HomeMy WebLinkAbout[04] Reliable Rolloff -Clarification on Condional Use Permit 04.'0E./ 2012 12:04 13203E31194 PELI ,ELE ROLLOFF PAGE E11
Rel iable Rolloff LLO
POBox 'P
Saint Joseph, MN 56374
_'
L LAPI
(320) 363 - 1194 office `'��� gyp
(320) 248 -9431 cell
April 6, 2012
Judy Weyrens,
I am requesting that I can have 80 containers on my
2 Tots in the Industrial Park East. Of those 80 containers,
10 can be loaded with debris for processing. All
containers containing debris outside must be covered.
Both lots are screened with 8' high fence from the
roadway. Any other questions call 248 -9431
Thank you for your help.
Tom Dullinger
Reliable Roiloff
STATE OF MINNESOTA ST. JOSEPH JOINT PLANNING BOARD
COUNTY OF STEARNS CONDITIONAL USE PROCEEDINGS
In the matter of:
A request for conditional use submitted by Tom and Susan Dullinger to allow the construction of a
facility to operate a transfer station was considered by the Joint Planning Board on March 12, 2012. The
matter was duly published and notice was provided to property owners within 350 feet of the above
referenced property.
PROPERTY ADDRESS: 8232 Delta Circle
PROPERTY IDENTIFICATION NUMBER: Lots 04 and Lot 05 Block 01 St. Joseph Industrial Park.
The St. Joseph Joint Planning Board acknowledged the following information in consideration of the
request for Conditional Use to allow for the construction of a facility to operate a transfer station:
1. The subject property is currently zoned Industrial and located within the St. Joseph
City/Township Orderly Annexation area.
2. The applicant currently owns and operates Reliable Rolloff which has been in business for 14
years. Reliable Rolloff provides ten (10) yard dumpsters for homebuilders, remodelers, and
residential cleaning which is currently operated at the address stated above.
3. The property owner has a desire to promote and manage his business by recycling, reusing or
donating useable items. The proposed facility would allow the dumpsters to be located
inside a warehouse were the material can be filtered.
4. The proposed use is consistent with the Steams County Comprehensive Plan an meets the
goal of encouraging industrial development within existing communities, including
redevelopment of existing sites and filling of industrial and business parks.
5. The proposed use will require the construction of 20' x 20' addition to the existing office and
a 50' x 70' addition to the existing storage space.
6. The proposed expansion can and will meet all zoning setback and site regulations including
impervious surfacing.
DECISION AND CONCLUSION
Based on the Finding of Fact, the St. Joseph Joint Planning Board approves the request Tom and
Susan Dullinger to secure a Conditional Use Permit to allow the construction of a facility to operate a
transfer station based on the following:
1. The property will conform to all the performance standards identified in Stearns County
Ordinance #439 or successor Ordinances.
2. The impervious surface plan submitted with the application will be implement no later than
August 1, 2012. The re- vegetation shall consist of working up the soil, adding a minimum of
4 inches tope soil and seeding.
3. A financial guarantee in the form of a letter of credit, cash or bond equal to 125% of the
impervious plan cost must be submitted to Stearns County prior to issuance of a construction
site permit.
4. If there will be running water within any part of the structure, a sub - surface sewage treatment
system permit must be submitted no later than June 15, 2012 and installed within 10 months
of the date of this resolution.
5. All required solid waste transfer station licenses/registrations shall be obtained from Stearns
County and the Minnesota Pollution Control Agency.
6. Any material stored outside must be contained within dumpsters and covered and no more
than ten (10) dumpster containing material shall be located outside at any given time.
7. No more than 80 empty containers shall be stored on site provided they are located in a
screened area.
8. Biodegradable waste shall not be stored or delivered to the property.
ST. JOSEPH JOINT PLANNING BOARD
By
Jerome Salzer, Chair
By
Ann Reischl, Secretary
St. Joseph Township Clerk
Drafted by:
City of St. Joseph
PO Box 668
St. Joseph MN 56374
320.363.7201
St. Joseph Joint Planning Board
IN RE:
FINDINGS OF FACT
Application of Tom Dullinger AND DECISION
Conditional Use Permit Transfer Station
FINDINGS OF FACT
On March 12, 2012 the St. Joseph Joint Planning Board conducted a public hearing to consider
the application of Tom and Susan Dullinger to secure a Conditional Use Permit to allow the construction
of a facility to operate a transfer station. The property is located at 8232 Delta Circle and the matter
was duly published and notice was provided to property owners within 350 feet of the above referenced
property.
The St. Joseph Joint Planning Board acknowledged the following information in consideration of
the request for Conditional Use to allow for the construction of a facility to operate a transfer station:
1. The subject property is currently zoned Industrial and located within the St. Joseph
City/Township Orderly Annexation area.
2. The applicant currently owns and operates Reliable Rofloff which has been in business for 14
years. Reliable Rolioff provides ten (10) yard dumpsters for homebuiiders, remodelers, and
residential cleaning which is currently operated at the address stated above.
3. The property owner has a desire to promote and manage his business by recycling, reusing
or donating useable items. The proposed facility would allow the dumpsters to be located
inside a warehouse where the material can be filtered.
4. The proposed use is consistent with the Stearns County Comprehensive Plan and meets the
goal of encouraging industrial development within existing communities, including
redevelopment of existing sites and filling of industrial and business parks.
5. The proposed use will require the construction of 20' x 20' addition to the existing office and
a 50' x 70' addition to the existing storage space.
6. The proposed expansion can and will meet all zoning setback and site regulations including
impervious surfacing.
DECISION AND CONCLUSION
Based on the Findings of Fact, the St. Joseph Joint Planning Board approves the request Tom and
Susan Dullinger to secure a Conditional Use Permit to allow the construction of a facility to operate a
transfer station based on the following:
1. The property will conform to all the performance standards identified in Stearns County
Ordinance #439 or successor Ordinances.
2. The impervious surface plan submitted with the application will be implemented no later
than August 1, 2012. The re- vegetation shall consist of working up the soil, adding a
minimum of 4 inches top soil and seeding.
3. A financial guarantee in the form of a letter of credit, cash or bond equal to 125% of the
impervious plan cost must be submitted to Stearns County prior to issuance of a
construction site permit.
4. If there will be running water within any part of the structure, a sub - surface sewage
treatment system permit must be submitted no later than June 15, 2012 and installed
within 10 months of the date of this resolution.
5. All required solid waste transfer station licenses /registrations shall be obtained from Steams
County and the Minnesota Pollution Control Agency.
6. Any material stored outside must be contained within dumpsters and covered and no more
than ten (10) dumpsters shall be located outside at any given time.
7. Biodegradable waste shall not be stored or delivered to the property.
Passed by Resolution of the St. Joseph Joint Planning Board on March 12, 2012.
ST. JOSEPH JOINT PLANNING BOARD
By
Jerome Salzer, Chair
By api _
Ann R eary