Loading...
HomeMy WebLinkAbout[08a] Park Board - Dog Park Council Agenda Item 8a MEETING DATE: July 17, 2017 AGENDA ITEM: Park Board – Dog Park SUBMITTED BY: Park Board BOARD/COMMISSION/COMMITTEE RECOMMENDATION: In November 2016 the Park Board requested the Council approve the development of a dog park at Millstream Park. The Park Board met on June 26 and discussed the Dog Park and financial status. The following is an extract of the minutes of the meeting: John made a motion for Council’s approval for the creation of a Dog Park. This would include $15,000 for Phase 1 ($10,000 from City Funds, $5,000 from donations). Phase 1 would include fencing, mulch, signage (to include rules and donators), trees, gravel and dispenser for “doggie bags”. Phase 2 and 3 would be dependent upon funding and could include water access, concrete or pavers, a shelter and expansion to accommodate varieties in dog sizes. The motion was approved. PREVIOUS COUNCIL ACTION: In November 2016 the City Council approved the development of a dog park with the following motion: Wick made a motion authorizing the location of the dog park at Millstream Park with an anticipated cost of $23,000. Development of the Park is contingent upon the receipt of $10,000 in donations to match the fencing cost by December 1, 2018. The motion was seconded by Schultz and passed unanimously by those present." The presentation at the meeting indicated that the project would be constructed in two phases with phase one consisting of the fencing cost $ 23,000 to include fencing and trees. Phase two would include mulch/trail, benches, concrete picnic table and water. The Park Board had agreed to raise $ 10,000 and the remaining funds would be expended from the Park Board CIP. In June the Council was updated that the fencing costs have been reduced and the cost of phase one is now $ 14,000 and the Park Board has raised $ 5,000. The Council requested the prior action of the Council be reviewed before moving forward. BACKGROUND INFORMATION: The Park Board has reviewed the costs of the costs for the park and they are as follows: Fence $ 13,968 (The original fence quote was $ 18,424, but after reviewing the material is was decided to change the fence to include a tension wire at the base and eliminate two rails saving $ 4,456) $ 100 Mulch, entry $ 450 Sign and wood $ 200 Dog Bag Receptacle $ 2,000 Trees (Tree Fund – approximately 12 trees $ 0 Donations for pavers and relocate existing picnic tables $ 16,718 Revenue Summary: Park Board Revenues $ 10,000 Tree Fund 2,000 Donations 5,025 The Park Board discussed that the park will not provide segregated areas for different size dogs; rather they decided to plan a future area for small dogs. The Park Board recognizes that additional fund raising will need to take place to build the park expansion but hopes that once residents see the park they will be willing to donate funds for the expansion. It is the intent of the Park Board to begin the project upon approval by the City Council. ATTACHMENTS: Exhibit of Dog Park Fence Quote Dog Park Sign REQUESTED COUNCIL ACTION: Approval of the three phased dog park, approving the utilization of $ 10,000 of park funds and $ 2,000 of the tree fund. OBERG FENCE CO. 23251 County Hwy 12 W est P.O. Box 118 Deerwood, MN 56444 218-534-3118 Sales@obergfence.com 218-534-3119 fax www.obergfence.com Date: March 21, 2017 Name: City of St. Joseph Attn; Terry T. Address: Dog Park Phone Number: Fax Number: E-mail: Description: Furnish and install 1,030’ of 5’ high black chain link fence with commercial posts and rail, to have (2) walk gates and (1) 10x10x10 section for dog entrance. 10-12’ wide maintenance gate. Prevailing wages not included! Staking done by customer. All brushing & removal of brush must be done prior to installation by owner. Certificate of insurance is available upon request. All site preparation including grading, clearing, brushing, mowing, debris removal or disposal shall be by others. Signature on proposal indicates agreement with Oberg terms and conditions provided. Signed proposal and P.O. or 1/2 down are necessary to begin the scheduling process, balance is due upon completion. We will furnish material and labor in accordance with the above description for the sum of: $ 13,968.00 Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. Owner to carry fire, tornado, and all other necessary insurance. Our workers are fully covered by Workman’s Compensation Insurance. Salesman Signature: ________________________This proposal may be withdrawn if not accepted in 7 days. John Brabbit Acceptance of Proposal: Signature: ___________________________Date:_________ You are authorized to do the work as specified. Payment will be made as outlined above. This proposal may be withdrawn if not accepted within 7 days. Changes to above description must be executed with a written change order, and will become an extra charge over the above price. We are fully insured; also bonding is available if required at an additional cost. This page intentionally left blank 1