HomeMy WebLinkAbout[04f] Change Order, Trail Project ok- Josta a Council Agenda Item [0411 criyMEETING DATE: June 17,2019 AGENDA ITEM: Change Order—Requested Action: Authorize execution of Change Order#1,adding conduit for future communications,and authorizing payment in the amount of$3,213.00. SUBMITTED BY: Engineering BOARD/COMMISSION/COMMITTEE RECOMMENDATION: PREVIOUS COUNCIL ACTION: BACKGROUND INFORMATION: The City approved the construction of trail along West MN Street. BUDGET/FISCAL IMPACT: $3,213.00 ATTACHMENTS: Request for Council Action—Change Order Supplemental Agreement REQUESTED COUNCIL ACTION: Authorize execution of Change order#1, adding conduit for future communications, and authorizing payment in the amount of $3,213.00 STATE AID FOR LOCAL TRANSPORTATION Rev.July 2014 tit � SUPPLEMENTAL AGREEMENT SP 233-090-001 MN Proj. No. TA 3318 (098) I SA No. 1 Project Location: St. Joseph, MN Local Agency: City of St. Joseph, MN Local Project No.: STJOE 139579 Contractor. R.L. Larson Excavating, Inc. 1 Contract No.: Address/City/State/Zip:2255 12th Street SE, St. Cloud, MN 56304 Total.Supplemental Agreement Amount$ $3,213.00 This contract is between City of St. Joseph, MN and the Contractor as follows: WHEREAS: This Contract provides for, among other things, construction of grading, aggregate base, bituminous pavement, storm sewer, and turf improvements for a new pedestrian trail; and WHEREAS: The construction documents provide estimated quantities and unit work bid items for the construction of a 2-inch non-metallic conduit(NMC)for future communication cable use by the City of St. Joseph. WHEREAS: The Engineer determined that installation of four pull handholes will provide improved access to the tracer wire system installed with the contract, and the handholes will better facilitate future cable installation within the conduit; WHEREAS: The Engineer directed the Contractor to install the handholes as requested by the City of St. Joseph. NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: 1. Contract Time will not be revised as a result of this Agreement Estimate Of Cost (Include any increases or decreases in contract Items,any negotiated or fame account Items.) ""Group/Funding� +or— +or— Category Item No. Description Unit Unit Price Quantity Amount$ I 1 Special 1 12565.602 Handhole j EACH $803.254.0 $3,213.00 j Net Change this Agreement $3,213.00 I **Group/Funding category is required for Federal Aid projects Group 1 —S.P. 233-090-001 Price approved MnDOT OCIC E.D.F. 06/#1#/19 Approved by Project Engineer: 6214.60A11— Date: 06/11/19\424,40/7 Print Name: Randy Sabart Phone: 320.229.4348 Approved byContract o � Date: ir"r 13 -) I Print Name: Brent Hamak—R.L. Larson Excavating, Inc. Phone: 320.654.0709 Approved by City of St. Joseph: Date: Print Name: Judy Wevrens—City Administrator Phone: 320.363.7201 /tit\ STATE AID FOR LOCAL TRANSPORTATION Rev.July 2014 SUPPLEMENTAL AGREEMENT of TFPA DSAE Portion: The State of Minnesota is not a participant in this contract. Signature by the District State Aid Engineer is for FUNDING PURPOSES ONLY and for compliance with State and Federal Aid Rules/Policy. Eligibility does not guarantee funds will be available. This work is eligible for: _ Federal Funding _ State Aid Funding _ Local funds District State Aid Engineer: Date: \\sehsaprojectslPTiS4STJOE\139579V-Dont-svcs173app-pymtlSA#1 docx Deem aaerwc P"°"64" 4807 Heatherwood Road .....1P`j�i,�K+ Box 1252 PHONE 3P0485-3143ELECTRICAL CONTRACTORS INC. COIN SPAM ELEC7 CSEMMES FAx St.Cloud MN 56302 TO: RI Larson ATTN: brent PROJECT: St.Joe Trail SUBJECT: Future conduit handholes We herewith submit our proposal and description for changes requested as follows: DESCRIPTION OF CHANGE: Add 4 24"X36"X24"composite hand hole on future conduit run Spec sheet attached AMOUNT: subcontractor with markup $ - Handhole $ 765.00 qty $ 4.00 Total $ 3,060.00 This proposal will be valid until: 30 days Normal working unless noted otherwise. Additional Comments: • If you have any questions,please feel free to contact us. Very truly yours, Nick Bischoff Design Electric,Inc. BULKU243624 BULK VAULT HDPE STRUCTURAL FOAM Covered Litt Pin 000E000a SHIELD X COMPOSITE COVER SHIELD X Cover c000E000 TM TM �► o00o0UOo n FEATURES: 161,,,,,,,,,7- 35 1/2'� 00000[]00 •24"X 36"X 24"(open floor)(actual dimensions on drawing) [903] Anti-Slip Tread Pattern •BULK VAULT—SHIELD X COVER-Tier 22 Load Rated (ANSI/SCTE 77:2013) •(2)Cover locking Auger bolts, Hex(9/16")or Penta .• •'�. (7/8")head with washer Logo �•••• •(2)Non-Seizing Fastening System, Field Replaceable �• • ......... ` :e'' : •(4)Embedded Composite Rack Support s•`, A �.d' 3" •(2)Lifting slot equipped with stainless steel pin(slot iso• '� j e�• ►., - ..�`' •-� [75] approximately 2%"x%") i ?Ai, •(2)Winterized Cable Dropslide(1 W'X 1 Y.") ' j I Embedded Racking `�4hts `�o'�/ (2 each side) •(1)Logo Disk 24" Ate a ,. [610] 1+ •'��• WEIGHT&SHIPPING: ' � 441 �;r•Cover Weight.47 lbslitlii$14144�� •Box Weight:55 lbs .' g � �� illiNiiiiivollK• 0100 •Assembly Weight:102 lbs XN `t '''1111q1114 2111404:11500 PERFORMANCE TESTING: iltstillamOrP •• , ............ ...�'� •ANSI/SCTE 77:2013-TIER 22 Rated (33,750 lbs) BULK Vault .. •AS3996—Class C 40 3/S • �'• [1026) 28 3/4" •EN124 Class B125 ••`-•~.k'. [731] •ASTM C1028-07 & AS-4586 (Slip Resistance) >< 0, •10,000 Hour Xenon-Arc Exposure(No fiber-bloom) •ASTM 0635-06(Flammability) , inside Dimensions Length Width Depth I° 34%" 22 %" 21" ,.,,� [873] [578] [533] CHANNELL