Loading...
HomeMy WebLinkAbout[06a] East ParkSEH INC | 10901 Red Circle Drive Minnetonka, MN 55343 | 952-912-2600 EAST PARK DRAFT VISION STATEMENT August 22, 2018 East Park will be a welcoming and wild place that is actively managed and mindfully stewarded to restore and protect its unique natural resources and recreational amenities for the enrichment and enjoyment of all park visitors. PARK PROGRAM Early and Middle Phases 1. Park entry sign 2. Paddle craft parking area, launch and dock 3. Park drive with several parking areas for cars and bikes 4. Boardwalks and seating through wet bog and meadow areas 5. Fishing pier 6. River access and overlook features (wood deck and/or stone steppers) 7. Outdoor gathering / class room gathering space (s) 8. Interpretive displays & wayfinding signage 9. Bird blind (s) 10. Reforestation 11. Prairie restoration 12. Wetland management/enhancement 13. Invasive species removal and management Later Phase (to support adjacent neighborhood development) 14. Park entry sign at connection with adjacent neighborhood 15. Picnic tables 16. Bike parking 17. Seating 18. Play equipment – nature / adventure play focus 19. Trail connections 20. Clover lawn 21. Dog park 22. Paved trails (in designated area or as a loop) SEH INC | 10901 Red Circle Drive Minnetonka, MN 55343 | 952-912-2600 New Naming Suggestions for East Park 1. Blazing Star Park 2. Prairie Bend Park 3. L’Etoile du Nord Park (the star of the north) 4. Meadowbrook Park 5. Riverview Park 6. Riverbend Park 7. Prairie Run Park 8. Sauk Bend Park 9. Streamwood Park 10. Foxglove Park Item Estimated Cost Earthwork (excavation & grading)315,000.00$ Reforestation 7,500.00$ Prairie establishment 170,000.00$ Wetland restroation / enhancement $36,000 Turf establishment 18,000.00$ Trees 12,000.00$ Parkway 400,000.00$ Parking areas 75,000.00$ Boardwalk and bird blind 90,000.00$ Hard surface trail 682,500.00$ Outdoor classroom / gathering areas 100,000.00$ Boat Launch $25,000 Fishing pier 25,000.00$ River access / stone blocks 10,000.00$ Furnishings (bike racks, benches, picnic tables, litter and 28,500.00$ Signs and wayfinding 32,000.00$ Dog park fencing 28,000.00$ Nature play ground 150,000.00$ Picnic shelters (10 x 20)60,000.00$ Sub total 2,264,500.00$ Contingency: 25% (mobilization & construction)566,125.00$ Inflation: 3% per year for 5 years 339,675.00$ Final design and engineering: 16%362,320.00$ Grand total 3,532,620.00$ Estimate of Probable Costs 8/22/2018 East Park Preliminary Master Plan VISION STATEMENT: East Park will be a welcoming and wild place that is actively managed and mindfully stewarded to restore and protect its unique natural resources and recreational amenities for the enrichment and enjoyment of all park visitors. EAST PARK: PROPOSED FEATURES GATHERING AREAS outdoor classroomcouncil ring picnicking access drive and parkingboardwalk TRAILS/ CIRCULATION soft trailshard trails PASSIVE RECREATION fishing pier birdingboat launch ACTIVE AREAS nature playdog park picnic shelter HABITAT ESTABLISHMENT & RESTORATION wetland restorationprairie b&b planting INTERPRETATION/ WAYFINDING wayfindingenvironmental educationinterpretation direct hardwood seeding BIRD BLINDVIEW UPRIVER FROM PROPOSED FISHING PIERFUTURE PARK DEVELOPMENT AREA PARKING & TURNAROUNDFUTURE DOG PARKRIVER TOUCH POINT/ACCESSHARD TRAILSPOTENTIAL FUTURE RESIDENTIAL PARCELSPRAIRIE CLASSROOMPRAIRIE POTHOLEHARDWOOD FOREST ESTABLISHMENTPRAIRIE RESTORATIONWETLAND RESTORATIONNEIGHBORHOOD CONNECTIONSRETAIN EXISTING WINDBREAKSPARKINGBOARDWALKRIVER TOUCH POINT/ACCESSDNRAPPROVED BOAT LAUNCHBOARDWALKFISHING PIER/OVERLOOKFISHING PIER/OVERLOOKFLOODPLAIN FOREST CLASSROOMPLAYGROUND PICNIC SHELTEROPEN LAWNEAST PARK: CONCEPT PLANEXISTING WETLANDSEXISTING AGRICULTURAL LAND