632.23
PO Box 27328 • Golden Valley, MN, 55427 • 763.546.7787 • 1.800.622.5425 • Fax 763.546.5050
e -mail info a,fnnwiplay.corn • www.mnwiplay.com 4(c):4
83' -5'
ACCESS
- BY OTHERS
EARTH BORDER / \
20
51Fr• l V \
127.10 ar s,EE \
ME
CDC* 'm a En
m
m
1411117 Ac= I
1 14110 , MOEv ffugnm
/ tl11N 1/11 MM�111�
/ ILe1EAfIL CDER a, S 1420_
I 11000 CD®1
S IN&
IM ` PlAnowl 4 Wr Na WINE
1 •11
1 . m (\
.m I
m 1 ,2on m
NEW OIL 9 NUNN,
CLA� 111011 F3
AIM
/ m �, `
r INS I
ftv 193M
KV40HOLD 90111161
/ONOOi 1'-r
14000
12704
INUMPERM 13547 m
mm
\ Cella' Owe /
SAFETY SURFACE
\ ENGINEERED
WOOD FIBER
3500 SO. FT.
SAFETY ZONE L
I I
L�\
NOT& Ot
IIIOO �'N `
J 1/P OA a 1/Y OA 3 1/P OA a 1/a• O0. 1
125113 In"
I I
PREMIUM[ SIMN0 prim one /
r'
I
I
I I
L— _ - - -_ —J
42•x•
EXISTING
BOUNDARY
EXISTING
ACCESS
I
ACCESSIBIUTY KEY
ADA REOUIRFJAENTS FOR STRUCTURE AGES 5-12 YEARS OLD
AGES 2-5 YEARS OLD
m TRANSFER ACCESSIBLE - BLUE
� ELEVATED NOT ACCESSIBLE = MAGENTA
tow Nmmut or nca m my ammmmm N PLm 1.:
10011 bum ADCOME VA 111AN4AEN N PUN
TOOK ACCESSIBLE 1i0E0 VA RAP N PUN
OFFEREN11' 74M OF Oa011M LBEELL QAENM INi PLAN a
in 7
MNL O
�o a
N PIAN
N PUN
N PUN
r P
o
0
O
i
INCYI 0
ILa0'D. 0
Im�ov °o
® NON PARTICIPATING = BLACK
THIS PLOGI la1D NESTS ALL CLWWff ADA STS a nlE
PeNI MILE
® RAMP ACCESSIBLE g RED
AMC C WI/Nro S APnx'raE eNEN NMIE All AWESOME SOW MNPACE
® ACCESS ROUTE = GREEN
o TO 20
40
SdIIE N PEEr
Mfg. By Sold a orarwured By: PO Box 27328 - Golden Valley, MN 55427
A P ,.rlall cPa,.Ar 763.546.7787 1.800.622.5425
Game %/me• A FAX 763.546.5050
Enriching Childhood Through Play. E -Mail info@mnwiplay.com _
THIS PRINT IS THE PROPERTY OF MINNESOTA WISCONSIN PLAYGROUND INC. AND IS NOT TO BE USED, COPIED OR REPRODUCED
Centennial Park
St. Joseph, Minnesota
4(c):3
�'M` , , � o
innes
PLAYGRGIUHD_"�
QUOTATION
TO: City of Saint Joseph
P.O. Bos 668
St. Joseph, MN 56374
Attn: Majorie A. Lesnick (Ph. 320 - 363 -7574)
36 5th Avenue NW
St. Joseph, MN 56374
Project: Centennial Park
Plan Drawing D4337J6
Date: 02- Feb -10
Quote No. D4337J6A
Drawing No. D4337J6
Qty
Unit
Description
Price
Extension
1
Lump Sum
PrimeTime 3.5" Steel Post System Playstructure
$23,990.74
$23,990.74
Mfg. By GameTime. See Attached Equipment List and Drawings
Factory Installed Locking System for Easy Installation
Direct Bolt 45.5" & 36" Post Center Formed Steel Deck System
Entry Archways on All Vertical Climbers
1
Lump Sum
Two Bay Swing Set
$2,972.49
$2,972.49
#12583 PrimeTime Swing Frame, 3 1/2" O.D. (Qty. 1)
#12584 PrimeTime Swing Add -A -Bay, 3 1/2" O.D. (Qty. 1)
#8910 Belt Seat, 3 1/2" O.D. (Qty. 2), #8696 Enclosed Tot Seat, 3 1/2" O.D. (Qty. 2)
1
Lump Sum
Engineered Wood Fiber for 3500 Sq. Ft. at 8" Compressed Depth
$3,669.00
$3,669.00
I
m wn
ass of erwrse no , prices s own are ater son y, ey m u e assem y, ms anon, a gmg, sa ety su sang, remov o ewsnng equipment, storage , �spo o pae n
materials, excavation, site or surface preparation, landscaping or bonding.
Unless otherwise noted the following applies to the purchased items requiring installation.
Minnesota Playground, Inc. will not be responsible for accepting delivery or storage of equipment, site preparation, unforeseen obstructions (may incur additional charges), or disposal of packaging materials. Owner or
General Contractor shall hold Minnesota Wisconsin Playground, Inc. harmless in the event of injury due to insufficient resilient safety surface. Owner is responsible for direct access to site for large trucks. A flat dirt
surface should be prepared prior to our arrival. Unless otherwise stated all excavated material is to remain on site and all installation shall be done in one trip. All material is guaranteed specified. All works is to be completed
in a workmanlike manner according to standard practice. Any alteration or division from above specifications involving extra costs must be executed upon written orders and will become an extra charge over and above
the purchase agreement. All Agreements are contingent upon strikes, accidents or delays beyond our control. Owner is to carry fire, tornado and other necessary insurance.
Prices Good For 30 Days
Shipping / Installation Date: 4 - 6 Weeks A.R.O.
Prices Based on Wages Without Prevailing Wage Adjustments
Signed By:
Accepted By:
John Elder
With Acceptance - Terms of Sale - Payment is Due Upon Receipt of Order
Sub Total
$30,632.23
Freight
Included
Installation
Not Included
Tax
Included
Total
$30,632.23
PO Box 27328 • Golden Valley, MN, 55427 a 763.546.7787 • 1.800.622.5425 a Fax 763.546.5050
e -mail i nfo@m nwip lay. coin • www.mnwiplay.com 4(c):4
A.
r
QUOTATION
TO: City of Saint Joseph
P.O. Bos 668
St. Joseph, MN 56374
Attn: Majorie A. Lesnick (Ph. 320 - 363 -7574)
36 5th Avenue NW
St. Joseph, MN 56374
Project: Centennial Park
Plan Drawing D4337J6
Date: 02- Feb -10
Quote No. D4337J6B
Drawing No. D4337J6
Qty
Unit
Description
Price
Extension
1
Lump Sum
Installation of Main Play Structure
$4,825.91
$4,825.91
Structure as Specified in Plan Drawing D4337J6
Price Includes Concrete for Footings
1
Lump Sum
Installation of Two Bay Swing Set
$944.30
$944.30
Swing Set as Specified in Plan Drawing D4337J6
1
Lump Sum
Installation of 3500 Sq. Ft. Engineered Wood Fiber
$981.55
$981.55
1
Lump Sum
Demolition of Existing Play Equipment
$3,350.00
$3,350.00
Disposal of Existing Play Equipment to Landfill Site
Removal & Re- installation of Existing Pea Rock
Removal of Existing Timber Border
Note: The customer is reponsible for accepting delivery of equipment and having
L,
it at the installation site
Unless otherwise no prices shown are matena s only, they DO NUll'included assembly, installation, edging, safety surfacing, remove o exsho g equipment, storage or equipment, crisposal of pac rig
materials, excavation, site or surface preparation, landscaping or bonding.
Unless otherwise noted the following applies to the purchased items requiring installation.
Minnesota Playground, Inc. will not be responsible for accepting delivery or storage of equipment, site preparation, unforeseen obstructions (may incur additional charges), or disposal of packaging materials. Owner or
General Contractor shall hold Minnesota Wisconsin Playground, Inc. harmless in the event of injury due to insufficient resilient safety surface. owner is responsible for direct access to site for large trucks. A flat dirt
surface should be prepared prior to our arrival. Unless otherwise stated all excavated material is to remain on site and all installation shall be done in one trip. All material is guaranteed specified. All works is to be completed
in a workmanlike manner according to standard practice. Any alteration or division from above specifications involving extra costs must be executed upon written orders and will became an extra charge over and above
the purchase agreement. All Agreements are contingent upon strikes, accidents or delays beyond our control. Owner is to carry fire, tornado and other necessary insurance.
Prices Good For 30 Days Sub Total $10,101.76
Shipping / Installation Date: 4 - 6 Weeks A.R.O. Freight No Applicable
Prices Based on Wages Without Prevailing Wage Adjustments Installation See Above
Signed By: Tax Not Applicable
John Elder
Accepted By: Total $10,101.76
With Acceptance - Terms of Sale - Payment is Due Upon Receipt of Order
PO Box 27328 • Golden Valley, MN, 55427 • 763.546.7787 • 1 .800.622.5425 a Fax 763.546.5050
e -mail info@a,mnwiplay.com • www.mnwiplay.com 4(C):5
- - ---- ----- .......... 0
QUOTATION
TO: City of Saint Joseph
P.O. Bos 668
St. Joseph, MN 56374
Attn: Majorie A. Lesnick (Ph. 320 - 363 -7574)
36 5th Avenue NW
St. Joseph, MN 56374
Project: Centennial Park
Plan Drawing N/A
Date: 02- Feb -10
Quote No. D4337.161)
Drawing No. N/A
Qty
Unit
Description
Price
Extension
1
Lump Sum
Installation of Three Bay Swing Set
$1,343.30
$1,343.30
Price Includes Concrete for Footings
Note: This price is only valid if the installation is ordered & preformed
alongside that of Quote D4337J6B installation
n ess of erwrse noted. prices shown are materials only, they included asserribly, installation, edging, safety surfacing, removal of existing equipment, sIMFe—al storage-al equrpmenn, sp'", or ns
materials, excavation, site or surface preparation, landscaping or bonding.
Unless otherwise noted the following applies to the purchased items requiring installation.
Minnesota Playground, Inc- will not be responsible for accepting delivery or storage of equipment, site preparation, unforeseen obstructions (may incur additional charges), or disposal of packaging materials. Owner or
General Contractor shall hold Minnesota Wisconsin Playground, Inc. harmless in the event of injury due to insufficient resilient safety surface. Owner is responsible for direct access to site for large trucks. A flat dirt
surface should be prepared prior to our arrival. Unless otherwise stated all excavated material is to remain on site and all installation shall be done in one trip. All material is guaranteed specified. All works is to be completed
in a workmanlike manner according to standard practice. Any alteration or division from above specifications involving extra costs must be executed upon written orders and will become an extra charge over and above
the purchase agreement. All Agreements are contingent upon strikes, accidents or delays beyond our control. Owner is to carry fire, tornado and other necessary insurance.
Prices Good For 30 Days
Shipping / Installation Date: 4 - 6 Weeks A.R.O.
Prices Based on Wages Without Prevailing Wage Adjustments
Signed By:
John Elder
Sub Total $1,343.30
Freight Not Applicable
Installation See Above
Tax Not Applicable
Accepted By: Total $1,343.30
With Acceptance - Terms of Sale - Payment is Due Upon Receipt of Order
PO Box 27328 • Golden Valley, MN, 55427 a 763.546.7787 • 1,800.622.5425 is Fax 763.546.5050 4(c):6
e -mail info @mnwiplay.com • www.mnwiplay.com
Quote TO
City of Joseph
P.O. Box 668
St. Joseph, MN
Praim Site:
Centennial Park
St, Joseph, MN
Proposal Number: 01251003
Date: 1/25/10
—Qty — Mom _-- Prim Ex0*rMlon
Misc. PraneTime 3.5 in post system $26,750.00 26,750.00
as manufactred by GT
Misc. Two Bay Swng $3,280.00 31280.00
#12583 PrimeTbne Frame qty -1
#12584 ad -*-bay qty -1
#8910 bek seat ty-2
#6696 enclosed tot qty -2
Misc. EWF 3019 eq ft @+ 8" compressed depth qty 100 CY $2,890.00 21890.00
Final des" may cause actual price to be higher or lower depending on
level of detail and material selections by owner.
Exclusions: on site footings and fourtdatiorrs, excavation, surface preparation, border, surfacing, l*ndaeaping Total: ,
Government fees, permits and sake tax. Freight: $0.00
Notes: All features to resemble drawings in size and confsgtrrshtion. Owner to approve cobra and textures. Tax: to be added
All work to be accepted by owner in writing on4te prior to install crew dwarture Installation; by othana
Total $32,820.00
Terms: 50% within 10 day of executed purchase order date, 40% prior to shippog to job Mite. Full belanm due *M*t 20 dWs of compledon and soelpayme by owner
Qlroe" will be haired for a prp6o1 of 30 dW& Pie" requ"t a now Woe* of w lift &m
Signed By:
Accepted.
Acceptance
Date:- - -- - --
8ioo Wayzata Blvd., Suite C, Golden valley, MN 554261 Phone: 612.67o.8195 Fax: 612.486.7740 1 lnfomcre8play.conl cT*8 ay,com
4(c):7
Quote To
City of Joseph
P.O. Box 668
St. Joseph, MN
ftiect Site:
Memorial Park
St, Joseph, MN
Proposal Nhrnber: 0125100
Clete: 1/25/10
QtiY Mockil DeeC"M Pike E%Undm
Misc. Installation of Three Bay Ong $1,675.00 1,675.00
kuludea foothlga
- Final design may cause actual price to be higher or lower depending on
level of detal and material selectkms by owner.
Exclusions *"ft footings and foundations, excavation, surface preperstW4 border, surfacing, landwapkV Sub Tot 1,
Government fees, pemnfts and sales tax
Notes: AN features to resemble drawings In size and cordgurstion. Owner to Freight: added
approve colors and texwroa. Tax: to be added
AN work to be accepted by owner le writhy on -site prior to Install crew departure buteRetgn by others
Tote! :11675.00
Terms: 50% within 10 day of executed purchase order date, 40% prior to wftm0 to job site. Full balance due wl" 20 days of completion and acceptance by owner
plots w6 be fiorroesd for a period of So drys, Massa r@WW a new Qaeta afar tae tinia.
SVIed By.
Accepted:
Acceptance
Date:- - - --- -- ___. -- -.
8loo Wayzata Blvd., Suite C, Golden Valley, MN 55426 1 Phone: 612.670.8195 Fax: 612.486.7740 I infoal)cre8play.com cre8play.cova
4(c):8
Quote To
City of Joseph
P.O. Box 668
St. Joseph, MN
Project Site:
Centennial Park
St, Joseph, MN
Proposal Nurdwr: 012510CI
Date: 1125110
Desalptlon Prbe F teffsion
Three Bay swing Set
1 Misc. #12583 PdMaTime Swing Frame 3 -1f2in 00 $4,890.00 4,890.00
# 12 584 Add-a -fray swing
#8910 Soft seat - qty -3
#8696 enclosed tot qty -2
#8537 adaptive wing qty -1
• Final design may cause actual price to be higher or lower depending on
level of detail and material selections by owner.
Fxcluslom On -site footings and fotmdatlom, excavation, surface preparation, border, surfacing, landscaping
Government fees, permits and sales tax. Freight $0.00
Notes: All features to rsaernble drawings In Size and configuration. Owner to approve cobra and textures. Tax: to be added
Terms: 50% within 10 day of executed Purchase order date, 40% prior to Odpping to job site. Full balance due within 20 days of completion and aowptww by owner
Oman car be honored for a period of 30 deyL Flew request a mw quota after title time.
Signed 11y:
Accepted:
Acceptance
Date:___._____. ____ ._
81oo Wayzata Blvd., Suite C, Golden valley, MN 554261 Mom 612.670.8195 Fax: 612.486.77401 infoalcre8play.com creeplaX.com
4(c):9
Quote To
City of Joseph
P.O. Box 668
St. Joseph, MN
Project Site:
Memorial Park
St, Joseph, MN
Proposal Number 012 51002
Oats: 1125110
0
Qty
Model
Description
Prim
ExImmelon
1
Misc.
Installation of Main Structure
$5,490.00
5,490.00
as shown in drawing D4337J1
1
Misc.
Installation of Two Bay Swing
$1,045.00
1,045.00
1
Misc.
Installation of engieersd wood fiber
$970.00
970.00
1
Misc,
Demolition of existing play equipment
$3,725.00
3,725.00
disposal of exisiting equipment
removal and reinstall xisiting pea rock
removal of existing timber border
* Final design may cause actual price to be higher or Ewer depending on
level of detail and material selections by owner.
Exclusions: On -site footings and foundations, excavation, surface preparation, bon e , surfacing, lartIscaping Sub Totak 3117W.W
Government fees, permits and sales tax. Freight $0.00
Notes: AO features to resemble drawings In size and configuration. Owner to approve cobra and textures. Tax: to be added
AM work to be accepted IX owner in writing on -site prior to install crew departure M1steNetion: by others
Told $1112MM
Tema: 50% within 10 day of executed purchase order date, 40% prior to shipping to job oce. Full balance due within 20 days of cornOstim and acceptance by owner
Quota ww6 be honored for a period of 30 days. Plan mput a now won ~ this tone.
Signed By:
Accepted:
Acceptance
Date:. -._ - - -_ -._
81oo Wayzata Blvd., Suite C, Golden Valley, MN 55426 { Phone: 612.670.8195 Fax: 612.486.7740 1 inf oocre8play.corn cmSpllay.com
4(c):10