Introductions & Background
• Introductions
— Randy Sabart, SEH, St. Joseph City Engineer
— Scott Mareck, Executive Director of the St. Cloud Area
Planning Organization (APO)
— Mike Kotila, Sr. Transportation Engineer, SEH
• Background
— Draft Transportation Plan (2006)
— Accepted as Amended (January 2007)
Presentation Outline
• Transportation Planning Principals
— " Transportation Planning 101"
• Purpose of the Transportation Plan
• Highlights of the Updated Plan
— Design Guide (Typical Roadway Cross -Sections)
— Existing Roadway Network
— Future Roadway Network
— Existing and Future Trail System
• Next Steps
Purpose of the Transportation Plan
• The Plan provides policy and program
guidance needed to make appropriate
transportation related decisions
• Defines an integrated transportation system
to serve existing and future travel needs
• Provides access management guidance to
maintain roadway safety and capacity
• Defines long term needs for right of way
preservation
19
Design Guide (Typical Cross-sections)
• Typical Cross -Sections
— Minor Arterials
— Community Collectors (Major Collectors)
— Neighborhood Collectors (Minor Collector)
121 10,
Driving Paved
Lane Shoulder
221
Minor Arterial
(Two -Lane Rural)
Minor Arterial
(Four -Lane Undivided Urban
M hor Arterial
(Four -Lane Urban Divided
L
R/W
R./W
IIY T 10k 121 12F 1 10t
1 1 - - - - I- Trail hou I r Driving [ ri r houlde
Parking Lane
LParking
2' 2'
$o'
Community Collector
(Two -Lane Urban)
Community Collector
(Three -Lane Urban)
1 00' width alarm add ng right
tum Iarm i0t htorsect ana,
x"12' leas and 4' Moulder
R/W R/W
1' in- 3--13- 'I-V 12' 12' 14! 14'-24'
Tamil Drlhft Xving Drib ng Driving
Lane Lane Lane Laren
26
80'-100'
Commun4 Collector
(Four -Lane Undivided Urban)
OINIIIIII,
RiW RJW
e0r
Him�/j � NeihbarhDad Collector
(�wv-Lana Urban}
II&WO11rVINIG,
R{W R/W
NeiZLane
rhoad Coll�tar
( Urban)
Minimum widths for Municipal State Aid street mfith, parking on 'both sides.
is rn 1 n imam 1 f pa rkin g 1 s al lawed on one srd a.
LWU
1
LU
wr
-.mrJ LU �
tow %am>
NO
Future Northl ou#h Arterial
f �To Be Determined as pari
of Ste' S e e tWa YL t uJY)
00/
Legend
Futu re Transpo rtat -in Network
Community Collector Future Interchang e'
Y
Potential COlInfInUnity Collector Study Area
Neighborhood Collector
Minor Arterial
Potential MI iior Arterial
Principal Arterial
I:D Project Emits
I City Limits
0 4.0G0
-eet
N
_
North Corridor AfIg meet
i
to be Determined
I
AL
k -JOWL 'm
_.
i
JI
I
M
Uepen�eal
upon
SW Beltway
Alignment
YER S.
LWU
1
LU
wr
-.mrJ LU �
tow %am>
NO
Future Northl ou#h Arterial
f �To Be Determined as pari
of Ste' S e e tWa YL t uJY)
00/
Legend
Futu re Transpo rtat -in Network
Community Collector Future Interchang e'
Y
Potential COlInfInUnity Collector Study Area
Neighborhood Collector
Minor Arterial
Potential MI iior Arterial
Principal Arterial
I:D Project Emits
I City Limits
0 4.0G0
-eet
N
KI
ISPOW 3
fi2 0
MEMO Owl=
400
MOP=
jj4v=
own
Cp
..�
Soo
1200
6401D 22700 2Aiia
L
L
Legend
Future Transportation Network
Community 011e for
Potential Community Collector
Neighborhood Collector
M-1norArterial
Potentia I Minor Arteria I
Principal Arterial
Project Limits
City Limits
"rDGEWOGD a�
T IN
�L 1400 AY, RS7 C3
E:31
490-1■
Zn
>
LD < M
C9
U)
T Ui
0
L r
SSUO
C4 L MOO
W� OEM
400P
-zoo 52W
# wilt
rp
Ob f
IRAW
14
n
AN
Next Steps /Implementation
• Finalize Transportation Plan Update
• Adoption of Plan
• Incorporate the Transportation Plan into the
City's Comprehensive Plan
• Use plain in preparation of the City's Capital
Improvement Program (CIP)
• Work with Stearns County, MnDOT & APO to
apply for grants and program funding
• Share plan with townships. Facilitate periodic
joint planning sessions.
• Review plan
reflect chant
periodically, make adjustments to
es, new issues,
Olici
es, etc.
Questions