Loading...
HomeMy WebLinkAbout[06b] Fog SealingJOA law 0F .ST. ao H�Pu MEETING DATE: March 7, 2013 AGENDA ITEM: Council Agenda Item SUBMITTED BY: Randy Sabart, City Engineer BOARDICOMMISSIONICOMMITTEE RECOMMENDATION: PREVIOUS COUNCIL ACTION: ordered construction of 2012 CSAH 2 Pedestrian Trail Improvements BACKGROUND INFORMATION: Recent research conducted by the Local Road Research Board (LRRB) suggests that adding preventive maintenance activities at an earlier pavement life can extend the serviceable life of a pedestrian trail. Fog sealing is the light application of a diluted, liquid asphalt emulsion (part water" -part asphalt) without the inclusion of aggregate to seal the surface against water penetration and UV radiation. The practice of fog sealing has its roots as a treatment for streets, but it is also being increasingly used for trail pavements. The Council may recall that a similar, specialized product called a "rejuventator" was used on the Klinefelter Park trail a couple of years back. The visual service life (the jet - -black look) of fog seals is relatively short (2 -3 years) and depends on the exposure to sunlight. However, the research suggests that despite the fading of the j et- -black look, the longer term benefit of fog sealing immediately after construction is that the sealant helps fill the very fine pores in the bituminous mixture, reduces the volume of material needed at the subsequent application, and when combined with fixture applications and routine maintenance, has slowed the aging and deterioration of the trail surface. Depending on the weather /temperatures at the time of application, the cure time for a fog seal can vary from several hours to up to a day. Thus, the trail will need to be closed for a relatively brief period of time during the application and to allow the fog seal to cure. Thus, it would be advisable to perform this work while there continues to be an active construction project in the vicinity of the trail and pedestrian traffic more easily managed. Staff solicited two quotes for the work: one from the CSAH 2 general contractor (Knife River) and one from Astech. Knife River quoted $0.39/Square Yard and Astech quoted $0.36/Square Yard. Based on the estimated volume of material to cover the new trail area of 8,250 SY, the cost is estimated to be $3,300. BUDGET/FISCAL IMPACT: $3,300 (estimated) ATTACHMENTS: Email quotes from Knife River and Astech REQUESTED COUNCIL ACTION: Since the two quotes are nearly the same for construction cost, staff recommends accepting Knife River's quote at $.391SY since the work can be covered by the CSAH 2 project warranty and the work administered more efficiently through the County's present contract process. P:1PTASISTJOE11174151corr\RfCA Fog Seal Quote 022713.doc :.: - RE: CSAH 2 Trail Fog Sealing note - g Q .......,:. Ringstad, Patrick to: Randy Sabart 02/04/2013 04:48 PM 1 History: This message has been forwarded. We can do the fog eal for $0.39 /SY. That is using a slight dilution but we g g g need to spray the fog seal a bit richer to allow it to blend. If you wish to do it, please have the county write a work order for the bike 1 f trail sub-project. Thanks [ Patrick f -- -- ---- -- original message---- ----- From: Randy Sabart [mailto:rsabart @sehinc.com] Sent: Noonday, f February 04, 2013 8-053 ANA To: Ringstad, Patrick Cc: Terry Thene; Miller, Jeffrey Subject: CSAH 2 Trail -- Fog Sealing Quote F Good morning Patrick! Would you provide me a quote for spraying a fog seal on the new CSAH 2 trail with CSS- -lh diluted at an application rate of 0.12 GAL/SY (unless you would recommend a lower rate). The area of trail is 8,250 SY. Sincerely, Randy Sabart, PE I Principal, Project Manager SEH Inc. 1 1200 25th Avenue South I St. Cloud, MN 56302 --1717 320.229.4348 direct 1 320.250.9187 cell 1 888.908.8166 fax www.sehinc.com SEH—Building a Better world for All of Us STJCE 117415, 14 Page 1 of 2 RE: CSAH 2 Fog Seal -j .r D.R. :3 Strandberg to' 1 ry Randy Sabart 02/08/2013 09:15 AM Hide Details From: T.R. Strandberg" <astechdale@hotmaii.com> To: Randy Sabart C rsabart@sehinc =com >, History: This message has been forwarded. 1 Attachment Stearns Co CSAH 2 Trail Fog Seal . pdf Randy, Please see attached. Dale Strandberg Vice- Presiden t Astech Corp. Phone: 320- 363 -8500 Fax: 320- 363 -8700 Mobile: 320 -248 -9121 Email: astechdale @ho tmail, corn > Subject: Re: CSAH 2 Fog Seal > To: astechdale @hotmail.com > From: rsabart @sehinc.com > Date: Thu, 7 Feb 2013 16:26:35 -0600 • Yes. Parallel to the north side of the Minnesota Street section, and then • north along the east side of CSAH 2 is a new bituminous trail. • There is a small section of trail that will be built this spring along CSAH • 3, between CSAH 75 and the Wobegon Trail, that is also included in • the 8,250 SY trail measurement. > The trail is shown as a solid pink link on the attached exhibit: > (See attached file: sjcsah2trailexl.pdf) > Sincerely, > Randy Sabart, PE j Principal, Project Manager > SEH Inc. 1 1200 25th Avenue South I St. Cloud, MN 56302 -1717 > 320.229.4348 direct 1320.250.9187 cell 1888.908.8166 fax > www.sehinc.com > SEH -- Building a Better World for All of Us file: HC: \Users\rsabart \AppData\ Local \Temp \notes00947E \— web6234.htm 212512013 Page 2 of 2 > From: T.R. Strandberg" <astechdale@hotmail.com> > To: <rsabart @sehinc.com>, > Date: 02/07/2013 04:11 PM > Subject: CSAH 2 Fog Seal > Randy, > Doug sent your email to me. > Just to be clear. is the section of CSAH 2 you want fog sealed the new > section just west of St. Joseph ? > Dale Strandberg > Vice - President > Astech Corp. > Phone: 320--363 -8500 > Fax: 320--363 --8700 > Mobile: 320- 248-9121 > Email: astechdale @hotmail.com file: HC: \Users\rsabart\AppD ataTo caffemp lnotes00947E\— web6234.htm 2/25/2013 a�4SPF[jkLT SUffACE TECHNOLOWES CORPORATION PeOv BOX 1025 ST. CLOUD, MN PHONE% 3E0- 363 —$500 FAX*'b 320-363%-8700 PROJECT NAME STEARNS CO., MN CSAH 2 TRAIL FOG SEAL DATE BID 21812013 ENGINEER S.E.H. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT I I FOG SEAL TRAIL {CSS -1 H 50150 DILUTE SQ. YD. 1 81250.000 $ 0,388 $ 21970.00 TOTAL $ 29970.00 PRICE INCLUDES ALL MATERIALS, EQUIPMENT, LABOR, SWEEPING, TEMP- TRAFFIC CONTROL. PRICE INCLUDES 'I MOBILIZATION. SUBMITTED BY DALE STRANDBERG ASTEGH CORP 320 - 363 -8500 OFFICE 320 -248 -9121 CELL