Park Board Agenda Item 5
MEETING DATE: October 23, 2017
AGENDA ITEM: 2018 Budget
SUBMITTED BY: Finance
BOARD/COMMISSION/COMMITTEE/COUNCIL RECOMMENDATION: N/A
PREVIOUS PARK BOARD ACTION: The Park Board identified project proposals for 2018 at their
August 2017 meeting.
BACKGROUND INFORMATION: Enclosed is the 2018 draft capital budget (CIP) for the Park
Board as I understood the budget requests. Please review the forms to ensure there is agreement on the
budget request before the CIP is submitted to the city council. If in agreement, the budget will be
presented to the Council in October.
BUDGET/FISCAL IMPACT: $285,075 for 2018
ATTACHMENTS: Request for Park Board Action –2018 Budget
Park Board Capital Improvement Plan
REQUESTED COUNCIL ACTION: Consider recommending the 2018 capital improvement plan to
city council.
City of St. Joseph Park Board
2018 Capital Improvement Budget Summary
DRAFT as of August 28, 2017
General Funds
Balance
Park Dedication Cash August 31, 2017$ 121,714
(Unaudited)
Adjustments
Starting Balance$ 121,714
2017 General Levy-remaining$ 11,005
Other Revenues-remaining$ 32,529
Potential Projects:
PotentialProposed
Millstream Cottages-phase 2$ 23,400
Sunset Ridge-phase 2 - 4 lots$ 2,000
Ending Balance for 2017$ 165,248
Projects - Budget
201720182019202020212022Total 17-21
PTR-01 (Millstream)$ 540,000$ 40,000 $ -$ -$ - $ -$ 40,000
PTR-02 (Northland)$ -$ -$ -$ -$ - $ -$ -
PTR-03 (Klinefelter)$ -$ -$ -$ -$ - $ 210,200$ 210,200
PTR-04 (Wobegon)$ -$ -$ -$ -$ - $ -$ -
PTR-05 (Memorial)$ -$ 3,200 $ -$ -$ - $ -$ 3,200
PTR-06 (Centennial)$ -$ -$ -$ -$ - $ -$ -
PTR-07 (Monument)$ 25,250$ 35,250 $ 250$ 250$ 250$ 250$ 36,250
PTR-08 (Hollow)$ -$ -$ -$ -$ - $ -$ -
PTR-09 (Cloverdale)$ -$ -$ -$ -$ - $ -$ -
PTR-10 (East Park)$ 4,500$ 175,120 $ 302,120$ 10,000.00$ - $ - $ 487,240
PTR-11 (West Park)$ -$ -$ -$ -$ - $ - $ -
PTR-12 (Trails)$ 10,000$ 10,000 $ 10,000$ 10,000$ 10,000$ 10,000$ 50,000
PTR-13 (Trees)$ 1,500$ 1,500 $ 1,500$ 1,500$ 1,500$ 1,500$ 7,500
PTR-14 (Dog Park)$ 20,000$ 20,000 $ 10,000$ -$ - $ -$ 30,000
Total$ 601,250$ 285,070 $ 323,870$ 21,750$ 11,750$ 221,950$ 834,390
Projects - ActualSpent 2016201717 Snow Town Expenses:Avail. Rev
PTR-01 (Millstream)$ 2,500 $ 7,203 Millstream Shelter$ -$ 905
PTR-02 (Northland)$ 2,351 $ -
Other 18 Expenses Budget:2017 YTD
PTR-03 (Klinefelter)$ 4,000 $ -
PTR-04 (Wobegon)$ - $ -Real Estate Taxes$ -$ 4,014
PTR-05 (Memorial)$ - $ -A-1 Toilets$ 1,600$ 563
PTR-06 (Centennial)$ - $ -
2018 Revenue Budget:2017 YTD
PTR-07 (Monument)$ - $ -
PTR-08 (Hollow)$ - $ -Interest$ 1,000$ 785
PTR-09 (Cloverdale)$ - $ -Round Up$ 120$ 94
PTR-10 (East Park)$ - $ 435 phase 1 canoe areaGF Levy$ 20,000$ 8,995
PTR-11 (West Park)$ - $ -Land Rent$ 5,400$ 1,060
PTR-12 (Trails)$ - $ -Transfer$ 525,000$ -
PTR-13 (Trees)$ - $ -Donations$ 30,000$ 4,052
PTR-14 (Dog Park)$ - $ 400.86 phase 1 dog parkPark Dedic.$ 2,000$ -
Total$ 8,851$ 7,638
17 Millstream 5k Expenses:Avail. Rev
Other Projects:
<= 20172018
$ -$ 3,024
Millstream Shelter$ 10,000
Park Plan Update$ 11,500
18 Dog Park Donation Budget:2016/2017
$ 10,000$ 5,052
thru 8/31/17
In 2015, the Park Board requested updating the Master Park Plan last completed in 2008.
Donations for Aquatics Facility being received.
Community Center - ISD 742 Community Ed will offer recreational activities to St Joseph residents in 2018.
some funds set aside under the community center budget for costs incurred by the City. Park Board supports.
PARK-1
PTR-01
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
Millstream Park$0.00
PROJECT TITLE:TOTAL COST:
PTR-01Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
Millstream Park was identified as a community park and was given a medium priority for implementation in the
Parks and Trails System Plan. A medium priority indicates implementation would occur between 2014-2019 if
funds are available. Millstream Park will need a Master Park Plan. The Park Board will meet at the Park in Sept
2017 to plan the remaining features of the park. $1,500 allocated for mapping/professional services fees. The
park includes a new year-round shelter (2017), 2 softball fields, basketball court, beach volleyball court, phase 1
dog park (2017 built), soccer field, play equipment, disc golf course, river walk, and an abandoned rustic
campground (closed 2016). The Park Board plans to add play equipment in 2018 after master park planning is
completed. Phase 2 of the dog park may be constructed in 2018 if donations are received.
Public Works and the City Engineer budgeted funds over a 5-year period to build a retaining wall, pond
dredging, storm sewer repairs and paving the driveway and parking area in Millstream Park. The detail of this
budgeted item can be found in the Engineer CIP/Public Works CEP budgets.
Movies in the Park added in 2014/2015. Local Rugby team used soccer fields in 2015. Softball leagues continue
through the St. Joseph Rec Assn. If not enough teams sign up for the league, softball may be discontinued. The
Park Board will be looking at options for the park including a band shell and sand volleyball courts when they
continue to update the master park plan.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
19,750.00
Parkland Dedication1,500.0021,250.00
¢
1/2 Sales Tax575,000.00575,000.00
250.00 250.00
Park Round Up
Donation40,000.00
20,000.00
General Levy20,000.00
Unfunded0.00
Priority Score43.1
PROJECT COSTS
2014$0.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
2018, ongoing0.00
PROJECT COMPLETION DATE:Construction
0.00
Equipment and Other
$0.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-2
PTR-02
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
Northland Park$0.00
PROJECT TITLE:TOTAL COST:
PTR-02Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
Northland Park was identified as a neighborhood park and was given a medium priority for implementation in the
Parks and Trails System Plan. A medium priority indicates implementation would occur between 2014-2019 if
funds are available. Northland Park will need a Master Park Plan and a grading study.
Northland Park play equipment was replaced in 2008 and 2012. The
Park Board added footgolf to the park in 2015. Little Library donated to park in 2015. The future budget includes
paving the trail inside the park. The Park Board moved the trail to a low priority after footgolf was added.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
Parkland Dedication0.000.00
0.00
0.00
0.00
Total0.00
Priority Score26
PROJECT COSTS
2006$0.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
20180.00
PROJECT COMPLETION DATE:Construction
0.00
Equipment and Other
Northland$0.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-3
PTR-03
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
Klinefelter Park$210,200.00
PROJECT TITLE:TOTAL COST:
PTR-03Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
Klinefelter Park was identified as a community park and was given a medium priority for implementation in the Parks
and Trails System Plan. A medium priority indicates implementation would occur between 2014-2019 if funds are
available. Klinefelter Park will need a Master Park Plan that may be able to be completed by City Staff. The Park
Board proposed adding restroom facilities as funds are available. Currently, a portable toilet is added to the park
seasonally. The restroom facilities proposed provides for sanitary sewer and water main extensions from Graceview
Estates into the park to serve a prefabricated restroom structure. \[$48,100 site improvements; $125,000 pre-fabricated
bathroom facility; $37,100 soft costs\] Local option sales tax funds cannot be used for this project since the park is not
considered regional (as previously determined by the Park Board). Trees
in the park will need replacement in 2017/2018 (under tree budget).
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
20,200.00
Parkland Dedication20,200.00
140,000.00
Debt Levy140,000.00
25,000.00
Water25,000.00
25,000.00
Sewer25,000.00
Total210,200.00
PROJECT COSTS
2022$4,000.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
2022273,000.00
PROJECT COMPLETION DATE:Construction
0.00
Equipment and Other
$277,000.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-4
PTR-04
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
Wobegon Trailhead$0.00
PROJECT TITLE:TOTAL COST:
PTR-04Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
The Wobegon Trail is budgeted and maintained through Stearns County. The City is included on planning for
trail or trailhead extensions/modifications. The Park Board did not allocate any funding to the Wobegon Trail
or Trailhead facility in the 5-year CIP. The Parks and Trails System Plan listed Wobegon Trail connections
from low to high priority; however, no funds were allocated directly to the Wobegon Trail.
The City Engineer budgeted funds for paving the South Parking Lot at the Wobegon Welcome Center. More
detail is available under the City Engineer's CIP.
Stearns County began the trail extension from St. Joseph to the Waite Park regional park. The City contributed
$200,000 local option sales tax funds towards the project. The City used 1/2 cent sales tax funds to add a heater
and air conditioner to the building in 2013. Little Library added to park in 2015. A bike repair station was
donated in 2017 by the Wobegon Trail Association.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
Parkland Dedication0.000.00
¢
1/2 Sales Tax200,000.00200,000
0.00
0.00
Total200,000
PROJECT COSTS
Unknown$0.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
Unknown0.00
PROJECT COMPLETION DATE:Construction
0.00
Equipment and Other
$0.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-5
PTR-05
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
Memorial Park$3,200.00
PROJECT TITLE:TOTAL COST:
PTR-05Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
Memorial Park was identified as a special use park and was given a low priority for implementation in the
Parks and Trails System Plan. A low priority indicates implementation would occur between 2020-2024.
Memorial Park will need a Master Park Plan that may be able to be completed by City Staff.
The St. Joseph Saints Baseball Team has identified future improvements that would be funded by outside
sources. In 2015, the old warming house will be converted to shed storage for the baseball field.
The engineer CIP listed the parking lot paving as a priority in the next few years. Added to the
2018 CIP is addng nets, posts and striping to the hockey rink for pickle ball in the summer. The Park Board
is setting aside $3,200 to add pickle ball. The skate park equipment that was used in the park will go into
storage. The equipment is degraded and needs updating.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
3,200.00
Parkland Dedication0.003,200.00
Donations0.00
0.00
0.00
Total3,200.00
Priority Score
PROJECT COSTS
2020$0.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
20240.00
PROJECT COMPLETION DATE:Construction
3,200.00
Equipment and Other
$3,200.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-6
PTR-06
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
Centennial Park
PROJECT TITLE:TOTAL COST:
PTR-06Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
Centennial Park was identified as a community park and was given a high priority for implementation in the
Parks and Trails System Plan. A high priority indicates implementation would occur between 2009-2013.
Centennial Park was given a high priority to add features to the Park for residents that rent the pavilion and to
finish developing the Park since it already was started in previous years. Centennial Park will need a Master
Park Plan that might be completed by City Staff.
The Park Board purchase new playground equipment for pre-K through teens in 2011. In addition, Public
Works did the necessary grading on the park to set it up for future park planning. Fencing was added in the
park in 2017. Other park improvements are not planned in this 5-year CIP.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
Parkland Dedication0.000.00
0.00
0.00
0.00
Total0.00
PROJECT COSTS
2009$10,000.00
PROJECT STARTING DATE:Preliminaries
Land Acquisition
2013
PROJECT COMPLETION DATE:Construction
67,500.00
Equipment and Other
$77,500.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-7
PTR-07
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
Monument Park$30,000.00
PROJECT TITLE:TOTAL COST:
PTR-07Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
Monument Park was identified as a special use park and was given a high priority for implementation in the
Parks and Trails System Plan. A high priority indicates implementation would occur between 2009-2013.
Monument Park will need a Construction Plan to determine where the trail connection should go. $2500 has
been allocated to Monument Park each year to purchase flowers for the monument. The Park Board
researched available grants and quotes to make needed repairs for the park through the local, state and
national historical societies. The repairs to the monument are estimated to be $35,000-$50,000. The Legacy
grant adds $150,000-$200,000 to the cost of the repairs as contractors indicated the regulations add much to
the costs. The Park Board determined the Legacy grant is not an option that can be used. The Park Board
will request the City's help to fund the repairs through other means in 2018/2019.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
250.00250.00250.00250.00
Parkland Dedication400.00250.001,650.00
0.00
35,000.00
City Funds35,000.00
0.00
Total36,650.00
Priority Score30.5
PROJECT COSTS
2009$1,500.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
201510,500.00
PROJECT COMPLETION DATE:Construction
10,550.00
Equipment and Other
$22,550.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-8
PTR-08
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
Hollow Park$0.00
PROJECT TITLE:TOTAL COST:
PTR-08Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
Hollow Park was identified as a neighborhood park and was given a low priority for implementation in the
Parks and Trails System Plan. A low priority indicates implementation would occur between 2020-2024.
Hollow Park will need a Master Park Plan before implementation. No funding has been allocated to Hollow
Park in the 5-year budget timeframe. Little Library donated to park in 2015. Paved trail to park added by
City with 2014/2015 street improvement projects.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
Parkland Dedication0.000.00
0.00
0.00
0.00
Total0.00
PROJECT COSTS
2020$0.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
20240.00
PROJECT COMPLETION DATE:Construction
0.00
Equipment and Other
$0.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-9
PTR-09
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
Cloverdale Park$253,000.00
PROJECT TITLE:TOTAL COST:
PTR-09Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
Cloverdale Park was identified as a mini park and was given a high priority for implementation in the Parks and
Trails System Plan. A high priority indicates implementation would occur between 2009-2013. Cloverdale
Park had a Master Park Plan created by Scenic Specialties in 2012. The Park Board budgeted $25,000 in 2013
and $10,000 in 2014 to implement the improvements to the park according to the park plan. Cloverdale
improvements include landscaping, gazebo and quiet meditation areas. Little Library donated to park in 2015.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
Parkland Dedication0.000.00
0.00
0.00
0.00
Total0.00
PROJECT COSTS
2009$10,000.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
20130.00
PROJECT COMPLETION DATE:Construction
243,000.00
Equipment and Other
$253,000.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-10
PTR-10
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
East Parkunknown
PROJECT TITLE:TOTAL COST:
PTR-10Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
East Park was identified as a regional park and was given a low priority for implementation in the Parks and Trails
System Plan. A low priority indicates implementation would occur between 2020-2024. East Park will need a
Master Park Plan before implementation. $1,500 set aside for professional services funding. The City received
$50,000 from Arcon in 2016 for East Park when the property was sold to CM of St. Joe for senior living community
development. The parkland was also contributed to the City. The City agreed to leasing the farm land to a farmer
until the park is developed. The lease revenue is reserved for the park development. The City applied for 2018 State
Bonding funds ($300,000) and a 2017 Initiative foundation grant (up to $13,000) to begin construction of the canoe
landing/picnic area/parking lot/bathrooms. If funding is received, construction could begin in 2018, pending master
park planning. The Park Board added the idea of adding a tree farm in the crop area to add to the nature feel of the
area. Also, the Park Board would like to work with the City to offer a Park Naming Contest in fall 2017.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
10,000.00
General Levy1,500.0010,000.0021,500.00
¢
#########150,000.00
1/2 Sales Tax
300,000.00
300,000.00
State Bonding300,000.00
2,120.002,120.00
Land Rent2,120.006,360.00
13,000.00
IF Grant13,000.00
Total640,860.00
Priority Score28.85
PROJECT COSTS
2015$0.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
2019, ongoing0.00
PROJECT COMPLETION DATE:Construction
0.00
Equipment and Other
Rivers Bend$0.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-11
PTR-11
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
West Parkunknown
PROJECT TITLE:TOTAL COST:
PTR-11Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
West Park was identified as a regional park and was given a low priority for implementation in the Parks and Trails
System Plan. A low priority indicates implementation would occur between 2020-2024. West Park will need a
Master Park Plan before implementation. Park planning was delayed until a developer proposes to develop the
subdivision. May be added as CM of St. Joe further develops their PUD.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
Parkland Dedication0.00
0.00
0.00
0.00
Total0.00
Priority Score14.05
PROJECT COSTS
TBD$0.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
TBD150,000.00
PROJECT COMPLETION DATE:Construction
100,000.00
Equipment and Other
Arcon development$250,000.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-12
PTR-12
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
City-Wide Trail Systemvaries
PROJECT TITLE:TOTAL COST:
PTR-12Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
The Parks and Trails System Plan breaks out the current and potential future City-wide trails. Each segment of
potential future trails was given a low, medium or high priority. A high priority is identified as a trail segment
that would be constructed between 2009 and 2013 if funding exists. The potential trail segments listed as high
priority in the Parks and Trails System.
Phase II/III CR2 trail extension will begin in fall 2017 connecting Minnesota St W to CR51. City Council
conducted a pedestrian crossing study over CSAH 75 in 2017. A 2018 State Bonding request submitted. Half
cent sales tax may help fund this project if it moves forward. Council will set the priority for completion as the
study is finalized and include the priorities in the engineer's CIP.
The Park Board adds funding to this item to close up gaps in trails/sidewalks around the city. Council identified
a need to extend the sidewalk along 2nd Ave NE between Elm St and Minnesota St. This project is considered
in the engineer CIP.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
10,00010,00010,00010,000
Parkland Dedication10,00010,00060,000
0
0
0.00
Total60,000
Priority Score32
PROJECT COSTS
on-going
PROJECT STARTING DATE:Preliminaries
Land Acquisition
on-going
PROJECT COMPLETION DATE:Construction
Equipment and Other
$0.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-13
PTR-13
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
City-Wide Tree Additions$9,000.00
PROJECT TITLE:TOTAL COST:
PTR-13Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
The Park Board, along with Public Works, created a plan to add trees to City parks. The first phase is adding
more flowering crab trees in Klinefelter Park to extend the trees previously planted by CSB/SJU. The students
indicated they would like to continue to help with planting in future years. PW stated a line of trees in
Klinefelter Park needs to be replaced in 2017/2018. The Park Board requests setting aside $1500 per year for
new trees. The Park Board is exploring an "Adopt a Tree" program to add/replace trees in parks. $1500 from
2016, $1500 from 2017 applied to dog park. A resident indicated he may donate pine trees to the dog park in
2017. If so, the 2017 tree budget can be opened for other city locations. Part of the tree budget for 2018 may
be allocated to replacing trees along Minnesota Street.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
General:
1,500.001,500.001,500.001,500.00
General Levy1,500.001,500.009,000.00
Donations0.00
Adopt a Tree0.00
Total9,000.00
Priority Score23.85
PROJECT COSTS
on-going$0.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
on-going0.00
PROJECT COMPLETION DATE:Construction
9,000.00
Equipment and Other
$9,000.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-14
PTR-14
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2018 - 2022
Dog Park$45,718.00
PROJECT TITLE:TOTAL COST:
PTR-14Parks, Trails, and Recreation
PROJECT NUMBER:PROJECT CATEGORY:
JUSTIFICATION:
The St. Joseph Dog Park group approached the Park Board to dedicated parkland to build a dog park. Over 50
volunteers agreed to clear brush, assist with setting up the fencing and adding amenities. The city council agreed
to a 3-phased development of a dog park in Millstream Park to the west of the soccer fields. Each phase will be
constructed as needed donations are received. Phase 1 constructed in 2017 (fencing, mulch, signage, trees,
gravel, pavers, picnic tables and doggie bag dispenser), phase 2 will be constructed in 2018 if donations received
(water access, concrete, shelter), phase 3 TBD as donations received (small dog play area).
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project FundingPrior
2018201920212022
SourceYears2020Total
10,000.005,000.00
Park Dedication9,673.0024,673.00
10,000.005,000.00
Donations6,045.0021,045.00
0.00
Total45,718.00
Priority Score31.7
PROJECT COSTS
on-going$0.00
PROJECT STARTING DATE:Preliminaries
0.00
Land Acquisition
on-going0.00
PROJECT COMPLETION DATE:Construction
45,718.00
Equipment and Other
$45,718.00
NEIGHBORHOOD:Total
Presented to the Park Board on ApprovedDeniedTabled
Presented to the City Council on ApprovedDeniedTabled
Comments
Approval to Purchase Date____________________________Authorizing InitialsDate
PARK-14