Loading...
HomeMy WebLinkAbout[03] St. Joseph Sand and Gravel CITY OF ST. JOSEPH PO BOX 585 PO BOX 668 St. Joseph MN 56374 St. Joseph MN 56374 320-363-8825 320-363-7201 Jweyrens@cityofstjoseph.com MEETING DATE: June 30, 2014 AGENDA ITEM: Public Hearing, Interim Use Permit St. Joseph Sand and Gravel Operate a temporary asphalt plant for four (4) years PREVIOUS BOARD ACTION: Recommended the Stearns County Board of Commissions grant a conditional Interim Use Permit for four (4) years to allow operation of an asphalt plant. BACKGROUND INFORMATION: There has been some question as to why St. Joseph Sand and Gravel has to come before the Joint Planning Board for the renewal of the Interim Use Permit (IUP). When the initial IUP was issued the Joint Planning Board was a recommending body to Stearns County and the Stearns County Planning Commission conducted all hearings forwarding a recommendation to the Board of Commissioners. In December 2010, the Township, City and Stearns County executed a new agreement designating the Joint Planning Board as the governing body for the Orderly Annexation area. ATTACHMENTS: Request for Board Action Public Hearing Notice Application Stearns County Staff Report Draft Findings REQUESTED BOARD ACTION: The application was received on June 10, 2014 requiring the Board to taken action within 60 days of that date. Consider the draft findings provided, while taking into account any public testimony received during the public hearing portion of the meeting. This page intentionally left blank CITY OF ST. JOSEPH PO BOX 585 PO BOX 668 St. Joseph MN 56374 St. Joseph MN 56374 320-363-8825 320-363-7201 Jweyrens@cityofstjoseph.com Notice of Public Hearing NOTICE IS HEREBY GIVEN that the Joint Planning Board of St. Joseph Township and the City of St. Joseph will be conducting a public hearing on Monday, June 30, 2014 at 7:00 PM in the St. Joseph Town Hall, 935 College Avenue South. The purpose of the hearing is to consider an interim use permit to allow a temporary asphalt plant for four (4) years. The request for interim use is in accordance with Sections 4.18, 6.15 and 9.15.7A of Stearns County Land Use and Zoning Ordinance #439 to operate a temporary asphalt plant for four (4) years. The property under consideration is Lot 1 Block 1 St. Joe Sand and Gravel and part of the NE1/4 SE1/4, Section 4 and part of the NW1/4 SW1/4 Section 4, lying westerly of County Road 2, St. Joseph Township (124/29). The request for interim use has been submitted by St. Joseph Sand and Gravel, St. Joseph MN. Publish: June 18, 2014 This page intentionally left blank RE ~INE ILI y,�anl JUN 10 2014 APPLICATION FOR ENVIRONM%TAL SERVICEtONDITIONAL 1 INTERIM USE PERMIT Concrete or Asphalt Mixing Facility Environmental Services Department http: / /co. steams.mn.us/ Environment /LandUscandSubdivision Administration Center Rm 343 - 705 Courthouse Square - St. Cloud, MN 56303 320- 656 -3613 or 1 -800- 450 -0852 - Fax 320- 656 -6484 Application Fee: $ File No. Receipt No. Property Owner - �L�f` �1l'' D 2, E L�-� ' -- -- - Phone �•' .�J `' Property Owner Email Address of Property 3 1,R5 3 U)j� !iLf Mailing Address -o. _ r V (-0 31A Applicant (if different from above) M1G'' +G °1 - �i� _ Phone Applicant Email 1'hna4Z Applicant Mailing A c Parcel I.D. Number(s }3i= z1 -sq� Ck�' Legal Description K 04 5 W 4 tic l l L� dG 0 (� Township __!f Section 03 I Ida 6io q- -/ 114 Mef- (V icNl Section of Ordinance V-6 Section of Ordinance 40.-/b Staff to Complete Overlay Districts Floodplain Airport Conservation Overlay Shoreland: Water Body Name/Number Classification 1. Detailed Description of Request. include current and proposed uses and structures you plan on building; number of employees and hours of business. I . f El 2. Will the facility be permanent or temporary? —T nppYJ_ Cad Concrete (Ready Mix) or Asphalt Mixing Facilities list requested days and hours of operation: Days MfltVJct� 1Y UL �,ZJ'tk�c� Ct U? Hours Mitt Y [b ti i �'1 q � o/ Proposed expiration date (for temporary facilities) `'t y/1-S ` f Note: In order to fully evaluate the proposed use, please supply a site plan map that shows all applicable distances, setbacks, buildings, roads, etc. Setbacks and lot size (As shown on site plan) I . Lot size 5o , D4 Mil%,oa 2. Road right -of -way setback 1 1 VIV�o 1_ 1 3. Rear lot line setback tip (nark p-�� 4. Side lot line setbacks 3 50 5. Distance to neighboring residential dwelling unit(s) D1 The following must be submitted with the application (See Section 6.15 Ordinance 439 for additional description): Transportation management plan Environmental management plan - F T S�txAp— +('erfemenn s [� Location of informational sign ® Location and description of screening, if applicable Property Owners Signature^ `^ Applicant's Signature. Date 6 f ° / y Date (,--It) — J 4�f Signature of this application authorizes Environmental Services Staff to enter upon the property to perform needed inspections. Entry may be without prior notice. WHAT HAPPENS NEXT? Staff will review your application and determine if the application is complete. If the application is complete, the application will be scheduled for a Public Hearing with the County Planning Commission who will recommend action to the County Board of Commissioners. It typically takes 2 months from the time a complete application is submitted until the County Board issues final approval or denial of the CUP / IUP. I' rn i Nov STATE OF MINNESOTA COUNTY OF STEARNS In the matter of: OFFICE OF COUNTY RECORDER f STEARNS COUNTY, MINNESOTA Document # 1308632 Certified, Filed, and /or Recorded on m 02 -02 -2010 at 11:51 AM —~ DIANE GRUNDFIOEFER STEARNS COUNTY RECORDER INTERIM USE PERMIT FILE NO. 10-01 A request for an interim use permit submitted by St. Joseph Sand and Gravel LLC, St. Joseph, MN. for Melrose Associates Inc and Rothfork Associates Inc, Melrose, MN. pursuant to Sections 4.18, 7.25 and 9.3.8E & F of the Stearns County Zoning Ordinance #209, to operate a temporary asphalt plant for four (4) years in an Agricultural 40 zoning district. Said Ordinance requires an interim use permit for the temporary storage and operation of equipment (asphalt plant) in an A -40 zoning district. The above entitled matter was heard before the Steams County Planning Commission on the 21 st of January, 2010, and granted by the Steams County Board of Commissioners on the 26th of January, 2010, on the request for an interim use permit pursuant to Steams County Zoning Ordinance Number 209 for the following property: PROPERTY ADDRESS: XXXX County Road 2, St. Joseph, MN 56374 PARCEL NO.: 31.20636.0000 & 31.20647.0000 LEGAL DESCRIPTION: See Attached Exhibit A IT IS ORDERED that Interim Use Permit No. 10-01 be granted with the following conditions: 1. Days and hours of operation shall be Gam to 8pm Monday — Friday, 8am to 2pm Saturday, and no operation on Sundays or holidays. 2. The interim use permit shall expire on January 26, 2014. 3. Recycled asphalt pavement (RAP) and/or excess materials shall be removed upon completion of operation. -+ e- �;`� oo-AA- � u�d 4. A certified letter shall be sent to Stearns County Environmental Service notifying them when the equipment is removed from the site. 5. The applicant shall submit a financial guarantee acceptable to the County, in the amount of $5000, to ensure that the temporary equipment and RAP be removed upon termination of the interim use permit, s/ �nuironmeft a.,-,vV—AS SCR_1____of 6. Truck hauling signs are required when hauling is occurring. 7. A sign is required at the entrance showing name(s) and telephone number(s) of property owner, site operator and hauling contractor. 8. An approach permit is required from the County Highway Department for the change in use. 9. No more than one asphalt plant shall be located on the property at any given time. 10. Dust shall be controlled. 11. The applicant shall meet with the St. Joseph Township -City of St. Joseph Joint Planning Commission for review of the requested permit. STATE OF MINNESOTA) ) ss. ENVIRONMENTAL SERVICES DEPARTMENT COUNTY OF STEARNS ) 1, Donald W. Adams, Director of the Stearns County Environmental Services Department, do hereby affirm that I have compared the foregoing document and Order granting this interim use permit with the original Planning Commission minutes thereof preserved in my office, and have found the same to be a correct and true transcript of the permit thereof. Dated this Y 4 day of , 2010. Director, Environmental Services Department SCR of 3 Drafted by. Stearns County Environmental Services 705 Courthouse Square 5t. Cloud, MN 56303 THIS INTERIM USE PERMIT SHALL EXPIRE AND BE CONSIDERED NULL AND VOID ONE (1) YEAR AFTER THE FINAL DECISION TO GRANT THE INTERIM USE PERMIT IF NO CONSTRUCTION HAS BEGUN OR IF THE USE HAS NOT BEEN ESTABLISHED. SCR of 3 Exhibit A That part of the Northeast Quarter of the Southeast Quarter of Section 4, and the Northwest Quarter of the Southwest Quarter of Section 3, Township 124, Range 29, Stearns County, Minnesota, described as follows: Beginning at the southeast corner of said Northeast Quarter of the Southcast Quarter; thence South 89 degrees 11 minutes 34 seconds West, assumed bearing, along the south line of said Northeast Quarter of the Southeast Quarter, 261.51 feet; thence North 01 degrees 49 minutes 52 seconds East, 100.39 feet; thence North 18 degrees 33 minutes 28 seconds West, 13.09 feet; thence North 00 degrees 29 minutes 14 seconds West, 94,97 feet; thence North 20 degrees 44 minutes 58 seconds East, 25.74 feet; thence North 06 degrees 09 minutes 51 seconds East, 58.80 feet to the westerly extension of the north line of the South 289.08 feet of said Northwest Quarter of the Southwest Quarter; thence North 89 degrees 24 minutes 52 seconds East, along said north line of the South 289.08 feet and its westerly extension, 1582.26 feet to the east line of said Northwest Quarter of the Southwest Quarter; thence South 00 degrees 28 minutes 55 seconds East, along said east line, 289.08 feet, to the southeast corner of said Northwest Quarter of the Southwest Quarter; thence South 89 degrees 24 minutes 52 seconds West, along the south line of the Northwest Quarter of the Southwest Quarter, 1320.73 feet to the point of beginning. AND The North Half of the Southwest Quarter of the Southwest Quarter of Section 3, Township 124, Range 29, Steams County, Minnesota, LESS AND EXCEPT, the South 315.00 feet of the East 859.33 feet of the North Half of the Southwest Quarter of the Southwest Quarter of Section 3, Township 124, Range 29, Stearns County, Minnesota, except the North 60.00 feet of the West 119.60 feet of the East 581.00 feet thereof, except the North 107.70 feet of the West 20.00 feet of the East 308.80 feet thereof. AND The North Half of the Southeast Quarter of the Southeast Quarter of Section 4, Township 124, Range 29, Stearns County, Minnesota. AND That part of the Northwest Quarter of the Southwest Quarter of Section 3, and the Northeast Quarter of the Southeast Quarter of Section 4, Township 124, Range 29, Stearns County, Minnesota, described as follows: Commencing at the southeast corner of said Northeast Quarter of the Southeast Quarter; thence South 89 degrees 11 minutes 34 seconds West, assumed bearing, along the south line of said Northeast Quarter of the Southeast Quarter, 261.51 feet, to the West line of the East 261.51 feet of said Northeast Quarter of the Southeast Quarter and the point of beginning of the tract to be described; thence continue South 89 degrees 11 minutes 34 seconds West, along said south line, 941.29 feet; thence North 16 degrees 51 minutes 34 seconds . East, 168.92 feet; thence North 00 degrees 19 minutes 51 seconds East, 66,01 feet, to the / southwest corner of a certain tract of land described in Document Number 576149, according to the files of the Stearns County Recorder, thence North 89 degrees 11 minutes 34 seconds East, . along the south line of said tract of land described in Document Number 676149, a distance of 447.71 feet, to the southeast corner of said tract of land described in Document Number 676149; thence North 04 degrees 40 minutes 43 seconds Fast, along the east line of said tract of land described in Document Number 676149 and its northerly extension, a distance of 1002.89 feet; to the south line of the North 82.50 feet of said Northeast Quarter of t#te Southeast Quarter; thence North 84 degrees 15 minutes 26 seconds East, along said south line of the North 82.50 feet of the Northeast Quarter of the Southeast Quarter, 607.51 feet; thence North 89 degrees 28 minutes 08 seconds East, along the south line of the North 82.50 feet of said Northwest Quarter of the Southwest Quarter, 114.15 feet, to the west line of the East 1206.69 feet of said Northwest Quarter of the Southwest Quarter; thence South 00 degrees 28 minutes 55 seconds East, along said west line of the East 1206.69 feet, a distance of 954.45 feet, to the north line of the, South 289.08 feet of said Northwest Quarter of the Southwest Quarter; thence South 89 degrees 24 minutes 52 seconds Guest, along said north line of the South 289.08 feet and its westerly extension, 359.43 feet; thence South 06 degrees 09 minutes 51 seconds West, 58.80 feet; thence South 20 degrees 44 minutes 58 seconds West, 25.74 feet; thence South 00 degrees 29 minutes 14 seconds East, 94,97 feet: thence South 18 degrees 33 minutes 28 seconds East, 13.09 feet; thence South 01 degrees 49 minutes 52 seconds West, 100.39 feet to the point of beginning. SC [t 3 of 3 o � O W N r � d N r C W � W U .O+ W 0 W a_ 'm W' c7. a c W L a W 0 0 N f/1 Q W N Q W U O N W Q Y O L O N O Q t4 J a X U'J n —S This page intentionally left blank Interim Use Permit Request Temporary Asphalt Plant File No: P- 001274 Parcel No.: 31.21399.0000 31.20647.0000 Owner: St. Joseph Sand & Gravel P O Box 639 St. Joseph MN 56374 Description of proposal: To consider a request for an interim use permit submitted by St. Joseph Sand and Gravel, St. Joseph MN, according to Sections 4.18, 6.15 and 9.15.7A of Stearns County Land Use and Zoning Ordinance #439 to operate a temporary asphalt plant for four (4) years. The property under consideration is Lot 1 Block 1 St. Joe Sand and Gravel and part of the NE1 /4 SE1 /4, Section 4 and part of the NW1 /4 SW1 /4 Section 4, lying westerly of County Road 2, St. Joseph Township (124/29). Background Information: The properties contain a gravel mining pit, which existed prior to the County Land Use and Zoning Ordinance 209. The gravel pits were registered as pre- ordinance mining operations in 2004. Mining and processing activities are allowed under the registration. The applicants received an interim use permit for an asphalt plant in 2010 which expired in 2014. Below are the conditions of Interim Use Permit 10 -01: 1. Days and hours of operation shall be 6am to 8pm Monday — Friday, Sam to 2pm Saturday, and no operation on Sundays or holidays. 2. The interim use permit shall expire on January 26, 2014. 3. Recycled asphalt pavement (RAP) and /or excess materials shall be removed upon completion of operation. 4. A certified letter shall be sent to Stearns County Environmental Services notifying them when the equipment is removed from the site. 5. The applicant shall submit a financial guarantee acceptable to the County, in the amount of $5000, to ensure that the temporary equipment and RAP be removed upon termination of the interim use permit. 6. Truck hauling signs are required when hauling is occurring. 7. A sign is required at the entrance showing name(s) and telephone number(s) of property owner, site operator and hauling contractor. 8. An approach permit is required from the County Highway Department for the change in use. 9. No more than one asphalt plant shall be located on the property at any given time. 10. Dust shall be controlled. 11. The applicant shall meet with the St. Joseph Township -City of St. Joseph Joint Planning Commission for review of the requested permit. Location of Property: The property under consideration is part of the W1/2 SW1 /4, Section 3 and part of the E1/2 SE1 /4 Section 4, lying westerly of County Road 2, St. Joseph Township (124/29). Zoning: Urban Expansion District Vehicular Access: They will utilize the existing access off County Road 2. Equipment Placement: The temporary asphalt plant area will be located more than 50 feet from all property lines. All setbacks will be met. Consistency with Comprehensive Plan: This use would not be in conflict with the goals and objectives of the Comprehensive Plan. Consistency with Comprehensive Plan: Future Land Use Category = Urban Expansion Policy Area = Metro Area Chapter 4. Natural Resources and Environmental Management Plan Goal 4. Protect the County's aggregate resources and provide for reasonable economic use of aggregate. Objective 1. Locate the high quality aggregate resources in the County to guide protection and utilization activities Objective 2. Manage aggregate resources to provide for the extraction of high quality aggregate prior to non - agricultural development on the site. Objective 3. Adopt regulations to minimize nuisances from aggregate extraction that affect developed areas and that ensure restoration of extraction sites to protect other natural resources and natural functions. Adjacent Land Uses: The surrounding uses are agricultural adjacent to the gravel pits. There are also rural residential lots surrounding the property. The City of St. Joseph is to the south and southeast. Other permits that are required for this site: • Air Emission Permit from MPCA • Spill Response Plan • NPDES Permit from MPCA Recommended Action: Staff recommends the Joint Planning Board consider the following conditions for the interim use permit according to Sections 4.18, 6.15, & 9.15.7A of Stearns County Land Use and Zoning Ordinance #439, or successor ordinance with the following conditions: 1. Hours of operation. Applicants are requesting hours of operation from 6:OOam to 10:OOpm, Monday through Saturday. Note: the hours of operation on the previous permit were 6am to 8pm Monday- Friday, Sam to 2pm Saturday. Sundays and Holidays should be excluded. 2. Date the interim use permit would expire. The applicants are requesting the permit be valid for 4 years, until December 31, 2018. 3. Recycled asphalt pavement (RAP) and /or excess materials shall be removed upon completion of operation. 4. The applicant shall submit a financial guarantee in the amount of $5000, to ensure that the temporary equipment and RAP be removed upon termination of the interim use permit. 5. Require truck hauling signs during times of hauling. 6. Require signs at entrances showing name of property owner and telephone number(s) of property owner, site operator and hauling contractor. 7. No more than one asphalt plant shall be located on the property at any given time. 8. Dust shall be controlled. This page intentionally left blank STATE OF MINNESOTA COUNTY OF STEARNS In the matter of. St. Joseph Sand and Gravel ST. JOSEPH JOINT PLANNING BOARD INTERIM USE PROCEEDINGS The Joint Planning Board considered a request for an Interim Use submitted by St. Joseph Sand and Gravel to operate a temporary asphalt plant for up to four (4) years. The property under consideration is Lot I Block I St. Joe Sand and Gravel and part of the NE' /4 SE' /4, Section 4 and part of the NW' /4 SW' /4 Section 4 lying westerly of County Road 2, St. Joseph Township (124/29). The matter was duly published and notice was provided to property owners within 1250 feet (.25 mile) of the above referenced property and the Joint Planning Board conducted a public hearing on June 30, 2014. PARCEL NO.: 31.20636.0000 AND 31.20647.0000 PROPERTY LEGAL DESCRIPTION: See Exhibit A The St. Joseph Joint Planning Board acknowledged the following Findings of Fact in consideration of the request for Interim to operate a temporary asphalt plan for up to four (4) years: 1. The subject property is currently zoned Urban Expansion 2. The adjacent land uses to the subject property are agricultural in addition to some rural residential lots. The City of St. Joseph is south and south east of the subject property. 3. On January 21, 2010 the Stearns County Planning Commission conducted a public hearing to consider issuance of a temporary four (4) year interim use permit to operate an asphalt plant and on January 26, 2010 the Stearns County Board of Commissioners granted conditionally the Interim Use Permit as requested. 4. The Interim Use Permit was granted with the following conditions, Stearns County recorded document number 1308632: a) Days and hours of operation shall be 6 AM to 8 PM Monday — Friday; 8 AM to 2 PM Saturday and no operation Sundays or Holidays. b) The Interim Use Permit shall expire on January 26, 2014. c) Recycled asphalt pavement (RAP) and /or excess materials shall be removed upon completion of operation. d) A certified letter shall be sent to Stearns County Environmental Services notifying them when the equipment is removed from the site. e) The applicant shall submit a financial guarantee acceptable to the County, in the amount of S 5,000, to ensure that the temporary equipment and RAP be removed upon termination of the Interim Use Permit. f) Truck Hauling signs are required when hauling is occurring. g) A sign is required at the entrance showing name(s) and telephone number(s) of property owner, site operator and hauling contractor. h) An approach permit is required from the County Highway Department for the change in use. i) No more than one asphalt plant shall be located on the property at any given time. j) Dust shall be controlled. k) The applicant shall meet with the St. Joseph Township -City of St. Joseph Joint Planning Commission for review of the requested permit. Consistency with the Stearns County Comprehensive Plan a. Chapter 4, Natural Resources and Environmental Management Plan: i. Objective 1: Locate the high quality aggregate resources in the County to guide protection and utilization activities. ii. Objective 2: Manage the aggregate resources to provide for the extraction of high quality aggregate prior to non - agricultural development on the site. iii. Objective 3: Adopt regulations to minimize nuisances from aggregate extraction that affect developed areas and that ensure restoration of extraction sites to protect other natural resources and natural functions. b. Future Land Use Map —Urban Expansion allows for limited commercial and industrial development. 6. Consistency with the City of St. Joseph Comprehensive Plan, Transportation Plan, and Utility Plans a. The subject property is located in Planning District three which identifies this area a low density residential. The mining operation is issued through a temporary interim use permit which allows the property to develop in the future. b. Utility Planning — The temporary interim use permit will not impact future utilities. c. Transportation Plan — The temporary interim use permit will not impact future roadways. As Zoning Administrator for the Orderly Annexation Area, Stearns County Environmental Services prepared and forwarded a staff report which included review of the application in relation to the standards for granting an interim use permit. The following are the review comments: a. The request for interim use permit is consistent with Land Use and Zoning Ordinance 9439 Sections 4.18, 6.15, and 9.17.7A. b. The properties contain a gravel mining pit, which existed prior to the County Land Use and Zoning Ordinance 209. The gravel pits were registered as pre - ordinance mining operations in 2004. Mining and processing activities are allowed under the registration. The applicants received an interim use permit in 2010 which expired January 26, 2014. c. The operation of a temporary asphalt plant requires the following permits: i. Air Emission Permit — MPCA ii. Spill Response Plan iii. NPDES Permit — MPCA d. The conditions required for the 2010 Interim Use Permit as identified in 94 above shall be applied less d, h, and k. DECISION AND CONCLUSION Based on the Finding of Fact, the St. Joseph Joint Planning Board approves the Interim Use Permit (IUP) as requested by St. Joseph Sand and Gravel with the following conditions: Hours Operation: Monday — Friday: 6 AM to 8 PM Saturdays: 8 AM to 2 PM Sundays and Holidays: Operation not allowed 2. Expiration of IUP: The IUP will expire on December 31, 2018. Excess Material: All recycled asphalt pavement (RAP) and /or excess material shall be removed upon completion of operation. 4. Financial Guarantee: The applicant shall submit a financial guarantee in the amount of S 5,000, to ensure that the temporary equipment and RAP be removed upon termination of the IUP. 5. Signage: a. Truck Hauling signs are required during times of hauling. b. Signs shall be placed at the entrance showing the name and telephone number of the property owner, site operator and hauling contractor. 6. No more than one asphalt plant shall be located on the property at any given time. 7. Required Permits: The applicant is responsible for obtaining all required permits and provide a copy of the same to Stearns County Environmental Services. The following permits shall be required: Air Emission Permit (MPCA); Spill Response Plan; NPDES Permit (MPCA) Dust shall be controlled. Adopted this 30th day of June —2014 Drafted by: City of St. Joseph PO Box 668 St. Joseph MN 56374 320.363.7201 ST. JOSEPH JOINT PLANNING BOARD in RISE Jeffrey Janssen, Chair Judy Weyrens, Secretary This page intentionally left blank