HomeMy WebLinkAbout[08a] Root Foaming rry {, owr+ xost+,rit Council Agenda Item 8(a) MEETING DATE: October 6, 2011 AGENDA ITEM: Root Foaming SUBMITTED BY: Public Works Director, Terry Thene BOARD / COMMISSION /COMMITTEE RECOMMENDATION: PREVIOUS COUNCIL ACTION: In 2008 the City Council authorized the root foaming of 8,398 feet of sanitary sewer mains. BACKGROUND INFORMATION: In 2008 the city root foamed 8,398 feet of clay sanitary sewer mains in the City, staff reviewed the effectiveness of the initial application and questioned the results. The company reapplied the foam in 2009 at no cost to the City; the results after the second application were good. The application should be reapplied on a two year cycle to keep roots that re -enter the pipe killed. The foam has an herbicide that will kill most roots that have worked into the sanitary sewer piping. Roots in the old clay sanitary sewer system of the City will be the main cause of sanitary sewer backups if not dealt with. This will reduce staff hours by reducing the need for root cutting. BUDGET/FISCAL IMPACT: $13,352.82, Sewer Funds budgeted ATTACHMENTS: Request for Council Action 8(a): 1-2 CIP Extract, WW -1108 8(a):3 -4 REQUESTED COUNCIL ACTION: Approve the expenditure of $ 13,352.82 for the root foaming of 8,398 feet of sanitary sewer mains that were completed in 2008 an 2009 THIS PAGE INTENTIONALLY LEFT BLANK f: WW -1108 CITY OF ST. JOSEPH CAPITAL IMPROVEMENT PLAN 2011 - 2015 PROJECT TITLE: Sewer Lining/Televising (TOTAL COST: $20,000 /year 2011 BUDGET: $20,000.00 (PROJECT CATEGORY: Improvements other than Bldg DESCRIPTION: JUSTIFICATION: 'Account Code: E601- 49450 -530 Much of the original Village site has old clay tile sewers servicing the area (approximately 4.4 miles of clay tile). The sewer mains are getting close to reaching their useful lives and will need replacing soon. To determine which sewer mains need replacing Public Works can televise the sewers to assess how well the mains are currently functioning. Ideally, the mains would be replaced when a street reconstruction project is planned. Roots growing into the clay tile mains can be treated and cut back on an on -going basis to keep the mains from collapsing. The mains that cannot wait for a street reconstruction project can be lined to add useful life to the existing mains. The existing $20,000.00 budgeted for lining the old clay tile is not sufficient to get a cost effective price. Mobilizing equipment is estimated to be $9,000. A $20,000 budget only deals with roughly 500' of pipe being lined. The City was quoted $34.00 per foot for approximately 500 feet ($17,000). The City was quoted $26.36 per foot for 8,783 feet ($231,519.88). The larger the footage the better price received per foot. Televising and root foaming should continue to avoid sanitary sewer backups as much as possible. PROJECT COSTS AND FUNDING SOURCES BY YEARS: Project Funding Prior Source Years 2011 2012 2013 2014 2015 Total Sewer: Improvements 59,352.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 159,352.00 PROJECT COSTS PROJECT STARTING DATE: 2008 Preliminaries Land Acquisition PROJECT COMPLETION DATE: 2010 Construction Equipment and Other 159,352.00 NEIGHBORHOOD: Total $159,352.00 Presented to the City Council on Approved Denied Tabled Comments Approval to Purchase Date Authorizing Initials Date ENT-4 THIS PAGE INTENTIONALLY LEFT BLANK