Pursuant to due call and notice thereof the Joint Planning Board for the Township and City of St. Joseph
met in special session on Tuesday, August 11, 2015 at 7:00 PM in the St. Joseph City Hall.
Members Present: Chair Rick Schultz. Members Jeff Janssen, Jerome Salzer, Steve Olson, Bob Loso,
Chad Hausmann Brenda Stanger, Mark Thompson. Secretary of the Board Judy Weyrens.
Others Present: Barb Ferrian, Bob Smith, Ralph Eiynck, Mike Nelson, Hal Undersander, Ann Reischl,
Floyd &Tresa Ostendorf, Don &Aggie Steichen, Karen Salzer, Chris Hensel, City Engineer Randy
Sabart. Cory Ehlert, Mike Koltes, Kevin Cox, Robert Smith, Mike Nelson
Approve Minutes: Salzer made a motion to approve the minutes of May 12, 2015; seconded by
Stanger and passed unanimously by those present.
Robert Smith, Sunset Ridge: Weyrens stated Robert Smith had contacted the City and Township
regarding property he purchased in Sunset Ridge. The property purchased was Lot 12 Block 1 and
construction had begun on a second driveway with direct access to 320th Street. The developer's
agreement identifies where accesses are to be located which was done for safety reasons. In discussions
with Stearns County Environmental Services, it was noted the County had missed the requirements when
the owner on Lot 1 constructed a home and driveway in the wrong location, directly across the street from
Robert Smith. The current driveway on lot 1 is close to an easement for a future roadway and should not
have been allowed to access 320th Street. Weyrens added the Board is being asked to allow the
driveway access on 320th street for the accessory building on Smith's lot. The second issue presented
was whether a home occupation exists on the property.
Salzer stated he was unable to locate in the developer's agreement where it requires the access to be off
of Cedar Ridge Road. Weyrens stated it is on page 7 of 40 in the agreement. The City Attorney had also
looked at the agreement, noting that 7.0(a) enforces the requirement. Weyrens added the accesses to the
home were put on Cedar Ridge Road to minimize the amount of traffic on 320th street and access points
on 320th Street.
Robert Smith, property owner. Smith approached the Board as the property owner of Lot 12 in Sunset
Ridge. Smith stated that his shed will be used to store dump trucks in and he would rather use the 2nd
driveway than use the same driveway he would use to go to his home. Smith added there already is
dump truck traffic on 320th street and does not feel that traffic would be slowed by his utilization of the 2nd
driveway. Smith added that his trucks are gone until the end of November and then the building becomes
a storage building.
Schultz asked if the extra driveway is needed if the trucks would not be using the access that often. Smith
stated it would be easier and more convenient to have the second driveway. Salzer stated he has no
issues with having the 2nd driveway as a direct access to 320th street as long as it is not an eyesore.
Weyrens stated that the issues comes down to enforcement of a development agreement the Joint
Planning Board negotiated. Other property owners have complied with the requirements and if the Board
decides to allow the second access then it becomes a matter if the development agreement will be
enforced to others or is it a case by case. As staff it becomes difficult enforcing an agreement if it is not
know when to apply the terms. The Agreement was agreed to for all the lots of the development with the
same rules applying to all land owners.
Jenssen stated that because there was already a field access, he would be okay with deviating from the
development agreement. Hausmann cautioned the board stating that they will need reasoning for the
decision otherwise there is no limit to what can and will be approved going forward. Schultz added there
would be no point in having a developer's agreement if the Board were to approve every exemption by
the landowners. Schultz acknowledged the needs for exemptions, but questions if exemptions are
needed if the developer's agreement is followed. Schultz stated he has no issues with the commercial
use on the property, but has an issue with the location of the second driveway.
August 11, 2015
Page 2 of 4
Thompson stated he is not in favor of the commercial use as businesses are not allowed in a residential
area and the covenants of the development do not allow for commercial businesses. Thompson is
concerned that the business may grow beyond what it is now. Weyrens stated the Board does not
enforce covenants, but they do control zoning matters. The use as identified by Smith could be
considered a commercial use and as such a conditional use permit would be required, needing a hearing
before the Joint Planning Board. The issuance of a conditional use permit would allow the Joint Planning
Board to place conditions or restrictions on commercial activity. A public hearing would also allow the
neighboring property owners a chance to speak on the topic.
Ann Reischl, 200 Hill St W. Reischl questioned how the Township will maintain access to the holding
pond located near the second driveway as the terrain is difficult. The second driveway could be benefit to
the City. City Engineer Sabart responded that access would come from the drainage utility easement and
access can be obtained through the ditch. If work were to be done in the pond, it would not require a
street vehicle, rather a backhoe or something similar that does manage varying topography; therefore the
driveway would not have a benefit.
Barb Ferrian: Ferrian, co-owner of the property, approached the Board stating she would be happy to
keep the field access there while slightly improving it into a second driveway. It would allow easier access
for the township to the holding pond. Sabart reiterated that maintenance of the holding pond does not
require a driveway access.
Salzer asked if the property owner could have a second gravel driveway off of Cedar Ridge Road so that
the trucks do not have to drive on the concrete driveway. Olson stated he would rather have a main
access to 320th Street for the dump trucks preventing them from driving in the residential subdivision.
Hausmann stated that variances are for situations where people have run out of options. Hausmann
added that in this case the driveway access off of 320th Street is not a necessity for access to the
property.
Smith stated that he would not have purchased the property if he had known he would not be able to
have the second driveway.
Salzer stated that it is their job as a Board to hold everyone to equal standards.
General consensus of the Board denied the request for access off of 320th street, but allowing a second
access for the property off of Cedar Ridge Road. Additionally the board thought the commercial use as is
does not require a Conditional Use Permit.
Public Hearing, River Ridge Estates— Preliminary Plat: Schultz opened the public hearing to which
Weyrens stated the purpose of the hearing is to consider a 17 lot plat entitled "River Ridge Estates"
submitted by CLC Partners, LLC.
Sabart stated that feedback was received and comments were given from the Township Engineer as well
as from the City's perspective. Sabart added he did not try to duplicate items brought forward by the
Township Engineer. The 100 year floodway and flood plain boundaries are illustrated on the preliminary
plat. In several instances, the principal structure pads are within only 50-70 feet of the flood plain
boundary line and the individual onsite sewage treatment sites are even closer to the flood plain. Sabart
stated the structures would need to be built at an elevation that would not be affected by the flood plain.
Sabart added another concern relates to the utility easements. The Future utility Plan contemplates
municipal sanitary sewer and water main being installed in a corridor either parallel with CR121 or along
the proposed street centerlines. It is unknown if the extension of sanitary sewer and water would occur at
the end of life cycle of the street, however, the provisions for utility easements are not adequate to avoid
disturbing roadways, taking into consideration the size and depth of the trunk infrastructure that has been
considered for the area.
August 11, 2015
Page 3 of 4
As no one else wished to speak, Chair Schultz closed the public hearing for board discussion.
Cory Ehlert, CLC Partners: Ehlert approached the Board to respond to the engineer's comments. Ehlert
stated he does not have any of the updated diagrams but some of the concerns addressed were
discussed at the rezoning hearing. Sabart stated the discussions were had but no updated diagrams were
submitted with the preliminary plat. Sabart added that the easement issues can be worked out.
Schultz stated that the issues need to be worked out between the Developer and the Engineer as they
are issues the Board does not decide upon. Schultz questioned how close they are to agreeing on the
preliminary plat and asked how many items that still need to be worked out including where the water and
storm sewer are going to go. Schultz suggested tabling the discussion for 30 days in order for all the
correct documentation to be submitted for proper review.
Ehlert stated that in the past he has been successful in getting preliminary and final plat approval
provided all the conditions are met. In this instance Ehlert suggested approving the preliminary plat with
conditions that still need to be worked out. Once those are resolved, then it will be brought back for final
plat approval.
Janssen agreed with Ehlert that in most cases the preliminary and final plats are approved providing all
the contingencies are met. Hausmann suggested approving the preliminary plat contingent upon the City
Engineer working out any outstanding issues related to the plat.
Ehlert stated that he has never been held to following the guidelines of the 500-year flood plan. Ehlert
added that Stearns County has restrictions on building in and near the floodplain. There are certain
elevations that need to be met in order to build. Ehlert stated they are not building on the 100-year flood
plain and are not allowing any buildings to be built in the flood plain. There are many homes built in the
flood plain and have flood insurance.
Sabart noted another concern is the location of the drainage paths. Based on what was provided,
overland flow includes drainage between and across lots. Drainage paths need to be located within
drainage easements to allow for continued conveyance and maintenance access. Ehlert stated that the
culverts are staggered so that not all the water will be draining through. The culverts will be elevated to
slow down the pooling of water.
Mike Nelson, Minnesota Engineering: Nelson approached the Board to discuss the drainage issue in
question. Nelson stated that when developing areas that are closer to wetlands, even storms that rain 1
inch are taken into account.
Hausmann moved to approve the Preliminary Plat entitled "River Ridge Estates", contingent upon
the City Engineer and City Staff working with the Developer to resolve any outstanding
conditions. The motion was seconded by Salzer.
Loso asked if there were any other outstanding issues besides the drainage and lot elevation. Sabart stated
there are and suggested amending the motion to include those concerns brought forth by the Township
Engineer as well.
Loso moved to amend the previous motion to include the concerns provided by Stearns County,and
the Township Engineer in addition to those of the City Engineer. The motion was seconded by Salzer
and passed unanimously by those present.
Ehlert stated he appreciates the opportunity to be able to come back to the Board for final approval.
Thompson asked if future land owners will be made aware of the flood plain prior to purchase. Ehlert felt it
would be a reasonable request to inform those wanting to purchase the lots.
Sabart wanted to clarify that the developer is compliant with the lot elevation requirements and that
discussion of the 500-year flood plan is only to raise awareness.
August 11, 2015
Page 4 of 4
Weyrens stated that after the preliminary plat is approved, a developer's agreement is created to include
detailed items such as roads.
Other Matters: None.
Adjourn: As there was no further business, Schultz adjourned the meeting at 8:30