Loading...
HomeMy WebLinkAbout[08a] 2020 Budget Park projects • Security cameras for Millstream,Centennial and Wobegon-$1,936.76 Millstream Park • 5 Security Parking lot lights—$18,000.00 • Acoustical improvements-$5,800.00 • Expansion of paved parking area by shelter—estimated $60,000.00 • Floor coating for pavilion-$10,000.00 • Irrigation system for around the shelter-$8,000.00 • Paved area by the softball fields is shot, bad, no life 5 years ago.Storm sewer replacement- $593,000.00 • Security camera inside hallway by restrooms—see above Baseball Park Memorial Park • Repave area South of the shelter,causing concrete failure of walk next to the building—2019 engineering estimate—$99,000.00 Northland Park • Add paved trail system around the edge of the park/Possibly combine with Northland Dr reconstruction-$100,000.00 Klinefelter Park • Repave trail -$100,000.00 • Schedule to replace play equipment—$45,000.00 • Remove pea rock and install engineered wood chips—ADA compliant-$6,000.00 • Add permanent restrooms to site and pave west parking area-$350,000.00 Cloverdale Park • Nothing required Hollow park • Schedule to replace play equipment-$45,000.00 • Remove pea rock and install engineered wood chips—ADA compliant$3,500.00 Centennial Park • Replace old picnic tables inside of the shelter-$5,000.00 • Irrigation system for the entire park-$6,000.00 • Security Cameras—see above There are funds in this year's budget to install the cameras in the three parks listed.Council approval is required.