HomeMy WebLinkAbout[05b] Seal Coating Parking LotRAW
Fire Board
Agenda Item 5 - B
MEETING DATE: May 3rd, 2011
AGENDA ITEM: Seal Coating Parking Lot
BACKGROUND INFORMATION: The parking lot at the Fire Hall was last seal coated in 2008 by Seal King
and is budgeted to be done every two - three years. In 2008 Seal King charged us $3,333.08 which
included the restriping of the parking stalls. Terry, from the maintance department, had Aztec into give
him a bid on resealing some city streets and I asked him to get me a bid on the Fire Hall also. According
to Aztech, they feel that the tar needs to be rejuvenated by putting the rock base down. They said that
sometimes all the sealing does is make it look black for a while, but what the parking lot needs, is to
have the rock base to help it last longer. They did not offer a written quote, but said if we would do it
when they are in to do the city streets, it would be about $2,550.00 (2962 sq yd at .85 cents) plus the
cost to have someone come and restripe the lot. Seal Kings bid for sealing and stripping is $2,674.00
BUDGET /FISCAL IMPACT: $2,674.00 - $2,900.00
ATTACHMENTS: yes
REQUESTED ACTION: Get feed back from fire board and have them ok the sealing of the lot. '(we do
budget for this every year and have a balance of $21,066.92 after 2011)
rte._ _r
Propo sd Date
April 21,2011
KING
MAL ,
GREG RAKOTZ
P.O. BOX 42 SA U K RA PI D,-A' M N 56379
Proposed
Completion
PROFESSIONAISFALCCATING 32A29.5464/ 1.866.689.5454
ANDASPHALTREPAIR www.sedking.com
PROPOSAL SUBM ITTED TO: WORK TO BE PERFORM ED:
Ca Wwy. SFD
SEALCOATING: �(
Cary cW. JEFFT
OTCRACKRLLING: YES
&red:
T A EPHALT REPAIR: NO
WylWeVir ST JOSEPH, M N 56374
STRIPING: YES
Tdg1W0F8 c
SI NEEPI N G: YES
D ESCRI PTI ON OF WORK
TOM PERFORM ED
SELCOATING:
1. Power edge grass along both sides of asphalt creating a neat and manicured finish.
2 H igh power blowers and rotating gas powered sweepers remove dirt and debris from asphalt
surface prior to the application of Seal King seeder.
3. Oil Spots are lightly scuffed and treated with a special oil primer ensuring a good adhesive
seeder bond over fresh oil.
4. Furnish and apply heavy duty coating of Seat King professional grade seeder.
5. Sealer will be applied using professional applicationstools and equipment.
SEALCOATI N C3 PRICE: sq. ft. _> pet sq. ft =>
H OT CRACKFI LLI N G
1. All pavement cracks 114' and larger will be cleaned of debris and filled with a hot 400
degree professional crack filler. DOT CERTIFIED CRACK FILLER
2 "Hot rubber filler" applied between GarageApron, Sidewalk and Street.
HOT CRACKFI LLI N G PRICE ft => per ft => INCLUDED
H OT ASPHALT REPAIR
1. Hot asphalt repairs using federally spec asphalt, apron repairs and patching.
ASPHALT REPAIR PRICE: sq. ft. => per sq. ft =a WA_
PING
1. Parking lot line striping using (Airless, Gram Line Lacer) commercial grade traffic paint
White or Yellow. A.D.A COMPLIANT.
STRIPING PRICE: ft => perft. => Am OR
TOTAL COST INCLUDING ALL PROC®URESABOVE:
SUMM
I M1
TH E SEAL KI N G D I FFEREN CE:
:1 HIGH PERFORMANCE PRODUCTS
Liquid asphalt suers in conjunction with high performance polymer additives and silica
sand give our material the durability to stand up to extreme climate Conditions. Our
crackfillers are premium hot rubber material preventing water penetration that can cause
heaving and shifting asphalt.
PROPER MIXING EQUIPMENTAND FACILITIES
Seal King stores 6,000 gallons of liquid asphalt sealer which is then pumped into a 1,000
gallon full -sweep agitator tank. Silica sand, high performance additives and water are
blended together. Liquid meters calculate the et amount of each ingredient. All products
are stored in our climate- oontrolled warehouse.
CONDITION OFSALE:
1, TH E TOTA L CONTRACT SHALL BE PA I D UPON COMPLETION. THANK YOU.
2 Any balance unpaid after 30 days is subject to a finance charge of 18% per annum (1.5% per month).
3. This contract shall be completed with reasonable promptness by the Contractor, but the Contractor shall not be
responsible for delays or failure in completion, caused by weather unfavorableto carrying outwork involved, fire
explosion, failure of equipment, strikes, differences with workmen, compliancewith orders of agovernment
agency, interruption in delivery of materials, or from any cause beyond his reasonable control.
4. The contract price does Ind ude taxes (no extra charges).
5. The Contractor shall indemnify the Owner from all claims because of any damages sustained by any person or
property on account of the operations of the Contractor in carrying out this contract.
a This contract contains the entire agreement between the parties. There are no oral promises, agreements, or
warranties affecting it. Any alteration or deviation from the abovequantitiesand specifications or other changes It
the contract must be made in writing, and executed by authorized representatives of the parties.
THESEAL KING GUARANTEE:
Choosing Sad King ensures you will reodvethehighed quality prcducts and prafesdc nal
service if for any relisan you arena satisffedwith your Sed King epplia#ic n, weplrorriiiseto
oarred theprodlern at noectra cod to ON LY if we are notifed before the first snowfall or
hard frost that yee
ACCEPTED (Owner) SEAL KING (Cmtmdarj
BY (SfgrrQh"atAuUWzedRWroaWadvy DAIEACCEPTED 1BY (ZVwftm0rAufi'WdAdRqWQWddW