HomeMy WebLinkAbout[04e] Application for Payment - Geislinger & SonsCouncil Agenda Item 4e
CITY [N+ ST. JOSEPH
MEETING DATE: February 2, 2015
AGENDA ITEM: 2014 Main Pump Station and Collection System Improvements
SUBMITTED BY: Randy Sabart
BOARD/COMMISSION/COMMITTEE RECOMMENDATION:
PREVIOUS COUNCIL ACTION: Application for Payment No. 5 and Change Order No. 1
BACKGROUND INFORMATION:
Included with the attached application for payment is Change Order No. 2 which addresses the
following requested changes:
• Existing sanitary sewer temporary re-route and down time related to a leak in existing
storm sewer: $16,804.88
BUDGET/FISCAL IMPACT: $37,434.63 (including Change Order No. 2)
ATTACHMENTS: Application for Payment No. 6 and Change Order No. 2
REQUESTED COUNCIL ACTION: Approve Application for Payment No. 6 and Change Order No. 2
OWNER
CONTRACTOR
ENGINEER
Contract
Project
CHANGE ORDER NO.2
City of St. Joseph
Geislinger & Sons, [no.
SEH
NIA
DATE January 20, 2015
OWNER's No. STJOE 126869
2014 Main lift Station Improvement, St. Joseph, MN
You are directed to make the following changes in the Contract Documents:
Description and Reason:
115. Existing sanitary sewer temporary re-route and down time related to a leak in existing storm
sewer: Excavation for Sanitary Sewer Manhole 12 revealed limited space to construct the new manhole
between the existing sanitary sewer and storm sewer pipes and structures. In order to construct the new
manhole, it was necessary for the Contractor to temporarily re-route the existing sanitary sewer pipe and
flow.
Secondly, while the jack and bore pit was open for installation of the new sanitary sewer under County
Road 75, storm water entered the excavation from an existing storm sewer that crossed the new pipe
alignment. The existing storm sewer did not have water -tight joints. The water in the excavation caused
downtime for the Contractor's personnel to remove the water before continuing with the jack and bore
operations.
ITEM
DESCRIPTION
UNIT
UNIT COST
QUANTITY
AMOUNT
115
EXISTING SANITARY SEWER TEMPORARY
LS
$16,804.88
1.00
$16,804.88
No Change
REROUTE AND DOWN TIME RELATED TO A
Contract price prior to the Change Order:
$1,625,726,25
No Change
No Change
Net increase (decrease) of this Change Order:
LEAK IN EXISTING STORM SEWER
No Change
No Change
Contract price with all approved Change
Orders;
$1,642,531.13
TOTAL ADD
$16,804.88
Attachments: NIA
ITEM
CHANGE IN
CONTRACT PRICE
CHANGE IN CONTRACT
TIMES
Substantial
Completion
Ready for Final
Payment
Original Contract Price:
$1,621,583.00
10/31/14
11/30/14
Net increase (decrease) from previous Change
Order No.0 to 1:
$4,143.25
No Change
No Change
Contract price prior to the Change Order:
$1,625,726,25
No Change
No Change
Net increase (decrease) of this Change Order:
$16,804.88
No Change
No Change
Contract price with all approved Change
Orders;
$1,642,531.13
10/31/14
11/30/14
RECOMMENDED:
SEH
PO Box 1717
St, Cloud, MN 5630
By: e�zr
APPROVED:
City of St. Joseph
PO Box 668
St. Joseph, MN 56374-0668
By:
Title: Project Engineer Title:
Date: 1 2 - I $" Date:
P:IPTIS%TJOE�12$80917-Cons1173.0-Paymenl{CO #2.docu
ACCEPTED:
Geislinger & Sons, Inc.
PO Box 437
Watkins, MN 55389-0437
By: .199. —
Title: Er,
Date: 1-�-�
APPLICATION FOR PAYMENT NO. 6
PROJECT NO. STJOE 126869
OWNER CITY OF ST. JOSEPH, MN
CONTRACTOR GEISLINGER & SONS, INC.
OWNER
CONTRACTOR
SEH
CONTRACTOR FOR: 2014 MAIN PUMP STATION
& COLLECTION SYSTEM IMP
AGREEMENT DATE: 01/16/15
FOR WORK ACCOMPLISHED THROUGH: 12/12/2014
ITEM
DESCRIPTION
I UNIT
JUNITCOST11
CONTRACT
I THIS PAYMENT
I WORK TO DATE
QUANTITY I AMOUNT
I QUANTITY I AMOUNT
I QUANTITY I AMOUNT
BASE
BID
GENERAL
1
MISCELLANEOUS PROJECT
LUMP SUM
$40,000.00
1.00
$40,000.00
$0.00
0.95
$38,000.00
DEWATERING
2
MOBILIZATION
LUMP SUM
$60,000.00
1.00
$60,000.00
$0.00
0.95
$57,000.00
3
TRAFFIC CONTROL
LUMP SUM
$5,000.00
1.00
$5,000.00
$0.00
0.90
$4,500.00
4
ROCK CONSTRUCTION ENTRANCE
EACH
$1,000.00
1.00
$1,000.00
$0.00
0.00
$0.00
5
REMOVE WATER MAIN
LIN FT
$2.00
250.00
$500.00
$0.00
20.00
$40.00
6
REMOVE SANITARY SEWER
LIN FT
$5.00
460.00
$2,300.00
$0.00
145.00
$725.00
7
REMOVE BITUMINOUS PAVEMENT
SQ YD
$4.00
3,310.00
$13,240.00
$0.00
3,310.00
$13,240.00
8
REMOVE CONCRETE PAVEMENT
SQ YD
$6.00
130.00
$780.00
$0.00
70.00
$420.00
9
REMOVE/ABANDON CHLORINE
LUMP SUM
$5,000.00
1.00
$5,000.00
$0.00
1.00
$5,000.00
CONTACT TANK
10
REMOVE METERING CHANNEL
LUMP SUM
$5,000.00
1.00
$5,000.00
$0.00
1.00
$5,000.00
11
REMOVE DIVERSION MANHOLE
LUMP SUM
$6,500.00
1.00
$6,500.00
$0.00
1.00
$6,500.00
12
REMOVE UNDERGROUND FUEL
LUMP SUM
$2,500.00
1.00
$2,500.00
$0.00
1.00
$2,500.00
STORAGE TANK
13
REMOVE BOLLARD
EACH
$50.00
2.00
$100.00
$0.00
2.00
$100.00
14
REMOVE RV DUMP SIGN
EACH
$50.00
1.00
$50.00
$0.00
1.00
$50.00
15
REMOVE CURB STOP
EACH
$25.00
1.00
$25.00
$0.00
1.00
$25.00
16
REMOVE GATE VALVE & BOX
EACH
$50.00
1.00
$50.00
$0.00
1.00
$50.00
17
REMOVE YARD HYDRANT
EACH
$350.00
1.00
$350.00
$0.00
1.00
$350.00
18
REMOVE SANITARY SEWER
EACH
$350.00
3.00
$1,050.00
$0.00
3.00
$1,050.00
MANHOLE
19
SAWING CONCRETE PAVEMENT
LIN FT
$6.00
115.00
$690.00
$0.00
6.00
$36.00
20
SAWING BITUMINOUS PAVEMENT
LIN FT
$4.00
200.00
$800.00
$0.00
0.00
$0.00
21
TEMPORARY CONSTRUCTION
LIN FT
$5.00
175.00
$875.00
$0.00
0.00
$0.00
FENCE
22
ABANDON WATER MAIN
LIN FT
$6.00
140.00
$840.00
$0.00
0.00
$0.00
23
ABANDON SANITARY SEWER
LIN FT
$10.00
765.00
$7,650.00
$0.00
500.00
$5,000.00
24
ABANDON YARD HYDRANTS AND
LUMP SUM
$500.00
1.00
$500.00
$0.00
1.00
$500.00
PIPING - NO GROUT
25
SALVAGE CHAIN LINK FENCE
LIN FT
$10.00
290.00
$2,900.00
$0.00
252.00
$2,520.00
26
SALVAGE HYDRANT ASSEMBLY
EACH
$250.00
1.00
$250.00
$0.00
1.00
$250.00
CONTROL
BUILDING AND WET WELL
27
EXISTING AND PROPOSED WET
LUMP SUM
$180,000.00
1.00
$180,000.00
$0.00
0.90
$162,000.00
WELL IMPROVEMENTS
28
WET WELL DEWATERING
LUMP SUM
$75,000.00
1.00
$75,000.00
$0.00
1.00
$75,000.00
29
GENERATOR REMOVAL AND
LUMP SUM
$2,500.00
1.00
$2,500.00
$0.00
0.00
$0.00
SALVAGE
30
BUILDING SHELL UPGRADES
LUMP SUM
$3,000.00
1.00
$3,000.00
$0.00
0.80
$2,400.00
31
CONCRETE CRACK SEALING BY
LIN FT
$150.00
30.00
$4,500.00
$0.00
30.00
$4,500.00
PRESSURE INJECTION
APPLICATION FOR PAYMENT NO. 6
PROJECT NO. STJOE 126869
OWNER CITY OF ST. JOSEPH, MN
CONTRACTOR GEISLINGER & SONS, INC.
OWNER
CONTRACTOR
SEH
CONTRACTOR FOR: 2014 MAIN PUMP STATION
& COLLECTION SYSTEM IMP
AGREEMENT DATE: 01/16/15
FOR WORK ACCOMPLISHED THROUGH: 12/12/2014
ITEM
DESCRIPTION
I UNIT
JUNITCOST11
CONTRACT
I THIS PAYMENT
I WORK TO DATE
QUANTITY I AMOUNT
I QUANTITY I AMOUNT
I QUANTITY I AMOUNT
32
PUMP LIFTING HOOK
LUMP SUM
$1,200.00
1.00
$1,200.00
$0.00
1.00
$1,200.00
REPLACEMENT
33
WATER HEATER REPLACEMENT
EACH
$1,500.00
1.00
$1,500.00
$0.00
0.90
$1,350.00
34
CONTROL BUILDING COATINGS
LUMP SUM
$15,000.00
1.00
$15,000.00
$0.00
0.00
$0.00
35
BUILDING VENTILATION
LUMP SUM
$3,500.00
1.00
$3,500.00
$0.00
0.90
$3,150.00
36
BUILDING PLUMBING
LUMP SUM
$2,500.00
1.00
$2,500.00
0.10
$250.00
1.00
$2,500.00
IMPROVEMENTS - WATER AND
WASTE
37
GENERAL ELECTRICAL
LUMP SUM
$3,500.00
1.00
$3,500.00
$0.00
0.85
$2,975.00
DEMOLITION
38
SITE LIGHTING POLE
LUMP SUM
$5,000.00
1.00
$5,000.00
$0.00
1.00
$5,000.00
39
INSTRUMENTATION AND
LUMP SUM
$63,000.00
1.00
$63,000.00
0.05
$3,150.00
0.94
$59,220.00
CONTROLS
40
BUILDING ELECTRICAL AND
LUMP SUM
$125,000.00
1.00
$125,000.00
0.10
$12,500.00
0.92
$115,000.00
CONTROLS
41
175 KW GENERATOR WITH
LUMP SUM
$73,000.00
1.00
$73,000.00
$0.00
1.00
$73,000.00
WEATHERPROOF ENCLOSURE
42
GENERATOR PAD AND
LUMP SUM
$5,000.00
1.00
$5,000.00
$0.00
1.00
$5,000.00
FOUNDATION - INCLUDES
43
ELECTRICAL SERVICE ENTRANCE
LUMP SUM
$10,000.00
1.00
$10,000.00
021
$2,100.00
0.88
$8,800.00
44
PANEL BOARDS
LUMP SUM
$8,000.00
2.00
$16,000.00
0.45
$3,600.00
0.98
$7,840.00
SCREENING
CHANNEL
45
IBAR SCREEN STRUCTURE
LUMP SUM
$25,000.00
1.00
$25,000.00
$0.00
0.95
$23,750.00
MODIFICATIONS
STREET
46
COMMON EXCAVATION (P) (CV)
CU YD
$10.00
4,100.00
$41,000.00
$0.00
4,100.00
$41,000.00
47
WET WELL SUBGRADE
CU YD
$8.00
1,000.00
$8,000.00
$0.00
1,000.00
$8,000.00
EXCAVATION
48
AGGREGATE BASE PLACED CLASS
CU YD
$22.00
1,970.00
$43,340.00
$0.00
1,159.00
$25,498.00
5 (CV) (P)
49
AGGREGATE BASE PLACED CLASS
CU YD
$22.00
200.00
$4,400.00
$0.00
200.00
$4,400.00
2 (CV) (P)
50
WEARING COURSE MIXTURE
TON
$74.00
435.00
$32,190.00
$0.00
0.00
$0.00
51
NON WEARING COURSE MIXTURE
TON
$72.00
680.00
$48,960.00
$0.00
661.00
$47,592.00
52
BITUMINOUS MATERIAL FOR TACK
GAL
$3.00
225.00
$675.00
$0.00
0.00
$0.00
COAT
53
GEOTEXTILE FABRIC, MNDOT TYPE
SQ YD
$3.00
750.00
$2,250.00
$0.00
400.00
$1,200.00
6
54
6" CONCRETE PAVEMENT
SQ YD
$75.00
185.00
$13,875.00
$0.00
162.00
$12,150.00
55
CHAIN LINK FENCE
LIN FT
$18.00
550.00
$9,900.00
$0.00
533.00
$9,594.00
56
12' WIDE DOUBLE LEAF SWING
EACH
$1,500.00
1.00
$1,500.00
$0.00
1.00
$1,500.00
GATE
57
16' WIDE ROLLING VEHICLE GATE
EACH
$4,000.00
1.00
$4,000.00
025
$1,000.00
0.75
$3,000.00
58
24' WIDE ROLLING VEHICLE GATE
EACH
$7,500.00
1.00
$7,500.00
$0.00
1.00
$7,500.00
59
BOLLARD
EACH
$550.00
10.00
$5,500.00
$0.00
9.00
$4,950.00
60
FURNISH & INSTALL 2" PVC UTILITY
LIN FT
$5.00
650.00
$3,250.00
$0.00
714.00
$3,570.00
CONDUIT
61
FURNISH & INSTALL 4" PVC UTILITY
LIN FT
$10.00
70.00
$700.00
$0.00
54.00
$540.00
CONDUIT
62
STREET SWEEPING
HOUR
$115.00
4.00
$460.00
$0.00
0.00
$0.00
APPLICATION FOR PAYMENT NO. 6
PROJECT NO. STJOE 126869
OWNER CITY OF ST. JOSEPH, MN
CONTRACTOR GEISLINGER & SONS, INC.
OWNER
CONTRACTOR
SEH
CONTRACTOR FOR: 2014 MAIN PUMP STATION
& COLLECTION SYSTEM IMP
AGREEMENT DATE: 01/16/15
FOR WORK ACCOMPLISHED THROUGH: 12/12/2014
ITEM
DESCRIPTION
I UNIT
JUNITCOST11
CONTRACT
I THIS PAYMENT
I WORK TO DATE
QUANTITY I AMOUNT
I QUANTITY I AMOUNT
I QUANTITY I AMOUNT
SANITARY
SEWER
63
10" PVC SANITARY SEWER, SDR35,
LIN FT
$100.00
160.00
$16,000.00
$0.00
160.00
$16,000.00
WITH TYPE 2 BEDDING
64
24" PVC SANITARY SEWER, SDR35,
LIN FT
$285.00
28.00
$7,980.00
$0.00
25.00
$7,125.00
WITH TYPE 2 BEDDING
65
42" CCFRPM SN18 SANITARY
LIN FT
$250.00
186.00
$46,500.00
$0.00
181.00
$45,250.00
SEWER WITH TYPE 2 BEDDING
66
42" CCFRPM SN72 SANITARY
LIN FT
$270.00
189.00
$51,030.00
$0.00
190.00
$51,300.00
SEWER WITH TYPE 1 BEDDING
67
2 PVC SCH 80 SANITARY SEWER
LIN FT
$50.00
120.00
$6,000.00
$0.00
11.00
$550.00
FORCE MAIN
68
JACK & BORE 42 SANITARY SEWER
LIN FT
$1,000.00
180.00
$180,000.00
$0.00
180.00
$180,000.00
69
JACKING PIT DEWATERING
LUMP SUM
$25,000.00
1.00
$25,000.00
$0.00
1.00
$25,000.00
70
CLEAN & TELEVISE SANITARY
LIN FT
$3.00
808.00
$2,424.00
$0.00
404.00
$1,212.00
SEWER
71
2 INSULATION
SQ YD
$17.00
825.00
$14,025.00
$0.00
544.00
$9,248.00
72
60" FRP SANITARY MANHOLE
EACH
$15,000.00
2.00
$30,000.00
$0.00
2.00
$30,000.00
73
72" FRP SANITARY MANHOLE
EACH
$17,000.00
1.00
$17,000.00
$0.00
1.00
$17,000.00
74
84" FRP SANITARY MANHOLE
EACH
$20,000.00
1.00
$20,000.00
$0.00
1.00
$20,000.00
75
PRECAST SANITARY MANHOLE
EACH
$7,500.00
1.00
$7,500.00
$0.00
1.00
$7,500.00
76
CONNECT TO EXISTING SANITARY
EACH
$2,500.00
1.00
$2,500.00
$0.00
1.00
$2,500.00
FORCE MAIN
77
CONNECT TO EXISTING SANITARY
EACH
$3,000.00
1.00
$3,000.00
$0.00
1.00
$3,000.00
SEWER
78
CONNECT TO EXISTING MANHOLE
EACH
$5,000.00
1.00
$5,000.00
$0.00
1.00
$5,000.00
79
BYPASS PUMPING
LUMP SUM
$100,000.00
1.00
$100,000.00
$0.00
1.00
$100,000.00
WATER
MAIN
80
6" WATER MAIN - DUCT IRON CL 52
LIN FT
$40.00
400.00
$16,000.00
$0.00
389.00
$15,560.00
81
HYDRANT
EACH
$4,500.00
1.00
$4,500.00
$0.00
1.00
$4,500.00
82
6" GATE VALVE AND BOX
EACH
$1,500.00
2.00
$3,000.00
$0.00
2.00
$3,000.00
83
YARD HYDRANT WITH 4X4
EACH
$350.00
1.00
$350.00
$0.00
2.00
$700.00
TREATED POST
84
CONNECT TO EXISTING WATER
EACH
$500.00
1.00
$500.00
$0.00
1.00
$500.00
MAIN
85
2" CORPORATION STOP
EACH
$350.00
1.00
$350.00
$0.00
1.00
$350.00
86
1" CORPORATION STOP
EACH
$200.00
1.00
$200.00
$0.00
1.00
$200.00
87
2 CURB STOP AND BOX
EACH
$550.00
1.00
$550.00
$0.00
1.00
$550.00
88
1" CURB STOP AND BOX
EACH
$240.00
1.00
$240.00
$0.00
2.00
$480.00
89
2 TYPE K COPPER PIPE
LIN FT
$50.00
110.00
$5,500.00
$0.00
94.00
$4,700.00
90
1" TYPE K COPPER PIPE
LIN FT
$40.00
150.00
$6,000.00
$0.00
169.00
$6,760.00
91
2 INSULATION
SQ YD
$17.00
150.00
$2,550.00
$0.00
64.00
$1,088.00
92
CONNECT TO EX WATER SERVICE
EACH
$500.00
3.00
$1,500.00
$0.00
1.00
$500.00
93
WATER MAIN FITTINGS
POUND
$5.00
500.00
$2,500.00
$0.00
319.00
$1,595.00
APPLICATION FOR PAYMENT NO. 6
PROJECT NO. STJOE 126869
OWNER CITY OF ST. JOSEPH, MN
CONTRACTOR GEISLINGER & SONS, INC.
OWNER
CONTRACTOR
SEH
CONTRACTOR FOR: 2014 MAIN PUMP STATION
& COLLECTION SYSTEM IMP
AGREEMENT DATE: 01/16/15
FOR WORK ACCOMPLISHED THROUGH: 12/12/2014
CONTRACT
I THIS PAYMENT
I WORK TO DATE
ITEM
DESCRIPTION
I UNIT
JUNITCOST11
QUANTITY I AMOUNT
I QUANTITY I AMOUNT
I QUANTITY I AMOUNT
TURF RESTORATION
94 INLET PROTECTION, MAINTAINED
EACH
$175.00
4.00
$700.00
$0.00
4.00
$700.00
95 SILT FENCE, HEAVY DUTY
LIN FT
$3.00
835.00
$2,505.00
$0.00
877.00
$2,631.00
96 BIOROLL BLANKET SYSTEM
LIN FT
$5.00
85.00
$425.00
$0.00
0.00
$0.00
97 SCREENED TOPSOIL BORROW (LV)
CU YD
$18.00
1,100.00
$19,800.00
$0.00
72.00
$1,296.00
98 SEEDING
ACRE
$2,500.00
1.60
$4,000.00
$0.00
0.00
$0.00
99 SEEDING (TEMPORARY)
ACRE
$300.00
1.60
$480.00
$0.00
0.50
$150.00
100 SEED MIXTURE 22-111
POUND
$2.00
96.00
$192.00
$0.00
0.00
$0.00
101 SEED MIXTURE 25-131
POUND
$3.00
704.00
$2,112.00
$0.00
50.00
$150.00
102 HYDRAULIC SOIL STABILIZER
POUND
$1.00
5,000.00
$5,000.00
$0.00
1,000.00
$1,000.00
103 COMMERCIAL FERTILIZER
POUND
$1.00
560.00
$560.00
$0.00
0.00
$0.00
TOTAL BASE BID
$1,613,123.00
$22,600.00
$1,433,130.00
ALTERNATE A - RV DUMP STATION
104 BOLLARD
EACH
$500.00
2.00
$1,000.00
$0.00
2.00
$1,000.00
105 CURB DESIGN V (6")
LIN FT
$25.00
20.00
$500.00
$0.00
15.00
$375.00
106 6" CONCRETE PAVEMENT
SQ YD
$100.00
5.00
$500.00
$0.00
5.00
$500.00
107 4" PVC SANITARY SEWER, SDR26
LIN FT
$100.00
10.00
$1,000.00
$0.00
12.00
$1,200.00
108 4" DI SANITARY SEWER
LIN FT
$100.00
2.00
$200.00
$0.00
0.00
$0.00
109 RV DUMP SIGN, WITH POST
SQ FT
$40.00
22.75
$910.00
$0.00
0.00
$0.00
110 RV DUMP 4" SANITARY HATCH
EACH
$600.00
1.00
$600.00
$0.00
1.00
$600.00
COVER
111 YARD HYDRANT WITH 4X4
EACH
$750.00
1.00
$750.00
$0.00
1.00
$750.00
TREATED POST
112 1" TYPE K COPPER PIPE
LIN FT
$50.00
60.00
$3,000.00
$0.00
48.00
$2,400.00
TOTAL ALTERNATE A
$8,460.00
$0.00
$6,825.00
CHANGE ORDER NO. 1
113 REPLACE GRADE ADJUSTMENT
LS
$1,098.25
1.00
$1,098.25
$0.00
1.00
$1,098.25
RINGS AND CASTING ON EXISTING
SANITARY MANHOLE ON SOUTH
SIDE OF CR 75.
114 PRIVACY SLATS INSTALLED IN NEW
LS
$3,045.00
1.00
$3,045.00
$0.00
1.00
$3,045.00
FENCING
TOTAL CHANGE ORDER NO. 1
$4,143.25
$0.00
$4,143.25
CHANGE ORDER NO. 2
115 EXISTING SANITARY SEWER
LS
$16,804.88
1.00
$16,804.88
1.00
$16,804.88
1.00
$16,804.88
TEMPOARY RE-ROUTE AND DOWN
TIME RELATED TO A LEAK IN
EXISTING STORM SEWER
TOTAL CHANGE ORDER NO. 2
$16,804.88
$16,804.88
$16,804.88
APPLICATION FOR PAYMENT NO.8
PROJECT NO. STJOE126869
OWNER CITY OF ST. JOSEPH, MN
CONTRACTOR GEISL€NGER & SONS, INC.
I ITEM I DESCRIPTION
OWNER
CONTRACTOR
SEH
CONTRACTOR FOR. 2014 MAIN PUMP STATION
& COLLECTION SYSTEM IMP
AGREEMENT DATE: 01!16!15
FOR WORK ACCOMPLISHED THROUGH: 12I12120t4
(MARY
'AL BASE 810 $1,613,123.00 $22,600.00 $1,433,139,00
'AL ALTERNATE A $6,460.00 $0.00 $6 825,00
'AL BID $1,621,583.00 $22,800.00 $1,439,966.00
AGE ORDER NO. 1 $4,143.25 $0.00 $4,143,26
AGE ORDER NO. 2 $16,804.88 $16,804.86 $16,804.66
AL 1,642,631,13 39, Ob.BB 1,460,903.13
The undersigned Contractor certifies that all previous payments received
gross Amount Due
$1,460,903.13
from the Owner for work done under this contract have been applied
Less Relelnage (5%)
$73,046.16
to discharge In full all obligations the Contractor Incurred in connection
with the work covered by said progress payments. The undersigned Contractor
Amount Eligible to Date
$1,387,867.97
agrees to pay all subcontractors Wthln 10 days of receipt of payment from
Less Previous Payments
$1,350,423.34
the municipality for undisputed services provided by the subcontractor.
Amount Duo This Application
$37,434.63
The Contractor agrees to pay Interest as described under Minnesota state statute.
SUBMITTED GEISLINGER & SONS, INC. BY: 115--
P<) BOX 437
WATKINS, MN 66368.0437
RECOMMENDED SEH BY: r
PO BOX 1717
ST. CLOUD, MN 56302-1717
APPROVED CITY OF ST. JOSEPH
PO BOX 688
ST. JOSEPH, MN 56374-0368
BY:
6
DATE: 1- -LG r -' -5'
DATE: 1- Z J 15 -
DATE:
This page intentionally left blank