Loading...
HomeMy WebLinkAbout[08a] Pedestrian Trail along CR2Probable Costs The opinion of probable cost summary is indicated in Table 1. The following costs are based on estimated 2011 construction costs. The estimate assumes that both phases of trail design/construction would occur at the same time and in association with the construction of CSAH 2: Table 1 O inion of Probable Cost Summary Phase I Minnesota Phase II Street/CSAH 2 Minnesota North' Street 4 Total Construction $445,100 2 $95,500 $540,600 Decorative Trail Lighting $67,000 $53,000 $120,000 Subtotal Construction $512,100 $148,500 $660,600 Contingency $51,200 $14,900 $66,100 Engineering 3 $74,000 $9,900 $83,900 Soil Borings $3,200 $800 $4,000 Wetland $6,600 $0 $6,600 Reporting/Permitting Wetland Mitigation $25,000 $0 $25,000 Legal and Administrative $7,700 $2,300 $10,000 TOTAL WITH LIGHTING $679,800 $176,400 $856,200 TOTAL WITHOUT LIGHTING $612,800 $123,400 $736,200 Notes 1. Assumes the trail begins near the green "St. Joseph Population" sign on CSAH 2 2. Add $60,000 for decorative railing upgrade at river crossing (box culvert) - chain link fence estimated. Cost includes $127,500 for three box culvert extensions. 3. Assumes approximately 40 construction days w /part-time observation (RPR). 4. Costs do not include any potential land acquisition or easement costs. W N tD n N 1p, N V) 0 m 0 O D 3 O J LO CD O J (D J f C) 0 n / T) 0 Cn 0 N O (D X O. J