Loading...
HomeMy WebLinkAbout[03a] Award Bid - MN St W Trail • Council Agenda Item 3 al.- CITY OF ST.JOSEPH MEETING DATE: September 6,2018 AGENDA ITEM: Minnesota Street(CSAH 2)Trail SUBMITTED BY: Randy Sabart BOARD/COMMISSION/COMMITTEE RECOMMENDATION: PREVIOUS COUNCIL ACTION: Approved plans and specs and authorized advertisement for bids. BACKGROUND INFORMATION: The City received four bids for this project at the opening on August 23,2018. A complete tabulation and recommendation for award is attached. BUDGET/FISCAL IMPACT: $1,172,953.71 Est.Construction $1,294,900 5%Construction Contingency $64,700 Right of Way Acquisition $46,000 Geotechnical Investigation(Soil Borings) $4,600 FHWA Project Memorandum $10,700 Prelim/Final Engineering, Survey,ROW Acquisition $80,000 Specifications/Bidding Services $15,000 Construction Engineering $112,500 Est. Construction Materials Testing $15,000 Permitting/Wetland Mitigation $55,000 Legal&Administrative $15,000 TOTAL $1,713,400 Programmed Federal TAP Funding(Grant) $650,594 ATTACHMENTS: Recommendation to Award and Bid Tabulation REQUESTED COUNCIL ACTION: Recommendation to Award is attached. P:\PT\S\STJOE\common\D39 Req Council Action\2018\139579 Recommend 090618.doc SEH Building a Better World for Ali of Us'' September 6, 2018 RE: St. Joseph, Minnesota Minnesota Street(CSAH 2)Trail SP No. 233-090-001, TA 3318(098) SEH No. STJOE 139579 14 Honorable Mayor and City Council do Judy Weyrens, City Administrator City of St.Joseph 75 Callaway Street East St. Joseph, MN 56374 Dear Ms.Weyrens: Bids were opened at City Hall at 11:00 a.m. on Thursday,August 23,2018, for the above-referenced improvement.The low Base Bid was submitted by R. L. Larson Excavating, Inc. of St. Cloud, Minnesota in the amount of$1,172,953.71.A complete tabulation of bids is enclosed. Contingent upon MnDOT approval to award,we know of no reason the project should not be awarded to the low bidder for the Base Bid amount of$1,172,953.71.The Base Bid project includes the Council- preferred pedestrian crosswalk flasher system with the mast arm across CSAH 2. Please contact me if you have any questions. Sincerely, , Randy Sab rt, PE City Engineer djg Enclosure p:\pt\s\stjoe\139579\1-genl\14corr\I city recommend award 090618.docx Engineers I Architects I Planners I Scientists Short Elliott Hendrickson Inc.,1200 25th Avenue South,P.O.Box 1717,St.Cloud,MN 56302-1717 SEH is 100%employee-owned I sehinc.com I 320.229.4300 I 800.572.0617 I 888.908.8166 fax �++ Page 1 SEH TABULATION OF BIDS PROJECT NO.: STJOE 139579 SP NO. 233-090-001;MN PROJ.NO.TA 3318(098) NAME: MINNESOTA STREET(CSAH 2)TRAIL OWNER: ST.JOSEPH,MN BID DATE: 11:00 A.M.,THURSDAY,AUGUST 23,2018 1 2 3 4 ENGINEER'S ESTIMATE R.L.LARSON C&L EXCAVATING LANDWEHR J.R.FERCHE ITEM MNDOT NO. QUANTITY UNIT DESCRIPTION UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL BASE BID 1 2021.501 1.00 LUMP SUM MOBILIZATION $34,500.00 $34,500.00 $140,000.00 $140,000.00 $65,000.00 $65,000.00 $63,000.00 $63,000.00 $65,000.00 $65,000.00 2 2101.502 13.00 TREE CLEARING $400.00 $5,200.00 $250.00 $3,250.00 $265.00 $3,445.00 $276.00 $3,588.00 $265.00 $3,445.00 3 2101.507 13.00 TREE GRUBBING $200.00 $2,600.00 $150.00 $1,950.00 $115.00 $1,495.00 $119.00 $1,547.00 $150.00 $1,950.00 4 2101.511 1.00 LUMP SUM CLEARING&GRUBBING $500.00 $500.00 $600.00 $600.00 $540.00 $540.00 $564.00 $564.00 $550.00 $550.00 BUSHES 5 2104.501 207.00 LIN FT REMOVE FENCE $5.00 $1,035.00 $3.00 $621.00 $5.00 $1,035.00 $5.00 $1,035.00 $6.00 $1,242.00 6 2104.501 98.00 LIN FT REMOVE WOOD EDGER $5.00 $490.00 $5.00 $490.00 $8.00 $784.00 $2.25 $220.50 $4.00 $392.00 7 2104.505 366.00 SQ YD REMOVE BITUMINOUS $6.00 $2,196.00 $4.00 $1,464.00 $3.50 $1,281.00 $9.00 $3,294.00 $10.00 $3,660.00 PAVEMENT 8 2104.507 20.00 CU YD REMOVE RIPRAP $15.00 $300.00 $20.00 $400.00 $30.00 $600.00 $25.00 $500.00 $10.00 $200.00 9 2104.511 6.00 LIN FT SAWING CONCRETE $5.00 $30.00 $10.00 $60.00 $10.00 $60.00 $8.00 $48.00 $5.00 $30.00 PAVEMENT(FULL DEPTH) 10 2104.513 213.00 LIN FT SAWING BITUMINOUS $3.00 $639.00 $3.00 $639.00 $4.00 $852.00 $4.00 $852.00 $3.00 $639.00 PAVEMENT(FULL DEPTH) 11 2104.521 58.00 LIN FT SALVAGE PIPE CULVERT $35.00 $2,030.00 $15.00 $870.00 $10.00 $580.00 $11.00 $638.00 $20.00 $1,160.00 12 2104.523 7.00 EACH SALVAGE PIPE APRON $400.00 $2,800.00 $125.00 $875.00 $400.00 $2,800.00 $153.00 $1,071.00 $200.00 $1,400.00 13 2104.523 1.00 EACH SALVAGE SIGN TYPE $4,000.00 $4,000.00 $200.00 $200.00 $1,500.00 $1,500.00 $220.00 $220.00 $5,000.00 $5,000.00 SPECIAL 14 2104.523 1.00 EACH SALVAGE LIGHTING UNIT $500.00 $500.00 $250.00 $250.00 $260.00 $260.00 $263.00 $263.00 $350.00 $350.00 15 2105.501 6,425.00 CU YD COMMON EXCAVATION(P) $9.00 $57,825.00 $21.00 $134,925.00 $30.25 $194,356.25 $14.40 $92,520.00 $18.00 $115,650.00 16 2105.507 7,752.00 CU YD MUCK EXCAVATION $12.00 $93,024.00 $4.00 $31,008.00 $6.25 $48,450.00 $7.34 $56,899.68 $12.00 $93,024.00 17 2105.521 7,138.00 CU YD GRANULAR BORROW(CV) $10.50 $74,949.00 $0.01 $71.38 $6.50 $46,397.00 $17.95 $128,127.10 $14.60 $104,214.80 18 2105.522 14,457.00 CU YD SELECT GRANULAR BORROW $11.75 $169,869.75 $11.00 $159,027.00 $8.00 $115,656.00 $17.95 $259,503.15 $14.80 $213,963.60 (CV) 19 2105.533 43.00 CU YD SALVAGE AGGREGATE(LV) $20.00 $860.00 $10.00 $430.00 $10.00 $430.00 $25.00 $1,075.00 $10.00 $430.00 20 2105.602 140.00 SQ YD GRAVEL ENTRANCE $10.00 $1,400.00 $7.25 $1,015.00 $12.00 $1,680.00 $16.00 $2,240.00 $30.00 $4,200.00 RESTORATION 21 2105.604 12,050.00 SQ YD GEOTEXTILE FABRIC TYPE V $1.75 $21,087.50 $0.45 $5,422.50 $0.45 $5,422.50 $1.70 $20,485.00 $1.62 $19,521.00 Short Elliott Hendrickson Inc.,1200 25th Avenue South,P.O.Box 1717,St.Cloud,MN 56302-1717 SEH Is 100%employee-owned I www.sehinc.com I 320.229.4300 I 800.572.0617 I 888.908.8168 fax 8/27/2018 Page 2 SEH TABULATION OF BIDS PROJECT NO.: STJOE 139579 SP NO. 233-090-001;MN PROJ.NO.TA 3318(098) NAME: MINNESOTA STREET(CSAH 2)TRAIL OWNER: ST.JOSEPH,MN BID DATE: 11:00 A.M.,THURSDAY,AUGUST 23,2018 1 2 3 4 ENGINEER'S ESTIMATE R.L.LARSON C&L EXCAVATING LANDWEHR J.R.FERCHE ITEM MNDOT NO. QUANTITY UNIT DESCRIPTION UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL 22 2112.501 50.96 ROAD STA SUBGRADE PREPARATION $150.00 $7,644.00 $150.00 $7,644.00 $150.00 $7,644.00 $125.00 $6,370.00 $250.00 $12,740.00 23 2123.61 5.00 HOUR STREET SWEEPER(WITH $125.00 $625.00 $125.00 $625.00 $125.00 $625.00 $150.00 $750.00 $160.00 $800.00 PICKUP BROOM) 24 2211.503 1,524.00 CU YD AGGREGATE BASE(CV) $26.00 $39,624.00 $32.00 $48,768.00 $35.00 $53,340.00 $36.00 $54,864.00 $24.00 $36,576.00 CLASS 5(P) 25 2211.503 300.00 CU YD AGGREGATE BASE(LV) $38.00 $11,400.00 $22.00 $6,600.00 $16.00 $4,800.00 $25.80 $7,740.00 $22.00 $6,600.00 CLASS 5 26 2355.502 529.00 GAL BITUMINOUS MATERIAL FOR $2.25 $1,190.25 $4.25 $2,248.25 $3.80 $2,010.20 $3.80 $2,010.20 $4.00 $2,116.00 FOG SEAL 27 2360.501 673.00 TON TYPE SP 9.5 WEARING $75.00 $50,475.00 $95.00 $63,935.00 $96.30 $64,809.90 $99.50 $66,963.50 $100.00 $67,300.00 COURSE MIX(2,C) 28 2360.503 277.00 SQ YD TYPE SP 9.5 WEARING $30.00 $8,310.00 $37.00 $10,249.00 $38.00 $10,526.00 $39.00 $10,803.00 $39.00 $10,803.00 COURSE MIX(2,C)3"THICK 29 2501.515 17.00 EACH 15"RC PIPE APRON $575.00 $9,775.00 $925.00 $15,725.00 $1,100.00 $18,700.00 $619.00 $10,523.00 $750.00 $12,750.00 30 2501.515 4.00 EACH 24"RC PIPE APRON $600.00 $2,400.00 $1,335.00 $5,340.00 $1,250.00 $5,000.00 $835.00 $3,340.00 $950.00 $3,800.00 31 2501.515 1.00 EACH 30"RC PIPE APRON $750.00 $750.00 $1,580.00 $1,580.00 $1,600.00 $1,600.00 $1,186.00 $1,186.00 $1,200.00 $1,200.00 32 2501.515 2.00 EACH 36"RC PIPE APRON $1,400.00 $2,800.00 $2,055.00 $4,110.00 $2,050.00 $4,100.00 $1,645.00 $3,290.00 $1,650.00 $3,300.00 33 2501.602 17.00 EACH TRASH GUARD FOR 15"PIPE $300.00 $5,100.00 $625.00 $10,625.00 $350.00 $5,950.00 $498.00 $8,466.00 $725.00 $12,325.00 APRON 34 2501.602 4.00 EACH TRASH GUARD FOR 24"PIPE $600.00 $2,400.00 $1,610.00 $6,440.00 $575.00 $2,300.00 $837.00 $3,348.00 $1,550.00 $6,200.00 APRON 35 2501.602 1.00 EACH TRASH GUARD FOR 30"PIPE $800.00 $800.00 $1,880.00 $1,880.00 $725.00 $725.00 $1,382.00 $1,382.00 $2,000.00 $2,000.00 APRON 36 2501.602 2.00 EACH TRASH GUARD FOR 36"PIPE $1,000.00 $2,000.00 $2,525.00 $5,050.00 $875.00 $1,750.00 $1,693.00 $3,386.00 $2,550.00 $5,100.00 APRON 37 2502.521 8.00 LIN FT 10"PE PIPE DRAIN(SMOOTH) $45.00 $360.00 $80.00 $640.00 $50.00 $400.00 $59.00 $472.00 $30.00 $240.00 38 2502.521 59.00 LIN FT 15"CM PIPE DRAIN $27.00 $1,593.00 $36.00 $2,124.00 $40.00 $2,360.00 $44.15 $2,604.85 $45.00 $2,655.00 39 2503.541 386.00 LIN FT 15"RC PIPE SEWER DESIGN $32.00 $12,352.00 $47.00 $18,142.00 $47.00 $18,142.00 $55.30 $21,345.80 $65.00 $25,090.00 3006 CLASS V 40 2503.541 167.00 LIN FT 24"RC PIPE SEWER DESIGN $45.00 $7,515.00 $63.00 $10,521.00 $61.00 $10,187.00 $63.78 $10,651.26 $80.00 $13,360.00 3006 CLASS III 41 2503.541 65.00 LIN FT 30"RC PIPE SEWER DESIGN $75.00 $4,875.00 $87.00 $5,655.00 $85.00 $5,525.00 $98.60 $6,409.00 $110.00 $7,150.00 3006 CLASS III 42 2503.541 46.00 LIN FT 36"RC PIPE SEWER DESIGN $95.00 $4,370.00 $118.00 $5,428.00 $125.00 $5,750.00 $135.00 $6,210.00 $150.00 $6,900.00 3006 CLASS III Short Elliott Hendrickson Inc.,1200 25th Avenue South,P.O.Boo 1717,St.Cloud,MN 56302-1717 SEH is 100%employee-owned I www.sehinc.com I 320.229.4300 I 800.572.0617 I 888.908.8188 fax 8/27/2018 _ill Page 3 SES TABULATION OF BIDS PROJECT NO.: STJOE 139579 SP NO. 233-090-001;MN PROJ.NO.TA 3318(098) NAME: MINNESOTA STREET(CSAH 2)TRAIL OWNER: ST.JOSEPH,MN BID DATE: 11:00 A.M.,THURSDAY,AUGUST 23,2018 1 2 3 4 ENGINEER'S ESTIMATE R.L.LARSON C&L EXCAVATING LANDWEHR J.R.FERCHE ITEM MNDOT NO. QUANTITY UNIT DESCRIPTION UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL 43 2503.602 6.00 EACH CONNECT TO EXISTING $875.00 $5,250.00 $450.00 $2,700.00 $880.00 $5,280.00 $425.00 $2,550.00 $750.00 $4,500.00 STORM SEWER 44 2504.602 1.00 EACH ADJUST HYDRANT $2,000.00 $2,000.00 $2,000.00 $2,000.00 $950.00 $950.00 $989.00 $989.00 $750.00 $750.00 45 2505.602 1.00 EACH ADJUST GAS VALVE $500.00 $500.00 $300.00 $300.00 $175.00 $175.00 $600.00 $600.00 $750.00 $750.00 46 2506.502 2.00 EACH CONSTRUCT DRAINAGE $3,500.00 $7,000.00 $2,500.00 $5,000.00 $3,942.00 $7,884.00 $2,850.00 $5,700.00 $3,000.00 $6,000.00 STRUCTURE DESIGN 48-4020 47 2506.502 2.00 EACH CONSTRUCT DRAINAGE $5,500.00 $11,000.00 $3,930.00 $7,860.00 $5,900.00 $11,800.00 $3,728.00 $7,456.00 $4,500.00 $9,000.00 STRUCTURE DESIGN 60-4020 48 2514.503 142.00 SQ YD STABILIZED AGGREGATE $65.00 $9,230.00 $6.00 $852.00 $15.00 $2,130.00 $11.00 $1,562.00 $45.00 $6,390.00 SLOPE PAVING 49 2515.501 130.00 SQ YD ARTICULATED BLOCK MAT $100.00 $13,000.00 $80.00 $10,400.00 $75.00 $9,750.00 $125.00 $16,250.00 $95.00 $12,350.00 OPEN CELL TYPE C 50 2521.501 5,970.00 SQ FT 6"CONCRETE WALK $7.00 $41,790.00 $7.50 $44,775.00 $7.60 $45,372.00 $9.10 $54,327.00 $7.70 $45,969.00 51 2531.501 251.00 LIN FT CONCRETE CURB&GUTTER, $28.00 $7,028.00 $32.00 $8,032.00 $32.50 $8,157.50 $33.50 $8,408.50 $35.00 $8,785.00 DESIGN B618 52 2531.618 326.00 SQ FT TRUNCATED DOMES $48.00 $15,648.00 $52.00 $16,952.00 $55.00 $17,930.00 $55.85 $18,207.10 $35.00 $11,410.00 53 2545.511 18.00 EACH LIGHTING UNIT TYPE $4,750.00 $85,500.00 $4,200.00 $75,600.00 $4,400.00 $79,200.00 $4,500.00 $81,000.00 $4,600.00 $82,800.00 SPECIAL 54 2545.515 18.00 EACH LIGHT FOUNDATION DESIGN $800.00 $14,400.00 $710.00 $12,780.00 $740.00 $13,320.00 $756.00 $13,608.00 $800.00 $14,400.00 E MODIFIED 55 2545.523 7,200.00 LIN FT 2"NON-METALLIC CONDUIT $6.00 $43,200.00 $4.20 $30,240.00 $4.40 $31,680.00 $4.50 $32,400.00 $4.60 $33,120.00 56 2545.523 600.00 LIN FT 2"NON-METALLIC CONDUIT $20.00 $12,000.00 $11.75 $7,050.00 $12.20 $7,320.00 $12.50 $7,500.00 $12.20 $7,320.00 (DIRECTIONAL BORE) 57 2545.531 8,700.00 LIN FT UNDERGROUND WIRE 1 $1.75 $15,225.00 $1.30 $11,310.00 $1.30 $11,310.00 $1.33 $11,571.00 $1.40 $12,180.00 COND NO 4 58 2545.531 8,700.00 LIN FT UNDERGROUND WIRE 1 $1.40 $12,180.00 $0.80 $6,960.00 $0.85 $7,395.00 $0.84 $7,308.00 $1.00 $8,700.00 COND NO 8 59 2545.531 6,720.00 LIN FT UNDERGROUND WIRE 1 $1.00 $6,720.00 $0.43 $2,889.60 $0.45 $3,024.00 $0.45 $3,024.00 $0.50 $3,360.00 COND NO 12 60 2545.541 1.00 EACH SERVICE CABINET $6,300.00 $6,300.00 $4,600.00 $4,600.00 $4,800.00 $4,800.00 $4,900.00 $4,900.00 $5,200.00 $5,200.00 61 2545.544 1.00 EACH SERVICE EQUIPMENT $1,400.00 $1,400.00 $2,950.00 $2,950.00 $3,035.00 $3,035.00 $3,100.00 $3,100.00 $3,000.00 $3,000.00 62 2545.545 1.00 EACH EQUIPMENT PAD $1,400.00 $1,400.00 $924.00 $924.00 $950.00 $950.00 $974.00 $974.00 $1,000.00 $1,000.00 63 2545.553 4.00 EACH HANDHOLE $900.00 $3,600.00 $825.00 $3,300.00 $900.00 $3,600.00 $885.00 $3,540.00 $900.00 $3,600.00 Short Elliott Hendrickson Inc.,1200 25th Avenue South,P.O.Box 1717,31.Cloud,MN 58302-1717 SEH is 100%employee-owned I www.sehinc.com I 320.229.4300 I 800.572.0817 I 888.908.8188 fax 8127/2018 ._.+ele �Il Page 4 SEH TABULATION OF BIDS PROJECT NO.: STJOE 139579 SP NO. 233-090-001;MN PROJ.NO.TA 3318(098) NAME: MINNESOTA STREET(CSAH 2)TRAIL OWNER: ST.JOSEPH,MN BID DATE: 11:00 A.M.,THURSDAY,AUGUST 23,2018 1 2 3 4 ENGINEER'S ESTIMATE R.L.LARSON C&L EXCAVATING LANDWEHR J.R.FERCHE ITEM MNDOT NO. QUANTITY UNIT DESCRIPTION UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL 64 2545.602 1.00 EACH INSTALL LIGHTING UNIT $500.00 $500.00 $380.00 $380.00 $400.00 $400.00 $407.00 $407.00 $400.00 $400.00 65 2557.501 800.00 LIN FT WIRE FENCE DESIGN $45.00 $36,000.00 $46.25 $37,000.00 $49.50 $39,600.00 $51.25 $41,000.00 $58.00 $46,400.00 SPECIAL VINYL COATED 66 2563.601 1.00 LUMP SUM TRAFFIC CONTROL $30,000.00 $30,000.00 $10,000.00 $10,000.00 $9,700.00 $9,700.00 $8,800.00 $8,800.00 $12,000.00 $12,000.00 67 2564.531 160.00 SQ FT SIGN PANELS TYPE C $80.00 $12,800.00 $90.00 $14,400.00 $92.00 $14,720.00 $94.00 $15,040.00 $95.00 $15,200.00 68 2564.536 17.00 EACH INSTALL SIGN PANEL $125.00 $2,125.00 $80.00 $1,360.00 $85.00 $1,445.00 $220.00 $3,740.00 $85.00 $1,445.00 69 2565.616 1.00 SYS PEDESTRIAN CROSSWALK $71,000.00 $71,000.00 $46,000.00 $46,000.00 $48,500.00 $48,500.00 $45,000.00 $45,000.00 $49,450.00 $49,450.00 FLASHER SYSTEM"A" 70 2565.616 1.00 SYS PEDESTRIAN CROSSWALK $47,500.00 $47,500.00 $18,425.00 $18,425.00 $18,950.00 $18,950.00 $20,000.00 $20,000.00 $21,500.00 $21,500.00 FLASHER SYSTEM"B" 71 2572.602 6.00 EACH TREE PRUNING $150.00 $900.00 $70.00 $420.00 $70.00 $420.00 $75.00 $450.00 $80.00 $480.00 72 2573.502 6,275.00 LIN FT SILT FENCE TYPE MS $2.10 $13,177.50 $2.00 $12,550.00 $2.30 $14,432.50 $2.40 $15,060.00 $2.25 $14,118.75 73 2573.53 26.00 EACH STORM DRAIN INLET $150.00 $3,900.00 $125.00 $3,250.00 $150.00 $3,900.00 $195.00 $5,070.00 $150.00 $3,900.00 PROTECTION 74 2573.533 400.00 LIN FT SEDIMENT CONTROL LOG $4.50 $1,800.00 $3.10 $1,240.00 $3.00 $1,200.00 $3.25 $1,300.00 $3.00 $1,200.00 TYPE WOOD FIBER 75 2573.535 1.00 LUMP SUM STABILIZED CONSTRUCTION $2,000.00 $2,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 EXIT 76 2574.508 1,576.00 POUND FERTILIZER TYPE 3 $0.75 $1,182.00 $0.65 $1,024.40 $1.00 $1,576.00 $0.93 $1,465.68 $1.00 $1,576.00 77 2574.525 3,583.00 CU YD COMMON TOPSOIL BORROW $15.00 $53,745.00 $0.01 $35.83 $10.00 $35,830.00 $0.01 $35.83 $25.00 $89,575.00 (LV) 78 2574.525 330.00 CU YD FILTER TOPSOIL BORROW $25.00 $8,250.00 $25.00 $8.250.00 $25.00 $8,250.00 $40.00 $13,200.00 $40.00 $13,200.00 (LV) 79 2575.501 4.50 ACRE SEEDING $750.00 $3,375.00 $160.00 $720.00 $550.00 $2,475.00 $550.00 $2,475.00 $250.00 $1,125.00 80 2575.501 4.50 ACRE SEEDING(TEMPORARY) $500.00 $2,250.00 $165.00 $742.50 $3,645.00 $16,402.50 $175.00 $787.50 $200.00 $900.00 81 2575.502 75.00 POUND SEED MIXTURE 25-151 $4.00 $300.00 $3.35 $251.25 $4.70 $352.50 $4.81 $360.75 $4.65 $348.75 82 2575.502 235.00 POUND SEED MIXTURE 25-142 $4.00 $940.00 $3.60 $846.00 $3.65 $857.75 $3.74 $878.90 $3.65 $857.75 83 2575.502 450.00 POUND SEED MIXTURE 21-111 $1.10 $495.00 $0.65 $292.50 $1.20 $540.00 $1.25 $562.50 $1.40 $630.00 84 2575.523 10,925.00 SQ YD EROSION CONTROL $1.35 $14,748.75 $1.10 $12,017.50 $1.10 $12,017.50 $1.20 $13,110.00 $1.30 $14,202.50 BLANKETS CATEGORY 3 Short Elliott Hendrickson Inc.,1200 25th Avenue South,P.O.Box 1717,St.Cloud,MN 58302-1717 SEH is 100%employee-owned I www.sehinc.com I 320.229.4300 I 800.572.0617 I 888.908.8166 fax 8/27/2018 _. t. Page 5 SEH TABULATION OF BIDS PROJECT NO.: STJOE 139579 SP NO. 233-090-001;MN PROJ.NO.TA 3318(098) NAME: MINNESOTA STREET(CSAH 2)TRAIL OWNER: ST.JOSEPH,MN BID DATE: 11:00 A.M.,THURSDAY,AUGUST 23,2018 1 2 3 4 ENGINEER'S ESTIMATE R.L.LARSON C&L EXCAVATING LANDWEHR J.R.FERCHE ITEM MNDOT NO. QUANTITY UNIT DESCRIPTION UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL 85 2575.56 2,281.00 POUND HYDRAULIC REINFORCED $1.50 $3,421.50 $2.00 $4,562.00 $1.50 $3,421.50 $1.55 $3,535.55 $1.60 $3,649.60 FIBER MATRIX 86 2575.56 17,060.00 POUND HYDRAULIC BONDED FIBER $1.10 $18,766.00 $1.00 $17,060.00 $1.05 $17,913.00 $1.05 $17,913.00 $1.18 $20,130.80 MATRIX 87 2582.501 200.00 SQ FT PAVT MSSG EPDXY $10.00 $2,000.00 $6.10 $1,220.00 $9.60 $1,920.00 $9.75 $1,950.00 $10.00 $2,000.00 88 2582.502 110.00 LIN FT 12"SOLID LINE EPDXY $8.00 $880.00 $4.10 $451.00 $6.50 $715.00 $6.60 $726.00 $6.75 $742.50 89 2582.503 1,240.00 SQ FT CROSSWALK EPDXY $6.00 $7,440.00 $4.10 $5,084.00 $5.65 $7,006.00 $5.75 $7,130.00 $6.00 $7,440.00 TOTAL BASE BID $1,306,060.25 $1,172,953.71 $1,257,474.60 $1,377,277.35 $1,480,082.05 ALTERNATE A 68A 2565.616 1.00 SYS PEDESTRIAN CROSSWALK ($22,000.00) ($22,000.00) $22,000.00 $22,000.00 $22,750.00 $22,750.00 $22,000.00 $22,000.00 $23,000.00 $23,000.00 FLASHER SYSTEM"A" BASE BID PLUS ALTERNATE A $1,284,060.25 $1,194,953.71 $1,280,224.60 $1,399,277.35 $1,503,082.05 PACTS\STJOE\139579\6-bidconst\Bidding\[Bid Tabulation.xisx]BI DTAB Short Elliott Hendrickson Inc.,1200 25th Avenue South,P.O.Box 1717,St.Cloud,MN 56302-1717 SEH Is 100%employee-owned I www.sehinc.com I 320.229.4300 I 800.572.0617 I 888.908.8166 fax 8127/2018