Council Agenda Item
MEETING DATE: February 18, 2015
AGENDA ITEM: Public Hearing – 2015 Proposed Improvement Hearing
SUBMITTED BY: Engineering/Administration
BOARD/COMMISSION/COMMITTEE RECOMMENDATION:
PREVIOUS COUNCIL ACTION: The City Council authorized and accepted the feasibility report for the
proposed 2015 Street Improvement and authorized the conducting of a public hearing.
BACKGROUND INFORMATION: The public hearing process is regulated through the 429 process which
includes a series of resolutions that must be adopted by the Council. The City Council has already
completed the first resolution by accepting the feasibility report calling for a public hearing.
Part of the public hearing is to provide a reasonable estimate as to the cost of the project and impact to
residents. Included in the information for the packet is a preliminary assessment roll. The purpose of
this hearing is not to focus on the assessment; rather the merits of the project. At this time the project
is not designed and the numbers are merely an estimate. Residents will have an opportunity at a later
time to discuss the assessments when final numbers are available.
The starting point for assessments, based on the policy is 60% and then the City looks at the benefit.
Staff is anticipating hiring Bill Waytas to complete the same analysis as was completed for Park Terrace.
Again, the public hearing at this time is to focus on the project not the assessment.
ATTACHMENTS: Request for Council Action
Hearing Notice
Power Point – Feasibility Study
Proposed Resolution
REQUESTED COUNCIL ACTION: Authorize the Mayor and Administrator to execute Resolution 2015-
002 ORDERING IMPROVEMENT AND PREPARATION OF PLANS for 2015 Street Improvement.
(Note: A 4/5 vote is required to order an improvement.)
This page intentionally left blank
Administrator
Judy Weyrens
CITY OF ST. JOSEPH
NOTICE OF HEARING ON IMPROVEMENT
Mayor
2015 Bituminous Street Improvements
Rick Schultz
Councilors
Notice is hereby given that the City Council of St. Joseph will meet in the St. Joseph Community
Matt Killam
th
Fire Hall, 323 4 Ave NE, at 6:00 PM on February 18, 2015, to consider the making of an
Bob Loso
improvement of the public streets as follows:
Renee Symanietz
k
Dale Wic
Subdivision Street Name From To
Clinton Village 6 th Avenue NW Minnesota Street Birch Street NW
Clinton Village 7 th Ave NW Ash Street NW Birch Street NW
Clinton Village Ash Street W West City Limits 6 th Avenue NW
Clinton Village Birch Street W West City Limits 6 th Avenue NW
Northland 2 nd Avenue NE Fir Street E North Plat Line
Northland Plat 2 3 rd Avenue NE Fir Street E Hickory Street E
Northland Plat 3 4 th Avenue NE Fir Street E Gumtree Street E
Northland Plat 3, 5 th Avenue NE Gumtree Street E Approx. 260 feet
Northland Plat 4 south of Gumtree St
Northland, Northland Plat Fir Street E 1 st Avenue NE 4 th Avenue NE
2 and Plat 3
Northland, Northland Plat Gumtree Street 2 nd Avenue NE Northland Drive
2 and Plat 3 E
Northland, Northland Plat Hickory Street E 2 nd Avenue NE 3 rd Avenue NE
2
Northland Plat 2 and Plat 3 Hickory Court 3 rd Avenue NE End of Cul-de-sac
The proposed improvement will consist of bituminous street resurfacing improvements
pursuant to MN Statute § 429.011 to 429.111.
The estimated cost of the improvement is $ 873,600. A reasonable estimate of the impact of
the assessments will be available at the hearing and on the City website
(www.cityofstjoseph.com). Such persons as desire to be heard with reference to the proposed
improvement will be heard at this meeting.
Judy Weyrens
Administrator
Publish: February 6 and February 13, 2015
This page intentionally left blank
2015 Bituminous Street
Improvements
Feasibility Report Highlights
Project Location
SubivisionStreet NameFromTo
Clinton Village6Ave NWMinnesota StBirch St NW
th
Clinton Village7 th Ave NWAsh St NWBirch St NW
ClintonVillageAsh St NEWest City Limits6Ave NW
th
Clinton VillageBirch St NWWest City Limits6Ave NW
th
Northland2 nd Ave NEFir StNorth Plat Line
Northland Plat 23Ave NEFir StHickorySt
rd
NorthlandPlat 34Ave NEFir StGumtreeSt
th
Northland, Northland Plat 2, Fir St1 st Ave NE4 th Ave NE
NorthlandPlat 3
Northland, Northland Plat 2, GumtreeSt2 nd Ave NENorthlandDr
NorthlandPlat 3
Northland, Northland Plat 2 HickorySt2 nd Ave NE3 rd AveNE
Northland, Northland Plat 2, Hickory Ct3Ave NEEnd of cul-de-sac
rd
NorthlandPlat 3
Building a Better World for All of Us®
Project Location
Building a Better World for All of Us®
Project Location
Building a Better World for All of Us®
Existing Conditions
•Clinton Village
•Constructed in 1983 (approx. 32 years old)
•36-foot wide urban section
•2” bituminous overlying 5” aggregate base
–Light 7-ton design
–Seal coated in 1997
•Pedtrail to Hollow Park is gravel
–May exist outside of plat boundary/easement
•Pavement surface in poor condition
–No longer candidate for preventative maint. Activities
•Localized ponding at east end of Ash St
Building a Better World for All of Us®
Existing Condition Photos
Building a Better World for All of Us®
Existing Condition Photos
Building a Better World for All of Us®
Existing Conditions
•Northland, Northland Plat 2, Northland Plat 3
•Constructed between 1991-1994
–(approx. 21-24 years old)
•36-foot wide urban street sections
•2.5” to 3” bituminous overlying 5” aggregate base
–Light 7-ton design
•Recent preventative maintenance activities
–Sealed coated in 2005
–Crack sealed in 2012
•Fair condition: block cracking & weathering; areas of
fatigue cracking (alligator cracking)
Building a Better World for All of Us®
Existing Condition Photos
Building a Better World for All of Us®
Existing Condition Photos
Building a Better World for All of Us®
Existing Condition Photos
Building a Better World for All of Us®
Proposed Improvements
•Clinton Village
•Reclaim to a depth of 7 in. and re-pave
•3.5” of bituminous over 4” of compacted reclaim mat’l
•Light 7-ton pavement section
•Pave section of pedestrian trail between Birch St and
Hollow Park (connect to work from Park Terrace)
•Extend short section of storm drain to curve at the
east end of Ash St
•Spot replacement of deteriorated curb & gutter
Building a Better World for All of Us®
Proposed Improvements
Building a Better World for All of Us®
Proposed Improvements
•Northland, Northland Plat 2, Northland Plat 3
•1.5”-2” bituminous overlay
•6-foot wide edge mill (1” deep) in front of curb &
gutter
•Spot repair (reclaim & pave) of the larger areas of
alligator cracking
•Pave section of pedestrian trail between Hickory Ct
and Northland Park parking lot (off GumtreeSt)
•Extend paved trail from existing trail at Iris Ln to new
playground equipment at northeast end of park
•No replacement of stop bar painting
Building a Better World for All of Us®
Proposed Improvements
Building a Better World for All of Us®
Opinion of Probable Cost
by Project Area
Project AreaType of ImprovementTotalCost
Clinton VillageReclaim &Pave$410,200
Northland, Northland Plat Overlay$463,400
2, Northland Plat 3
Total$873,600
Building a Better World for All of Us®
Project Fundingby Project Area
Project AreaAssessment LevelCity SubsidyTotal
(60%)(40%)
Clinton Village$234,500$175,700$410,200
1
Northland, $260,900$202,500 2$463,400
Northland Plat 2,
Northland Plat 3
Total$495,400$378,200 3$873,600
Notes:
1 Includes $19,430 for estimated trail and pedestrian ramp construction
2 Includes $28,660 for estimated trail and pedestrian ramp construction
2 Actual estimated City cost is $378,200 + $4,220 = $382,420 (44%)
Building a Better World for All of Us®
Preliminary Special Assessments
Project AreaAssessment Rate
(60%)
Clinton Village$51.68/ Lineal Foot
Northland, Northland Plat 2, $27.20/Lineal Foot
Northland Plat 3
Building a Better World for All of Us®
Preliminary Schedule
MilestoneDate
Receive Feasibility ReportFebruary 2
Conduct PublicImprovement HearingFebruary18
Council Orders Preparation of Plans & Specs
Council Authorizes Advertisementfor BidsMarch 16
CouncilDeclares Costs to be Assessed (resolution)April6
1
Council Sets Assessment Hearing Date
Bid OpeningApril 9
SpecialAssessment HearingApril27
Councilmay Award Construction ContractApril 27 or June 1
1
Declared costs would be based on final engineer’s opinion of cost. Assessed costs could
be lowered, but not increased.
Building a Better World for All of Us®
Questions ?
Building a Better World for All of Us®
Resolution 2015-002
Ordering Improvement and Preparation of Plans
2015 Street Improvement Project
nd
WHEREAS, a resolution of the city council adopted on the 2 day of February, 2015, fixed a date for a
council hearing on the proposed improvement of the following area:
Subdivision Street Name From To
Clinton Village 6 th Avenue NW Minnesota Street Birch Street NW
Clinton Village 7 th Ave NW Ash Street NW Birch Street NW
Clinton Village Ash Street NW West City Limits 6 th Avenue NW
Clinton Village Birch Street NW West City Limits 6 th Avenue NW
Northland 2 nd Avenue NE Fir Street North Plat Line
Northland Plat 2 3 rd Avenue NE Fir Street Hickory Street
Northland Plat 3 4 th Avenue NE Fir Street Gumtree Street
Northland, Northland Plat 2 Fir Street 1 st Avenue NE 4 th Avenue NE
and Plat 3
Northland, Northland Plat 2 Gumtree Street 2 nd Avenue NE Northland Drive
and Plat 3
Northland, Northland Plat 2 Hickory Street 2 nd Avenue NE 3 rd Avenue NE
Northland Plat 2 and Plat 3 Hickory Court 3 rd Avenue NE End of Cul-de-sac
AND WHEREAS, ten days’ mailed notice and two weeks’ published notice of the hearing was given, and
the hearing was held thereon on the 18th day of February, 2015, at which all persons desiring to be heard
were given an opportunity to be heard thereon,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ST. JOSEPH, MINNESOTA:
1. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report.
2. Such improvement is hereby ordered as proposed in the council resolution adopted the 18th day
of February, 2015.
3. SEH is here by designated as the engineer for this improvement. The engineer shall prepare plans
and specifications for the making of such improvement.
4. The city council declares its official intent to reimburse itself for the costs of the improvement
from the proceeds of the tax exempt bond.
Adopted by the council on this 18th day of February, 2015.
________________________________
Rick Schultz, Mayor
________________________________
Judy Weyrens, Administrator
This page intentionally left blank
2/18/2015
1
Hearing
Improvement
Public
2/18/2015
2
Hearing
Improvement
Public
2/18/2015
3
Hearing
Improvement
Public
2/18/2015
4
Hearing
Improvement
Public
2/18/2015
5
Hearing
Improvement
Public
2/18/2015
6
Hearing
Improvement
Public
2/18/2015
7
Hearing
Improvement
Public