HomeMy WebLinkAbout[04.1] 2019 Budget Park Board Agenda Item 5
CITY(3F ST.JUSICPH
MEETING DATE: October 22, 2018
AGENDA ITEM: 2019 Budget
SUBMITTED BY: Finance
BOARD/COMMISSION/COMMITTEE/COUNCIL RECOMMENDATION: N/A
PREVIOUS PARK BOARD ACTION: The Park Board discussed the potential project
recommendations at their September 24,2018 meeting. The Park Board suggested adding a skate park to
the CIP draft and would review again in October.
BACKGROUND INFORMATION: Enclosed is the 2019 proposed capital budget(CIP) for the Park
Board to review. The items presented in the 2018 budget were carried forward and a skate park was
added. Staff is requesting discussion and agreement on budget items to present to the Council in
November.
Staff looked at a couple skate parks and requested costs from the following communities. Photos of the
parks are attached.
City of Oak Grove(2003) $37,157.80 for equipment,installation and tax. They already had land location
established for the skate park. Oak Grove received two$2,500 grants from MDU Resources and Bauerly
Companies to help build. The equipment was purchased from True Ride, Inc. out of Duluth.
City of Big Lake(2007) spent$100,724.62 for their skate park along the lake. They fundraised for a
good portion and keep$200,000 in their CIP for future equipment replacements. Big Lake suggests
involving other departments such as the police department as plans develop.
City of Ramsey(2009)spent$139,797 for their skate park adjacent to their Alpine Park ball fields and
dog park. North Country Concrete completed their project.
BUDGET/FISCAL IMPACT: $309,460 for 2019
ATTACHMENTS: Request for Park Board Action—2019 Budget
Park Board Capital Improvement Plan
Skate Park Photos
REQUESTED COUNCIL ACTION: Consider recommending the 2019 capital improvement plan to
city council.
This page intentionally left blank
! !
„,.......
4-4,:
•-'1 f
1 '
-, _,, Id •
'
. ' . -- • el
,.
t ,
4 • - ,
- '
I ,
, ...
4..,
'
.,
' 4
' ' ....
.. .
:-=
, 4
1 ,
„'•
,..
,; ,, .--
I
t, . .
. , .•.
,..
''.''-,.',,.,„,:,,,,..
, , t lit '
'' . ';i:A. 1/;*,,'
.,
•, ' '- 4. I ”`
, ,••
• .17=."7:::r ,..,,'.,',::.':',-.).,1; .
_ ._ •,,1__ .,, „411 .*,, _ ,,,.: ,,
, 1..,„
, .
se. -
-,
,.. ,
- -
it
,. .
.-':
f,
-...
. _.
'0's•1);?
_.•.:--i.1
„
I
f,
i
lk '.,, ' .,,;::!-,'•' .. .' .
.-.
kJ.)
111'.
1
-
' *
11 I 1'
(\C3.
•
t.:•-
-
.,., „
-1C1'
' 3 FIr a8 i� Jnr .';
•
` s;w i
.. '■rte --y - * •113
r
•
I. F
Ili
1111111.4111 ,,..'.1',•. , ,J
{
t Y'
ji
-- ',444,-7'.---',./-*1--1:1 ''''
::,.'F `Q
i}�Mf
., .
,.
Its �_
r •
•
.,r.,., .,,,,,,,. .
...
, ,,: „. ,.,„,,,
GaIc 6rov---
t
talc G trav-e
��4/1sey
1 �
y tK s �A �� •i"C
•
J.
f
.z ':tR4 , ' -- . p ,:..1
F, .' ,. -4.
+Y .. '~ - '3 }� +4.
t om
,.... . .;x, fry y} �'� ,�. ,+k -.n"f J a. .E ,;P.' `•
e
y
x f�
AJ
a
7
4.
sP
r
,. _; w.
Kms. •
.:�.
t
•
'F
K1{
•
r—\-- CIL-V •- I S. tt _r
t•
w
'.
. .#
. •
I 4 ,,4.
• ''''' •
4.. f
.,31..:—.)7
., , 1 o
..i,V,: .,,.., ..,7q2.1..p
A ' 44:' 4 0.4Vd:' 11' '4. '' • •
ilr' f. t, ! ' f
, t,•li,y' 4 • ' ' , .1,
.
. .. •
. . .. . . . .. , .
.. .. -I
. .. , • , '
. . • ,
. .• '..1011S00.1:•' • • "4...,'...c ,,,,'J,..''
I .
,• ,,. . ...1 • ' le'''..:'
• '..
.., , ••
, .
• • • • . .,','.' 1''':.;.'P''''.4;.''.•i.r"..*A ri,,,7 177::::
• '' '' '
. ..• . ' ' W „1, , .t0' ,4, h.4,AI*.41.
V. • –.4.4E–' — ' '.•F.* -'7'44••.1',C •
. .., '''I t • '*.'v:,.. ' ,•igt7t' 1'.. ..
- • —
• ---417' ,1-' I; ,,!Itm,,. ;';') ....... —1,... -
af' " lk. - ' -'''''`. ....-,'-‘' ' - •' •x
...'--0.,-- , '• }'.i...*A.tV,4,1*-i.,,, ---, --
1-:..,•-,
.'' .,'I.'44 -.....4,-,... - .:-`-:.- ' -2:•.i•A:e7----' "ti'-`
•-t,.• .',:•-•:%;:-;•'' .. . •
, ....-.
- '"- • •---*-.. ''T"..-.-"1,-;"..Tri- * :'.-..-2-3,-•• . • •-`4-';',,,q7^ov..,'",- ....- . ; :- 1* .
. —
* •
. .
.., ..
7:7'4'tt''''4.CtSii%t 'At,•-•"-' ••-- ....41,..'"..... ;,+..;,.-•
4V".•:',..-„,,:0-0-...-.c:-'t.-,,--.;-:..'........- ''.t,".',•'7. 1...,.51.Z•4;^'^;;''.°:Z• i:44--'3N'•• •'4101 :4.-4''''-.•-..'. 2,--'
: .. .1
•...
...,
-wow
. . • .
. ••,.., .• . , .
•
.__
_. .
- .
..,..
........7„..........A1'- . _ . ._ _ - ____
-,
....
-------„............._:_.„ _...........,..._..•
•-...... 1 ' , .. , '
-f, . .. .
, ... ,
. -..
. - .
. ,-.„. ...._
. „
. . .
. . .
...
. .
. _..
, .
-..
.. .. . .
i kvi S.2
. 1
,.. ,
,-
.,--
....-- .
„---
---
...,-
k..... „/
.„--- ”
City of St.Joseph Park Board
2019 Capital Improvement Budget Summary
Proposed as of October 22,2018
General Funds Balance
Park Dedication Cash September 30,2018 $ 113,772
(Unaudited)
Adiustments
Starting Balance $ 113,772
2018 General Levy-remaining $ 10,579
Other Revenues-remaining $ 13,999
Potential Proiects: Potential Proposed
Millstream Cottages-phase 2 $ 23,400
The Oaks on 20th-Phase 1 $ 35,100
The Oaks on 20th-Phase 2 $ 35,100 Potential for 2020
Industrial Park $ 8,580
Sunset Ridge-phase 2-4 lots $ 2,000
Ending Balance for 2018 $ 182,030
Projects-Budget 2018 2019 2020 2021 2022 2023 Total 19-23
PTR-01 (Millstream) $ 40,000 $ - $ - $ 100,000 $ - $ - $ 100,000
PTR-02(Northland) $ - $ - $ - $ - $ 180,000 $ - $ 180,000
PTR-03(Klinefelter) $ - $ - $ - $ - $ 250,200 $ - $ 250,200 .
PTR-04(Wobegon) $ - $ - $ - $ - $ - $ - $ -
PTR-05(Memorial) $ 5,200 $ 600 $ - $ - $ - $ - $ 600
PTR-06(Centennial) $ - $ - $ - $ - $ - $ - $ -
PTR-07(Monument) $ 35,250 $ 250 $ 250 $ 250 $ 250 $ 250 $ 1,250
PTR-08(Hollow) $ 1,000 $ - $ - $ - $ - $ - $ -
PTR-09(Cloverdale) $ - $ - $ - $ - $ - $ - $ -
PTR-10(East Park) $ 24,620 $ 296,610 $ 600,000 $ - $ - $520,000.00 $1,416,610
PTR-12(Trails) $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 50,000
PTR-13(Trees) $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 2,000 $ 10,000
PTR-14(Dog Park) $ 20,000 $ - $ - $ 10,000 $ - $ - $ 10,000
PTR-15(Skate Park) $ - $ - $ - $ 125,000 $ - $ - $ 125,000
Total $ 138,070 $ 309,460 $ 612,250 $ 247,250 $ 442,450 $ 532,250 $2,143,660
Projects-Actual Spent 2018 2019
PTR-01(Millstream) $ 263 $ - play equip Other 19 Expenses Budget: 2018 YTD
PTR-02(Northland) $ - $ - Real Estate Taxes $ - $ 3,862
PTR-03(Klinefelter) $ - $ - A-1 Toilets $ 2,150 $ 931
PTR-04(Wobegon) $ - $ -
PTR-05(Memorial) $ - $ - 2019 Revenue Budget: 2018 YTD
PTR-06(Centennial) $ - $ - Interest $ 500 $ 80
PTR-07(Monument) $ - $ - Round Up $ 135 $ 98
PTR-08(Hollow) $ - $ - GF Levy $ 20,000 $ 9,421
PTR-09(Cloverdale) $ - $ - Land Rent $ - $ 1,060
PTR-10(East Park) $ 12,355 $ - design,phase 1 Transfer $ - $ -
PTR-11(West Park) $ - $ - Donations $ 500 $ 147
PTR-12(Trails) $ - $ - Park Dedic. $ 8,580 $ -
PTR-13(Trees) $ 1,000 $ -
PTR-14(Dog Park) $ - $ - phase 2 19 Dog Park Donation Budget: 2016/2017/2018
Total $ 13,618 $ - pavers/treats $ 1,149
cash $ - $ 5,593
thru 9/30/18
PARK-1
This page intentionally left blank
PTR-01
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Millstream Park TOTAL COST: $100,000.00
PROJECT NUMBER: PTR-01 PROJECT CATEGORY: Parks,Trails,and Recreation
JUSTIFICATION:
Millstream Park was identified as a community park and was given a medium priority for implementation in the
Parks and Trails System Plan. A medium priority indicates implementation would occur between 2014-2019 if
funds are available. Millstream Park has the Park Board identify needs for an informal Master Park Plan. The
park includes a new year-round shelter(2017),2 softball fields,basketball court,beach volleyball court,phase 1
dog park(2017 built),soccer field,play equipment,disc golf course,river walk,and an abandoned rustic
campground(closed 2016). The Park Board plans replaced the play equipment in 2018 and shelter in 2017.
Phase 2 and 3 of the dog park will be constructed when donations are received(see PTR-14). A performance
stage is scheduled when funds are available. The Park Board is estimating 2021.
Movies in the Park added in 2014. Local Rugby team used soccer fields in 2015. Softball leagues continue
through the St.Joseph Rec Assn. If not enough teams sign up for the league,softball may be discontinued.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Parkland Dedication 10,000.00 10,000.00
1/2C Sales Tax 0.00
Park Round Up 0.00
Donation
General Levy 10,000.00 10,000.00
Unfunded 80,000.00 80,000.00
Priority Score 27.05 PROJECT COSTS
PROJECT STARTING DATE: 2014 Preliminaries $0.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: 2021 Construction 0.00
Equipment and Other 80,000.00
NEIGHBORHOOD: Total $80,000.00
Presented to the Park Board on Approved Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-2
PTR-02
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Northland Park TOTAL COST: $180,000.00
PROJECT NUMBER: PTR-02 PROJECT CATEGORY: Parks,Trails,and Recreation
JUSTIFICATION:
Northland Park was identified as a neighborhood park and was given a medium priority for implementation in the
Parks and Trails System Plan. A medium priority indicates implementation would occur between 2014-2019 if
funds are available. Northland Park will need a Master Park Plan and a grading study.
Northland Park play equipment was replaced in 2008 and 2012. The
Park Board added footgolf and a Little Library was donated to park in 2015. The future budget includes paving
the trail inside the park. The Park Board scheduled the trail at the time Northland Drive improvements are
completed potentially in 2022.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source _ Years 2019 2020 2021 2022 2023 Total
Parkland Dedication 0.00 20,000.00 20,000.00
Debt Levy 140,000.00 140,000.00
General Levy 20,000.00 20,000.00
0.00
Total 180,000.00
Priority Score 26 PROJECT COSTS
PROJECT STARTING DATE: 2022 Preliminaries $0.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: 2022 Construction 0.00
Equipment and Other 0.00
NEIGHBORHOOD: Northland Total $0.00
Presented to the Park Board on Approved_ Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
•
PARK-3
PTR-03
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Klinefelter Park TOTAL COST: $250,200.00
PROJECT NUMBER:PTR-03 PROJECT CATEGORY: Parks,Trails,and Recreation
JUSTIFICATION:
Klinefelter Park was identified as a community park and was given a medium priority for implementation in the Parks
and Trails System Plan. A medium priority indicates implementation would occur between 2014-2019 if funds are
available. Klinefelter Park will need a Master Park Plan that may be able to be completed by City Staff. The Park Board
proposed adding restroom facilities as funds are available. Currently,a portable toilet is added to the park seasonally.
The restroom facilities proposed provides for sanitary sewer and water main extensions from Graceview Estates into the
park to serve a prefabricated restroom structure. [$48,100 site improvements;$125,000 pre-fabricated bathroom
facility; $37,100 soft costs]Local option sales tax funds cannot be used for this project since the park is not considered
regional(as previously determined by the Park Board). The Park Board would also like to add a gazebo sitting area and
connecting trail if funds are available. This could be added with the restrooms or as a separate project. Added to the
2022 budget with the restrooms.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Parkland Dedication 40,000.00 40,000.00
Debt Levy 160,200.00 160,200.00
Water 0.00 25,000.00 25,000.00
Sewer 0.00 25,000.00 25,000.00
Total 250,200.00
PROJECT COSTS
PROJECT STARTING DATE: 2022 Preliminaries $4,000.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: 2022 Construction 273,000.00
Equipment and Other 0.00
NEIGHBORHOOD: Total $277,000.00
Presented to the Park Board on Approved_ Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-4
PTR-04
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Wobegon Trailhead TOTAL COST: $0.00
PROJECT NUMBER: PTR-04 PROJECT CATEGORY: Parks,Trails,and Recreation
JUSTIFICATION:
The Wobegon Trail is budgeted and maintained through Stearns County. The City is included on planning for
trail or trailhead extensions/modifications. The Park Board did not allocate any funding to the Wobegon Trail
or Trailhead facility in the 5-year CIP. The Parks and Trails System Plan listed Wobegon Trail connections
from low to high priority;however,no funds were allocated directly to the Wobegon Trail.
The City Engineer budgeted funds for paving the South Parking Lot at the Wobegon Welcome Center. More
detail is available under the City Engineer's CIP.
Stearns County extended the trail from St.Joseph to the Waite Park regional park in 2017/2018. The City
contributed$200,000 local option sales tax funds towards the project. The City used 1/2 cent sales tax funds to
add a heater and air conditioner to the building in 2013. Little Library was donated in 2015. A bike repair
station was donated in 2017 by the Wobegon Trail Association.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Parkland Dedication 0.00 0.00
1/2C Sales Tax , 0
0.00
0.00
Total 0
PROJECT COSTS
PROJECT STARTING DATE: Unknown Preliminaries $0.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: Unknown Construction 0.00
Equipment and Other 0.00
NEIGHBORHOOD: Total $0.00
Presented to the Park Board on Approved_ Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-5
PTR-05
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Memorial Park TOTAL COST: $5,200.00
PROJECT NUMBER: PTR-05 PROJECT CATEGORY Parks,Trails,and Recreation
JUSTIFICATION:
Memorial Park was identified as a special use park and was given a low priority for implementation in the
Parks and Trails System Plan. A low priority indicates implementation would occur between 2020-2024.
Memorial Park will need a Master Park Plan that may be able to be completed by City Staff.
The St.Joseph Saints Baseball Team has identified future improvements that would be funded by outside
sources. In 2015,the old warming house was converted to shed storage for the baseball field and a new
warming house was constructed. The engineer CIP listed the parking lot paving as a priority in 2019(see
ENG-1538).
Added to the 2018 CIP is adding nets,posts and striping to the hockey rink for pickle ball for a summer
activity at an estimated cost of$3,200. Pickle ball was relocated to the tennis courts by the community
center and indoors at the community center. Wind screens will be added to the tennis courts in 2019.In
addition,the Park Board would like to partner with a Boy Scout Troop to add a Gaga Ball court at a cost of
$2,000. The skate park equipment that was used in the park will go into storage. The equipment is degraded
and needs updating. Per council,public request,equipment will be placed in the hockey rink in 2019 and
used until the equipment is no longer usable. The Mayor asked the Park Board to consider other options for
a larger skate park and/or off road bike park.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Parkland Dedication 2,600.00 600.00 3,200.00
Donations 2,000.00 2,000.00
0.00
0.00
Total 5,200.00
Priority Score PROJECT COSTS
PROJECT STARTING DATE: 2018 Preliminaries $0.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: 2019 Construction 0.00
Equipment and Other 3,200.00
NEIGHBORHOOD: Total $3,200.00
Presented to the Park Board on Approved_ Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-6
PTR-06
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Centennial Park TOTAL COST:
PROJECT NUMBER: PTR-06 PROJECT CATEGORY: Parks,Trails,and Recreation
JUSTIFICATION:
Centennial Park was identified as a community park and was given a high priority for implementation in the
Parks and Trails System Plan. A high priority indicates implementation would occur between 2009-2013.
Centennial Park was given a high priority to add features to the Park for residents that rent the pavilion and to
finish developing the Park since it already was started in previous years. Centennial Park will need a Master
Park Plan that might be completed by City Staff.
The Park Board purchase new playground equipment for pre-K through teens in 2011. In addition,Public
Works did the necessary grading on the park to set it up for future park planning. Fencing was added in the
park in 2017. Other park improvements are not planned in this 5-year CIP.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Parkland Dedication 0.00 0.00
0.00
0.00
0.00
Total 0.00
PROJECT COSTS
PROJECT STARTING DATE: unknown Preliminaries $10,000.00
Land Acquisition
PROJECT COMPLETION DATE: unknown Construction
Equipment and Other 67,500.00
NEIGHBORHOOD: Total $77,500.00
Presented to the Park Board on Approved Denied Tabled
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-7
PTR-07
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Monument Park TOTAL COST: $35,000.00
PROJECT NUMBER: PTR-07 PROJECT CATEGORY Parks,Trails,and Recreation
JUSTIFICATION:
Monument Park was identified as a special use park and was given a high priority for implementation in the
Parks and Trails System Plan. A high priority indicates implementation would occur between 2009-2013.
Monument Park will need a Construction Plan to determine where the trail connection should go. $250 has
been allocated to Monument Park each year to purchase flowers for the monument. The Park Board
researched available grants and quotes to make needed repairs for the park through the local,state and
national historical societies.The repairs to the monument are estimated to be$35,000-$50,000. The
Legacy grant adds$150,000-$200,000 to the cost of the repairs as contractors indicated the regulations add
much to the costs. The Park Board determined the Legacy grant is not an option that can be used. The
Park Board will request the City's help to fund the repairs through other means in 2018/2019. Council
approved the 2018 budget to use Debt Service Reserve funds to complete the needed repairs.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Parkland Dedication 250.00 250.00 250.00 250.00 250.00 250.00 1,500.00
0.00
Debt Service Reserve 35,000.00 35,000.00
0.00
Total 36,500.00
Priority Score 30.5 PROJECT COSTS
PROJECT STARTING DATE: 2009 Preliminaries $1,500.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: 2018 Construction 10,500.00
Equipment and Other 10,550.00
NEIGHBORHOOD: Total $22,550.00
Presented to the Park Board on Approved_ Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-8
PTR-08
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Hollow Park TOTAL COST: $1,000.00
PROJECT NUMBER:PTR-08 PROJECT CATEGORY Parks, Trails, and Recreation
JUSTIFICATION:
Hollow Park was identified as a neighborhood park and was given a low priority for implementation in the
Parks and Trails System Plan. A low priority indicates implementation would occur between 2020-2024.
Hollow Park will need a Master Park Plan before implementation. Little Library was donated to park in
2015. Paved trail to park added by City with 2014/2015 street improvement projects. The Park Board
added$1,000 to the 2018 budget to complete the park name and address on the boulder sign.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Parkland Dedication 1,000.00 1,000.00
0.00
0.00
0.00
Total 1,000.00
PROJECT COSTS
PROJECT STARTING DATE: 2018 Preliminaries $0.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: 2018 Construction 0.00
Equipment and Other 1,000.00
NEIGHBORHOOD: Total $1,000.00
Presented to the Park Board on Approved Denied Tabled
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-9
PTR-09
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Cloverdale Park TOTAL COST: $253,000.00
PROJECT NUMBER: PTR-09 PROJECT CATEGORY:Parks,Trails,and Recreation
JUSTIFICATION:
Cloverdale Park was identified as a mini park and was given a high priority for implementation in the Parks
and Trails System Plan. A high priority indicates implementation would occur between 2009-2013.
Cloverdale Park had a Master Park Plan created by Scenic Specialties in 2012. The Park Board budgeted
$25,000 in 2013 and$10,000 in 2014 to implement the improvements to the park according to the park plan.
Cloverdale improvements include landscaping,gazebo and quiet meditation areas. Little Library donated to
park in 2015. The Park Board did not allocate additional funding in the 5-year CIP.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Parkland Dedication 0.00 0.00
0.00
0.00
0.00
Total 0.00
PROJECT COSTS
PROJECT STARTING DATE: 2009 Preliminaries $10,000.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: 2013 Construction 0.00
Equipment and Other 243,000.00
NEIGHBORHOOD: Total $253,000.00
Presented to the Park Board on Approved Denied Tabled
Presented to the City Council on Approved Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-10
PTR-10
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: East Park TOTAL COST: $620,000.00
PROJECT NUMBER:PTR-10 PROJECT CATEGORY: Parks,Trails,and Recreation
JUSTIFICATION:
East Park was identified as a regional park and was given a low priority for implementation in the Parks and Trails
System Plan. A low priority indicates implementation would occur between 2020-2024. The Park Board accepted a
Master Park Plan for East Park in 2018. The City applied for 2018 State Bonding funds($300,000)to begin
construction of the canoe landing/picnic area/parking lot/bathrooms. The lobbyist will try to get 2019 State funds to
begin the construction. PW plans to begin the reforestation and prairie development in fall 2018. Without State
bonding,the Park Board suggests developing East Park in phases. Phase 1 canoe area construction would begin in
2019. The details would be identified with the master park plan.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Park Dedication 21,500.00 26,610.00 48,110.00
General Levy 20,000.00 20,000.00 20,000.00
1/2C Sales Tax 250,000.00 280,000.00 500,000.00 1,030,000.00
State Bonding 300,000.00 300,000.00
Land Rent 4,240.00 4,240.00
IF Grant 2,500.00 2,500.00
Total 1,384,850.00
Priority Score 28.85 PROJECT COSTS
PROJECT STARTING DATE: 2017 Preliminaries $0.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: 2019,ongoing Construction 0.00
Equipment and Other 0.00
NEIGHBORHOOD: Rivers Bend Total $0.00
Presented to the Park Board on Approved_ Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-11
PTR-12
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: City-Wide Trail System TOTAL COST: varies
PROJECT NUMBER: PTR-12 PROJECT CATEGORY:Parks,Trails,and Recreation
JUSTIFICATION:
The Parks and Trails System Plan breaks out the current and potential future City-wide trails. Each segment of
potential future trails was given a low,medium or high priority. A high priority is identified as a trail segment
that would be constructed between 2009 and 2013 if funding exists. The potential trail segments listed as high
priority in the Parks and Trails System.
Phase II/III CR2 trail extension will begin in fall 2018 connecting Minnesota St W to CR51. City Council
conducted a pedestrian crossing study over CSAH 75 in 2017. A 2019 State Bonding request submitted,
lobbyist hired. Half cent sales tax may help fund this project if it moves forward.
The Park Board added funding to this item to close up gaps in trails/sidewalks around the city. The funding is
only available if park dedication fees are collected. Council identified a need to extend the sidewalk along
2nd Ave NE between Elm St and Minnesota St. This project is considered in the engineer CIP. Also,sidewalk
has been proposed with the Northland Dr project from CSAH 75 to the Northland development.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Parkland Dedication 0 10,000 10,000 10,000 10,000 10,000 50,000
0
0
0.00
Total 50,000
Priority Score 32 PROJECT COSTS
PROJECT STARTING DATE: on-going Preliminaries
Land Acquisition
PROJECT COMPLETION DATE: on-going Construction
Equipment and Other
NEIGHBORHOOD: Total $0.00
Presented to the Park Board on Approved_ Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-12
PTR-13
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: City-Wide Tree Additions TOTAL COST: $9,500.00
PROJECT NUMBER: PTR-13 PROJECT CATEGORY:Parks,Trails,and Recreation
JUSTIFICATION:
The Park Board,along with Public Works,created a plan to add trees to City parks. The Park Board requests
setting aside$1500 per year for new trees. Part of the tree budget for 2018 may be allocated to replacing trees
along Minnesota Street.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
General:
General Levy 2,000.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 9,500.00
Donations 500.00 500.00 500.00 500.00 500.00 2,500.00
0.00
Total 12,000.00
Priority Score 23.85 PROJECT COSTS
PROJECT STARTING DATE: on-going Preliminaries $0.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: on-going Construction 0.00
Equipment and Other 9,500.00
NEIGHBORHOOD: Total $9,500.00
Presented to the Park Board on Approved_ Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-13
PTR-14
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Dog Park TOTAL COST: $41,718.00
PROJECT NUMBER: PTR-14 PROJECT CATEGORY:Parks,Trails,and Recreation
JUSTIFICATION:
The St.Joseph Dog Park group approached the Park Board to dedicated parkland to build a dog park. The city
council agreed to a 3-phased development of a dog park in Millstream Park to the west of the soccer fields.
Each phase will be constructed as needed donations are received. Phase 1 constructed in 2017 (fencing,mulch,
signage,trees,gravel,pavers,picnic tables and doggie bag dispenser),phase 2 will be constructed in 2018 if
donations received(water access,concrete,shelter),phase 3 TBD as donations received(small dog play area).
Estimate phase 3 for 2021 to show the projected costs.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Park Dedication 20,673.00 5,000.00 25,673.00
Donations 11,045.00 5,000.00 16,045.00
0.00
Total 41,718.00
Priority Score 31.7 PROJECT COSTS
PROJECT STARTING DATE: on-going Preliminaries $0.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: on-going Construction 0.00
Equipment and Other 41,718.00
NEIGHBORHOOD: Total $41,718.00
Presented to the Park Board on Approved Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-14
PTR-15
CITY OF ST. JOSEPH
CAPITAL IMPROVEMENT PLAN
2019 - 2023
PROJECT TITLE: Skate Park TOTAL COST: $125,000.00
PROJECT NUMBER: PTR-15 PROJECT CATEGORY: Parks,Trails,and Recreation
JUSTIFICATION:
The Park Board has received inquiries to continue and upgrade a skate park. The current skate park equipment is
degraded and has not been placed in the hockey rink for a couple summers. Residents and the Council requested the
equipment continue to be used until becomes unusable,and/or,a new park is constructed. Council has indicated they
would like to offer the recreational activity for pre-teens,teens. The Park Board will look for locations and research
the cost to construct a permanent skate park within the city limits.
PROJECT COSTS AND FUNDING SOURCES BY YEARS:
Project Funding Prior
Source Years 2019 2020 2021 2022 2023 Total
Park Dedication 100,000.00 100,000.00
Donations 25,000.00 25,000.00
0.00
Total 125,000.00
Priority Score 27 PROJECT COSTS
PROJECT STARTING DATE: on-going Preliminaries $0.00
Land Acquisition 0.00
PROJECT COMPLETION DATE: on-going Construction 0.00
Equipment and Other 125,000.00
NEIGHBORHOOD: Total $125,000.00
Presented to the Park Board on Approved_ Denied Tabled
Presented to the City Council on Approved_ Denied Tabled
Comments
Approval to Purchase Date Authorizing Initials Date
PARK-15