HomeMy WebLinkAbout[04e] Payment Application lb
Council Agenda Item
CITY OF ST.JOSS PH
MEETING DATE: August 3,2015
AGENDA ITEM: 2015 Bituminous Street Improvement
SUBMITTED BY: Randy Sabart
BOARD/COMMISSION/COMMITTEE RECOMMENDATION:
PREVIOUS COUNCIL ACTION: Award project.
BACKGROUND INFORMATION:
BUDGET/FISCAL IMPACT: $25,674.70
ATTACHMENTS: Application for Payment No. 1
REQUESTED COUNCIL ACTION: Approve Application for Payment No. 1
P:\PT\S\STJOE\common\D39 Reg Council Action\2015\131108 Pmt 1 080315.doc
i
SEH
Building a Better World
for All of Us`
July 23, 2015 RE: St. Joseph, Minnesota
2015 Bituminous Street Improvement
SEH No. STJOE 131108 14
Honorable Mayor and Members of the City Council
do Judy Weyrens, City Administrator
City of St. Joseph
25 College Avenue North
PO Box 668
St. Joseph, MN 56374-0668
•
Dear Mayor and Members of the City Council:
Please find enclosed Application for Payment No. 1 for this project. When payment is made, please sign
all copies and distribute as follows:
Knife River
SEH
City of St. Joseph
Sincerely,
avrai 0412.64a-
Randy J. Sabart, PE
City Engineer
djg
Enclosures
p:\pt\s\stjoe\131108\7-contt-svcs\73-contr-app-paylapl-o.doc
Engineers I Architects I Planners I Scientists
Short Elliott Hendrickson Inc.,1200 25th Avenue South,P.O.Box 1717,St.Cloud,MN 56302-1717
SEH is an equal opportunity employer I www.sehinc.com I 320.229.4300 I 800 572 0617 I 888 908 8166 fax
OWNER
CONTRACTOR
SEH
APPLICATION FOR PAYMENT NO.1 CONTRACTOR FOR: 2015 BITUMINOUS STREET
IMPROVEMENT
PROJECT NO. STJOE 131108 AGREEMENT DATE: 05/04/15
OWNER ST.JOSEPH,MN FOR WORK ACCOMPLISHED THROUGH: 07/17/15
CONTRACTOR KNIFE RIVER CORP-NORTH CENTRAL
CONTRACT THIS PAYMENT I WORK TO DATE
ITEM DESCRIPTION , UNIT UNIT COST QUANTITY AMOUNT QUANTITY I AMOUNT I QUANTITY I AMOUNT
CL INTON VILLAGE BASE BID
GENERAL
1 MOBILIZATION LUMP SUM $3,000.00 1.00 $3,000.00 $0.00 0.00 I $0.00
2 TRAFFIC CONTROL LUMP SUM $4,000.00 1.00 $4,000.00 0.15 $600.00 0.15 $600.00
3 INLET PROTECTION EACH $150.00 14.00 $2,100.00 14.00 $2,100.00 14.00 $2,100.00
4 ROCK CONSTRUCTION ENTRANCE EACH $500.00 1.00 $500.00 $0.00 0.00 $0.00
5 REMOVE TYPE III BARRICADE EACH $25.00 2.00 $50.00 $0.00 0.00 $0.00
6 REMOVE CONCRETE CURB AND LIN FT $4.50 585.00 $2,632.50 521.00 $2,344.50 521.00 $2,344.50
GUTTER
7 REMOVE BITUMINOUS PAVEMENT SQ YD $3.00 790.00 $2,370.00 $0.00 0.00 $0.00
8 REMOVE BITUMINOUS DRIVEWAY SQ YD $3.00 25.00 $75.00 $0.00 0.00 $0.00
PAVEMENT
9 REMOVE CONCRETE DRIVEWAY SQ YD $5.00 35.00 $175.00 $0.00 0.00 $0.00
PAVEMENT
10 SAWING BITUMINOUS PAVEMENT LIN FT $1.75 415.00 $726.25 $0.00 0.00 $0.00
11 SAWING CONCRETE PAVEMENT LIN FT $4.50 80.00 $360.00 $0.00 0,00 $0.00
INTLIM►JN0US STREET RECLANATM
12 BITUMINOUS PAVEMENT SQ YD $1.00 9,800.00 $9,800.00 9,800.00 $9,800.00 9,800.00 $9,800.00
RECLAMATION.
13 SALVAGE AGGREGATE BASE(LV) CU YD $6.60 1,150.00 $7,590.00 $0.00 0.00 $0.00
14 RECLAIMED AGGREGATE BASE ROAD STA $205.00 28.00 $5,740.00 $0.00 0.00 $0.00
PREPARATION
15 TYPE SP 9.5 WEARING COURSE TON $61.35 1,090.00 $66,871.50 $0.00 0.00 $0.00
MIXTURE(2,C)
16 TYPE SP 12.5 WEARING COURSE TON $59.00 1,225.00 $72,275.00 $0.00 0.00 $0.00
MIXTURE(2,C)
17 BITUMINOUS MATERIAL FOR TACK GAL $2.00 500.00 $1,000.00 $0.00 0.00 $0.00
COAT
18 BITUMINOUS STREET PATCH SQ YD $15.50 790.00 $12,245.00 $0.00 0.00 $0.00
19 BITUMINOUS DRIVEWAY PAVEMENT SQ YD $42.00 25.00 $1,050.00 $0.00 0.00 $0.00
RESTORATION
20 CONCRETE DRIVEWAY PAVEMENT SQ YD $67.50 35.00 $2,362.50 $0.00 0.00 $0.00
RESTORATION
21 ADJUST MANHOLE CASTING EACH $275.00 8.00 $2,200.00 $0.00 0.00 $0.00
22 ADJUST FRAME&RING CASTING EACH $400.00 6.00 $2,400.00 $0.00 0.00 $0.00
23 INTERNAL CHIMNEY SEAL EACH $600.00 14.00 $8,400.00 $0.00 0.00 $0.00
24 ADJUST VALVE BOX EACH $190.00 9.00 $1,710.00 $0.00 0.00 $0.00
25 VALVE EXTENSION STEM EACH $155.00 8.00 $1,240.00 $0.00 0.00 $0.00
26 WATER MGAL $18.25 150.00 $2,737.50 $0.00 0.00 $0.00
27 STREET SWEEPER(TYPE WET PICKUP) HOUR $100.00 6.00 $600.00 $0.00 0.00 $0.00
28 CONCRETE CURB&GUTTER,DESIGN LIN FT $24.50 585.00 $14,332.50 $0.00 0.00 $0.00
B618
29 SCREENED TOPSOIL BORROW(LV) CU YD $22.00 125.00 $2,750.00 $0.00 0.00 $0.00
30 TURF ESTABLISHMENT(INCLUDES SQ YD $3.50 650.00 $2,275.00 $0.00 0.00 $0.00
SEEDING,SEED MIX,FERTILIZER,AND
HYDRO MULCH)
1
OWNER
CONTRACTOR
SEH
APPLICATION FOR PAYMENT NO.1 CONTRACTOR FOR: 2015 BITUMINOUS STREET
IMPROVEMENT
PROJECT NO. STJOE 131108 AGREEMENT DATE: 05/04/15
OWNER ST.JOSEPH,MN FOR WORK ACCOMPLISHED THROUGH: 07/17/15
CONTRACTOR KNIFE RIVER CORP-NORTH CENTRAL
CONTRACT THIS PAYMENT WORK TO DATE
ITEM DESCRIPTION UNIT UNIT COST QUANTITY I AMOUNT QUANTITY AMOUNT QUANTITY f AMOUNT
STOW SEWER
31 INLET PROTECTION EACH $150.00 3.00 $450.00 $0.00 0 00 $0.00
32 CONNECT TO EXISTING STORM SEWER EACH $1,300.00 1.00 $1,300.00 $0.00 0.00 $0.00
MANHOLE
33 CONSTRUCT DRAINAGE STRUCTURE EACH $2,200.00 2.00 $4,400.00 $0.00 0.00 $0.00
DES 48-4020
34 CONSTRUCT DRAINAGE STRUCTURE EACH $1,200.00 1.00 $1,200.00 $0.00 0.00 $0.00
DESIGN H
35 12"RCP PIPE SEWER DESIGN 3006,CL LIN FT $34.00 245.00 $8,330.00 $0.00 0.00 $0.00
TOTAL CLINTON VILLAGE BASE BID $249,247.75 $14,844.50 $14,844.50
CLINTON VILLAGE ALTERNATES TM L INIPROVEMENTS
$4.50 9
368 REMOVE CONCRETE CURB AND LIN FT $4.50 20.00 $90.00 17,00 $76.50 17.00 $76.50
GUTTER
37B SAWING BITUMINOUS PAVEMENT LIN FT $1.75 8.00 $14.00 $0.00 0.00 $0.00
38B SAWING CONCRETE PAVEMENT LIN FT $4.50 5.00 $22.50 $0.00 0.00 $0.00
39B COMMON EXCAVATION(P) CU YD $22.00 105.00 $2,310.00 $0.00 0.00 $0.00
40B TYPE SP 9.5 WEARING COURSE TON $90.00 24.00 $2,160.00 $0.00 0.00 $0.00
MIXTURE(2,C)
41B 6"CONCRETE WALK W/SAND BEDDING SO FT $7.50 900.00 $6,750.00 $0.00 0.00 $0.00
42B PLACE SALVAGED AGGREGATE BASE CU YD $22.54 35.00 $788.90 $0.00 0.00 $0.00
(CV)
436 TRUNCATED DOMES SO FT $40.00 16.00 $640.00 $0.00 0.00 $0.00
448 CONCRETE CURB&GUTTER,DESIGN LIN FT $24.50 20.00 $490.00 $0.00 0.00 $0.00
B618
45B ADJUST MANHOLE CASTING EACH $275.00 1.00 $275.00 $0.00 0.00 $0.00
46B INTERNAL CHIMNEY SEAL EACH $600.00 1.00 $600.00 $0.00 0.00 $0.00
47B TURF ESTABLISHMENT(INCLUDES SO YD $3.50 700.00 $2,450.00 $0.00 0.00 $0.00
SEEDING,SEED MIX,FERTILIZER,AND
HYDRO MULCH)
48B FOG SEAL CSS-1H GAL $52.00 15.00 $780.00 $0.00 0.00 $0.00
49B SCREENED TOPSOIL BORROW(LV) CU YD $22.00 135.00 $2,970.00 $0.00 0.00 $0.00
TOTAL CLINTON VILLAGE ALTERNATE $20,340.40 $76.50 $76.50
B
NORTHLAND OVERLAY
GENERAL
50 MOBILIZATION LUMP SUM $3,000.00 1.00 $3,000.00 $0.00 0.00 $0.00
51 TRAFFIC CONTROL LUMP SUM $3,000.00 1.00 $3,000.00 0.15 $450.00 015 $450.00
52 INLET PROTECTION EACH $150.00 21.00 $3,150.00 $0.00 0.00 $0.00
53 REMOVE CONCRETE CURB AND LIN FT $4.50 90.00 $405.00 $0.00 0.00 $0.00
GUTTER
54 SAWING BITUMINOUS PAVEMENT LIN FT $1.75 1,150.00 $2,012.50 $0.00 0.00 $0.00
55 SAWING CONCRETE PAVEMENT LIN FT $4.50 25.00 $112.50 $0.00 0.00 $0.00
2
OWNER
CONTRACTOR
SEH
APPLICATION FOR PAYMENT NO.1 CONTRACTOR FOR: 2015 BITUMINOUS STREET
IMPROVEMENT
PROJECT NO. STJOE 131108 AGREEMENT DATE: 05/04/15
OWNER ST.JOSEPH,MN FOR WORK ACCOMPLISHED THROUGH: 07/17/15
CONTRACTOR KNIFE RIVER CORP-NORTH CENTRAL
CONTRACT THIS PAYMENT WORK TO DATE
ITEM DESCRIPTION UNIT ,UNIT COST QUANTITY I AMOUNT QUANTITY I AMOUNT QUANTITY AMOUNT
BITUMINOUS STRE `OVERLAY "
56 MILL BITUMINOUS SURFACE(0-1") SQ YD $1.50 7,770.00 $11,655.00 7,770.00 $11,655.00 7,770.00 $11,655.00
57 BITUMINOUS PAVEMENT SQ YD $3.50 2,930.00 $10,255.00 $0.00 0.00 $0.00
RECLAMATION
58 TYPE SP 9.5 WEARING COURSE TON $58.50 2,590.00 $151,515.00 $0.00 0.00 $0.00
MIXTURE(2,C)
59 BITUMINOUS MATERIAL FOR TACK GAL $2.00 1,170.00 $2,340.00 $0.00 0.00 $0.00
COAT
60 BITUMINOUS STREET PATCH SQ YD $6.25 2,930.00 $18,312.50 $0.00 0.00 $0.00
61 ADJUST MANHOLE CASTING EACH $275.00 14.00 $3,850.00 $0.00 0.00 $0.00
62 ADJUST FRAME&RING CASTING EACH $400.00 9.00 $3,600.00 $0.00 0.00 $0.00
63 INTERNAL CHIMNEY SEAL EACH $185.00 21.00 $3,885.00 $0.00 0.00 $0.00
64 ADJUST VALVE BOX EACH $190.00 18.00 $3,420.00 $0.00 0.00 $0.00
65 VALVE EXTENSION STEM EACH $155,00 9.00 $1,395.00 $0.00 0.00 $0.00
66 STREET SWEEPER(TYPE WET PICKUP) HOUR $100.00 10.00 $1,000.00 $0.00 0.00 $0.00
67 CONCRETE CURB&GUTTER,DESIGN LIN FT $24.50 90.00 $2,205.00 $0.00 0.00 $0.00
B618
68 SCREENED TOPSOIL BORROW(LV) CU YD $22.00 30,00 $660.00 $0.00 0.00 $0.00
69 TURF ESTABLISHMENT(INCLUDES SQ YD $3.50 150.00 $525.00 $0.00 0.00 $0.00
SEEDING,SEED MIX,FERTILIZER,AND
HYDRO MULCH)
TRAIL MPRCNEMENTS
70 INLET PROTECTION EACH $150.00 1.00 $150.00 $0.00 0.00 $0.00
71 REMOVE CONCRETE CURB AND LIN FT $4.50 20.00 $90.00 $0.00 0.00 $0.00
GUTTER
72 SAWING BITUMINOUS PAVEMENT LIN FT $1.75 8.00 $14.00 $0.00 0.00 $0.00
73 SAWING CONCRETE PAVEMENT LIN FT $4.50 5.00 $22.50 $0,00 0.00 $0.00
74 COMMON EXCAVATION(P) CU YD $22.00 80.00 $1,760.00 $0.00 0.00 $0.00
75 TYPE SP 9.5 WEARING COURSE TON $80.00 65.00 $5,200.00 $0.00 0.00 $0.00
MIXTURE(2,C)
76 6"CONCRETE WALK W/SAND BEDDING SQ FT $7.50 130.00 $975.00 $0.00 0.00 $0.00
77 PLACE SALVAGED AGGREGATE BASE CU YD $21.00 60.00 $1,260.00 $0.00 0.00 $0.00
(CV)
78 TRUNCATED DOMES SQ FT $40.00 16.00 $640.00 $0.00 0.00 $0.00
79 TURF ESTABLISHMENT(INCLUDES SQ YD $3.50 1,500.00 $5,250.00 $0.00 0.00 $0.00
SEEDING,SEED MIX,FERTILIZER,AND
80 FOG SEAL CSS-1H GAL $18.00 50.00 $900.00 $0.00 0.00 $0.00
81 SCREENED TOPSOIL BORROW(LV) CU YD $22.00 210.00 $4,620.00 $0.00 0.00 $0.00
TOTAL NORTHLAND OVERLAY $247,179.00 $12,105.00 $12,105.00
3
OWNER
CONTRACTOR
SEH
APPLICATION FOR PAYMENT NO.1 CONTRACTOR FOR: 2015 BITUMINOUS STREET
IMPROVEMENT
PROJECT NO. STJOE 131108 AGREEMENT DATE: 05/04115
OWNER ST.JOSEPH,MN FOR WORK ACCOMPLISHED THROUGH: 07/17115
CONTRACTOR KNIFE RIVER CORP-NORTH CENTRAL DATE
CONTRACT THIS ITEM DESCRIPTION t UNIT UNIT COST] QUANTITY I AMOUNT _ QUANTITY I AMOUNT I QUANTITY J TO
AMOUNT
SUMMARY
TOTAL CLINTON VILLAGE BASE BID $249,247.76 $14,844.50 $14,844.60 _
TOTAL CLINTON VILLAGE ALTERNATE B $20,340.40 $76.50 $76.50
TOTAL NORTHLAND OVERLAY $247 179.00 $12 105.00 $12,108.00
GRAND TOTAL $618,767.15 $27,028.00 $27,026.00
CHANGE ORDER
TOTAL $518,787.16 $27,028.00 $27,028.00
The undersigned Contractor certifies that all previous payments received Gross Amount Oue $27,026.00
from the Owner for work done under this contract have been applied Less Ratainege(5%) $1,351.30
to discharge in full all obligations the Contractor incurred in connection
with the work covered by said progress payments.The undersigned Contractor Amount Eligible to Date $25,874.70
agrees to pay all subcontractors within 10 days of receipt of payment from Less Previous Payments $0.00
' the municipality for undisputed services provided by the subcontractor. Amount Due This Application $2074.70
The Contractor agrees to pay interest as described under Minnesota state st le.
SUBMITTED KNIFE RIVER CORP-NORTH CENTRAL BY: �/DATE: i/Z-3/
ST.BOX 1333
ST.CLOUD.
MN 56302-1333
• •
RECOMMENDED SEH. BY. A,I,i■• f(a All.,l/ DATE: 7/23/15
SO BOO 1717 ST.CLOUDO,,
MN 56302-1717 •
I l...c
PH
APPROVED CITY OF ST.JOSEPH . ! DATE: 3 1 ' V
PO 80X 668 •
ST.JOSEPH,MN 56374-0688 •
•
•
4
•