Loading...
HomeMy WebLinkAbout[06] Water Amenity PresentationProject history Started out as grass roots splash pad committee • Brought up at Council Workshop -9/22/14 • Determine Splash Pad or Larger Facility • Wick added that he would like US Aquatics to work • with the pool committee to see if an aquatic venue is something the City would be able to handle. Project history October Council Meeting –10/2/14 • Discussion and proposal from USAquatics • Schaefer presented the Council with a proposal for services • to complete an analysis at a cost of $7,500 and an additional $1,000 if a community survey is part of the process. Losoadded he would like a community survey conducted. • Frank questioned if the City were to build a basic splash pad, • how much would that cost. Schaefer responded that it depends on where it is located and what types of support items are needed. They have designed splash pads for as little as $200,000. Project history October Council Meeting –10/2/14 • Discussion and proposal from USAquatics • Frank made a motion authorizing the Administrator to execute the • contract to engage US Aquatics to complete a water amenity study with a final report presented to the Council. The study will include determining need, type of facility, location and cost analysis and community survey at a cost not to exceed $9,500.00. The type of community survey will be determined by the pool committee. The motion was seconded by Wick and passed unanimously. • Discussion: Schultz questioned if the survey could be a • community forum. Schaefer stated it could be and a survey could be done as well. Project history April 6, 2015 –Council Receives Completed USAquaticsReport • April 20, 2015 –Public Input Session • April 29, 2015 –Council Open Session on Priorities • Design 600 Person Capacity • Three Bodies of Water • Zero Depth Entry Splash Area • Four Lane Lap Pool • Tot Slide / Family Slide • 1M & 3M Diving • Zip Line • Inner Tube Waterslide • Enclosed Body Slide • Open Flume Slide • Lazy River • Climbing Wall • Rental Tents • Shade Structures • Sun Deck • Bathhouse • $6.00 Entry Fee Includes All Features Exceptions are Rental Tents and Possibly Lockers Location 31.55 acres • Advantages including: • Lower purchase cost • Ample room for future • expansion/other use (i.e. community center, park areas, trails, etc.) Close proximity to • controlled intersection at CR75/Elm Street High visibility on • Highway 133 Other Potential Locations Site 6 • Cost Prohibited • No Utilities • Site 4 • Higher Cost • Location –Closeness to Residential • Orientation of Park Layout • Site 7 • Location • Visibility • Vegetation • Estimated Costs Total Project Estimate -$ 6.1 Million • Fundraising Goal -$ 1.2 Million • Fundraising Issues • Time for businesses to make decision • Small, inexperienced committee • Some Local Grant Processes Start in July • Misconception • City to pay $2 for every $1 raised by fundraising effort • Rotary and St. Cloud partnership for Lake George Project • Breakdown Estimated Costs Breakdown Estimated Costs Revenue Projections Assumptions Revenue totals are based on a 78 day season • Rate of $6.00 per day in admissions • Average of $1.50 per day in concessions. • But It Will Rain ~105 Days between Memorial Weekend and • Labor Day Weekend 105 –78 = 27 Rain Days • Rain Days Operating Hours / Staff Expense Projections Market Area Assumptions in Projections Stearns County Population • 150,642 • .75% would use weekly (1,129) • St. Cloud MSA Population • Minnesota's third largest • 189,093 Residents • Stearns/Benton/Sherburne • 276,980 Residents • Market Area Additional Information Stearns County -150,642 • 20 Mile Radius • 181,000 • Mean Household Income $66,382 • 30 Mile Radius • 262,000 • Mean Household Income $66,926 • 40 Mile Radius • 436,100 • Mean Household Income $66,692 • Comparisons Foley Pool –23 Miles –$4.00 • St. Joseph Waterpark -Proposed –$6.00 • Becker Community Center –30 Miles–$6.50 • Monticello Community Center –36 Miles–$7.50 • Perham Area Community Center –117 Miles–$7.50 • Summerland -Unlimited Waterslide –12 Miles –$7.95 • Nisswa Outdoor Waterpark –74 Miles –$9.39 • Cascade Bay –Eagan –92 Miles –$10.00 • St. Cloud YMCA –9 Miles –$10.50 • The Lodge -Brainerd –65 Miles –$14.95 • Bunker Beach -Coon Rapids –69 Miles –$15.00 • Arrowwood-Alexandria –61 Miles –$20.95 • ValleyFairSoak City –Shakopee–83 Miles –$38.00 • Waterpark of America –83 Miles –$39.95 • Splash Pad Comparison Mechanics Flow-through System – Water from a potable source is pumped onto the pad • and allowed to drain into a municipality's storm system Requires no water treatment and testing • Large amounts of water consumed —perhaps 10 • million gallons over the course of a season Recirculating System – Operates more like a pool —with chemicals, filters and • pumps Splash Pad Comparison Geared toward younger children • Up to 8 or 9 years old generally – Construction Costs • Anywhere from $200,000 -$600,000+ – Questionable use of “regional” sales tax – More local park attribute • Revenue Projections -$0 • Maintenance Costs • $25,000 -$45,000 (Waite Park Budget) – ~ $10.00 –$17.50 per year on $150,000 home • St. Cloud YMCA Indoor Alternative • Area Cities allocated $4 – million to funding through main regional sales tax project designation From concept drawing size – estimates it looks to have capacity under 200 Includes plunge area, one • slide, family swim pool, and lazy river Estimate does not include • lap pool Sales Tax Fund 2014 Balance -$1,486,280 • 2015 Estimated -$400,000 • Ending Balance -~ $1,886, 000 – 2018 Ending (1Authorization) -~ $3,200,000 st • 2Authorization (2019 –2038) -~ $17,000,000 nd • Sales Tax Fund Kennedy School Property Bond • ~ $166,000 / year –Sales Tax Funded – Starting in 2016 for 15 years – Waterpark Bond • ~ $375,000 / year –Sales Tax Funded – Starting in 2016 for 20 years – 2038 Ending Balance -~ $7,000,000 • Timeline Growing Support