HomeMy WebLinkAbout[05] Southview Heights, KJ Construction
Council Agenda Item 5
MEETING DATE: October 24, 2017
AGENDA ITEM: Concept Plan – Southview Heights
SUBMITTED BY: Community Development
BOARD/COMMISSION/COMMITTEE RECOMMENDATION: By consensus, the Planning
Commission recommends the applicant’s ability to move forward with the development process
with the private roads. Based on their input, they viewed this similar to a multi-family lot with
internal maneuvering areas rather than a typical local thru street.
PREVIOUS COUNCIL ACTION: Approved the Rezoning from B-2 Highway Business
District to R-3 Multiple Family Residential in 2016.
BACKGROUND INFORMATION: KJ Development of St. Joseph, LLC is considering an
application for approval of an R3 Planned Unit Development (PUD) to accommodate the
construction of a mixed housing development to include townhomes (6-plex) and duplexes on
th
the property located just west of the Army Reserve Building and 20 Avenue SE on the former
Delwin Ballroom site. The property owner and consultants met with staff a month ago and
presented a preliminary concept plan with duplexes and townhomes. A PUD would allow for a
mixture of housing that would not otherwise be allowed. The property is required to be platted
(preliminary and final) and receive site plan approval prior to any development. Additionally,
PUD approval would be required as part of the plat approval process depending on the specific
development request. The purpose of presenting a concept plan to the City Council is to have
preliminary discussion and input on the private roads only. The specific development plan is not
being contemplated as that will be reviewed based on city ordinances and any specific land use
application requests. The City of St. Joseph prohibits private streets per the City’s Subdivision
Ordinance as a result of problems with previously approved private streets. The City was asked
to take over the private streets in Graceview Estates and Liberty Pointe subdivisions. The City
agreed to take over the private streets in Graceview Estates because there was adequate room for
public right of way but not Jefferson Lane in Liberty Pointe since there lacked adequate public
right of way and utility easements where the houses are built as close as 15 feet from the street
curb. Typically, private streets are not built to city specifications, including narrow street widths
and lack of space for utilities, drainage, snow storage, and sidewalks.
ATTACHMENTS: Concept Plan and Narrative
REQUESTED COUNCIL ACTION: Provide input and direction on private roads only.
St. JosephPlanningCommission
October9, 2017
RE: Del-WinRedevelopmentProject
BACKGROUND:
KJDevelopment ofSt. Joseph, LLCisthecurrentowneroftheDel-Winredevelopment property. Thepropertyconsistsof
th6.05acresandislocatedontheeastsideof20 AvenueSouthEast. WhenKJDevelopmentofSt. Joseph, LLCpurchased
theproperty, thepropertywasrezonedfromB2toR3withtheintentionofconstructinga56unitapartmentbuildingon
thenorthernhalfofthepropertyandmixtureofduplexesandquadunitsonthesouthernhalf. TheCitywasinfavorof
thisrezoningandtheproposeduseasitwasseenasanaturalprogression ofhousingunitswithinarea.
InJuly, KJDevelopmentofSt. Joseph, LLCapproachedLumberOneAvonInc. toconsultintheplanningofthis
redevelopmentarea. Inaddition, WestwoodProfessionalServices washiredtodevelopconceptplansforthesite. Over
thecourseofdevelopingconceptplans, theteamdecidedtoeliminatethe56unitapartmentcomplex andfocuson
duplexesandsix-plexes. ThechangeinscopehasreducedtheoverallunitdensityforthissiteaspresentedtotheCity
whenthepropertywasrezoned.
Theteamhas metwithCityStafftosolicit inputonconceptplansandtoreviewtheCity’sdevelopmentrequirements.
Theproposeddevelopmentwillconsistofduplexandsix-plexbuildingswithanoveralldensityof52units. Thisproposed
development willbeaprivatedevelopment andtheunitswillberental. Theinternaldrivesandutilitiesareprivatein
natureaswell.
PROPOSAL:
KJDevelopmentofSt. Joseph, LLCisconsideringthesubmittalofaR3-PlannedUnitDevelopment (PUD) applicationfor
theredevelopment oftheDel-Winsite. Theconceptplanconsistsof14duplexbuildingsand4six-plexbuildings, witha
mixtureof2and3bedroom units. Eachunitwillhavea2stallgarageand25’ driveway, additionalparking, raingarden
infiltrationforstormwater, andprivateinternaldrivesandutilities.
ConceptF includestwolargerbuildingpads intheSWcorneroftheproperty fortheoptionofconstructing twinpatio
homesforanadditionalhousingstyle.
BasedondirectionfromCityStaff, aPUDisthebestoptionforthissiteandwillallowtheownerstorequestrelieffrom
someoftheR3Districtregulations, whilecreatinganopendialogbetweentheCityandownerswhendeveloping thesite.
WithConceptF, thefollowingR3development requirementshavebeenmet:
1) Parking: CityCoderequires4parkingstallsper3-bedroomunit. Theproposalincludesa2stallgarageandparking
inthedriveforeveryunit. Inaddition, thereare16additionalparkingstallswithinthedevelopment.
2) Density: CityCoderequires4,000sfofpropertyper3-bedroomunit. Ifallunitswere3bedrooms, theproposed
unitdensityis208,000sf. Thesiteconsistsof263,433sf.
3) BuildingSiteCoverage: CityCodestatesthatthemaxbuildingcoverageonagivenlotcannotexceed35%. The
proposedconceptconsists65,776ftor25% lotbuildingcoverage.
4) SideYardSetback: CityCoderequiresa20footsideyardsetback. ConceptFisconsidering a20footsideyard
setback.
5) FrontYardSetback: CityCoderequiresa35footfrontyardsetback. ConceptFisconsideringa35footfrontyard
setback.
PUDANDDEVIATIONS FROMR3DISTRICT:
BasedonConceptF, theownersareconsidering thesubmittalofaPUDanddeviationsfromtheR3districtforthe
following:
1) RearSetbacktoResidential: CityCoderequiresarearsetbacktoresidential areaof50feet. ConceptFis
considering arearsetback toresidentialof30feet.
2) SideYardSetback toResidential: CityCoderequiresasideyardsetbacktoresidentialareaof50feet. ConceptF
isconsidering asideyardsetback toresidentialof30feet.
3) HighWaterLevel (HWL) fromStormWaterPond: CityCoderequiresasetbackfromtheHWLof70feet. Concept
Fisconsideringa50footsetbackfromtheHWL.
4) ImperviousSurfaceCoverage: CityCoderequiresamaximpervious surfacecoverageof50%. ConceptFis
consideringanimpervioussurfacecoverageof56.1%. The56.1% coverageincludesa10’x15’ patiooneach
duplex, spaceforadditional parking, andthelargerbuildingpadforthepatiohomesintheSWcornerofthe
concept. Constructionoptionstoreducetheamountofimperious surfacemaybeconsidered.
5) Privatevs. PublicDriveandUtilities: Asstated, theproposed developmentwillberental. Theownersare
requestingthatCityrecognize theinternaldrivesandutilitiesasprivateandnotpublic. Thereareseveral
developmentswithinthesurroundingcommunitiesthatfollowthisconceptasaprivatedevelopment. Those
developmentsare:
a. KensigntonGardens PatioHomes – St. Cloud
b. LibertyGlen – St. Cloud
c. Donovan Lakes – St. Cloud (new)
d. MiddleTown2 – Sartell
e. AngushireGreens – WaitePark
Thesedevelopmentsaboveareallsuccessful, private, developmentsthatincludea30footroadright-of-way
and26footdrive. Theutilitiesareinstalledinthestreetanda30footdrainageandutilityeasement isoverlaid.
REQUESTFORINPUT:
Basedonarecommendation fromCityStaff, theownersarepresenting thisconceptplantothePlanning Commission
fordiscussion andinput. LumberOneAvonIncwillpresentConceptFandthisnarrativetothePlanningCommissionon
thOctober9 andtheownerswillbeavailablefordetailedquestions abouttheproposeddevelopment. Basedonthe
directionreceivedfromthePlanning Commission, theownerswillsubmitformalapplicationsforconsideration.