HomeMy WebLinkAbout[04c] Application for paymentCouncil Agenda Item
crrY OF lil: josom
MEETING DATE: November 7, 2013
AGENDA ITEM: 2013 Bituminous Street Improvements
SUBMITTED BY: Randy Sabart
BOARD/ COMMISSION /COMMITTEE RECOMMENDATION:
PREVIOUS COUNCIL ACTION: Approved Application for Payment No. 1
BACKGROUND INFORMATION:
BUDGET/FISCAL IMPACT:
ATTACHMENTS:
$18,354.48
Application for Payment No. 2
REQUESTED COUNCIL ACTION: Approve Application for Payment No. 2
PAPnS \STJ0E \common \D39 Req Council Action\2013 \124425 PMT #2 110713.doc
THIS PAGE INTENTIONALLY LEFT BLANK
-A
SEH
Building a Better World
for All of Us'"
October 30, 2013
Honorable Mayor and Members of the City Council
c/o Judy Weyrens, City Administrator
City of St. Joseph
25 College Avenue North
PO Box 668
St. Joseph, MN 56374 -0668
Dear Mayor and Members of the City Council:
RE: St Joseph, Minnesota
2013 Bituminous Street Improvements
SEH No. STJOE 124425 14
Enclosed find Application for Payment No. 2 for this project.
We reviewed this application and it appears to be in order. When payment is made, sign all copies and
distribute as follows:
Knife River
SEH
City of St. Joseph
Sincerely,
Randy J. a rt, PE
City Engineer
dig
Enclosures
p.\pt\s\stj" 124125 %7- const\7- raymeot\apl -o.dw
Engineers 1 Architects I Planners 1 Scientists
Short Elliott Hendrickson Inc., 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302 -1717
SEH Is an equal opportunity employer 1 www.ashinc.com 1 320.229.4300 1 800.572.0617 1 888.908.8188 fax
THIS PAGE INTENTIONALLY LEFT BLANK
APPLICATION FOR PAYMENT NO.2
PROJECT NO. STJOE124425
OWNER CITY OF ST. JOSEPH
CONTRACTOR KNIFE RIVER CORPORATION - NORTH CENTRAL
OWNER
CONTRACTOR
SEH
CONTRACTOR FOR. 2013 BITUMINOUS STREET
IMPROVEMENTS
AGREEMENT DATE: 07/09/13
FOR WORK ACCOMPLISHED THROUGH: 10/11113
1
MOBILIZATION
LUMP SUM
$8,750.00
1.00
$8,750.00
13
$0.00
2
TRAFFIC CONTROL
LUMP SUM
$4,500.00
1.00
$4,600.00
0.20
$900.00
3
INLET PROTECTION
EACH
$130.00
29.00
$3,770.00
COAT
$0.00
4
REMOVE CONCRETE CURB AND
LIN FT
$3.90
475.00
$1,852.50
17
$0.00
CU YD
GUTTER
1(LV)
$1,207.60
18
COMMERCIAL BITUMINOUS
SO YD
$2,000.00
5
REMOVE CONCRETE WALK
SO YD
$5.76
105.00
$603.75
ADJUST MANHOLE CASTING
$0.00
5
REMOVE BITUMINOUS PAVEMENT
SO YD
$2.95
350.00
$1,032.50
23
$0.00
7
SAWING BITUMINOUS PAVEMENT
LIN FT
$2.75
920.00
$2,530.00
EACH
$0.00
8
SAWING CONCRETE PAVEMENT
LIN FT
$4.20
155.00
$851.00
STRUCTURE DES 484020
$0.00
9
SIGN PANELS, TYPE C
SO FT
$34.00
223.75
$7,607.50
234.75
$7,981.50
10
STREET NAME SIGN ASSEMBLY
EACH
$200.00
27.00
$5,400.00
12.00
$2,400.00
11
MILL BITUMINOUS SURFACE (0-17
3Q YD
12
MILL BITUMINOUS SURFACE (3')
SO YD
13
TYPE SP 12.5 WEARING COURSE
TON
:31767.50
MIXTURE (2,B)
$10,955.00
14
TYPE SP 9.5 WEARING COURSE
TON
$1,400.00
MIXTURE (2,B)
$800.00
15
BITUMINOUS MATERIAL FOR TACK
GAL
$2,250.00
COAT
$700.00
15
FULL DEPTH STREET
SO YD
$3,3W.00
RESTORATION
$760.00
17
AGGREGATE SHOULDERING CLASS
CU YD
$11,700.00
1(LV)
$1,207.60
18
COMMERCIAL BITUMINOUS
SO YD
$2,000.00
DRIVEWAY
$4,800.00
19
COMMERCIAL GRAVEL DRIVEWAY
BO YD
20
ADJUST MANHOLE CASTING
EACH
21
ADJUST FRAME& RING CASTING
EACH
22
EXTERNAL CHIMNEY SEAL
EACH
23
ADJUST CURB BOX
EACH
24
ADJUST VALVE BOX
EACH
25
CONNECT TO EXISTING STORM
EACH
SEWER
26
CONSTRUCT DRAINAGE
EACH
STRUCTURE DES 484020
27
CONSTRUCT DRAINAGE
EACH
STRUCTURE DESIGN H
28
12" RCP PIPE SEWER DESIGN 3006,
LIN FT
CL V
29
6" CONCRETE WALK W/SAND
SO FT
BEDDING
30
BOLLARD
EACH
31
TRUNCATED DOMES
SO FT
32
CONCRETE VALLEY GUTTER
LIN FT
33
CONCRETE CURB & GUTTER,
LIN FT
DESIGN B618
34
CONCRETE CURB & GUTTER,
LIN FT
DESIGN V
$175.
$375.
$175
$125.
$150.
$760.
1,950
1,700,
$67.
$27
11,095.00
$18,861.50
1,175.00
$4,112.50
370.00
$21,830.00
205.00
$152,100.00
1,515.01
:31767.50
350.00
$10,955.00
50.00
$2,450.00
20.00
$1,400.00
60.00
$800.00
18.00
$3,160.00
8.00
$2,250.00
4.00
$700.00
1.00
$125.00
22.00
$3,3W.00
1.00
$760.00
1.00
$11550.00
1.00
$11,700.00
21.00
$1,207.60
945.00
$5,670.00
2.00
$2,000.00
120.00
$4,800.00
20.013
$740.00
455.00
$12,285.00
105.00
$3,675.00
1
78.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,822.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.90
3.00
369.00
166.00
310.00
768.00
176.00
234.75
12.00
1,175.00
112.54
2,170.41
1,150A0
233.00
78.00
0.00
0.00
24.00
1.00
2.00
1.00
22.00
1.00
1.00
1.00
23.00
1,244.00
0.00
112.00
34.00
337.00
53.00
$4,050.00
$390.00
$1,517.10
$954.60
$914.50
$2,064.50
$739.20
$7,981.50
$2,400.00
$4,112.50
$6,839.85
$130,214.60
$2,675.00
$7,292.90
$3,822.00
$0.00
$D.OD
$4,200.00
$375.00
$350.00
$125.00
$.9,300.00
$750.00
$1,960.00
$1,700.00
$1,322.50
$7,464.00
$0.00
$4,480.00
$1,256.00
$9,099.00
$1,855.00
APPLICATION FOR PAYMENT NO.2
PROJECT NO. STJOE 124425
OWNER CITY OF ST. JOSEPH
CONTRACTOR KNIFE RIVER CORPORATION - NORTH CENTRAL
35
TURF ESTABLISHMENT (INCLUDES
SO YD
$12,421.13
SEEDING, SEED MIX, FERTILIZER,
54.00
$1,050.00
AND HYDRO MULCH)
450.00
36
SCREENED TOPSOIL BORROW (LV)
CU YD
37
24" STOP LINE WHITE -EPDXY
LIN FT
38
4" SOLID LINE WHITE-EPDXY,
LIN FT
39
6" SOLID LINE WHITE -EPDXY
LIN FT
$4.00
TOTAL ITEMS BID
$1,100.00
ORDER
OWNER
CONTRACTOR
SEH
CONTRACTOR FOR: 2013 BITUMINOUS STREET
IMPROVEMENTS
AGREEMENT DATE: 07/09113
FOR WORK ACCOMPLISHED THROUGH: 10/11113
1,350.001 $3,376.001 1 $0.001 690.001 $1,726.00
20.00
270.00
$5,400.00
$12,421.13
$0.00
54.00
$1,050.00
$7.00
450.00
$3,150.00
338.00
$2,365.00
336.00
$2,388.00
$1.40
11700.00
$2,380.00
625.00
$735.00
625.00
$135.00
$4.00
275.00
$1,100.00
279.00
$1,118.00
279.00
$11118100
The undersigned Contractor ceNfles that a0 previous payments received
from the Owner for work done under this conbect have been applied
to discharge In full all obligations the Contractor Incurred In connection
with the work covered by said progress payments. The undersigned Contractor
agrees to pay ell subcontractors within 10 days of receipt of payment from
the municipality for undisputed services provided by the subcontractor.
The Contractor agrees to pay Interest as described under Minnesota state statu
KNIFE RIVER CORP -NORTH CENTRAL
4787 SHADOWWOOD DR NE
SAUK RAPIDS, MN 66379 -9431
BEN
PO BOX 1717
ST. CLOUD, MN 5=2-1717
CITY OF ST. JOSEPH
PO BOX 888
ST. JOSEPH, MN 66374-0888
'Gross Amount Due
$248,422.86
Less Retehage (5 %)
$12,421.13
Amount Eligible to Date
$238,001.53
Less Previous Payments $217,647.05
Amount Due This Application
$18,364.48
BY:
2