HomeMy WebLinkAbout[07a] Millstream Dredging ProjectCITY OF ST. JOSLPH
MEETING DATE: February 3, 2011
Council Agenda Item % a
AGENDA ITEM: Public Works Director Reports
SUBMITTED BY: Terry Thene, Public Works Director
BOARD /COMMISSION /COMMITTEE RECOMMENDATION:
PREVIOUS COUNCIL ACTION: During the budget process the Council approved the funding for the
dredging of Millstream Pond, at an estimated cost of $ 12, 000.
BACKGROUND INFORMATION: Based on the Council action funding the dredging of Millstream Pond,
the DNR was contacted to secure a permit to dredge the pond. The DNR has approved the work and it
must be completed by March 2011. The work will be outsourced to C & L Excavating and they will haul
the material off site.
BUDGET /FISCAL IMPACT: $ 12,000.00
ATTACHMENTS: Request for Council Action ............................ 7(a)•1 -2
CIP Form, PW1118 ............... ............................... 7(a):3
C & L Quote ........................... ............................... 7(a):4
Minute Extract, August 25, 2010 ....................... 7(a):5
Minute Extract, September 2, 2010 ................. 7(a):6 -7
Letter to DNR Requesting Permit ..................... 7(a):8
DNR Maintenance Permit ... ............................... 7:(a):9 -10
REQUESTED COUNCIL ACTION: Accept the quote of C& Lin the amount of $12,000 to complete the
maintenance dredging of Millstream Pond.
7(a):1
THIS PAGE INTENTIONALLY LEFT BLANK
7(a):2
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2011 -2015
PROJECT TITLE: Millstream Pond
I TOTAL COST: $12,000.00
2011 BUDGET: $12,000.00
1PROJECT CATEGORY: Minor equipment
DESCRIPTION: Dredge Millstream Pond - fishing area
JUSTIFICATION: JAccount Code: E49045202 -530
The Millstream Park pond has been a fishing attraction since the park was developed. The fishing area is in need of
dredging to remove all the sediments that have accumulated through the years. The dredging is required to be
completed in the winter months according to the MN DNR. The pond dredging should be completed every 8 -10
years.
PROJECT COSTS
AND FUNDING
SOURCES
BY YEARS;
Project Funding
Prior
Source
Years
2011
2012
2013
2014
2015
Total
General Fund:
Parks Levy
0.00
1,300.00
1,300.00
1,300.00
1,300.00
5,200.00
To Be Determined
12,000.00
PROJECT COSTS
Preliminaries
PROJECT STARTING DATE: 2011
Land Acquisition
Construction
PROJECT COMPLETION DATE 2011, ongoing
Equipment and Other
5,200.00
Total
$5,200.00
NEIGHBORHOOD:
Presented to the City Council on Approved Denied _ Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
7(a):3
NOT INCLUDED IN THIS BID: PERMITS, TRAFFIC CONTROL, BOND, SEED, SOD, SILT FENCE, MORE THAN TWO MOBILIZATION,STAKING, DENSITY
TESTS, EXPORT, SPECIAL INSURANCE,BLACKTOP OR CURB REMOVAL AND REPLACEMENT, WAC /SAC FEES,EROSION CONTROL,
RESTORATION,CASTING ADJUSTMENTS,RAIL ROAD PERMITS /INSURANCE, INTERNAL OR EXTERNAL MANHOLE SHEILDS.NO ELECTRICAL WORK
IN /OUT OF ANY LIFT STATIONS. NO RETAINAGE
EXTRACT OF CITY COUNCIL MINUTES
AUGUST 25, 2010
Millstream Park Pond Dredging
Budget, 2011: Weyrens stated that at the August 11, 2011 Budget meeting the City Council requested an
inventory of services provided by the City. The list of services was requested to gain a better
understanding of the different functions provided by each department in relation to the budget submitted.
Therefore, Weyrens presented a summary of each function provided with a brief discussion. The Council
discussed proposed cuts to building inspection, prosecution services, skating hours, snow removal and
cable operations.
Weyrens stated that the budget can be reduced further by removing some one time expenditures that
have been included. For example, the Police budget includes a $ 10,000 expenditure to review and
revise the police polices. In 2009 the City Council budgeted for capital expenditures, but froze capital
spending to prepare for proposed reductions in Local Government Aid (LGA). As a result of the proactive
decision of the Council, the City showed a surplus of revenue for the year 2009. Therefore, if the City
allocated approximately 50% of the surplus to fund one time expenditures, the 2010 budget could be
reduced. The remaining surplus could be designated reserve balance to increase the reserve balance to
prepare for continuing reduced aids. Finance Officer Lori Bartlett presented the Council with a list of
projects that totaled $ 92,000, all of which could be funded through the 2009 surplus. One of the projects
on the list included dredging of the Millstream Pond. Their was some discussion on whether the project
was needed or could be delayed. The Council agreed to place the transfer of $ 92,000 to the capital fund
on the September 2, 2010 City Council agenda and requested staff provide additional information on the
dredging project.
Bartlett stated that she had contacted the Stearns County Auditors Office and they were able to provide
very preliminary data regarding St. Joseph's growth. It is anticipated that the net tax capacity for the
budget year 2011 will decrease approximately 4.2 %. In addition, the tax records indicate that
uncollectible taxes have increased approximately 1 %, with St. Joseph collecting 96.4% of the total taxes
payable.
When questioned if the proposed preliminary budget included levying the maximum allowed, Bartlett
responded it does not. The current legislation allows the City to levy back the LGA that has previously
been un- allocated by the Governor, the proposed budget does not recapture all of the loss. The Council
concurred that since the budget at this time is preliminary and the City can reduce the budget once the
final growth numbers are available, the preliminary budget should be established at the limit established
by the Department of Revenue. The Council reaffirmed that the budget will be reduced once the impact
can be determined. Staff was directed to prepare the preliminary budget resolution for the September 2,
2010 Council meeting.
7(a):5
EXTRACT OF CITY COUNCIL MINUTES
SEPTEMBER 2, 2010
TRANSFER OF PROJECT FUNDS
Operating Fund Transfer: Bartlett stated that during the budget discussions, they discussed where the
City ended in 2009 with respect to the General Fund. The City's goal is to have 4-6 months of working
capital in reserve. After the Audit, the City came in close to 6 months in reserve and staff is now
proposing to use part of that equity to fund some projects that have come our way through State and
Federal Mandates. The total of those projects is $92,000. She stated that those funds can be transferred
while maintaining a working capital reserve of 5.2 months.
Loso made a motion to authorize the 2010 operating transfers as presented. The motion was
seconded by Wick.
7(a):6
crry of rn: i
MEETING DATE: September 2, 2010
AGENDA ITEM: Transfers
SUBMITTED BY: Finance
Council Agenda Item 9 b
BOARD / COMMISSION /COMMITTEE RECOMMENDATION: N/A
PREVIOUS COUNCIL ACTION: The City Council made a decision to forego funding the Capital
improvement Plan (CIP) budgets for 2008 and 2009 due to reductions in State aids (LGA). The City
Council discussed transferring half of the 2009 general capital budget to the capital reserve fund for
possibly funding the projects listed below. Due to the balance of the 2009 working capital reserves in
the General Fund, the Council determined a portion of the 2009 capital budget may be reallocated while
still maintaining a working capital reserve of 5.2 months. The Council's policy is to maintain a working
capital reserve of 4 -6 months. The City Council approved restoring the EDA capital budget in July..
BACKGROUND INFORMATION: Preparing the 2011 budget became difficult as a result of new mandates
imposed, continued reductions in State aids, and decreased market values. Rather than budget for the
following one time projects, Department heads requested authorization to reallocate the funds
previously budgeted through the CIP that were held in reserve. The Council discussed the projects
below and agreed by consensus to move the items forward for Council consideration and possibility
adoption. T
Repair City Hall Sidewalks
$
5,650
Park Terrace Feasibility Study
$
30,000
Millstream Pond Dredging
$
12,000'
Computer /Software Updates
$
10,000
CR 121 /College Ave Seal Coating
$
12,850
Police LEXIPOL Policies
$
5,000
OPEB Update — GASB
$
1,500
Sign Reflectivity Survey /Plan
$
10,000
Remodel Admin Spaces
$ 5.000
Total
$92,000
Note: Millstream Pond was last dredged in 1999 — 2000.
BUDGET /FISCAL IMPACT:
ATTACHMENTS:
$92,000 between funds
2010 Operating Transfers
REQUESTED COUNCIL ACTION: Authorize the 2010 operating transfers as presented.
9(b):1
7(a):7
-,,J�.,�n��1 CITY OF ST. JOSEPH
\Y'V� U -itvo}stio'c p h.com
January 13, 2011
DN R Waters
Attn: Dan Lais
940 Industrial Dr. S; Suite 103
Mn mstrator Sauk Rapids MN 56379
(uci}' V,`evrens
RE: Dredging Millstream Pond
M'Ivor
Kick Schultz Dear Mr. Lais:
The City of St. Joseph is requesting authorization to perform maintenance on the holding pond
Steve Vr nk located in Millstream Park under DNR Permit No. 85 -3010. The purpose of the maintenance is
Steve crank to remove waste and sediment from the pond and increase the depth
[301) Lc�so
Koice Symanietz The pond is approximately 150'x 200' in size and I' in depth. The City is requesting
D,il T \k" 1A, authorization to excavate sediment from the Millstream Pond, increasing the depth by four to
six feet. All sediment and spoils will be removed and hauled off site to private site.
The City Council had funded the routine maintenance and we would like to secure the necessary
permits to begin work as soon as possible. Therefore, please advise the City as to whether or
not the project can proceed or if additional information is needed.
Sincerely,
CITY OF ST. JOSEPH
r�Jud Weyrens
ministrator
cc: Terry Thene, Public Works Director
Randy Sabart, City Engineer
zs C.ollc e , <�vcnuc orth (�C1 Box r�68 Saint loseph, �'linnesota ti6374
Phone 32 o.3cr3 201 I "ax 320 363_0342
7(a) :8
Minnesota Department of Natural Resources Minnesota I
Division of Waters
940 Industrial Drive S. #103
Sauk Rapids, MN 56379 SCAI
320 - 255 -4279 ext. 232 DEPARTMENTOE
NATURAL RESOURCES
January 28, 2011 RECEIVED
Judy Weyrens, Clerk JAN 3 1 2011
City of St. Joseph
PO Box 668 t.;i1 '.` I r
St. Joseph, MN 56374
Dear Ms. Weyrens:
Maintenance, Permit 1985 -3010, South Fork of the Watab River, Stearns County
We acknowledge receipt of your request dated January 13, 2011 for maintenance work
on Millstream Pond under Permit 1985 -3010.
In accordance with Special Provision #17, you are hereby granted authorization to
complete the maintenance work associated with the original terms of Permit 85 -3010
(attached). Maintenance work must take place in the same 150' x 200' area, and to a
depth of four (4) feet. All spoil material excavated must be hauled off -site to an upland
location and stabilized to prevent erosion and transport to other water resources. Also,
adequate precautions must be planned during excavation to prevent silt and suspended
particles from being washed downstream (i.e. staked silt fence at the Millstream pond
outlet). All other terms and conditions of the original permit remain in effect.
All maintenance work must be completed by March 15, 2011.
Enclosed is a new permit card, which must be conspicuously posted at the project site
during maintenance. Also enclosed is a contractor form which should be completed and
given to the contractor prior to project start. If you have any questions, please feel free
to contact me at the above phone number and/or address.
Sincerely,
Aalw'z�
Marshall Deters
Area Hydrologist
Enc.
C: Stearns County SWCD
Stearns County Environmental Services
USCOE
Regional Manager
St. Paul EWR Permits
Mike Martin, Conservation Officer
Wildlife, Sauk Rapids
Fisheries, Montrose
www.mndnr.gov
AN EOUAL OPPORTUNITY EMPLOYER
PRINTED ON RECYCLED PAPER CONTAINING A MINIMUM OF 10% POST- CONSUMER WASTE
7(a):9
THIS PAGE INTENTIONALLY LEFT BLANK
7(a):10