2011 Transportation Plan Update - Work Plan Summary
OPTION 1: Revise transportation and trails system maps, tables & text. Document
updates as Addendums to the Orginal Plan.
SeniorEng Tech
Principal / Trans.Eng.Admin
Trans./GIS
Title
SfWkummar oor
ProjMgrro.gr.PlanneranneTechnicianecncanAssistantsssan
SEHTtlSEH Total APOStffAPO Staff
SyfWk TitlePjMPlrThiiAitt
Eng.Specialist
HoursRole
Tasks
Randy
Jennifer
Mike
Name
Mike KotilaBob Rogers
Deb Gilyard
SabartSchmitz Strnagel
0NI
Task 1.0 - Introduction
000000
0NI
Task 2.0 - Community Profile
000000
Task 3.0 - Principals of Roadway
0NI
000000
System Planning
20LR
Task 4.0 - Roadway System
2100080
Task 5.0 - Pedestrian and Bicycle
12SR
040080
System
0NI
Task 6.0 - Plan Implementation
000000
Tk70PbliIltdas. - ucnvovemen an
Tk70PbliIltd
34SR
10160044
Project Adminstration
Total Project Hours
12300020466
Labor Based Costs$9,276
Reimbursable Expenses$688
$9,964
Total SEH Project Cost
APO Staff Role
NI - APO Not Involved in Task
SR - APO Support Role in Task
LR - APO Lead Role in Task
P:\PT\S\STJOE\116965\Agree\[St Joe Trans Plan 3 Options 111011.xlsx]Summary 1
City of Saint Joseph
2011 Transportation Plan Update - Workplan
OPTION 1
Eng Tech
Principal / SeniorTrans. Eng.Admin
WORK TASKS
Title/GIS
Proj. Mgr.Trans. Eng.PlannerTechnicianAssistant
SEH APO Staff
Specialist
HoursRole
Jennifer
Randy SabartMike KotilaBob Rogers
Name
Mike StrnagelDeb Gilyard
Schmitz
Task 1.0 - Introduction
Introduction - Add description of change associated with this transportation plan
No Change AnticipatedNI
1.00
update
Purpose and Need -
1.1No Change Anticipated0NI
Goals and Objectives
1.2No Change Anticipated0NI
Planning Process - Add text to acknowledge the update
1.3No Change Anticipated0NI
process
Public Involvement - Document public involvement activity
No Change Anticipated
1.40NI
associated with the update
Task 1.0 Total Hours100000000
Task 1.0 Deliverables: None
Task 2.0 - Community Profile
Community ProfileNo Change Anticipated
2.00NI
Study Area - Revise Figure 1, Project Limits Map to reflect current City limits and
2.1No Change Anticipated0NI
orderly annexation areas
Land Use - Revise existing land use and future land use sections; Update Figure
2, Future Land Use; Update Table 2 - Existing Land Use; Update Table 3 - Future No Change Anticipated
2.20NI
Land Use; Revise Figure 2, Future Land Use Map
Task 2.0 Total Hours
0000000
Task 2.0 Deliverables: None
Task 3.0 - Principals of Roadway System Planning
Principles of Roadway System Planning
3.0No Change Anticipated0NI
Functional Classification - Develop more thorough definitions for Collector
Streets and local/neighborhood roads in terms of expected traffic volumes served,
egree o access, operang spee, parng, an peesranaces; paeoangencpae
31.dftidkiddtifilitiUdtNChAtiitd0NI
31dftidkiddtifilitiUdtNChAtiitd0NI
Table 4 - Functional Classification Description; Differentiate between Major
Collectors and Minor Collectors - display graphically and in tabular form
Jurisdictional ClassificationNo Change Anticipated
3.20NI
Access Management - Review APO Access Management Guidelines; Distinguish
3.3access spacing guidelines for Major and Minor Collector streets; Update Table 5; No Change Anticipated0NI
Add planning guidance for preferred access conditions using generic examples;
Design Guide - Update Collector Roadway criteria recognizing potential
3.4differences in Major and Minor Collectors; Update Figure 4 for Major Collectors; No Change Anticipated0NI
Add Figure 4A for Minor Collectors
Task 3.0 Total Hours
0000000
Task 3.0 Deliverables: None
Task 4.0 - Roadway System
Roadway System
4.0No Change Anticipated0NI
Existing Transportation System - Update Figure 5 to reflect areas recently
4.1No Change Anticipated0NI
developed, new roadways and/or changes to the City limits.
FutureTransportationSystem-CoordinatewithAPOto
FutureTransportationSystem-CoordinatewithAPOto
update traffic forecast to reflect 2035 constrained model
assumptions; Update Tables 6 - 10; Update Figure 6 - Future
4.248
Transportation Network; Update Table 7 - TAZ Boundaries; 12LR
Update Figure 8 - Full Build-Out Traffic Forecasts; Reassess
roadway network deficiences based upon revised forecast
results;
Topics of Discussion - Update status of Field Street, North
Corridor/CSAH 2 Realignment, Future Location of Southwest
14
4.35LR
Beltway; Correlate the written description with the updated map
representations in the appropriate Figures;
12
4.4Recommendations - Update Table 12 - Recommendations3LR
Task 4.0 Total Hours
210008020
Task 4.0 Deliverables: Updated Tables 6-10 and 12 and Figures 5-8
City of Saint Joseph
2011 Transportation Plan Update - Workplan
OPTION 1
Eng Tech
Principal / SeniorTrans. Eng.Admin
WORK TASKS
Title/GIS
Proj. Mgr.Trans. Eng.PlannerTechnicianAssistant
SEH APO Staff
Specialist
HoursRole
Jennifer
Randy SabartMike KotilaBob Rogers
Name
Mike StrnagelDeb Gilyard
Schmitz
Task 5.0 - Pedestrian and Bicycle System
Pedestrian and Bicycle System
5.0No Change Anticipated0NI
5.1Facility TypesNo Change Anticipated0NI
Existing Trail System - Update written descriptions and Table
5.222SR
13 - Existing Intra-City Trail System
Future Trail System - Update written descriptions and Table
5.314 - Future Intra-City Trail System; Update Figure 9 - Trails 2810SR
Map
Task 5.0 Total Hours04008012
Task 5.0 Deliverables: Updated Text and Transportation/Trails Plan Map (Figure __) to be consistent with adopted Parks & Trail plan
Task 6.0 - Plan Implementation
Plan ImplementationNo Change Anticipated
6.00NI
Transportation Plan Adoption - Update to reflect current
6.1No Change Anticipated0NI
status/intent to move the plan towards adoption by City Council
Sources of Funding - Update roadway funding sources;
6.2No Change Anticipated0NI
Include trail funding sources.
Task 6.0 Total Hours
0000000
Task 6.0 Deliverables: None
Task 7.0 - Public Involvement and Project Adminstration
City Staff Meetings - SEH will attend up to two meetings with City staff to review
7.10NI
project progress.
Coordination Meetings - 2 SEH staff will attend up to two meetings with City
7.2448SR
staff and APO representatives
Public Involvement - SEH will facilitate one general open house public
7.3meetings; Preparer meeting notice, meeting materials, gather and summarize 0NI
public comments.
Stakeholder Meetings - SEH will attend up to two meetings with specific
7.40NI
stakeholders or neighborhod groups.
City Council and Planning Commission Meetings - SEH (2 staff) and APO
44
7.48SR
staff will attend up to two meetings with City Council and/or Planning Commission
Prepare Transportation Plan Addendums - Draft and Final addendums for
842
7.514SR
Sections 4 & 5
Project Management - Staff oversight, quality control, project communications;
7.5224SR
invoicing, progress reports, and schedule.
Task 7.0 Total Hours1016004434
Task 7.0 Deliverables: 15 Draft and 15 Final printed Transportation Plan Addendums with updated color Maps/Figures; CD's with pdf versions will be provided with Final Addendums.
Reimbursable Expenses
Estimated Mileage Costs$88
Addendum Reproductions (15 draft + 15 Final w/CD's)$600
Open House Boards$0
Reimbursable Expenses Totals$688
APO Staff Role
NIAPONtIldiTk - onvovenas
NIAPONtIldiTk
SR - APO Support Role in Task
LR - APO Lead Role in Task
P:\PT\S\STJOE\116965\Agree\[St Joe Trans Plan 3 Options 111011.xlsx]Summary 1
City of Saint Joseph
2011 Transportation Plan Update - Work Plan Summary
OPTION 2: Update the original Transportation and Trails plan report. Update all text,
tables and figures and facilitate a Public Meeting.
SeniorEng Tech
Principal / Trans.Eng.Admin
Trans./GIS
Title
Summary of Work
Proj. Mgr.PlannerTechnicianAssistant
SEH Total APO Staff
Eng.Specialist
y Eng.Specialist
HoursRole
Tasks
RandyJennifer
Name
Mike KotilaBob Rogers
Mike StrnagelDeb Gilyard
SabartSchmitz
3SR
Task 1.0 - Introduction030000
10SR
Task 2.0 - Community Profile040060
Task 3.0 - Principals of Roadway
20SR
2100080
System Planning
23LR
Task 4.0 - Roadway System
31000100
Task 5.0 - Pedestrian and Bicycle
12SR
040080
040080 12SR
System
4SR
Task 6.0 - Plan Implementation040000
Task 7.0 - Public Involvement and
78SR
302600166
Project Adminstration
Total Project Hours
356100486150
Labor Based Costs$21,675
Reimbursable Expenses$1,842
$23,517
Total SEH Project Cost
APOStaffRole
APOStaffRole
NI - APO Not Involved in Task
SR - APO Support Role in Task
LR - APO Lead Role in Task
P:\PT\S\STJOE\116965\Agree\[St Joe Trans Plan 3 Options 111011.xlsx]Summary 1
City of Saint Joseph
2011 Transportation Plan Update - Workplan
OPTION 2
Eng Tech
Principal / SeniorTrans. Eng.Admin
WORK TASKS
Title/GIS
Proj. Mgr.Trans. Eng.PlannerTechnicianAssistant
SEH APO Staff
Specialist
HoursRole
Jennifer
Randy SabartMike KotilaBob Rogers
Name
Mike StrnagelDeb Gilyard
Schmitz
Task 1.0 - Introduction
Introduction - Add description of change associated with this transportation plan
1
1.01SR
update
Purpose and Need -
1.1No Change Anticipated0NI
Goals and Objectives
1.2No Change Anticipated0NI
Planning Process - Add text to acknowledge the update
1.311SR
process
Public Involvement - Document public involvement activity
1
1.41SR
associated with the update
Task 1.0 Total Hours100300003
Task 1.0 Deliverables: Section 1 text updates
Task 2.0 - Community Profile
Community ProfileNo Change Anticipated
2.00NI
Study Area - Revise Figure 1, Project Limits Map to reflect current City limits and
2.1123SR
orderly annexation areas
Land Use - Revise existing land use and future land use sections; Update Figure
2.22, Future Land Use; Udate Table 2 - Existin Land Use; Udate Table 3 - Future 347SR
pgp
pgp
Land Use; Revise Figure 2, Future Land Use Map
Task 2.0 Total Hours04006010
Task 2.0 Deliverables: Updated Report Sections, Revised Figures and Tables
Task 3.0 - Principals of Roadway System Planning
Principles of Roadway System PlanningNo Change Anticipated
3.00NI
Functional Classification - Develop more thorough definitions for Collector
Streets and local/neighborhood roads in terms of expected traffic volumes served,
egree o access, operang spee, parng, an peesranaces; pae
31.dftidkiddtifilitiUdt2428SR
31dftidkiddtifilitiUdt2428SR
Table 4 - Functional Classification Description; Differentiate between Major
Collectors and Minor Collectors - display graphically and in tabular form
Jurisdictional Classification
3.2No Change Anticipated0NI
Access Management - Review APO Access Management Guidelines; Distinguish
3.3access spacing guidelines for Major and Minor Collector streets; Update Table 5; 426SR
Add planning guidance for preferred access conditions using generic examples;
Design Guide - Update Collector Roadway criteria recognizing potential
3.4differences in Major and Minor Collectors; Update Figure 4 for Major Collectors; 246SR
Add Figure 4A for Minor Collectors
Task 3.0 Total Hours210008020
Task 3.0 Deliverables: Functional classification criteria/definitions, Updated Table 5, Access planning exhibits
Task 4.0 - Roadway System
Roadway SystemNo Change Anticipated
4.00NI
Existing Transportation System - Update Figure 5 to reflect areas recently
4.1123SR
developed, new roadways and/or changes to the City limits.
Future Transportation System - Coordinate with APO to update traffic forecast
o reec consrane moe assumpons; paeaes - ;pae
tflt2035tiddltiUdtTbl610Udt
tflt2035tiddltiUdtTbl610Udt
4.2Figure 6 - Future Transportation Network; Update Table 7 - TAZ Boundaries; 4812LR
Update Figure 8 - Full Build-Out Traffic Forecasts; Reassess roadway network
deficiences based upon revised forecast results;
Topics of Discussion - Update status of Field Street, North Corridor/CSAH 2
4.3Realignment, Future Location of Southwest Beltway; Correlate the written 145SR
description with the updated map representations in the appropriate Figures;
Recommendations - Update Table 12 - Recommendations12
4.43SR
Task 4.0 Total Hours
3100010023
Task 4.0 Deliverables: Updated Tables 6-10 and 12 and Figures 5-8
Task 5.0 - Pedestrian and Bicycle System
City of Saint Joseph
2011 Transportation Plan Update - Workplan
OPTION 2
Eng Tech
Principal / SeniorTrans. Eng.Admin
WORK TASKS
Title/GIS
Proj. Mgr.Trans. Eng.PlannerTechnicianAssistant
SEH APO Staff
Specialist
HoursRole
Jennifer
Randy SabartMike KotilaBob Rogers
Name
Mike StrnagelDeb Gilyard
Schmitz
5.0Pedestrian and Bicycle SystemNo Change Anticipated0NI
Facility TypesNo Change Anticipated
5.10NI
Existing Trail System - Update written descriptions and Table 13 - Existing Intra-
5.222SR
City Trail System
Future Trail System - Update written descriptions and Table 14 - Future Intra-City
5.32810SR
Trail System; Update Figure 9 - Trails Map
Task 5.0 Total Hours04008012
Task 5.0 Deliverables: Updated Text and Transportation/Trails Plan Map (Figure __) to be consistent with adopted Parks & Trail plan
Task 6.0 - Plan Implementation
Plan Implementation
6.0No Change Anticipated0NI
Transportation Plan Adoption - Update to reflect current status/intent to move
6.122SR
the plan towards adoption by City Council
Sources of Funding - Update roadway funding sources; Include trail funding
6.222SR
sources.
Task 6.0 Total Hours
0400004
Task 6.0 Deliverables: Chapter 6 Text Updates
Task 7.0 - Public Involvement and Project Adminstration
City Staff Meetings - SEH will attend up to three meetings with City staff to
7.16612SR
review project progress.
Agency Coordination Meetings - SEH will attend up to two meetings with
7.2agency representatives (APO, County, MnDOT, etc) to coordination roadway or 448SR
trail planning updates
Public Involvement - SEH will facilitate one general open house public
7.3meetings; Prepare meeting notice, meeting materials, gather and summarize 44816SR
public comments.
Stakeholder Meetings - SEH will attend up to two meetings with specific
7.4448SR
stakeholdersorneighborhodgroups.
stakeholdersorneighborhodgroups
City Council and Planning Commission Meetings - SEH will attend up to two
7.4448SR
meetings with City Council and/or Planning Commission
7.5Prepare Draft Reports, Final Reports and Meeting exhibits 48416SR
Project Management - Staff oversight, quality control, project communications;
82
7.510SR
invoicing, progress reports, and schedule.
Task 7.0 Total Hours30260016678
Task 7.0 Deliverables: 15 printed bound, color draft reports and 15 printed and bound final reports. CD's included with final report in pdf format. Schedule, Progress Reports, Meeting
Displays
and Handouts, Meeting Agendas and Summaries
Reimbursable Expenses
Estimated Mileage Costs$242
Report Reproductions (15 draft + 15 Final w/CD's)$1,200
Open House Exhibits/Boards$400
Reimbursable Expenses Totals$1,842
APO Staff Role
NI - APO Not Involved in Task
SR - APO Support Role in Task
LR - APO Lead Role in Task
P:\PT\S\STJOE\116965\Agree\[St Joe Trans Plan 3 Options 111011.xlsx]Summary 1
City of Saint Joseph
2011 Transportation Plan Update - Work Plan Summary
OPTION 3: Initiate a new Transportation Plan Study and develop a new report. Revisit
all base goals and assumptions. Recreate text, tables and figures. Facilitate
stakeholder meetings and a Public Meeting.
SeniorEng Tech
Principal / Trans. Eng.Admin
Trans. /GIS
Title
Summary of Work
Proj. Mgr.PlannerTechnicianAssistant
SEH Total APO Staff
Eng.Specialist
Tasks HoursRole
Randy Jennifer
Mike KotilaBob Rogers
Name
Mike StrnagelDeb Gilyard
SabartSchmitz
18SR
Task 1.0 - Introduction
1413000
17SR
Task 2.0 - Community Profile
117080
Task 3.0 - Principals of Roadway
56SR
39208160
System Planning
62LR
Task 4.0 - Roadway System
513160280
Task 5.0 - Pedestrian and Bicycle
27SR
456480
System
14SR
Task 6.0 - Plan Implementation
248000
Task7.0-PublicInvolvementand
138SR
36263043210
36263043210
Task7.0PublicInvolvementand 138SR
Project Adminstration
Total Project Hours
5262100169210332
Labor Based Costs$41,467
Reimbursable Expenses$2,480
Total Project Cost$43,947
APO Staff Role
NI - APO Not Involved in Task
SR - APO Support Role in Task
LR - APO Lead Role in Task
P:\PT\S\STJOE\116965\Agree\[St Joe Trans Plan 3 Options 111011.xlsx]Summary 1
SEH, Inc.11/11/2011
City of Saint Joseph
2011 Transportation Plan Update - Workplan
OPTION 3
Eng Tech
Principal / Senior Trans. Eng. Admin
WORK TASKS
/GIS
Title
Proj. Mgr.Trans. Eng.PlannerTechnicianAssistant
SEHAPO Staff
Specialist
HoursRole
Randy Jennifer
NameMike KotilaBob Rogers
Mike StrnagelDeb Gilyard
SabartSchmitz
Task 1.0 - Introduction
1SR
1
Introduction - Develop a new introduction section.
1.0
5SR
14
1.1Purpose and Need - Develop new purpose and need statements
6SR
114
1.2Goals and Objectives - Develop new goals and objectives
3SR
12
1.3Planning Process - Document the new plan development process
Public Involvement - Document public involvement activity associated with the
3SR
12
1.4
update
Task 1.0 Total Hours
141318
Task 1.0 Deliverables: New Report Section 1
Task 2.0 - Community Profile
2SR
2
Community Profile - Update the community profile
2.0
5SR
14
2.1Study Area - Revise Figure 1, Project Limits Map to reflect current City limits and orderly annexation areas
Land Use - Revise existing land use and future land use sections; Update Figure 2, Future Land Use; Update
10SR
1144
2.2
Table 2 - Existing Land Use; Update Table 3 - Future Land Use; Revise Figure 2, Future Land Use Map
Task 2.0 Total Hours
117817
Task 2.0 Deliverables: New Report Sections, Revised Figures and Tables
Task 3.0 - Principals of Roadway System Planning
5SR
14
3.0Principles of Roadway System Planning
Functional Classification - Develop more thorough definitions for Collector Streets and local/neighborhood
roads in terms of expected traffic volumes served, degree of access, operating speed, parking, and pedestrian
22SR
2488
3.1
facilities; Update Table 4 - Functional Classification Description; Differentiate between Major Collectors and
Minor Collectors - display graphically and in tabular form
9SR
144
3.2Jurisdictional Classification - Document jurisdictional issues and update jurisdictional map figures
Access Management - Review APO Access Management Guidelines; Distinguish access spacing guidelines
9SR
144
3.3for Major and Minor Collector streets; Update Table 5; Add planning guidance for preferred access conditions
using generic examples;
Design Guide - Update Collector Roadway criteria recognizing potential differences in Major and Minor
11SR
128
3.4
Collectors; Update Figure 4 for Major Collectors; Add Figure 4A for Minor Collectors
Task 3.0 Total Hours392081656
Task 3.0 Deliverables: Functional classification criteria/definitions, Updated Table 5, Access planning exhibits
Task 4.0 - Roadway System
Roadway System - Recreate the future roadway system plam with input from stakeholder groups and the
17SR
1484
4.0
public information meeting
Existing Transportation System - Update Figure 5 to reflect areas recently developed, new roadways and/or
6SR
114
4.1
changes to the City limits.
Future Transportation System - Coordinate with APO to update traffic forecast to
reflect 2035 constrained model assumptions; Update Tables 6 - 10; Update Figure
23LR
14216
4.26 - Future Transportation Network; Update Table 7 - TAZ Boundaries; Update Figure
8 - Full Build-Out Traffic Forecasts; Reassess roadway network deficiences based
upon revised forecast results;
Topics of Discussion - Update status of Field Street, North Corridor/CSAH 2
9SR
1224
4.3
Realignment, Future Location of Southwest Beltway; Correlate the written
description with the updated map representations in the appropriate Figures;
7SR
124
4.4Recommendations - Update Table 12 - Recommendations
Task 4.0 Total Hours
513162862
Task 4.0 Deliverables: Updated Tables 6-10 and 12 and Figures 5-8
Task 5.0 - Pedestrian and Bicycle System
SEH, Inc.11/11/2011
City of Saint Joseph
2011 Transportation Plan Update - Workplan
OPTION 3
Eng Tech
Principal / Senior Trans. Eng. Admin
WORK TASKS
/GIS
Title
Proj. Mgr.Trans. Eng.PlannerTechnicianAssistant
SEHAPO Staff
Specialist
HoursRole
Randy Jennifer
NameMike KotilaBob Rogers
Mike StrnagelDeb Gilyard
SabartSchmitz
3SR
12
5.0Pedestrian and Bicycle System - Reflect the adopted trail plan in the transportation plan
Facility Types - provide descriptions / definitions for various facility types using text
8SR
1124
5.1
and figures
Existing Trail System - Update written descriptions and Table 13 - Existing Intra-
5SR
122
5.2
City Trail System
Future Trail System - Update written descriptions and Table 14 - Future Intra-City
11SR
128
5.3
Trail System; Update Figure 9 - Trails Map
Task 5.0 Total Hours4564827
Task 5.0 Deliverables:
Task 6.0 - Plan Implementation
2SR
2
Plan Implementation
6.0
Transportation Plan Adoption - Update to reflect current status/intent to move the
6SR
24
6.1
plan towards adoption by City Council
Sources of Funding - Update roadway funding sources; Include trail funding
6SR
24
6.2
sources.
Task 6.0 Total Hours
24814
Task 6.0 Deliverables: 20 printed bound, color draft reports and 20 printed and bound final reports. 1-CD with final report in pdf format and o 1 -unbound reproducible original copy.
Task 7.0 - Public Involvement and Project Adminstration
18SR
666
City Staff Meetings - SEH will attend up to three meetings with City staff to review project progress.
7.1
Agency Coordination Meetings - SEH will attend up to two meetings with agency representatives (APO,
12SR
444
7.2
County, MnDOT, etc) to coordination roadway or trail planning updates
Public Involvement - SEH will facilitate one general open house public meetings; Preparer meeting notice,
28SR
44416
7.3
meeting materials, gather and summarize public comments.
Stakeholder Meetings - SEH will attend up to two meetings with specific stakeholders or neighborhod
12SR
444
7.4
groups.
City Council and Planning Commission Meetings - SEH will attend up to two meetings with City Council
12SR
444
7.4
and/or Planning Commission
42SR
2484168
Prepare Draft Reports, Final Reports and Meeting exhibits
7.5
Project Management - Staff oversight, quality control, project communications; invoicing, progress reports,
14SR
122
7.5
and schedule.
Task 7.0 Total Hours36263043210138
Task 7.0 Deliverables: 15 printed bound, color draft reports and 15 printed and bound final reports. CD's included with final report in pdf format. Schedule, Progress Reports, Meeting
Displays and Handouts, Meeting Agendas and Summaries
Reimbursable Expenses
Estimated Mileage Costs$880
Report Reproductions (15 draft + 15 Final w/CD's)$1,200
Open House Boards$400
Reimbursable Expenses Totals$2,480
APO Staff Role
NI - APO Not Involved in Task
SR - APO Support Role in Task
P:\PT\S\STJOE\116965\Agree\[St Joe Trans Plan 3 Options 111011.xlsx]Summary 1
LR - APO Lead Role in Task
SEH, Inc.11/11/2011