PROJECT TITLE: Street Overlays ITOTAL COST: varies each year
2012 BUDGET: $75,000.00 (PROJECT CATEGORY: Improvements other than Buildings
DESCRIPTION: Street Maintenance Program
JUSTIFICATION: (Account Code: Will depend on bond issue /E490 -43120 -530
Street overlays prolong the life of the streets before a total reconstruction is needed. The City also sealcoats /crack fills the
streets annually to prolong the street lives (see Public Works CIP). The street overlays are anticipated on an as needed basis
at about the 15 -20 year mark after construction/reconstruction. Overlays are paid for by levy and special assessments. The
2012 overlays are proposed to be on Cedar Street, Date Street, 1st Ave NW, CSAH 75 to Date Street, Cedar Street to Date
Street, Minnesota Street east of 20th Ave, and 1st Ave NE. The street overlays follow the Pavement Management Plan
(PMP).
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
General Levy:
Streets 0.00 0.00 39,000.00 0.00 0.00 0.00 39,000.00
Debt Levy - Streets 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Property Owner
Special Assessments 0.00 75,000.00 68,000.00 34,095.00 232,515.00 135,194.00 544,804.00
PROJECT COSTS
PROJECT STARTING DATE: 2012 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: ongoing Construction
Equipment and Other
NEIGHBORHOOD: Total $0.00
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -1
ENG -1211
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: CSAH 2 Realignment Trail TOTAL COST: $856,200
2012 Budget: $856,200 (PROJECT CATEGORY: Regional trails
DESCRIPTION: CSAH 2 Realignment - trail between MN Street & CSAH 75
JUSTIFICATION: (Account Code: 200 - 45202 -580
Stearns County is planning the realignment of County Road 2 in 2009/2010. Stearns County has indicated
construction would be let in fall 2012 with construction in 2012. Stearns County is paying for a rural 2 lane
roadway section. The City Council opted to leave the bypass as rural in 2008. Additional costs to the city may
be incurred for trail construction from Minnesota Street W to CSAH 75. Estimate does not include segment
from Minnesota Street to County Road 51. Estimate includes phase I and phase II with trail lighting.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
1/2 ¢ Sales Tax 856,200 856,200
PROJECT COSTS
PROJECT STARTING DATE: 2011 Preliminaries $10,000
Land Acquisition $50,000
PROJECT COMPLETION DATE: 2012 Construction $796,200
Equipment and Other
NEIGHBORHOOD: W/N city Total $856,200
Presented to the City Council on Approved Denied Tabled -
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -2
ENG -1214
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Southwest Trunk Sewer 'TOTAL CO: $3,834,000
2012 Budget: (PROJECT CATEGORY: Sanitary Sewer System - trunk
DESCRIPTION: Construct a trunk sewer to serve the SW area
JUSTIFICATION: 'Account Code: E602- 49480- 530/E602 -49480 -510
This plan provides for 6,000 feet of 24 "- 42" trunk sanitary sewer to be constructed along the south fork of the Watab
River, from the existing Main Pump Station to I -94. The pipe will be sized to serve growth to the west from the
current city limits to I -94, and along CSAH 2 southwest to I -94. The plan accounts for a 50' of acquired perpetual
utility easements and 50' of acquired temporary construction easements, or approximately 7.5 acres for each. It is
anticipated that actual construction will depend on potential development tied to CR2 /3 realignment construction. In
2008/2009 the City updated the comprehensive sewer study to include the area to be served by the SW trunk sewer to
analyze the future capacity needs. Easements are estimated to cost $73,000 in 2012.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Trunk Sewer (Main) 1,653,000 1,653,000
Trunk Sewer (Land) 73,000 73,000
Developer Assessments 8,215 2,099,785 2,108,000
PROJECT COSTS
PROJECT STARTING DATE: 2012 Preliminaries $50,000
Land Acquisition $73,000
PROJECT COMPLETION DATE: 2013 Construction $3,711,000
Equipment and Other
NEIGHBORHOOD: SW/W City Total $3,834,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG-3
ENG -1215
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Southwest Trunk Water (TOTAL COST: $1,314,000
2012 Budget: $10,000 (PROJECT CATEGORY: Water Main System
DESCRIPTION: Construct a trunk water main - CSAH 2 to CSAH 75
JUSTIFICATION: IAccount Code: E601 -49430 -530
This plan provides for 4,800 feet of 16" trunk water main between CSAH 2 and CSAH 75 and 12" trunk
watermain along CSAH 75 to 1st Ave NW. It does not include cost for the lateral connections to the adjacent
developments. City Council may consider the option to update the comprehensive water study to include future
development needs along CSAH 2/3. It is anticipated this project may be developer /development driven. No
easement or land acquisition costs are included.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Trunk Water (55 %) 5,000 690,000 695,000
Developer
Assessments (45 %) 5,000 563,800 568,800
Water Revenue 50,000 50,000
PROJECT COSTS
PROJECT STARTING DATE: 2012 Preliminaries $50,000
Land Acquisition
PROJECT COMPLETION DATE: 2013 Construction $1,264,000
Equipment and Other
NEIGHBORHOOD: W /SW City Total $1,314,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG-4
ENG -1216
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Park Terrace Improvements (TOTAL COST: $2,149,800
2012 Budget: (PROJECT CATEGORY: Reconstruct - utilities /street
DESCRIPTION: Street & utility improvements
JUSTIFICATION: Account Code: E602- 49480- 303/E601- 49440- 303/E651 -49900 -303 Unknown -
new debt will be issued
Reconstruction of water main, sanitary sewer, storm sewer, and street in the Park Terrace neighborhood.
Construction includes 4th Avenue, 5th Avenue, Ash Street, and Birch Street. The water main is planned to be
upsized, along with portions of the storm sewer for larger capacity. City Public Works televised the sewer lines in
2008 and killed some roots that were growing into the sewer mains. Staff recommends the project to be initiated by
preparing a feasibility study of the proposed improvements in 2010 with construction possibly in 2011/2012. Council
voted to not continue the project on 9- 15 -11.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
General CIP Reserve 30,000 30,000
Devt Levy
Water Revenue 10,092 10,092
Sewer Revenue 10,092 10,092
Storm Revenue 10,092 10,092
Special Assessments
PROJECT COSTS
PROJECT STARTING DATE: 2010 Preliminaries 39,600
Land Acquisition
PROJECT COMPLETION DATE: 2013 Construction 2,110,200
Equipment and Other
NEIGHBORHOOD: Park Terrace Subdivision Total 2,149,800
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG-5
ENG -1218
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Replace 12" Sanitary Sewer Under CR 75 'TOTAL COST: $409,000
2012 Budget: $394,000 'PROJECT CATEGORY: Sanitary Sewer System - trunk
DESCRIPTION: Replace the existing 12" sanitary sewer line with a 42" trunk sewer
JUSTIFICATION: 'Account Code: E602- 49480 -530
This plan provides for the construction of a minimum 42" trunk sewer pipe to be jacked and bored under CR
75 south of the main lift station. This line will be able to handle increased wastewater flow, including
wastewater carried by the new southwest trunk sewer. Depending upon the timing of the construction, this
pipe will connect to either the existing main pump station or a new upgraded pump station. Staff recommends
the project be initiated with a feasibility study ($15,000) to identify preliminary costs and alternatives for
connections to the head works and wet well at the main pump station.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Sewer Revenue 15,000 394,000 409,000
PROJECT COSTS
PROJECT STARTING DATE: 2012 Preliminaries $15,000
Land Acquisition
PROJECT COMPLETION DATE: 2013 Construction $394,000
Equipment and Other
NEIGHBORHOOD: Old City Total $409,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -6
ENG -1219
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Millstream Park Driveway/Parking /Retain Wall (TOTAL COST: $271,000
2012 Budget: (PROJECT CATEGORY: Parks and Trails
DESCRIPTION: Pave Millstream Park driveway and parking area. Build retaining wall.
JUSTIFICATION: (Account Code: E205- 45202 - 530/490 -45202 -530
This plan provides for paving the existing 39,000 square -foot parking lot and driveway with a three and one -half
inch thick bituminous layer. The existing pavement would be reclaimed. A six -inch aggregate base would be used
along the north drive and an eight -inch aggregate base would be used under the east lot, along the Watab River.
This plan also includes a six -inch curb continuing along the north, east and west edges of the parking lot. A pond
at the south end of the parking lot is included to handle storm water runoff. Millstream Park needs some updating
to correct erosion and drainage issues. The retaining wall will cost around $60,000. In addition, the project will
consider maintaining the old CSAH 3 that is by- passed when the new CSAH 2/3 realignment occurs in 2010/2011.
The CSAH 3 turn-back portion of the project is eligible to be paid for with 1 /2C sales tax revenue.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Special Levy- 1/2¢
Sales Tax 201,000 201,000
General Levy:
Parks 20,000.00 - 10,000 10,000 10,000 10,000 60,000
PROJECT COSTS
PROJECT STARTING DATE: 2015 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2015 Construction 261,000
Equipment and Other
NEIGHBORHOOD: NW City Total $261,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -7
ENG -1209
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Northland Heights- Jasmine Lane (TOTAL COST: $402,000
2012 Budget: $314,400 (PROJECT CATEGORY: Utility /Street Extension
DESCRIPTION: Extend street/utilities along Jasmine Lane
JUSTIFICATION: (Account Code: E435 -43120 -530
The proposed project involves construction of approximately 650 lineal feet of street on Jasmine Lane, east of
Northland Drive. The proposed street will connect Northland Heights to Northland Plat 8, allowing two access
points to the development. Construction of Jasmine Lane is a condition of the Developer Agreement for
Northland Heights.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Developer
Assessments 314,400 314,400
Water Revenue 4,800 4,800
Sewer Revenue 48,500 48,500
Storm Revenue 34,300 34,300
PROJECT COSTS
PROJECT STARTING DATE: 2012 Preliminaries $15,000
Land Acquisition
PROJECT COMPLETION DATE: 2012 Construction $387,000
Equipment and Other
NEIGHBORHOOD: Northland Heights Total $402,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG-8
ENG -1235
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: First Avenue NE Improvements TOTAL COST: $840,000
2012 Budget: $840,000 (PROJECT CATEGORY: Utility extension
DESCRIPTION: Street, water main, sanitary sewer improvements Fir St to Northland Plat line
JUSTIFICATION: lAccount Code: E601- 49440- 5301E602 -49480 -530
Improvements include water main & sanitary sewer between Fir Street and the Northland Plat line. The street
is proposed as an urban section from Fir Street to CSAH 2. Utilities from CSAH 2 to Jasmine lane would be
installed in the ditch to avoid disturbing the pavement.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Special Assessments 840,000 840,000
PROJECT COSTS
PROJECT STARTING DATE: 2012 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2012 Construction $840,000
Equipment and Other
NEIGHBORHOOD: N City Total $840,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -9
ENG -1225
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Old Water Tower Maintenance (TOTAL COST: $500,000
2012 Budget: - (PROJECT CATEGORY: Water System - storage
DESCRIPTION: Interior/Exterior (sandblast and paint) water tower maintenance
JUSTIFICATION: 'Account Code: E601 -49435 -300
Perform general maintenance needed for the interior and exterior of the existing water tower. Since the
preparation of the 2006 Water Tank Evaluation Study, coating maintenance on the existing tower has been
delayed due to an indefinite schedule to construct a second water tower. It is anticipated that the coating
conditions and severity have continued to wear since the last evaluation was conducted. Public works staff has
identified a short-term maintenance need to address the deteriorated access door.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Water revenue 51,829 450,000 10,000 10,000 10,000 531,829
PROJECT COSTS
PROJECT STARTING DATE: 2013 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2013, ongoing Construction $500,000
Equipment and Other
NEIGHBORHOOD: city wide Total $500,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -10
ENG -1246
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: CSAH 2 Water Main Adjustments 'TOTAL COS' $30,000
2012 BUDGET: $0.00 I PROJECT CATEGORY: Improvements other than Buildings
DESCRIPTION: Water main and hydrant relocations for new CSAH 2 alignment
JUSTIFICATION: 'Account Code: E601 -49430 -530
It is anticipated that construction of the new CSAH 2 alignment will require some adjustments to the existing 16-
inch trunk watermain in -place along the existing road ditch. Adjustments may include relocation/adjusting fire
hydrants and gate valves, adding insulation to protect against freezing due to reduced cover over the pipe, and /or
lowering the pipe if necessary. Stearns County's plans are still in the development stage, so it is not yet clear the
extent of the impacts to the City's water main.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Water Revenue 30,000.00 30,000.00
PROJECT COSTS
PROJECT STARTING DATE: 2011 Preliminaries $5,000.00
Land Acquisition
PROJECT COMPLETION DATE: 2012 Construction 25,000.00
Equipment and Other
NEIGHBORHOOD: Western city limits Total $30,000.00
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -11
ENG -1243
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Monument Sign (TOTAL COST: $20,000.00
2012 Budget: 20,000.00 I Equipment certificate
DESCRIPTION: Welcome to St. Joseph sign
JUSTIFICATION: 'Account Code: E490 - 45201 - 530
The current Welcome to the City of St. Joseph sign on the western entrance to the city will be removed when
the County Road 2/3 bypass is constructed in 2012. The current sign is made out of brick and morter that is
not able to be relocated. The proposed monument sign will be relocated in an area that will not interfere with
future development plans and will be visible from the new bypass. The sign budget includes engineering costs
for a granite sign with solar lighting including installation.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
To Be Determined 20,000.00 20,000.00
PROJECT COSTS
PROJECT STARTING DATE: 2013 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE 2013 Construction
Equipment and Other 20,000.00
NEIGHBORHOOD: Total _ $20,000.00
Presented to the City Council on Approved Denied Tabled
Presented to the EDA on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -12
ENG -1245
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: CBD Alley Improvements TOTAL COST $229,000
2012 BUDGET: $45,000.00 PROJECT CATEGORY: Improvements other than Buildings
DESCRIPTION: Sanitary sewer and alley reconstruction
JUSTIFICATION: (Account Code: Will depend on bond issue
Project includes reconstructing approximately 420 feet of alley between College Avenue and 1st Avenue NW and
425 feet of alley between Minnesota Street and Ash Street that has deteriorated. The project also includes replacing
clay tile sanitary sewer. Archive documents indicate the alley was last graded and paved in 1979 and considered for
reconstruction in 2002, but ultimately not reconstructed. It is anticipated the alley would be reconstructed to its
current width of 16 feet and similar in structure to the alley behind the LaPlayette (3.5 - 4 inches of bituminous and
8 inches of aggregate base). The estimate presently does not account for expanded construction for parking in the
central business district.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Debt Levy:
Streets 16,200.00 44,000.00 60,200.00
Sewer Revenue 10,000.00 15,000.00 25,000.00
Property Owner
Special Assessments 28,800.00 105,000.00 133,800.00
PROJECT COSTS
PROJECT STARTING DATE: 2012 Preliminaries $16,200.00
Land Acquisition
PROJECT COMPLETION DATE: 2013 Construction 212,800.00
Equipment and Other
NEIGHBORHOOD: Central Business District Total $229,000.00
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -13
ENG -1244
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Field Street ROW and Construction (TOTAL COST: $2,425,500
2012 Budget: 125,000 'PROJECT CATEGORY Streets
DESCRIPTION: Construction and Right of Way Acquisition - CR 121 to 12th Ave
JUSTIFICATION: (Account Code: Unknown - new debt will be issued
Right of Way acquistion and construction of Field Street from CR121 to 12th Avenue. The road will provide
the southern access for the Graceview development. This portion will be the first portion of the Field St road
and would be constructed as two lanes with a center boulevard with a 4 -lane ROW. The APO has a request in
for federal transportion funds, but the project did not get included in the 2010 transportation bill. Since the
street has regional significance as the southern loop around the city sales tax revenue can be used to construct
this road. Deferred assessments to the south of the road are also considered for this project. In the future,
Field Street will connect to 20th Avenue and the proposed Gateway Commons area near I -94. The projected
costs include debt levy and 1 /2C sales tax funds. The federal funds are not included in this estimate since the
project did not make the 2010 federal transportation bill.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years - 2012 2013 2014 2015 2016 Total
Debt Levy (40 %) 50,000 900,200 900,200
1 /2C Sales Tax (40 %) 50,000 50,000 900,200 950,200
Developer Assessments
(20 %) 25,000 450,100 450,100
PROJECT COSTS
PROJECT STARTING DATE: 2012 Preliminaries $50,000
Land Acquisition $500,000
PROJECT COMPLETION DATE: 2013 Construction $1,875,500
Equipment and Other
NEIGHBORHOOD: South City Total $2,425,500
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -14
ENG -1205
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: SIS Phase 4 (TOTAL COST: $566,820
2012 Budget: $0 'PROJECT CATEGORY: Sanitary sewer pumping
DESCRIPTION: Rehabilitate Upper and Lower Pan Interceptors
JUSTIFICATION: (Account Code: E602- 49480 -418
Part of the St. Cloud Sewer Use Agreement is rehabilitating the interceptor system as deemed necessary. The
City of St. Cloud conducted an extensive analysis of the sewer lines after the January 2008 Lower Pan
interceptor collapse. The interceptor assessment found some sewer lines that would need rehabilitation over the
next few years. In 2012, phase 4 of the interceptor rehabilitation project is scheduled to be completed. St. Cloud
will continue to monitor these interceptors for deteriorization. If deteriorization slows down the phase 4 project
will be held off. St. Cloud will issue a 10 -year debt when the project starts. St. Joseph will make monthly
payments for their share to the City of St. Cloud beginning in 2013. The rehabilitation will occur on the Upper
and Lower Pan interceptors. St. Joseph only shares in 18.69% the cost of the Lower Pan interceptor per the SUS
agreement. The total project cost is estimated at $3.968M, St. Joseph's share is $566,820.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Sewer Revenue 0 566,820 566,820
St. Cloud Debt Pmts
PROJECT COSTS
PROJECT STARTING DATE: 2013 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2013 Construction $566,820
Equipment and Other
NEIGHBORHOOD: Entire City Total $566,820
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -15
ENG -1231
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Lake Wobegon Trail Extension (TOTAL COST: $1,736,694
2012 Budget: - (PROJECT CATEGORY: Streets
DESCRIPTION: Extend Lake Wobegon Trail from St. Joseph to Waite Park
JUSTIFICATION: ,Account Code: Unknown - new debt will be issued
Right of Way acquistion and construction of the Lake Wobegon Trail extension from St. Joseph to CR 138 in
Waite Park- based on the APOs 2010 -2013 Transportation Improvement Program (TIP). Project not included in
the 2010 federal appropriations bill. Council approved support of their portion of phase 1 of the trail extension
in 2007.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Debt Levy - local
share 80,000 80,000
federal/State County 1,656,694 1,656,694
PROJECT COSTS
PROJECT STARTING DATE: 2013 Preliminaries
Land Acquisition $500,000
PROJECT COMPLETION DATE: 2013 Construction $1,236,694
Equipment and Other
NEIGHBORHOOD: NE City Total $1,736,694
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -16
ENG -1221
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Northland Drive Improvements (TOTAL COST: $374,000
2012 Budget: 'PROJECT CATEGORY: Streets, storm sewer, trails
DESCRIPTION: Northland Dr from CSAH 75 to Fir Street
JUSTIFICATION: 'Account Code: Unknown - will be a new fund
The proposed plan is for a mill and overlay from CSAH 75 to Fir Street, with the addition of curb & gutter
where there is not existing. It also includes construction of a 6' sidewalk from CSAH 75 to Hickory Drive.
The project is projected to occur when the 15th Street N is extended to CR133.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Special Assessments 221,375 221,375
Debt Levy 50,000 102,625 152,625
PROJECT COSTS
PROJECT STARTING DATE: 2013 Preliminaries 50,000
Land Acquisition
PROJECT COMPLETION DATE: 2014 Construction $324,000
Equipment and Other
NEIGHBORHOOD: Northland Development Total $374,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -17
ENG -1240
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Clinton Village Improvements ITOTAL COST: $350,000
2012 Budget: 'PROJECT CATEGORY: Reconstruction /utilities - streets
DESCRIPTION: Street and utility improvements
JUSTIFICATION: 'Account Code: Unknown - new debt will be issued for this project
Clinton Village addition was constructed in 1983. This improvement includes excavation, reclaim, and overlay
of the street section in the neighborhood.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Special Assessments
50,000 300,000 350,000
PROJECT COSTS
PROJECT STARTING DATE: 2013 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2014 Construction $350,000
Equipment and Other
NEIGHBORHOOD: Clinton Village Development Total $350,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -18
ENG -1243
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Stationary Generator for Baker Street Lift StatITOTAL COST: $75,000
2012 Budget: $0 (PROJECT CATEGORY: Sanitary Sewer Pumping
DESCRIPTION: Purchase a stationary generator to free up the portable generator.
JUSTIFICATION: 'Account Code: E602- 49470 -530
This plan provides for the purchase of a 50 kW stationary generator with an auto - transfer switch for the Baker
Street lift station.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Sewer Revenue 0 75,000 - 75,000
PROJECT COSTS
PROJECT STARTING DATE: 2013 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2013 Construction
Equipment and Other $75,000
NEIGHBORHOOD: Baker Street - South East Total $75,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -19
ENG -1224
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Main Lift Station Upgrade (TOTAL COST: $550,000
2012 Budget: 'PROJECT CATEGORY: Sanitary Sewer System - Pumping
DESCRIPTION: Upgrade the main lift station controls and generator
JUSTIFICATION: !Account Code: E602- 49480 -530
Improvements to the building envelope (windows, doors, walls, etc.) have been completed with the Energy and
Efficiency Block Grant award. This plan provides for upgrading the main lift station's aging control system,
pump motor drives, modifications to the headworks, and piping to connect to the upgraded CR75 pipe crossing.
Project moved to 2013 to keep utility rates at a lower increase for 2011. Staff will look into possible low
interest financing and grants to complete the project.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
SAC 281,600 - 281,600
Sewer Revenue 268,400 - 268,400
PROJECT COSTS
PROJECT STARTING DATE: 2013 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2013 Construction $550,000
Equipment and Other
NEIGHBORHOOD: Old City Total $550,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -20
ENG -1222
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 -2016
PROJECT TITLE: Stationary Generator for CR 121 Lift Station (TOTAL COST: $174,000
2012 Budget: (PROJECT CATEGORY: Sanitary Sewer Pumping
DESCRIPTION: Purchase a stationary generator to free up the portable generator.
JUSTIFICATION: !Account Code: E602- 49473 -530
This plan provides for the purchase of a 100 kW stationary generator with an auto - transfer switch and a sound
attenuation and fencing package for the CR 121 lift station. This purchase will free up the portable generator to
be used at the other lift stations as needed. The construction of the stationary generator for the CR 121 lift
station should coincide with the construction of the lift station designed to serve the Kennedy Community
School and the Rivers Bend development.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Sewer Trunk -
CR121 174,000 - 174,000
PROJECT COSTS
PROJECT STARTING DATE: 2014 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2014 Construction $174,000
Equipment and Other
NEIGHBORHOOD: CR121 - South Total $174,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -21
ENG -1226
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Wobegon Welcome Center - S. Parking Lot ITOTAL COST: 208,000
2012 Budget: (PROJECT CATEGORY: Regional Trails
DESCRIPTION: Construct the south parking lot for the Wobegon Welcome Center
JUSTIFICATION: (Account Code: E200 -45202 -530
The south parking lot is one of two lots designed to serve the Wobegon Welcome Center. The north parking
lot, which was designed to handle automobile traffic only, was completed in 2004. The south lot is designed to
handle automobiles and vehicles with snowmobile trailers. An easement will be required to access the lot from
the intersection of Elm Street East and First Avenue Northeast. A cost for right -of -way was not included due
to pending negotiations with both property owners. Cost figures will change if the existing parking lot is
incorporated into the site. This project is eligible to use 1 /2C sales tax revenue.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Special Debt Levy -
1/2¢ Sales Tax 208,000 208,000
PROJECT COSTS
PROJECT STARTING DATE: 2014 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2014 Construction $208,000
Equipment and Other
NEIGHBORHOOD: Wobegon Welcome Center Total $208,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -22
ENG -1228
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: North Corridor ROW and Construction (TOTAL COST: $8,437,500
2012 Budget: - PROJECT CATEGORY: Streets
DESCRIPTION: Construction and Right of Way Acquisition - 73rd Av to CR 133
JUSTIFICATION: (Account Code: Unknown - new debt will be issued
Right of Way acquistion and construction of the North Corridor from 73rd Avenue to CR 133. - based on the
APOs 2010 -2013 Transportation Improvement Program (TIP). Project not included in the 2010 federal
appropriations bill.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Debt Levy - local
share 1,687,500 1,687,500
federal/State County 6,750,000 6,750,000
PROJECT COSTS
PROJECT STARTING DATE: 2014 Preliminaries
Land Acquisition $1,000,000
PROJECT COMPLETION DATE: 2014 Construction $7,437,500
Equipment and Other
NEIGHBORHOOD: N -E -W City Total $8,437,500
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -23
ENG -1206
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: 3rd Forcemain - St. Cloud (TOTAL CO: $1,010,000
2012 Budget: $0 'PROJECT CATEGORY: Sanitary sewer pumping
DESCRIPTION: Add a 3rd Sewer Forcemain from the St. Cloud Country Club to the WWTP
JUSTIFICATION: 'Account Code: E602- 49480 -418
SCAWAC has identified the need to add a third sewer forcemain from the St. Cloud Country Club to the St. Cloud
wastewater treatment plant. The forcemain will provide additional capacity and redundancy for the main
interceptors for all area cities included in the St. Cloud Sewer Use Agreement with exception of St. Augusta. The
estimated cost is $10M with St. Joseph sharing 10.1% of the cost. The project is slated to begin in 2015. St. Cloud
will issue a 10 year debt. St. Joseph will make monthly payments for their share to St. Cloud beginning in 2016.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Sewer Revenue 0 50,000 960,000 1,010,000
St. Cloud Debt Pmts
PROJECT COSTS
PROJECT STARTING DATE: 2015 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2016 Construction $1,010,000
Equipment and Other
NEIGHBORHOOD: Entire City Total $1,010,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -24
ENG -1210
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: New Water Tower ITOTAL COST: $2,817,000
2012 Budget: (PROJECT CATEGORY: Water System - storage
DESCRIPTION: Construct a 750,000 gallon water tower.
JUSTIFICATION: 'Account Code: E601- 49436- 303/E601 -49436 -530
The 2006 water system comprehensive study indicated a shortage of 40,000 gallons per day for recommended
storage capacity. The additional capacity would allow for better fire flow sustainability and provide
redundancy to perform necessary repairs and maintenance on water tower 1. The construction of three new
wells with the water treatment plant in 2007 provided additional supply and has afforded the City time to plan
for additional storage capacity. The city's current storage capacity is 500,000 gallons. Constructing a new
tower in 2011 will allow a four -year breather after funding a new water treatment plant. Construction in 2011
will be sufficient with slow growth in 2007 through 2010. The City Council approved Design of the second
tower in 2008; bidding, construction, and construction administration in 2011/2012. During the October 2010
Council budget workshop, consensus to move the new water tower back to 2015 based on current tower usage
and other means to refurbish the current tower. 2015 is an estimated need time, but may change depending on
future development.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
WAC 779,800 779,800
Water Revenue 1,872,200 1,872,200
PROJECT COSTS
PROJECT STARTING DATE: 2008 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2016 Construction 2,652,000
Equipment and Other
NEIGHBORHOOD: city -wide Total 2,652,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -25
ENG -1213
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: North Corridor EIS ITOTAL COST: $310,000
2012 Budget: - 'PROJECT CATEGORY: Streets
DESCRIPTION: EIS for North Corridor
JUSTIFICATION: 'Account Code: Unknown - new debt will be issued
Tier I Environmental documentation CR 133 to CSAH 3 - based on APO 2010 -2013 Transportation Improvement
Program (TIP). The scoping document was going to completed in 2011, but has been suspended since Federal
funding is not included in the 2010 transportation bond for the EIS document. The project is not a financially
constrained project in the APO's 2035 Transportation Plan.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Debt Levy (20 %) 62,000 62,000
federal /State County
(80 %) 248,000 248,000
PROJECT COSTS
PROJECT STARTING DATE: 2015 Preliminaries $310,000
Land Acquisition
PROJECT COMPLETION DATE: TBD Construction
Equipment and Other
NEIGHBORHOOD: N -E -W City Total $310,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -26
ENG -1227
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Upgrade Old Water Main ITOTAL COST: $2,532,000
2012 Budget: 'PROJECT CATEGORY: Water System - trunk
DESCRIPTION: Upgrade old water main 1st Ave NW, College Ave, Cedar St
JUSTIFICATION: 'Account Code: E601- 49430 -530
This plan includes upgrading the old water main (installed between 1949 and 1950) with new pipe on 1st
Avenue NW from CSAH 75 to Date, College Avenue from Ash to Elm, Cedar Street from 1st Avenue to Ace
Hardware. This estimate includes the addition of a water main on Elm Street from 1st Avenue NW to College
Avenue. There is also street replacement and other affected utility costs included for the disturbed areas.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Special Assessments 1,932,000 1,932,000
Water Revenue 600,000 600,000
PROJECT COSTS
PROJECT STARTING DATE: 2015 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2015 Construction $2,532,000
Equipment and Other
NEIGHBORHOOD: N side of CSAH 75 Total $2,532,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -27
ENG -1237
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Birch Street Improvements (TOTAL COST: $303,000
2012 Budget: (PROJECT CATEGORY: Water System - trunk/streets
DESCRIPTION: Water main/street reconstruction
JUSTIFICATION: 'Account Code: unknown - new debt will be issued for project
The improvements include water main from College Avenue to connect up with the 12" water main to the East
near 1 st Avenue. Street reconstruction is anticipated from College Avenue to 1st Avenue NE. This project
could be completed as redevelopment occurs or it could be completed to update this street/watermain to
current city standards.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Special Assessments 198,000 198,000
Debt Levy 105,000 105,000
PROJECT COSTS
PROJECT STARTING DATE: 2015 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2015 Construction $303,000
Equipment and Other
NEIGHBORHOOD: NW City Total $303,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -28
ENG -1220
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Pedestrian Bridge /Crossing Study (TOTAL COST: $35,000
2012 Budget: (PROJECT CATEGORY: City -wide regional trails
DESCRIPTION: Crossing Study
JUSTIFICATION: 'Account Code: E200- 45202 -303
This study provides for an evaluation of alternatives and public involvement associated with potential
improvements to the pedestrian crossing of CSAH 75 at College Avenue or 4th Avenue. Options may include
count -down clocks at the intersections. A count -down clock was installed by Stearns County at the 4th
Avenue intersection in 2009. Another count -down clock could be added to the College Avenue intersection.
The crossing would provide access to Wobegon Trail for the entire area.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
1/2 Cent Sales Tax 35,000 35,000
PROJECT COSTS
PROJECT STARTING DATE: 2016 Preliminaries $35,000
Land Acquisition
PROJECT COMPLETION DATE: 2017 Construction
Equipment and Other
NEIGHBORHOOD: City -wide Total $35,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -29
ENG -1223
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: 20th Avenue South (TOTAL COST: $2,388,000
2012 Budget: (PROJECT CATEGORY: streets
DESCRIPTION: Street Construction - CR 121 (Jade Road) to 20th Avenue Corridor
JUSTIFICATION: 'Account Code: Unknown - new debt will be issued
The plan proposes an east -west connection from County Road 121 to the proposed 20th Avenue Corridor. It
provides a 4200 lineal foot three lane road, curb & gutter construction with storm sewer, a sidewalk or trail
behind the back of curb, and turn lanes off of County Road 121.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012. 2013 2014 2015 2016 Total
Developer
Assessments TBD
PROJECT COSTS
PROJECT STARTING DATE: TBD Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: TBD Construction $2,388,000
Equipment and Other
NEIGHBORHOOD: S City Total $2,3 88,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -30
ENG -1232
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: 20th Avenue SE Improvements ITOTAL COST: $1,278,000
2012 Budget: $0 (PROJECT CATEGORY: Streets
DESCRIPTION: Corridor CSAH 75 to N Line of Rassier Property
JUSTIFICATION: (Account Code: Unknown - new debt will be issued
This plan provides for future transportation corridor in the area of 20th Avenue E. The corridor is an estimated
3-4 lane undivided roadway from CSAH 75 to the North line of the Rassier Property.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Developer
Assessments TBD 0
Federal/State /County 0
PROJECT COSTS
PROJECT STARTING DATE: TBD Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: TBD Construction $1,278,000
Equipment and Other
NEIGHBORHOOD: S - E City Total $1,278,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -31
ENG -1247
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: 20th Avenue SE ]TOTAL COST: $2,772,000
2012 Budget: $0 'PROJECT CATEGORY: Private Development - Utility Extension
DESCRIPTION: Corridor Construction - Rassier property to 209th Street
JUSTIFICATION: 'Account Code: Enew -43120 -530
The plan provides for an extension of 20th Avenue for future transportation corridor. The estimate is based on
constructing 5300 lineal feed of 44' roadway from the Rassier property to 290th Street.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Debt Levy - Streets TBD 0
PROJECT COSTS
PROJECT STARTING DATE: TBD Preliminaries $0
Land Acquisition
PROJECT COMPLETION DATE: TBD Construction
Equipment and Other
NEIGHBORHOOD: SE corridor Total $0
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -32
ENG -1229
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: North Corridor ROW and Construction (TOTAL COST: $10,312,500
2012 Budget: - (PROJECT CATEGORY: Streets
DESCRIPTION: Construction and Right of Way Acquisition - CR133 to CSAH 3
JUSTIFICATION: !Account Code: Unknown - new debt will be issued
Right of Way acquistion and construction of the North Corridor from CR 133 to CSAH 3 - based on the APOs
2010 -2013 Transportation Improvement Program (TIP). Project not included in the 2010 federal appropriations
bill.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Debt Levy - local
share TBD 0
federal/State County 0
PROJECT COSTS
PROJECT STARTING DATE: TBD Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: TBD Construction $10,312,500
Equipment and Other
NEIGHBORHOOD: N -E -W City Total $10,312,500
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -33
ENG -1233
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Northland Heights Phase II 'TOTAL COST: $1,989,000
2012 Budget: !PROJECT CATEGORY: utility extension
DESCRIPTION: Northland Phase II
JUSTIFICATION: !Account Code: Unknown - new debt will be issued for this project
The proposed development is the second phase of Northland Heights. The cost is based upon constructing sanitary
sewer, water main, streets, and storm sewer for the 70 lot subdivision.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Developer
Assessments 1,989,000 1,989,000
PROJECT COSTS
PROJECT STARTING DATE: 2016 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2016 Construction $1,989,000
Equipment and Other
NEIGHBORHOOD: Northland Heights - N City Total $1,989,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG-34
ENG -1231
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Jade Road Improvements (TOTAL COST: $2,147,000
2012 Budget: 'PROJECT CATEGORY: streets
DESCRIPTION: Street Improvements - Neary Street to 1 -94
JUSTIFICATION: 'Account Code: Unknown - new debt will be issued
This plan provides for street reconstrution of Jade Road from Neary Street to 1 -94. The plan proposes a three lane
road, curb & gutter construction with storm sewer, and a sidewalk or trail behind the back of curb. The estimate
does not include pond excavation, sanitary sewer, or water main to the school site. These items shall be included
with Rivers Bend Phase I. Jade Road improvements from CR121 to Neary Street was completed in 2008.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Developer
Assessments 2,147,000 2,147,000
PROJECT COSTS
PROJECT STARTING DATE: 2016 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2016 Construction $2,147,000
Equipment and Other
NEIGHBORHOOD: S City Total $2,147,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG-35
ENG -1236
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: 16th Avenue Improvements (TOTAL COST: $688,000
2012 Budget: (PROJECT CATEGORY: street/utility extension
DESCRIPTION: Dale Street to City limits
JUSTIFICATION: 'Account Code: Unknown - new debt will be issued
This plan provides for street, curb and gutter, sanitary sewer, water main, and storm sewer from Dale Street to the
City Limit line. 16th Avenue improvements from Minnesota St E to Dale Street was completed in 2010. This
project will not begin until a developer requests the extension.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Debt Levy 188,000 188,000
Special Assessment 350,000 350,000
Water Revenue 50,000 50,000
Sewer Revenue 50,000 50,000
Storm Water Revenue 50,000 50,000
PROJECT COSTS
PROJECT STARTING DATE: 2016 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: 2016 Construction $688,000
Equipment and Other
NEIGHBORHOOD: SE City Total $688,000
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -36
ENG -1239
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: CSAH 75 Relief Storm Sewer (TOTAL COST: $272,000
2012 Budget: 'PROJECT CATEGORY: Streets and Drainage
DESCRIPTION: Construct a storm sewer to convey runoff from the downtown area across CSAH 75
JUSTIFICATION: !Account Code: E651- 49900 -530
As the downtown area develops with more impervious area, the existing system will need to be expanded to
accommodate the increased runoff. This plan provides for the construction of approximately 1,000 linear feet
of new storm sewer and two new drainage structures to provide relief to existing storm sewers at College
Avenue NW /CSAH 75 and 1st Avenue NW /CSAH 75.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Storm Water Utility
Fees TBD
PROJECT COSTS
PROJECT STARTING DATE: TBD Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: Construction
Equipment and Other
NEIGHBORHOOD: NW City /CSAH75 Total
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -37
ENG -1208
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: Industrial Park Expansion (TOTAL COST: $2,179,000
2012 Budget: 'PROJECT CATEGORY: Private Development - Utility Extension
DESCRIPTION: Expand NE Industrial Park - Feld Property
JUSTIFICATION: (Account Code: Enew -43120 -530
The existing Industrial Park would expand to the East into the Feld Property. There are approximately 15
industrial lots proposed, 11 lots in phase 1 of 2, with improvements including sanitary sewer, water main, street
with curb & gutter, and storm sewer. The expansion will be privately funded. Council approved the fmal plat
and developers agreement on November 20, 2008. The developer could not secure financing; thus, the
agreement fell through. Other developers are looking at the plot, but no one has come forward with a plan to the
City. The City will not consider moving foward with this expansion until a developer requests to do so.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Escrow/Pass Thru 20,000 TBD
PROJECT COSTS
PROJECT STARTING DATE: 2010 Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: TBD Construction $2,179,000
Equipment and Other
NEIGHBORHOOD: NE Industrial Park Total $2,179,000
Presented to the City Council on Approved Denied Tabled
Comments
•
Approval to Purchase Date Authorizing Initials Date
ENG -38
ENG -1241
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: St. Wendel Trunk Sewer (TOTAL COST: TBD
2012 Budget: 'PROJECT CATEGORY: Sewer System - trunk
DESCRIPTION: Construct the trunk sewer to serve St. Wendel Township.
JUSTIFICATION: 'Account Code: E602- 49480 -530
This plan provides for 6,000 feet of trunk sanitary sewer to serve St. Wendel Township. The funding schedule
assumes that approximately 66% of the entire length of trunk sewer will be assessed at a rate equivalent to the
probable cost of an 8" sanitary sewer of the same length, plus the probable acquisition costs of the associated
utility and construction easements. The balance of the funding is scheduled to come from bonding covered by
future sewer trunk fees. The plan assumes a construction width of 100', including 50' (6.9 acres) of acquired
perpetual utility easements and 50' (6.9 acres) of acquired temporary construction easements.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Developer
Assessments TBD
PROJECT COSTS
PROJECT STARTING DATE: TBD Preliminaries
Land Acquisition -
PROJECT COMPLETION DATE: Construction -
Equipment and Other
NEIGHBORHOOD: St. Wendel Township - N City Total -
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG -39
ENG -1242
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2012 - 2016
PROJECT TITLE: St. Wendel Water Main ITOTAL COST: TBD
2012 Budget: (PROJECT CATEGORY: Water System - trunk
DESCRIPTION: Construct a 16" water main to serve St. Wendel Township.
JUSTIFICATION: 'Account Code: E601- 49440 -530
This plan provides for 6,250 feet of 16" water main to serve St. Wendel Township. The funding schedule
assumes the entire length of water main will be assessed at a rate equivalent to the probable cost of
constructing an 8" water main plus the probable cost of the utility easements. The balance of the funding is
scheduled to come from bonding covered by future water main trunk fees. The plan accounts for 65' of
construction width, including 15' within the right of way, 10' (1.4 acres) within perpetual utility easements and
40' (5.7 acres) within temporary construction easements.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2012 2013 2014 2015 2016 Total
Developer
Assessments TBD
PROJECT COSTS
PROJECT STARTING DATE: TBD Preliminaries
Land Acquisition -
PROJECT COMPLETION DATE: Construction -
Equipment and Other
NEIGHBORHOOD: St. Wendel Township - N City Total
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
ENG-40