2011 Park Terrace Subdivision
Improvements
Public Improvement Hearing
April 14, 2011
Randy Sabart, PE
Existing Conditions
• Streets
— Reconstructed in 1985
— Seal coated in 1997
— Urban pavement design (curb and gutter)
• Light 5 -7 ton structural design
— Paved width: 32 feet face -to -face
—Deteriorated pavement surface z
Alligator /fatigue cracking
Block cracking
Large transverse cracking'
• Weathering',n r:itk:
Existing Conditions
• Sanitary Sewer
— 12" clay pipe on Birch St (east of 411 Ave NW)
— 8" vitrified clay pipe installed in 1960
• Located in back yards
• No dedicated utility easements
— Typical clay pipe deficiencies observed:
Root intrusion
Cracked or broken pipe
Offset or open pipe joints
• Cut -in /protruding service taps
Public Imrprovement Hearing Presentation
Project Location
• Park Terrace
a. 0-
Subdivision
—4 th Avenue NW
t,
.. 1{ - r', �1 I, k
— 51h Avenue NW
— Ash Street W
— Birch Street W
— Minnesota St
• Alternates
'.! 'm
—Old Highway 52
— Birch Street W
Existing Conditions
• Drainage
— 12" — 15" storm sewer on 4'h Avenue NW
• Portions constructed 1985 (so. Ash St.) &
1960's
— 12" storm sewer on Birch St W (at 4th Ave NW)
• Constructed in 1985 and 1960's
— Drains north through Hollow Park Subd. And
discharges at South Fork Watab River
— Larger volumes of run -off observed at Ash St/4th
Ave NW intersection
— Ponding observed on Birch St near 4'h Ave NW
Existing Pipe Conditions
aimm
No manhole kvart Bmkan p4m Rods at service
4/14/2011
2011 Park Terrace Improvements
Existing Access Conditions
Existing Conditions
Water main
— 1" - 1 '/4" copper water mains (1960)
Ash St
• So. side Birch St (W of 4th Ave NW)
No. side of Ash St
E side of 4th Ave NW
— 2" and 4" cast iron water mains (1960)
• No. side Birch St (W of 4th Ave)
411 Ave NW
511 Ave NW
Proposed Project Alternatives
Option 1
— Construct new 6 " -10" sanitary sewer main in street
• Construct new building service pipe to homes
• Abandon existing sewer & manholes
— Construct new 6" water main in the street
• Reconnect building service pipes in the front yards
— Reconstruct storm sewer along 4th Ave and Birch St
• Extend new storm sewer to 5- Ave on Ash St
— Reconstruct 32 foot -wide urban section (C &G)
• Reconstruct driveways in kind
4/14%2011
Existing Access Conditions
Existing Conditions
Water main
— 6" ductile iron water main (1985)
• Only one home connected to 6" water main
— Existing pipes buried in front boulevards /yards
and not in the street
— Staff have reported calls about low water
pressure experienced in neighborhood during
hydrant flushing operations
— Existing water main sizes less than 6" do not
meet current standards for water mains
providing domestic flows & fire protection
Public Imrprovement Hearing Presentation 2
-
c o
�z
O v) w
O z�
u7 �
Public Imrprovement Hearing Presentation 2
2011 Park Terrace Improvements
Proposed Project Alternatives
Option 2
— Rehabilitate existing 8" sanitary sewer mains
Cured In -Place Pipe (CIPP Methods — "pipe liner)
Apply CIP coating on manholes
• Indiv. sewer services would not be rehabilitated
— Construct new 8" water main in the street
• Reconnect building service pipes in the front yards
— Reconstruct storm sewer along 40 Ave and Birch St
• Extend new storm sewer to 5'^ Ave on Ash St
— Reconstruct 32 foot -wide urban section (C &G)
• Reconstruct driveways in kind
— Dedicate public utility easements for utility access
Project Alternatives
Flatten slopes at Centennial Park w /excess
grading materials generated by project
Alternate A
— Old Highway 52
• Construct 150 LF new 8" sanitary sewer to locate
sewer to the street from the side yard
• Reconstruct 8" water main (replace 1973 CIP)
• Reconstruct disturbed portions of street
Alternate B
— Birch Street W (between Old Hwy 52 & 2nd Ave NW)
• Reconstruct existing 12" clay pipe
• Reconstruct 8" water main (replace 1960 CIP)
• Reconstruct disturbed portion of street
a I
va 0 I
t4Z r '
p O
,t
.%�
PIN,
Cured In -Place Pipe Animation Clip
Proposed Improvements
Street
– 32 foot -wide urban section (C &G)
• Redaim /salvage aggregates where possible
– Driveway reconstruction in kind
– Turf restoration (sod)
4/14/2011
Public Imrprovement Hearing Presentation 3
161. 16'• 861, CWCRETF
CURB 8 GUI IEP
—SL
ARIES
MIN. /A[1 YAK
SE ORti01 ORE 1.Oi VARIES
0:1 YIR• /�'
5011
—2- BITWIROUS KE1R Cow"
5' IWSOIL 8 SOD
BITWIYOUS TACK COAT
1' BI TUY I..S HOH-KLAR C-11
—6' AGGREGATE BASE. CLASS 5
. I6'- BIRCH STREET
R PROW M AVEWE TO OLO PICRRA• 52
4/14/2011
Public Imrprovement Hearing Presentation 3
2011 Park Terrace Improvements
Opinion of Probable Project Costs
Includes Alternate A Construction (Old Hgfrway 52).$27,600
Includes Alt-te B Construction (Birch Street W): $116.300
':-We, All ZW A Construction (Old Hghway 52): $26,400
' Iraludes Ab W B Construction (Birch Street W): $117500
Preliminary Special Assessments
• Assumptions
- Assessments based on benefitting footage for
street and no. of units for utilities
- City would not assess sewer service
reconnection costs
- No water main assessment for residents on
511 Avenue due to existing 6 -inch water main.
However, water services assessed
• Reconstruction Project Costs
- Practice: 60% assessed, 40% City subsidy
• Interior lots: 100% benefitting front footage
Preliminary Funding Allocations
Utility Option 1 - Sanitary Sewer Reconstruction
Option 1 with
Sanitary Sewer
Reconstruction
Option 2 with
Sanitary Sewer
Rehabilitation
Construction
1 $1,516,000
2 $1,365,600
Contingency
$151,600
$136,600
Engineering
$295,600
$266,300
Geotechnical Investigation
$4,700
$4,000
Legal& Administrative
$30,300
$27,300
Financing
$151,600
$136,500
TOTAL
$2,149,800
$1,936,300
Includes Alternate A Construction (Old Hgfrway 52).$27,600
Includes Alt-te B Construction (Birch Street W): $116.300
':-We, All ZW A Construction (Old Hghway 52): $26,400
' Iraludes Ab W B Construction (Birch Street W): $117500
Preliminary Special Assessments
• Assumptions
- Assessments based on benefitting footage for
street and no. of units for utilities
- City would not assess sewer service
reconnection costs
- No water main assessment for residents on
511 Avenue due to existing 6 -inch water main.
However, water services assessed
• Reconstruction Project Costs
- Practice: 60% assessed, 40% City subsidy
• Interior lots: 100% benefitting front footage
Preliminary Funding Allocations
Utility Option 1 - Sanitary Sewer Reconstruction
ConaWCeon
Category
Special
Assessment
City SubaWy
Total
Streetend Restoration (60140)
'5471,800
$314,500
$786,300
Memorial Park Sbpa Fhtdnbg
$0
327,100
527.100
Cknton Vi, Sewer Resign @ Park
$0
$9,700
S9700
Sa-ry Se Mein (60/40)
$183,100
$122,000
$305,100
S.-, Sauer Servloes
$0
$340.300
$340,3DD
Water Main(60140)
$138,400
$92,300
$230, 7D0
Wafer Main Realign @ S° AVelPark
$0
59,300
39,300
Water Sennces(60/40)
$49.100
$32.800
$81900
Storm Sewer
30
$155,400
$155.400
Alternate A -OW H91,,sy 52
$0
$39.100
$39,100
Alternate B - Birch St W of 2'° Ave
$0
$164.900
$164900
TOTAL
1 3842.400(39.2 %)
$1,307,400(60.8 %)
$2.149.800
' Inckdes an at $64.306 the CM of St Joseph woUd pay es a bsnef" lot owrr,
Opinion of Probable Project Costs
Construction
Category
Option 1 with
Sanitary Sewer
Reconstruction
Option 2 with
Sanitary Sewer
Rehabilitation
Street and Restoration
1$813,400
1 $755,900
Sanitary Sewer
2$314,800
$399,700
Sanitary Sewer Services
$340,300
$106,700
Water Main
$$240,000
$230,300
Water Services
$81,900
$81,600
Storm Sewer
$155,400
$155,100
Altemate A -Old Highway 52
$39100
$40,300
Alternate B- Birch St W of 2- Ave
$164,900
$166,500
TOTAL
4$2,149,800
4$1,936,300
1 Im"s an est. $27,110 for Memorial Park slop g,adkrg
' Incktles an est. $$9,700 far Clhton VShge sewer reakgmm through park
Irakdes an est. 39.300 for 5'" Avenue NW water main reakgnment at park
'Goes ratm etemporary /permanent easementacqua2on coats
Preliminary Special Assessments
• Reconstruction Project Costs (cont'd)
Corner lots: 100% short-side footage and
50% long -side footage
• Irregular lots: Lot area divided by average lot
depth - 110 feet (130 feet along 511 Ave) -
to determine average front footage
• Assessment payment term and interest rate
to be determined by council prior to
Assessment Hearing
Preliminary Funding Allocations
Utility Option 2 - Sanitary Sewer Rehabilitation (Lining)
Construction
Category
8paolal
Assessment
City 9utisley
Total
Streetand Rectoratbn(60/40)
15437,300
$291.500
$728,800
Memoral Park Sbpa Flattering
s0
$27.100
327100
Sanitary Sewer Main (60140)
$239,800
$159,900
$399,700
S.-, Sewer Services
$0
$106.700
$106,700
Water Main(60/40)
$138.200
$92,100
$230,300
Wass, Services (60/40)
$49,100
$32,700
$81,800
Stone Sewer
50
$155,100
$155,100
Alterrote A- OM Hqg y 52
50
$40,300
$40,300
After - B - Birch St Wof 2n°Aw
s0
$166,500
$166,500
TOTAL
$864,400(44.6 %)
$1.071,900(55.4 %)
$1.936,300
' lmkdes an set $59.606 the Cey of St. Joseph would pay as a benef n,; lot owns,
4/14/2011
Public Imrprovement Hearing Presentation 4
2011 Park Terrace Improvements
Preliminary Assessment Rates
Utility Option 1 - Sanitary Sewer Reconstruction
Construction
Cabgory
ADProa. le nits
Foobge /NO. U Assessab
Special
Assnsm.rt Rate
Strest and Restoration (60/40)
5217 LF
390.44/LF
Cenhmal Park Sbpe Fhttenng
Reconstruction
$0
Clnton Vi. Seeer Realgn @ Park
0 Units
$0
SaNbry Sewer Main (60 140)
49 Units
$3,736 1Un,t
Sanitary Sewer Services
46 Unite
$0
Water Main(60/40)
33 Units
$4, 193/Un4
Water Main Resign @5-AV lPark
0 unth
$0
WabrS.— a(60/40)
44Un.
$1,117Nrvt
Storm Sewer
81,177
$0
Aeerreb A— Old Hgl,wy 52
EO
Alternate B — Bich St W of 2n 1 Ave
516,281
ED
Preliminary Special Assessments
Typical 80400t Wide Interior Lot Example
Assessment
Option 1 with
Option 2 with
Street and Restoration (60/40)
Sanitary Sewer
Sanitary Sewer
Category
Reconstruction
Rehabilitation
Soa.tand Restoration (60140)
$7,235
56.706
80 Lineal Feet
49 Units
$4 89VUn,t
Senibry Sewer Main Isom)
$3736
$4.894
1 Unit
33 UnLS
$4.187 /Unit
Water W.(60/40)
$4.193
$4.187
1 UM
44 Urk6
$1.115 /Une
Water Service (60/40)
81,177
$1,175
1 Un
$0
ExAMPLE TOTAL
516,281
$16.902
Small Cities Development Program
Assessment Abatement
The City of St. Joseph could apply
• Provides assessment abatement to eligible
households in the reconstruction project area.
• If awarded, the grant would pay for the entire
assessment of all eligible households.
-Grant pays for the assessments that affect very low -
income (VLI) households.
• A VLI household is defined as a household having
a total income of 50% or less of the Stearns County
median income. We would identify how many
households fit this criteria through an income survey.
Public Imrprovement Hearing Presentation
Preliminary Assessment Rates
Utility Option 2 - Sanitary Sewer Rehabilitation
Construction
Cabgory
APProa.
Assess.
Foobge /NO. U nea
Specal
Asxasment Rah
Street and Restoration (60/40)
5,217 LF
$83.83/LF
Centennial Park SbDe Fbthni g
7 Person
$0
Cknwn Vi. Sewer Reakgn ® Park
0 Urkb
$0
Sar Sewer Main (60140)
49 Units
$4 89VUn,t
Sarvbry Sewer Services
MU—
$0
Water Main (60 /40)
33 UnLS
$4.187 /Unit
Water Main Realign @5"AV /Park
a U_
$0
Water Services (60/40)
44 Urk6
$1.115 /Une
Storm Sewer
$0
Albmate A —Oki 11, w—y 52
$0
ABemab B — Birch St W of 2n Ave
50
Seniors & Disability Assessment Deferral
• City Ordinance 38
- Homestead property
- Owner is 65 or older or a Disabled Owner
- Payment constitutes unreasonable financial
hardship per ordinance definitions
• Process
— Apply on forms from the City
— Complete financial disclosure form
— Application deadline: Sept. 1 before asmnts due
— City council to make finding: grant or deny
— Interest accrues on principal
Small Cities Development Program
Assessment Abatement
2010 (Gross) Income
Limits
1 Person
2 Person
3 Person
4 Person
5 Person
6 Person
7 Person
8 Person
823,400
$26750
431.100
$33,400
$36,100
1 $38.750
1 $41,450
1 $44.100
TIMELINE SCDP:
Survey Residents
May — June 2011
Submit Pre - application
Sept. / Oct. 2011
Notification if invited to submit full application
November 2011
Submit Full Application
February 201
Grant Award
April 2012
IF AWARDED:
Clear Grant Special Conditions
April /May 2012
Kick -off Grant Program
June 2012
4/14/2011
2011 Park Terrace Improvements
Preliminary Project Schedule
Survey & design project May- September 2011
Meetings with property owners June
- Review plumbing /basement
• City advertises for bids Sept/October 2011
Conduct Assessment Hearing November 2011
Council award contract January 2012
Begin construction May- October 2012
• Finish construction June 2013
4/14/2011
Public Imrprovement Hearing Presentation 6
Cif
O
U
O
AF IJ
ct
O
O
• O
r-
3 0
�
o+as
0
O
O
LO
f`
r-
0
o
ti
O
CO
0
0
ti
O
T—
0
0
M
OM
(N
0
0
00
00
Ol
0
O
r-
LO
r-
0
O
M
mot'
Oa
0
O
Lo
(D
0
O
M
M
d')
�
L„
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
V
CO
mot'
O
O
LO
O
�-
O
i
T-�
d'
o0
CO
CO
N�
O M a
O
r
OQ. c/a�
NQi
c + Li
Q
N
CV
>I
O
�
O
_
N
C)
•L
O
O
vJ
•
,*,W
U
V
U)
O
m
O
U
v
L
I
-0
cn
U)
?
Q
m
Cl)
cr)
O
Q
Q
I-
L L
c�
c
O N cn
� � o
O) o
0) '
L L
N
c�
(D
> n c
o o c�
E o > E
O L L
0 0 0 m
p p p O
,-oo o-
r,: ti co E
N 0) c a)
6r)Y> 6
Q) a) a)
o
0 0 o c
U U U 0
O
i
�J
U
4�
O
LIJ
ct
O
n�--I
O
O
O
0 0 0 0
0 0 0 0
co(Y) ";I- LO
ti (6 oo ti
L L
5U) _ 6) CO
_ -
i -p i
O O 0.2
U U U U
L L L L-
U) �"'I - "I
O O O O
U U U U
i .. u.
0 0 0 0
Q Q Q Q
_0 _0 -a -0
_D D D D
U U U U
N N
0
0
0
0
0
0
0
O
O
O
C00
CO
M
O
M
O
�
(.0
p
c0
n
N
c`7
C�j
cn
N �=
6,D,
6c}
N
O � �
CL r_
0 M
CD
°r°
O
c°0
c°0
°
°
coo
.�+
cn
L
r-
N
V>
r-
r i
Ef}
to
N
C
O cv
'+'+ •— O
CL V
c
O
>
'^)
V J
N"f
N
L
>
U)
O
U
U
_0
U
O
Q
�
O
U
06
U
J
4-j
N
Q
c
c
0)
p
O
U
U
w
0 0 0 0
0 0 0 0
co(Y) ";I- LO
ti (6 oo ti
L L
5U) _ 6) CO
_ -
i -p i
O O 0.2
U U U U
L L L L-
U) �"'I - "I
O O O O
U U U U
i .. u.
0 0 0 0
Q Q Q Q
_0 _0 -a -0
_D D D D
U U U U
N N
L
Q�
O
O
O)
4-
N
N
..Q
m
c�
Q
O
Q
O
O
CO
O
A
1
N
co
p
co
O
U)
m
c
c�
U)
N
U
C
C)
O
p
p
O
O
O
p
O
p
O
O
O
O
O
O
p
O
p
O
p
O
O
p
M
c-
r
r-
M
'r-
(3)
00
-
(fl
�
r
°)
Lo
o
o
co
C
Ln
ai
M
lq
C0
ai
d'
O
F-
Ef}
co
co
�
6a
�
609
�
N
60}
O
O
O
O
O
O
O
O
O
O
O
^
O
O
O
O
O
O
O
O
O
O
O
o
o
r-
O
M
M
co
oo
�r
r-
O
00
O
C►
,N
M
N
Ef?
6q
N
�7
O
ba
cN
LO
M
CQO
60-
X-
61!>
M
69.
6a
6a
r-
Ef?
6a
N-
63
N
0
i y
C/)
0 0
i
ti
vU
oM
O
60�
O
O
O
el>
O
O
O
O
O
O
O
O
O
^
Q j
7
00
60-
O
60-
O
Olt>
O
Ef}
U>
Ef?
o
cn
00
O
_i
C CU
CD
= =
Q
p
LL
(n (n
)
d
00
i r
O
m
4-1
^
0)
co
Cl-
Q
Q
CL O
c
U
o
N
o
<
LO
O
co
N
^
+-•
L
L.-
O
L
N
p
O
T-
Q
N
O
N
U)
L
O
p U
Q
L
ai
°
a)
(
°/
�
O
m
I-
U
�
co
cn
�
�
i
N
U
L
I
I
M
>
OC
O
co
m
L
L
L
C
cu
M
C
L
L
L
C/)
U
cn
cn
L
Q�
O
O
O)
4-
N
N
..Q
m
c�
Q
O
Q
O
O
CO
O
A
1
N
co
p
co
O
U)
m
c
c�
U)
N
U
C
L
m
C
O
4-
O
N
C
N
c�
c�
c�
O
N
Cn
O
U)
v-
O
U
(D
Cfl
O
Cfl
C3�
Lf•)
4f?
a�
s=
co
U)
a)
U
O
O
00
O
O
r-
O
O
I`
O
O
I`
O
O
M
O
O
00
O
O
T-
O
O
C'7
O
O
LO
O
O
C'7
,},
O
OCT
N
ti
ti
N
U>
O
C)
cy')
C.6
O
�
O
C'7
N
-
CO
CP}
Ln
LO
T-
O
d
GPI*
(
(D
r-
(9
C')
CA
0i
O
O
LO
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
LO
^
d
...�
CA
.Q
CA
N
U>
N
Ef?
LO
r-
ff}
(fl
O
r-
Et}
N
C)
ff}
N
CY)
H?
Ln
LO
r-
}
O
It
EA
CO
C.0
r-
LO
LO
•�
O
to O
r_ =
m
(n
rn CD
O
a�
Q
O
O
C'7
O
U).
O
C:)
00
O
U>
O
O
N
O
O
�
O
6
O
O
^
(D
i ch
N
c
d
V.. i
+''
N y
(n N
N
Q
-
O
tQ �
000
_ cn
I
>
.� N
Qi C
L' O
Q.
p
O
c
o
N
LO
Q
N
0
•�
>
0V O
i�
O
��
N
0
�_
Ct1
O
_
O
O
O
O
2
4-
U)
J
Q
c c)
O
�
�
a�
a�
°
O
a
N
U
O
m
I
~
U
0-
>
L
Q
m
4,
(n
O
O
C6
N
(n
CQ
C6
(n
L-
Cii
L
c >l�
>
O
Cn
C
�
Q
Q
L
m
C
O
4-
O
N
C
N
c�
c�
c�
O
N
Cn
O
U)
v-
O
U
(D
Cfl
O
Cfl
C3�
Lf•)
4f?
a�
s=
co
U)
a)
U
i
O
i
N
Co C
.O
Q
N
N
Q
LL
CD
O
Ef}
O
C
c�
(f}
O
cq
07
Efl
O
U).
C
ti
�-
Ef}
O
ER
O
61:>
}
O
6c>
V
_
X
J
(n
U)
w
O
OL
N Z
C
C
C
Q
N
O
N
LL
Q
E.
C/)
N
L
Q
�
r
O
�
O
Q
N
LO
� CN
-
O
4-
• -
O
O
:F:�
C
LL
0)
O
U)
L
L Q
O >'
N
(�
U
0-�
�
O
N
cn
d
.�
L
L
L
_0
O
L
m
+�
0 U
co
(D
U
L
U
cn
I
c
Q
L
O
W
W
W
L
L
m
C6
c6
O
N
N
cn
N
U
U
RS
CO
C�
co
CO
Q
Q
Q
}+
t/1 —
d
4-0
cu
.0 d
� E
O- to
N
N
LL
-1
(')
00
O
(f}
O
(f}
C
O
00
O
U>
C
ti
00
T-
C)
6c>
6�-
9-
60?
Ec.�
U>
ia
N
E
O
O
iy%1
a Q
L
�t
d
M
O
d
Vi
O
LL
a�
I
Ca
N
Lt-
es
O
9
O
�1J
Q
L
N
Q
O
(II
c
r
>,
O
Q.
O
C)
N
LO
L
O
(D
>%
> a)
M
ca
N
O
�_
O
=
�j..i
S..
L
L
C
}�
cu
U
L
N
N
O
O
m
O
O
(n
U
L
I
I
:E
2
n
C
m
Q
co
M
L--
L- L-
L-
c
c
N
C
o
0=
C
-1--�
4--�
+-,
L
�fL
L
�
�
0
U
3:
U')
Q
Q