Loading...
HomeMy WebLinkAbout[06a] 2013 Street ImprovementMEETING DATE: AGENDA ITEM: Council Agenda Item 6(a) June 17, 2013 Engineer Reports — 2013 Street Improvement SUBMITTED BY: Administration /Engineering BOARD /COMMISSION /COMMITTEE RECOMMENDATION: PREVIOUS COUNCIL ACTION: The City Council on February 7, 2013 ordered the improvement for the project entitled 2013 Bituminous Overlay and on April 25, 2013 authorized the City Engineer to solicit bids for the making of the improvements. BACKGROUND INFORMATION: On Wednesday, June 12 the City Engineer opened the bids for the proposed improvement (see following pages). The City has in the past conducted the assessment hearing before awarding the contract to minimize risk. Therefore the Council is being asked to conduct a public hearing on Tuesday, July 9, 2013 a 6:30 PM. The contract would be awarded after the assessment hearing is conducted. The project is scheduled to be constructed this year following the assessment hearing. ATTACHMENTS: Request for Council Action Resolution 2013 -023 Bid Results and Recommendation REQUESTED COUNCIL ACTION: Authorize the Mayor and Administrator to execute Resolution 2013 -023 authoring the hearing on the proposed assessments for the 2013 Bituminous Overlay Improvement. This page intentionally left blank IA"'�\ ' ­ ',,, i , 1 <RV, CITE' CAF ST. JOSEPH Resolution 2013 -023 Hearing on Proposed Assessment 2013 Bituminous Overlay (STJOE 123390) WHEREAS, by a resolution passed by the council on June 17, 2013, the City Administrator was directed to prepare a proposed assessment of the cost or the 2013 bituminous overlay improvement which affects the following areas: Baker Street, from 2nd Avenue SE to 7th Avenue SE; 7th Avenue SE from Baker Street to Minnesota Street E; Ridgewood Court, from Ridgewood Road (CR 134) to the cul -de -sac, approximately 1,100 feet west of Ridgewood Road (CR 134); Cedar Street E, from 1st Avenue NE to Northland Drive; 1st Avenue NE, from Cedar Street to Date Street E; Date Street E, from College Avenue N (CSAH 2) to 1st Avenue NE; Date Street W, from 1st Avenue NW to College Avenue N (CSAH 2); and 1st Avenue NW, from CSAH 75 to Date Street W. AND WHEREAS, the City Administrator has notified the council that such proposed assessment has been completed and filed in her office for public inspection, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ST. JOSEPH, MINNESOTA: A hearing shall be held on 9th day of July, 2013 in the city hall at 6:30 PM to pass upon such proposed assessment and at such time and place all persons owning property affected by such improvement will be given an opportunity to be heard with reference to such assessment. The City Administrator is hereby directed to cause a notice of the hearing on the proposed assessment to be published once in the official newspaper at least two weeks prior to the hearing, and he /she shall state in the notice the total cost of the improvement. He /she also cause mailed notice to be given to the owner of each parcel described in the assessment roll not less than two weeks prior to the hearings. The owner of any property so assessed may, at any time prior to certification of the assessment to the county auditor, pay the whole of the assessment on such property, with interest accrued to the date of payment, to the City Administrator, except that no interest shall be charged if the entire assessment is paid within 30 days from the adoption of the assessment. He /she may at any time thereafter, pay to the City Administrator the entire amount of the assessment remaining unpaid, with interest accrued to December 31 of the year in which such payment is made. Such payment must be made before November 15 or interest will be charged through December 31 of the succeeding year. Adopted by the council this day of , 2013. Rick Schultz, Mayor Judy Weyrens, Administrator This page intentionally let blank i SEH Building a Better World for All of Us'" June 12, 2013 Honorable Mayor and Members of the City Council c/o Judy Weyrens City Administrator City of St. Joseph 25 College Avenue North PO Box 668 St. Joseph, MN 56374 -0668 Dear Mayor and Members of the City Council: RE: St Joseph, Minnesota 2013 Bituminous Street Improvements SEH No. STJOE 124425 7 Bids were opened in the City Hall at 11:00 a.m. on Wednesday, June 12, 2013, for the above - referenced improvement. The low bid was submitted by Knife River Corporation, of Sauk Rapids, Minnesota. A complete tabulation of bids is enclosed. We know of no reason the project should not be awarded to the low bidder for the amount of $312,501.25. Please contact me if you have any questions. SiCXa'n4 cerely, Randy J. Sabart, PE City Engineer mrc Enclosure c: Terry Thene, City of St. Joseph (w /enclosure) p: \pt\s \stjoe \124425 \1- gen \14- coin \1 -city recco=end - 061213. doe Engineers I Architects I Planners I Scientists Short Elliott Hendrickson Inc., 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302 -1717 SEH is an equal opportunity employer I www.sehinc.com 1 320.229.4300 1 800.572.0617 1 888.908.8166 fax -A SEH TABULATION OF BIDS PROJECT NO.: STJOE 124425 NAME: 2013 BITUMINOUS OVERLAY IMPROVEMENT OWNER: CITY OF ST. JOSEPH, MN BID DATE: WEDNESDAY, JUNE 12, 2013 @ 11:00 AM Page 1 11 11,095.00 SQ YD MILL BITUMINOUS SURFACE $0.80 $8,876.00 $1.70 1 $1.45 2 (0-1") ENGINEER'S ESTIMATE KNIFE RIVER CORP. HARDRIVES, INC. ITEM QUANTITY UNIT DESCRIPTION UNIT TOTAL UNITCOST TOTAL UNITCOST TOTAL GENERAL (3 „) 13 370.00 TON 1 1.00 LUMP SUM MOBILIZATION $8,000.00 $8,000.00 $8,750.00 $8,750.00 $9,000.00 $9,000.00 2 1.00 LUMP SUM TRAFFIC CONTROL $4,500.00 $4,500.00 $4,500.00 $4,500.00 $4,626.15 $4,626.15 3 29.00 EACH INLET PROTECTION $100.00 $2,900.00 $130.00 $3,770.00 $131.00 $3,799.00 4 475.00 LIN FT REMOVE CONCRETE CURB $4.00 $1,900.00 $3.90 $1,852.50 $4.27 $2,028.25 BITUMINOUS MATERIAL FOR $2.50 $3,787.50 AND GUTTER $3,787.50 $2.25 $3,408.75 TACK COAT 5 105.00 SQ YD REMOVE CONCRETE WALK $6.00 $630.00 $5.75 $603.75 $6.30 $661.50 6 350.00 SO YD REMOVE BITUMINOUS $3.50 $1,225.00 $2.95 $1,032.50 $3.23 $1,130.50 PAVEMENT 17 50.00 CU YD AGGREGATE SHOULDERING $20.00 $1,000.00 $49.00 7 920.00 LIN FT SAWING BITUMINOUS $4.50 $4,140.00 $2.75 $2,530.00 $3.01 $2,769.20 18 20.00 PAVEMENT COMMERCIAL BITUMINOUS $35.00 $700.00 $70.00 $1,400.00 $32.69 8 155.00 LIN FT SAWING CONCRETE $6.50 $1,007.50 $4.20 $651.00 $4.60 $713.00 19 60.00 SQ YD COMMERCIAL GRAVEL PAVEMENT $1,200.00 $10.00 $600.00 $11.82 $709.20 9 223.75 SQ FT SIGN PANELS, TYPE C $43.00 $9,621.25 $34.00 $7,607.50 $37.00 $8,278.75 10 27.00 EACH STREET NAME SIGN $300.00 $8,100.00 $200.00 $5,400.00 $219.00 $5,913.00 $500.00 $3,000.00 $375.00 ASSEMBLY $382.63 $2,295.78 CASTING 11 11,095.00 SQ YD MILL BITUMINOUS SURFACE $0.80 $8,876.00 $1.70 $18,861.50 $1.45 $16,087.75 (0-1") 12 1,175.00 SQ YD MILL BITUMINOUS SURFACE $1.25 $1,468.75 $3.50 $4,112.50 $3.70 $4,347.50 (3 „) 13 370.00 TON TYPE SP 12.5 WEARING $64.00 $23,680.00 $59.00 $21,830.00 $56.70 $20,979.00 COURSE MIXTURE (2,B) 14 2,535.00 TON TYPE SP 9.5 WEARING $64.00 $162,240.00 $60.00 $152,100.00 $60.25 $152,733.75 COURSE MIXTURE (2,B) 15 1,515.00 GAL BITUMINOUS MATERIAL FOR $2.50 $3,787.50 $2.50 $3,787.50 $2.25 $3,408.75 TACK COAT 16 350.00 SQ YD FULL DEPTH STREET $45.00 $15,750.00 $31.30 $10,955.00 $32.74 $11,459.00 RESTORATION 17 50.00 CU YD AGGREGATE SHOULDERING $20.00 $1,000.00 $49.00 $2,450.00 $40.00 $2,000.00 CLASS 1 (LV) 18 20.00 SQ YD COMMERCIAL BITUMINOUS $35.00 $700.00 $70.00 $1,400.00 $32.69 $653.80 DRIVEWAY 19 60.00 SQ YD COMMERCIAL GRAVEL $20.00 $1,200.00 $10.00 $600.00 $11.82 $709.20 DRIVEWAY 20 18.00 EACH ADJUST MANHOLE CASTING $300.00 $5,400.00 $175.00 $3,150.00 $346.06 $6,229.08 21 6.00 EACH ADJUST FRAME & RING $500.00 $3,000.00 $375.00 $2,250.00 $382.63 $2,295.78 CASTING 22 4.00 EACH EXTERNAL CHIMNEY SEAL $250.00 $1,000.00 $175.00 $700.00 $219.08 $876.32 23 1.00 EACH ADJUST CURB BOX $150.00 $150.00 $125.00 $125.00 $136.93 $136.93 24 22.00 EACH ADJUST VALVE BOX $200.00 $4,400.00 $150.00 $3,300.00 $237.10 $5,216.20 25 1.00 EACH CONNECT TO EXISTING $900.00 $900.00 $750.00 $750.00 $821.56 $821.56 STqffM A�M%nckson Inc., 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302 -1717 SEH is an equal opportunity employer I www.sehinc.com 1 320.229.4300 1 800.572.0617 1 888.908.8166 fax 6/12/2013 Page 2 I TABULATION OF BIDS PROJECT NO.: STJOE 124425 NAME: 2013 BITUMINOUS OVERLAY IMPROVEMENT OWNER: CITY OF ST. JOSEPH, MN BID DATE: WEDNESDAY, JUNE 12, 2013 @ 11:00 AM Short Elliott Hendrickson Inc., 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302 -1717 SEH is an equal opportunity employer I www.sehinc.com 1 320.229.4300 1 800.572.0617 1 888.908.8166 fax 6/12/2013 1 2 ENGINEER'S ESTIMATE KNIFE RIVER CORP. HARDRIVES, INC. ITEM QUANTITY UNIT DESCRIPTION UNIT TOTAL UNIT COST TOTAL UNIT COST TOTAL 26 1.00 EACH CONSTRUCT DRAINAGE $2,000.00 $2,000.00 $1,950.00 $1,950.00 $2,136.06 $2,136.06 STRUCTURE DES 48 -4020 27 1.00 EACH CONSTRUCT DRAINAGE $1,500.00 $1,500.00 $1,700.00 $1,700.00 $1,862.20 $1,862.20 STRUCTURE DESIGN H 28 21.00 LIN FT 12" RCP PIPE SEWER DESIGN $40.00 $840.00 $57.50 $1,207.50 $62.99 $1,322.79 3006, CL V 29 945.00 SQ FT 6" CONCRETE WALK W /SAND $4.25 $4,016.25 $6.00 $5,670.00 $10.41 $9,837.45 BEDDING 30 2.00 EACH BOLLARD $300.00 $600.00 $1,000.00 $2,000.00 $328.63 $657.26 31 120.00 SQ FT TRUNCATED DOMES $42.00 $5,040.00 $40.00 $4,800.00 $38.34 $4,600.80 32 20.00 LIN FT CONCRETE VALLEY GUTTER $36.00 $720.00 $37.00 $740.00 $21.91 $438.20 33 455.00 LIN FT CONCRETE CURB & GUTTER, $22.00 $10,010.00 $27.00 $12,285.00 $26.11 $11,880.05 DESIGN B618 34 105.00 LIN FT CONCRETE CURB & GUTTER, $20.00 $2,100.00 $35.00 $3,675.00 $20.63 $2,166.15 DESIGN V 35 1,350.00 SQ YD TURF ESTABLISHMENT $5.00 $6,750.00 $2.50 $3,375.00 $2.74 $3,699.00 (INCLUDES SEEDING, SEED MIX, FERTILIZER, AND HYDRO MULCH) 36 270.00 CU YD SCREENED TOPSOIL $16.00 $4,320.00 $20.00 $5,400.00 $21.91 $5,915.70 BORROW (LV) 37 450.00 LIN FT 24" STOP LINE WHITE -EPDXY $9.00 $4,050.00 $7.00 $3,150.00 $7.67 $3,451.50 38 1,700.00 LIN FT 4" SOLID LINE WHITE -EPDXY $0.65 $1,105.00 $1.40 $2,380.00 $1.53 $2,601.00 39 275.00 LIN FT 6" SOLID LINE WHITE -EPDXY $1.00 $275.00 $4.00 $1,100.00 $4.38 $1,204.50 GRAND TOTAL BID $318,902.25 $312,501.25 $318,646.63 PAPTAS \STJ0EV124425VBidding Documents\bidtab.xls Short Elliott Hendrickson Inc., 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302 -1717 SEH is an equal opportunity employer I www.sehinc.com 1 320.229.4300 1 800.572.0617 1 888.908.8166 fax 6/12/2013 This page intentionally left blank