Council Agenda Item 4g
MEETING DATE: March 19, 2019
AGENDA ITEM: WTP #1 Filter Rehabilitation
SUBMITTED BY: Terry Thene, Public Works Director
Randy Sabart, City Engineer
BOARD/COMMISSION/COMMITTEE RECOMMENDATION:
PREVIOUS COUNCIL ACTION: Award Bid for WTP #1 Filter Rehabilitation
BACKGROUND INFORMATION:
Prior to bidding the project, construction plans were submitted to the Minnesota Department of Health
(MDH) for review and approval for construction. The plans were approved for construction as submitted.
Recently, the MDH visited WTP #1 to conduct a routine sanitary survey. During the sanitary survey,
MDH staff requested piping modifications be made to a recycle piping system that is planned to be
installed as part of the WTP #1 project.
SEH met with City staff at WTP #1 to determine the best solution moving forward to satisfy the request
of the MDH and requested a proposal from RLCG to complete the work. The proposal to complete the
piping modifications is attached, and staff recommend acceptance.
BUDGET/FISCAL IMPACT: $1,085.00
ATTACHMENTS: RFP 1 – Piping Modifications
REQUESTED COUNCIL ACTION: Authorize piping modifications for the rehabilitation of WTP #1
at the request of the MDH.
Date: 3/15/2018
Short Elliot Hendrickson Inc
Attn: Kevin Young
th
1200 25 Avenue South
St. Cloud, MN 56302
Sub: RFP 1 Piping Modifications
Dear Mr. Young,
Please see the attached proposal from Rice Lake Construction Group for the Piping
Modifications at the City of St. Joseph Water Treatment Plant No. 1 Improvements Project (City of St.
Joseph Project No. 143547) as requested per RFP #1. The price as requested is $1,085.00
If you have any questions or are in need of any further clarifications on price or scope, please do not
hesitate to call.
Thank you,
Nick Bentley
Project Manager
PROPOSALREQUEST FOR
CONTRACT MODIFICATION
Water Treatment Plant No. 1 Filter Improvements
City of St. Joseph
SEH No. STJOE 143547
To:
Nick Bentley
Date:
March 15, 2018
Rice Lake Construction Group
22360 County Road 12
Deerwood, MN 56444
Please submit an itemized proposal for changes to the Contract Price and/or Time resulting from proposed
modifications to the Contract Documents described below. The proposal should be submitted within 5days to
the Engineer.
Description of proposed modifications:
During the City's recent sanitary survey inspection by the Department of Health, they had concernsrelated to
the connection between the HSP discharge and the backwash water reclaim line. In order to prevent potential
solids from settling into the recycle piping (from HSPs to reclaim line) it was requested to rotate the connecting
tee to provide a top outlet, install an additional 90-degree bend, and then connect as planned.
This change will require:
One (1) additional 90-degree bend.
One (1) additional length of spool pipe to account for the up-turned tee and the addition of the 90.
Attachments:
Revised Sheet P2 3-15-18
This form requests information only. Authorization to execute the proposed modifications will be given
subsequently by Change Order.
Requested by:
Kevin Young
SignaturePrinted Name
Project EngineerShort Elliott Hendrickson Inc.
Title
c:Randy Sabart, Miles Jensen (SEH)
Terry Thene(City)
p:\\pt\\s\\stjoe\\143547\\7-const-svcs\\71-mgmt\\50-chg-order\\proposal request 1\\proposal request 1 -piping modifications.docx07.13
Short Elliott Hendrickson Inc., 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717
SEH is an equal opportunity employer|www.sehinc.com|320.229.4300|800.572.0617|888.908.8166 fax
ST JOSEPH, MINNESOTA
REVISIONS
REGISTRATION NO.10-02-2017DATE
54828
DESCRIPTIONDATEMARK
RWFDRAWN BY
Kevin Young
KBYDESIGNED BY
ISSUE DATE
10-02-2017
STATE OF MINNESOTA.
BID DOCSPROJECT STATUS
SHEET
P2
IMPROVEMENTS
CITY PROJECT NO.
SECTIONS & DETAIL
WATER TREATMENT PLANT NO. 1 FILTER
STJOE143547SEH FILE NO.SHEET TITLE
NEW FILTER MEDIA: 6" TORPEDO SANDREHABILITATE UNDERDRAIN NOZZLE SYSTEM ACCORDING TO SPECIFICATION SECTION 44 41 56CUT EXISTING 3" SYSTEM PIPING AND INSTALL 3"X3" TEEINSTALL 3" BUTTERFLY
VALVE WITH OPEN/CLOSE PNEUMATIC ACTUATORINSTALL NEW 3" DOUBLE DOOR CHECK VALVEINSTALL NEW 6"x3" REDUCERREMOVE EXISTING 6"X4" REDUCING ELBOW AND INSTALL NEW 6"x6"x4" TEEINSTALL NEW FINISHED
WATER SAMPLE TAP IN SPOOL
12'-7" (VERIFY)
11121314151617181920
10'-4" (VERIFY)
8'8'
678
20
SECTIONSECTION
4'4'
1
2'2'
00
1
24
P2P2
10'-0" (VERIFY)
4
5
14
BLAST AND RE-PAINT INTERIOR OF FILTERREMOVE EXISTING CHLORINE INJECTOR AND CLOSE VALVEINSULATE EXISTING AIR WASH PIPINGEXISTING FLUORIDE INJECTOR TO REMAINNEW FILTER MEDIA: 12" ANTHRACITENEW
FILTER MEDIA: 18" SAND
AND REPLACE WITH PNEUMATIC ACTUATOR AND CYLINDERINSTALL NEW RETRACTABLE CHLORINE INJECTOR AS SUPPLIED BYVESSCO INC, OR APPROVED EQUAL. SEE DETAIL THIS SHEET.VALVE AND PNEUMATIC ACTUATOR
AND CYLINDER
REMOVE EXISTING 8" FILTER EFFLUENT BUTTERFLY VALVES REFURBISH ORREPLACE ACCORDING TO SECTION 40 23 20 (TYP OF 4).REMOVE EXISTING HANDWHEEL ACTUATOR FROM 12" BUTTERFLY VALVEEXTEND PVC
CARRIER PIPE TO INJECTOR LOCATION.REMOVE EXISTING 8" GATE VALVE AND REPLACE WITH 8" BUTTERFLY
123456789
10
KEYNOTES:
PIPING
CONNECT
REQUIRED
EXTEND AS TO
16171819
1415
9
3
10111213
FOR
BEND
8'8'
TEE
SEE SECTION 44 41 56 FOR COMPLETE DESCRIPTION OF GRAVITY FILTER REHABILITATION.ALL PIPE INSULATION DAMAGED DURING CONSTRUCTION TO BE REPLACED ACCORDING TOSECTION 40 42 13.NEW AND REPLACED
PROCESS PIPING SHALL BE INSULATED ACCORDING TO SECTION 40 42 13.
90-DEG
TEE
OUTLET
NOTES:2.3.
1.
ADD OFF
ROTATE TOP
SECTIONSECTION
4'4'
1
2'2'
00
1
25'-0" (VERIFY)
13
P2P2
2
PCHEM002
4
12'-7" (VERIFY)
CHEMICAL DIFFUSER DETAIL
CHECK VALVE
WATER PIPE OR FITTINGTAP WATER PIPE FOR NPT OR MUELLERTHREADS (VERIFY TYPE AND SIZE)POLYETHYLENE TUBING FROMCHEMICAL FEEDERPVC BALL VALVESTAINLESS STEEL CHAINPVC CARRIER PIPEFLEXIBLE
CONNECTION
DIFFUSER TUBE INSERTED 1/3 DIAMETER OFWATER PIPE
PLUG EXISTING 3/4" HOLECONNECT TO EXISTING FLANGE
SCALE: NONE
XREFs:
P:\\PT\\S\\STJOE\\143547\\5-final-dsgn\\51-drawings\\z-STJOEbdr; P:\\PT\\S\\STJOE\\143547\\5-final-dsgn\\51-drawings\\55-Water\\143547-SC-WTP
6" = 1'-0"PLOT SCALE:REGINALD FULKUSER:10-12-2017 10:44 AMSAVED:
10-13-2017 8:30 AMPLOTTED:
P:\\PT\\S\\STJOE\\143547\\5-FINAL-DSGN\\51-DRAWINGS\\55-WATER\\143547-P2.DWG