MEETING DATE: September 19, 2016
AGENDA ITEM: Administrator Report—Government Center
SUBMITTED BY: Administration
PREVIOUS COUNCIL ACTION: The City Council approved the construction of the Government
Center and originally made provisions for a portable generator.
BACKGROUND INFORMATION: The project is over 50% complete and the project still has a
contingency of over S 200,000. Most of the changes to date have been minor with the largest price
change the addition of the sign. Since we are proposing to use the Government Center as the hub in the
event of an emergency the staff is requesting the placement of a permanent generator. The proposed
generator has been sized to accommodate the facility. The summary of price adjustments is included with
the Treasurers Report along with the financial summary.
BUDGET IMPACT: S up to S 60,000
ATTACHMENTS: Request for Council Action
Price Proposal
REQUESTED COUNCIL ACTION: Authorize the purchase and installation of a generator for the
Government Center.
OFS4 aECnW PMME=M-1658 4807 Heatherwood
RUL(5701=4276
Box 1252
ELECTRICAL CONTRACTORS INC. COLD Sv+W4aELECTMCSEirvM FAX E32°'�63 St.Cloud,MN 5631
TO: R.A.Morton Date: 9/8/2016
ATTN: Paul
PROJECT: ST.Joseph Government Center
SUBJECT: Added Diesel Generator
We herewith submit our proposal and description for changes requested
as follows:
DESCRIPTION OF CHANGE:
Added Caterpillar Diesel Generator total$59,592.12
Gen pad by others
Fuel By City
AMOUNT: Subcontractor with markup $
Material $ 66,267.41
Labor $ 3,324.71
Bond $ -
Total $ 59,592.12 Deduct from total$-3,400 for Cummins
This proposal will be valid until:
30 days
Normal working unless noted otherwise.
Additional Comments:
See attached breakdown.
If you have any questions,please feel free to contact us.
Very truly yours,
Adam Kempenich
Design Electric,Inc.
DESCRIPTION QTY JUNITPRICE PER I AMOUNT UNIT PER I AMOUNT
10awg 280 $ 143.70 1000 $ 40.24 5.5 1000 1.54
12awg 140 $ 96.59 1000 $ 13.52 4.5 1000 0.63
14awg 560 $ 65.61 1000 $ 36.74 4 1000 2.24
4SQ BOX 2 $ 2.25 1 $ 4.50 0.3 1 0.6
4"PVC FIT 13 $3.79 1 $ 49.27 0.25 1 3.25
Backhoe trench 20 5.5 11 110 8 1001 1.6
Backfill 20 4.5 1 90 8 100 1.6
ground rod and clamp 2 25.5 1 51 0.3 1 0.6
Relocate conduit stack 1 1 $ - 7.5 1 7.50
2"PVC 60 $62.25 100 $ 37.35 3.5 100 2.1
2"PVC FIT 9 $0.65 1 $ 5.85 1 0
2"PVC 90 3 $1.86 1 $ 5.58 0.3 1 0.9
breaker 2 1 $ - 0.15 1 0.30
1/2 FLEX 20 $ 65.00 100 $ 13.00 3.5 1001 0.7
motor cnn 2" 3 49.36 1 148.08 0.9 11 2.7
4"flex 10 794.96 100 79.496 6 1001 0.6
4 flex conn 4 190.72 1 762.88 0.15 1 0.6
off load/crane 1 $ 750.00 1 $ 750.00 2.5 1 2.50
ATS startup test check out 1 1 $ - 4 1 4.00
Gen layout 1 1 $ 2 1 2.00
Startup and training en 1 1 $ 2 1 2.00
Gen Design 1 1 $ - 2.5 1 2.50
CAT Generator Quote 1 $45,545.00 1 $ 45,545.00 1
1/0 ground wire 120 $ 1,386.00 1000 $ 166.32 16 1000 1.92
Gen conn. Cab return 1 $ 3,100.00 1 $ 3,100.00 1 -
en level 2 sound cab 1 $ 1,075.00 1 $ 1,075.00 1
4hr load bank 1 $ 1,335.00 1 $ 1,335.00 1
remote annunciator 1 $ 420.00 1 $ 420.00 1
1 $ 1
1 $ 1
Clean up 1 I 1 $ 01 1
Testing Check out 1 1 $ 1
adjustment 11 1 1 $ - 1
MAT $ 47,638.83 LABOR 42.38
Material $ 47,638.83
Mark up 10% $ 4,763.88
Material w/Mark up $ 52,402.71
TAX 7.38% $ 3,864.70
Material subtotal $ 56,267.41
Subcontractor with markup
Inspection fee $ -
Hours Rate
Labor 42.38 $ 71.00 $ 3,008.98
Labor Premium Hours Adder $ 35.00 $ -
Foreman Labor 4.24 $ 74.50 $ 315.73
Subtotal $ 59,592.12
Bond cost 0% $ -
Subtotal $ 59,592.12
Total Cost $ 599592.12
Proposal by
Date: September 8, 2016 Z I E G L E R ► Proposal No. EPG222461
r
PoweSystems
8050 State Highway 101
Shakopee, MN 55379
952-887-4535
To. Design Electric Re: Caterpillar Standby Generator
Attn: Adam Kempenich St Joseph Government Center
WE PROPOSE TO FURNISH INA CCORDANCE WITH THE FOLLOWING SPECIFICATIONS,TERMS AND CONDITIONS
QUANTITY One (1) new CATERPILLAR Diesel Generator Set, UL Listed Certified Package
In Weatherproof Enclosure mounted on top of 24 hour Dual Wall Base Fuel Tank,
MODEL D200-2 3 phase, Tier 3 emissions certified,
RATING 200kW 3 phase standby power
VOLTAGE 120/208, 3 phase, 60 HZ, 1800 RPM,
CIRCUIT BREAKER One (1) 800 amp
SWITCHGEAR By others
INSTALLATION By others
TOTAL EQUIPMENT PRICE $ 45,545 .00-
OPTIONAL
5,545 .00*OPTIONAL ADDERS
Provide Level 2 Sound Attenuated insulated enclosure in place of standard Weatherproof Enclosure
TOTAL PRICE ADDER $ 1,075 .00*
Provide Four(4) hour load bank test on generator at site after installation (fuel by others)
TOTAL PRICE ADDER $ 1,335 .00*
Provide Remote Annunciator, NFPAI 10 with alarms, shipped loose
TOTAL PRICE ADDER $ 420 .00*
*Please refer to the attached Bill of Material.
*Price does not include state or local sales and/or use tax.
APPROXIMATE SHIPPING DATE 8-10 weeks after approval drawings
F O.B Jobsite on truck
TERMS: Net 20 days
THIS PROPOSAL SUBJECT TO ALL PROVISIONS OF THE CONTRACT AND WARRANTY ONREVERSE SIDE
ACCEPTED: Respectfully submitted,
ZIEGLER INC.
By P&tAA Ec kt�rwiaw
Doug Eckerman, Sales Engineer
By Subject to approval by APPROVED:
ZIEGLER INC.
Its By
BILL OF MATERIAL
EPG222461
-1 -
EMERGENCY STANDBY GENERATOR SET, RATED 20OKW 3 PHASE STANDBY
@ 120/208 VOLT, 60 HERTZ, 1800 RPM
ENGINE SPECIFICATIONS
6 Cylinder In-line engine
7.1 liter displacement
Oil filter, spin-on type
Electrical governor
Radiator cooling system, blower fan
Water pump
12V DC starting system
Jacket water heater, 120 volt, 1500 watt
Alternator, 55 ampere, 12 VDC
Fuel system, diesel
STANDARD ENGINE SAFETY FEATURES
Shutdowns
Fail to start/ Overcrank
High coolant temperature
Low lube oil pressure
Overspeed
Low coolant level
Spare alarm/shutdown channel w/LED annunciation
GENERATOR SPECIFICATIONS
Class H insulation, rotor and stator, single bearing design, upgraded from std generator
Flexible coupling
Brushless Excitation
Solid-state regulator, +/- 0.5%regulation
Mainline circuit breaker, 3 pole, 800 amps, 208 volt
EMCP 4.2 Series control panel features:
Run/off/auto switch
Remote signals/contacts from panel:
Terminals for remote emergency stop
Common fault alarm signal
Start/Stop volt free control
Panel lights
Audible alarm
Modbus Isolated Data Link RS 485 Communications built in
Three (3)-attempt start timer(adjustable)
Lamp test pushbutton
AC instrumentation for volts, amps, frequency
Seven (7)position voltmeter phase selector switch
Four(4)position ammeter phase selector switch
Red lockdown stop pushbutton
ENCLOSURE
Standard weatherproof enclosure
Lockable doors,
Color, white
BILL OF MATERIAL
EPG222461
-2 -
ANCILLARY EQUIPMENT
Battery charger, 10 ampere, float type, dual rate
Battery, with battery rack and cables
Exhaust silencer, critical grade, shipped loose
Voltage Adjust Potentiometer
Volt free contacts for Generator set run and alarm
LTL Listed base mounted fuel tank, dual wall, 24 hour capacity
SWITCHGEAR
By others
PROJECT MANAGEMENT SERVICES
Submittal drawings
Dimensional drawings
Electrical schematics
Product specifications
Prototype testing
Production testing
Technical assistance - coordinated through project manager
Jobsite testing
Operation and maintenance manual
Engine, generator
Warranty, Two (2) years
Training of owner's personnel
COMMENTS AND CLARIFICATIONS
Crane to offload NOT included
Fuel is NOT included
Installation is NOT included
NOTES
Ziegler limits the scope of supply for this quotation to the equipment and services listed. Equipment not
listed is assumed to be provided by others.
Ziegler cannot provide air emission permits for customers. We will provide emission information on the
Caterpillar engine to the owner to aid in the permitting process.
Orders are subject to re-stocking charges if cancelled after release for production.
State and local permits for fire, air, fuel tanks or building permits are not included and provided by others
Terms:
• Extension of contract beyond term must be at the mutual agreement of the parties.
• Ziegler Inc. shall not be liable for consequential damages or damages beyond our control.
• This quotation is subject to availability at time of order
• Orders are subject to re-stocking charges if cancelled after release for production.
• Customer is responsible for adequate site conditions and security.
• Customer is responsible for scheduled maintenance and fuel costs.
• Customer must provide adequate insurance to cover equipment damage or loss.
• Price(s) do not include state or local sales and/or use taxes.
• Quotation is valid for 90 days.
Power
Generation
Our - working
Quotation
Cummins NPower, LLC
1600 Buerkle Road
White Bear Lake MN 55110 United States
Direct: 651-286-2124
September 8, 2016
Project Name: St Joseph Government Center
Quotation: 36352562
Thank you for your inquiry. We are pleased to quote as follows:
USD
Description
Diesel Genset: 60Hz-200kW
U.S. EPA, Stationary Emergency Application
200DSGAE Genset-Diesel,60Hz,200kW 1
Duty Rating-Standby Power
Listing-UL 2200
Emissions Certification, EPA, Tier 3, NSPS Cl Stationary Emergency
Enclosure-Steel,Sound Att,Level 2,w/Exhaust System
Voltage-120/208,3 Phase,Wye,4 Wire
Alternator-60 Hz, 12 Lead, Lower Broad Range, 105C
Generator Set Control-PowerCommand 2.2
Exciter/Regulator-Torque Match
Engine Governor-Electronic, Isochronous Only
Display Language-English
Control Mounting-Left Facing
Relays-Genset Status, User Configured
Stop Switch-Emergency
Signals-Auxiliary, 8 Inputs/8 Outputs
Heater-Alternator, 120 Volt AC
CB or EB or TB-Left Only
CirBrkr-800A,Left,3P,600/415V,SS RMS,80%UL/IEC
CB or EB or TB-Bottom Entry, Left
Shunttrip-12vdc,Single Circuit Breaker
Listing, ULC-S601-07
Wind Rating-150 MPH,Steel Housing
Fuel Tank-Dual Wall Subset, 24 Hour Capacity
Separator-Fuel/Water
Warning-Low Fuel Level
Warning-Fuel in Rupture Basin
Engine Starter- 12 VDC Motor
Battery Charging Alternator-Normal Output
Engine Cooling-High Ambient Air Temperature
Shutdown-Low Coolant Level
Extension-Engine Coolant Drain
Engine Coolant-50% Antifreeze, 50% Water Mixture
Coolant Heater-120 Volt Ac, Single Phase
Engine Air Cleaner-Heavy Duty
Engine Oil
Genset Warranty- Base
Literature-English
Packing-Skid, Poly Bag
Rack-Battery
Extension-Oil Drain
Common Parts Listing
Product Revision - E
Freight to site
Startup
2- 12volt batteries
Grand Total $4 ,
Not included in above: Sales tax, Offloading, Verbal Deduct of-10% _ $ 42,750.00
Fuel, Special testing, Engineering, Permits
Annunciator ---------------Add $ 500.00
4-Hour Load test---------Add $ 1,200.00
Submitted by