No. of Stalls
Location (with ponds) Option 1 Option 2 Option 3 ** Option 4 **
Existing site
22,000 SF Option
299200 SF Reduced Option
Total building area
227000 SF Total
297200
SF Total
Community room
(2,364) 225 p
(37600)
300 p
Council Chambers
(1,578) 35 p
(17600)
40 p
Lobby
(17872)
(1,592)
Lot 32
PD garage
(2,866)
(47400)
23
PD sallyport
(819)
(1,024)
Toilet rooms
(273)
(500)
Lot 34
Toilet rooms
(246)
16
Break and toilets
(239)
(192)
Intox toilet
(85)
(64)
Lot 34, 24, and alley
Kitchen
(174)
(290)
Locker room
(584)
(800)
Locker room
(347)
117
123
Mechanical /electrical /jan
(300)
300
Evidence storage
(474)
(384)
CR storage
(181)
(225)
CC storage
(96)
(100)
building
Records
(267)
(80)
Storage
(204)
(17104)
Subtotal
97031 SF Net
137545
SF Net
Parking - Office (1 /250sf)
250 36 stalls
250 54
stalls
Parking - Comm Rm (1/4 seats)
4 56 stalls
4 75
stalls
Parking - Chambers (1/4 seats)
4 9 stalls
4 10
stalls
Total Parking Required
101 stalls
139
stalls
No. of Stalls
Location (with ponds) Option 1 Option 2 Option 3 ** Option 4 **
Existing site
32
32
32
10
10
Lot 25
30
30
Lot 25 and 29
62
62
62
62
Lot 32
23
23
23
23
23
Lot 26 (swap with SJMM)
23
Lot 34
16
16
16
Lot 24 (partial)
38
38
38
Lot 34, 24, and alley
60
Total
117
123
111
149
Required - 22,OOSF Option
101
Required - 29,200SF Option
139
* *Options 3 and 4 include new building and anticipate greater
building
coverage of existing site with limited on -site parking.
CONCEPT ESTIMATE
St. Joseph Government Center
November 1, 2012
hag ern-eister macs
Notes:
1 This estimate is the property of RA Morton and Associates, Inc. Use or circulation of this document is prohibited without written consent from RA Morton.
2 Costs represented are based on the 'Better" model on the Good /Better /Best scale.
3 Costs do not reflect relocation during construction.
4 Option 1 assumes no work in the basement except locker room area. Costs is represented in line 26.
5 Option 1 assumes gutting of the 1st floor and basement locker room area.
6 Option 2 is not represented in this recap and is a variation of option 1 with a second floor addition.
7 Option 3 includes costs for removal of existing building to accommodate new layout.
8 Option 4 assumes a new site yet to be determined. Costs of land and site improvements are a projection at this time.
9 Option 4 & 5 Property Sale is only a projection. Current mortgage less sale price will be the value assigned to budget. The current mortgage debt is ($345,000).
10 Soft costs are only projections except the Architect and Engineer fees at 7 %.
11 Option 5 is based on HMA concept plan and Includes more square footage of building and property than other options.
12 The general condition line items do not reflect building permit and builders risk insurance cost. The estimated vale is $28,301.00.
ADDITION /RENOVATION
NEW FACILITY LOCATED AT
NEW FACILITY LOCATED AT
RENOVATED BUILDING
EXISTING ONE ACRE SITE
EXISTING ONE ACRE
SITE
ALTERNATIVE
SITE
KENNEDY
17 ACRE
SITE
TOTAL BUILDING 21,976 SF
TOTAL BUILDING 21,976 SF
TOTAL BUILDING 21,976 SF
TOTAL
BUILDING 41,665 SF
Dollars
Square Feet
Cost/SF
oars
Square Feet
Cost/SF
oars
Square Feet
Cost/51-
oars
quare eet
ost
1 1. LAND COSTS
2
3 LAND
$
-
$
-
$
-
$
-
$
400,000
$ -
$
3,000,000
$
-
4 LAND PURCHASE ADDITIONAL PARKING
TBD
$
-
TBD
$
-
$
-
$ -
$
-
$
-
5 PROPERTY SALE
$
-
$
-
$
-
$
-
$
150,000
$ -
$
150,000
$
-
6 DEMOLITION
$
-
$
-
$
50,000
$
-
TBD
$ -
$
-
$
-
7 TEMPORARY CONSTRUCTION RELOCATION
TBD
$
-
TBD
$
-
$
-
$ -
$
-
$
-
8 TOTAL LAND COST $
-
$
-
$
50,000
$
-
$
550,000
$ -
$
3,150,000
$
-
9
10 H. CONSTRUCTION COSTS
11
12 GENERAL CONDITIONS /OVERHEAD
$
69,224
21,976
$
3.15
$
69,224
21,976
$
3.15
$
69,224
21,976
$ 3.15
$
99,163
41,665
$
2.38
13
14 SITE IMPROVEMENTS
$
102,312
Allowance
$
-
$
185,000
Allowance
$
-
$
300,000
Allowance
$ -
$
372,441
Allowance
$
-
15
16 PD SUPPORT / GARAGE
$
468,185.50
5,050
$
92.71
$
530,250.00
5,050
$
105.00
$
530,250.00
5,050
$ 105.00
$
483,704
5,660
$
85.46
17
18 PD OFFICES EXPANSION
$
88,011.20
670
$
131.36
$
83,750.00
670
$
125.00
$
83,750.00
670
$ 125.00
$
714,032
6,420
$
111.22
19
20 CITY OFFICES EXPANSION
$
89,324.80
680
$
131.36
$
85,000.00
680
$
125.00
$
85,000.00
680
$ 125.00
$
1,284,475
11,360
$
113.07
21
22 LOBBY/ COMMONS EXPANSION
$
240,103.44
1,656
$
144.99
$
223,560.00
1,656
$
135.00
$
223,560.00
1,656
$ 135.00
$
-
-
$
-
23
24 COMMUNITY ROOM/ SUPPORT EXPANSION
$ 395,671.50
3,150
$
125.61
$ 393,750.00
3,150
$
125.00
$ 393,750.00
3,150
$ 125.00
$
488,622
5,735
$
85.20
25
26 COUNCIL CHAMBERS/ SUPPORT EXPANSION
$ 352,134.60
2,370
$
148.58
$ 319,950.00
2,370
$
135.00
$ 319,950.00
2,370
$ 135.00
$
-
-
$
-
27
28 POLICE / CITY OFFICES RENOVATION
$
497,664.00
4,800
$
103.68
$
600,000.00
4,800
$
125.00
$
600,000.00
4,800
$ 125.00
$
-
-
$
-
29
30 BASEMENT / OPTION 5 RENTAL SPACE
$
-
3,600
$
-
$ 450,000.00
3,600
$
125.00
$ 450,000.00
3,600
$ 125.00
$
726,758
8,890
$
81.75
31
32 GYMNASIUM
$
-
-
$
-
$
-
-
$
-
$
-
-
$ -
$
294,300
3,600
$
81.75
33
34 CONSTRUCTION MANAGEMENT FEES
211,000
211,000
211,000
211,000
35
36 CONSTRUCTION CONTINGENCY
275,000
275,000
275,000
450,428
37
38 TOTAL CONSTRUCTION COST $
2,788,631
21,976
$
126.89
$
3,426,484
21,976
$
155.92
$
3,541,484
21,976
$ 161.15
$
5,124,922
41,665
$
123.00
39
40 111. SOFT COSTS AND OWNER ITEMS
41 BOND, FINANCE & LEGAL COSTS
$
30,000
$
1.37
$
30,000
$
1.37
$
30,000
$ 1.37
$
30,000
$
0.72
42 ARCHITECT & ENGINEER FEES 7%
$
195,204
$
8.88
$
239,854
$
10.91
$
247,904
$ 11.28
$
358,745
$
8.61
43 CIVIL ENGINEERING
$
20,000
$
0.91
$
20,000
$
0.91
$
30,000
$ 1.37
$
30,000
$
0.72
44 SURVEY / SOIL BORINGS
$
5,000
$
0.23
$
5,000
$
0.23
$
10,000
$ 0.46
$
10,000
$
0.24
45 DESIGN CONTINGENCY
$
-
$
-
$
-
$
-
$
-
$ -
$
-
$
-
46 FURNITURE, FIXTURES & EQUIPMENT
$
400,000
$
18.20
$
400,000
$
18.20
$
400,000
$ 18.20
$
400,000
$
9.60
47 FIBER OPTIC CONNECTION
$
-
$
-
$
-
$
-
$
-
$ -
$
-
$
-
48 TECHNOLOGY
$
150,000
$
6.83
$
150,000
$
6.83
$
150,000
$ 6.83
$
150,000
$
3.60
49 TOTAL SOFT COST $
800,204
21,976
$
36.41
$
844,854
21,976
$
38.44
$
867,904
21,976
$ 39.49
$
978,745
41,665
$
23.49
50
51 IV. TOTAL PROJECT COST
$
3,588,836
21,976
$
163.31
$
4,321,338
21,976
$
196.64
$
4,959,388
21,976
$ 225.67
$
9,253,667
41,665
$
222.10
Notes:
1 This estimate is the property of RA Morton and Associates, Inc. Use or circulation of this document is prohibited without written consent from RA Morton.
2 Costs represented are based on the 'Better" model on the Good /Better /Best scale.
3 Costs do not reflect relocation during construction.
4 Option 1 assumes no work in the basement except locker room area. Costs is represented in line 26.
5 Option 1 assumes gutting of the 1st floor and basement locker room area.
6 Option 2 is not represented in this recap and is a variation of option 1 with a second floor addition.
7 Option 3 includes costs for removal of existing building to accommodate new layout.
8 Option 4 assumes a new site yet to be determined. Costs of land and site improvements are a projection at this time.
9 Option 4 & 5 Property Sale is only a projection. Current mortgage less sale price will be the value assigned to budget. The current mortgage debt is ($345,000).
10 Soft costs are only projections except the Architect and Engineer fees at 7 %.
11 Option 5 is based on HMA concept plan and Includes more square footage of building and property than other options.
12 The general condition line items do not reflect building permit and builders risk insurance cost. The estimated vale is $28,301.00.
Notes:
1 This estimate is the property of RA Morton and Associates, Inc. Use or circulation of this document is prohibited without written consent from RA Morton.
2 Costs represented are based on the 'Better" model on the Good /Better /Best scale.
3 Relocation during construction specifics are unknown
4 Option 1 assumes no work in the basement except locker room area. Costs is represented in line 27.
5 Option 1 assumes gutting of the 1st floor and basement locker room area.
6 Option 3 includes costs for removal of existing building to accommodate new layout.
7 Option 4 assumes a new site yet to be determined. Costs of land and site improvements are a projection at this time.
8 Option 4 Property Sale is only a projection. Current mortgage less sale price will be the value assigned to budget. The current mortgage debt is ($345,000).
9 Soft costs are only projections except the Architect and Engineer fees at 7 %.
10 The general condition line items do not reflect building permit and builders risk insurance cost. The estimated vale is $28,301.00.
11 Costs for land purchase for additional parking based on estimated market values: Lot 25 - $150,000 (increased for lost revenue), Lot 29 - $74,000, Lot 32 - $80,100, Lot 34 - $84,500, and Lot 24 - $100,600.
CONCEPT ESTIMATE
St. Joseph Government Center
r:r J
November 8, 2012
hagerr} -easier mac k
OPTION 1
OPTION 3
OPTION 4
ADDITION /RENOVATION
NEW FACILITY
LOCATED
AT
NEW FACILITY LOCATED AT
EXISTING ONE ACRE
SITE
EXISTING ONE ACRE
SITE
ALTERNATIVE SITE
TOTAL
BUILDING 29,188
SF
TOTAL BUILDING 29,188
SF
TOTAL BUILDING 29,188 SF
Dollars
Square Feet
Cost/SF
oars
Square Feet
ost
oars
Square Feet Cost/SF
1 1. LAND COSTS
2
3 LAND
$
-
$
-
$
-
$
-
$
400,000
$ -
4 LAND PURCHASE ADDITIONAL PARKING
$
489,200
$
-
$
489,200
$
-
$
-
$ -
5 ADDITIONAL PARKING DEMO /IMPROVEMENTS
$
330,849
$
330,849
6 PROPERTY SALE
$
-
$
-
$
-
$
-
$
150,000
$ -
7 DEMOLITION
$
-
$
-
$
50,000
$
-
$
-
$ -
8 TEMPORARY CONSTRUCTION RELOCATION
$
50,000
$
-
$
50,000
$
-
$
-
$ -
9 TOTAL LAND COST $
870,049
$
-
$
920,049
$
-
$
550,000
$ -
10
11 H. CONSTRUCTION COSTS
12
13 GENERAL CONDITIONS /OVERHEAD
$
91,942
29,188
$
3.15
$
91,942
29,188
$
3.15
$
91,942
29,188 $ 3.15
14
15 SITE IMPROVEMENTS
$
102,312
Allowance
$
-
$
185,000
Allowance
$
-
$
300,000
Allowance $ -
16
17 PD SUPPORT / GARAGE
$
661,449
7,135
$
92.71
$
749,133
7,135
$
105.00
$
749,133
7,135 $ 105.00
18
19 PD OFFICES EXPANSION
$
329,451
2,508
$
131.36
$
643,500
5,148
$
125.00
$
643,500
5,148 $ 125.00
20
21 CITY OFFICES EXPANSION
$
330,751
2,518
$
131.36
$
644,738
5,158
$
125.00
$
644,738
5,158 $ 125.00
22
23 LOBBY/ COMMONS EXPANSION
$
325,023
2,242
$
145.00
$
302,607
2,242
$
135.00
$
302,607
2,242 $ 135.00
24
25 COMMUNITY ROOM/ SUPPORT EXPANSION
$
759,941
6,050
$
125.61
$
756,250
6,050
$
125.00
$
756,250
6,050 $ 125.00
26
27 COUNCIL CHAMBERS/ SUPPORT EXPANSION
$
513,383
3,455
$
148.58
$
466,461
3,455
$
135.00
$
466,461
3,455 $ 135.00
28
29 POLICE / CITY OFFICES RENOVATION
$
547,430
5,280
$
103.68
$
-
-
$
125.00
$
-
- $ 125.00
30
31 BASEMENT REMODEL
$
-
$
-
$
-
-
$
125.00
$
-
- $ 125.00
32
33 GYMNASIUM
$
-
-
$
-
$
-
-
$
-
$
-
- $ -
34
35 CONSTRUCTION MANAGEMENT FEES
211,000
211,000
211,000
36
37 CONSTRUCTION CONTINGENCY
275,000
275,000
275,000
38
39 TOTAL CONSTRUCTION COST $
4,147,682
29,187
$
142.11
$
4,325,631
29,187
$
148.20
$
4,440,631
29,187 $ 152.14
40
41 111. SOFT COSTS AND OWNER ITEMS
42 BOND, FINANCE & LEGAL COSTS
$
30,000
$
1.03
$
30,000
$
1.03
$
30,000
$ 1.03
43 ARCHITECT & ENGINEER FEES 7%
$
290,338
$
9.95
$
302,794
$
10.37
$
310,844
$ 10.65
44 CIVIL ENGINEERING
$
20,000
$
0.69
$
20,000
$
0.69
$
30,000
$ 1.03
45 SURVEY / SOIL BORINGS
$
5,000
$
0.17
$
5,000
$
0.17
$
10,000
$ 0.34
46 DESIGN CONTINGENCY
$
-
$
-
$
-
$
-
$
-
$ -
47 FURNITURE, FIXTURES & EQUIPMENT
$
400,000
$
13.70
$
400,000
$
13.70
$
400,000
$ 13.70
48 FIBER OPTIC CONNECTION
$
-
$
-
$
-
$
-
$
-
$ -
49 TECHNOLOGY
$
150,000
$
5.14
$
150,000
$
5.14
$
150,000
$ 5.14
50 TOTAL SOFT COST $
895,338
29,187
$
30.68
$
907,794
29,187
$
31.10
$
930,844
29,187 $ 31.89
51
52 IV. TOTAL PROJECT COST
$
5,913,069
29,187
$
202.59
$
6,153,474
29,187
$
210.83
$
5,921,475
29,187 $ 202.88
Notes:
1 This estimate is the property of RA Morton and Associates, Inc. Use or circulation of this document is prohibited without written consent from RA Morton.
2 Costs represented are based on the 'Better" model on the Good /Better /Best scale.
3 Relocation during construction specifics are unknown
4 Option 1 assumes no work in the basement except locker room area. Costs is represented in line 27.
5 Option 1 assumes gutting of the 1st floor and basement locker room area.
6 Option 3 includes costs for removal of existing building to accommodate new layout.
7 Option 4 assumes a new site yet to be determined. Costs of land and site improvements are a projection at this time.
8 Option 4 Property Sale is only a projection. Current mortgage less sale price will be the value assigned to budget. The current mortgage debt is ($345,000).
9 Soft costs are only projections except the Architect and Engineer fees at 7 %.
10 The general condition line items do not reflect building permit and builders risk insurance cost. The estimated vale is $28,301.00.
11 Costs for land purchase for additional parking based on estimated market values: Lot 25 - $150,000 (increased for lost revenue), Lot 29 - $74,000, Lot 32 - $80,100, Lot 34 - $84,500, and Lot 24 - $100,600.