Loading...
HomeMy WebLinkAbout2019 [07] Jul 29 July 29, 2019 Page 1 of 6 Pursuant to due call and notice thereof, the Planning Commission for the City of St. Joseph met in a special session on Monday, July 29, 2019 at 6:00 PM in the St. Joseph City Hall opening with the Pledge of Allegiance. Planning Commission Members Present: Chair Gina Dullinger, Commissioners, Steve Olson, Mike Ross, Brian Theisen, Chad Hausmann, Daryl Schaefer, Community Development Director Therese Haffner Members Absent: Matt Johnson Others Present: Tom Opatz, John Fahning, Bruce Batzer, Kevin Cox, Janice Mensinger, Jane Reber, Margaret Kalla, Al Brandenburger, Alfred Kalla, Joel Ostendorf Approval of the Agenda: Dullinger made a motion to approve the agenda. The motion was seconded by Olson and passed unanimously by those present. Approval of the Minutes: Theisen made a motion to approve the minutes of June 10, 2019. The motion was seconded by Ross and passed unanimously by those present. Public Hearing, Preliminary & Final Plat - Batzer Second Addition/Astech Corporation: Haffner stated a request for preliminary and final plat approval as well as a conditional use permit (CUP) were submitted by CLC Partners and Bruce Batzer Properties LLC, Astech Corporation. The requests were made to accommodate the expansion of Astech’s outdoor storage. No additional public right of way was proposed. The site would have access off of Ridgewood Road. Haffner added there are wetlands on the property and a wetland delineation had been completed. A forty (40) foot drainage and utility easement is proposed along a portion of the southerly boundary to accommodate planned city utilities. An additional easement will be needed to accommodate the city lift station. Dullinger opened up the public hearing for the preliminary plat. Kevin Cox, 415 Elena LN: Cox stated that he represents CLC Partners LLC, the seller of the property. Cox stated he received comments from the City Engineer a couple of hours prior to the meeting that could change the entire scope of the project. Bruce Batzer, Astech Corporation: Batzer stated he has been interested in purchasing the property for many years. Now that the new property owner is interested in selling, Batzer wants to utilize the property for storage. Batzer hired Westwood Professional Services to see if they could delineate a 2.2 acre wetland and create an access from Batzer’s current property to the Outlot A. Batzer stated the comments received by the engineer make his CUP request considerably different. As no one else present wished to speak, Dullinger closed the public hearing. Schaefer questioned whether the property would be able to function with the incorporation of the lift station. Cox stated they are not against the lift station; however, the discussions that were held revolved around having a 40x60 foot easement for the pump station. The engineer’s comments would extend that easement to 200x125 feet. Will Huston, Westwood Professional Services: Huston stated the engineer’s comments would locate a pond onto Batzer’s property. Huston questioned why Batzer should house the pond on his land when it will be benefitting all the neighboring properties as well. Huston added that typically cities do not make applicants plat to an Outlot. Haffner responded that lots require public access and there would not be public access to the lot. In order to accommodate the request, the property would be platted as an Outlot. July 29, 2019 Page 2 of 6 City Engineer Sabart stated that discussions regarding the forty (40) foot easement have been limited to force main discussion. If a lift station were to be built, than additional easement would need to be dedicated. In regards to the stormwater pond, Sabart shared it was moved due to access issues on the lot. In order to provide an adequate access point to the property, access would need to go through the existing pond. The pond would need to be restored and relocated elsewhere. The size of the easement around the lift station is a recommendation and can be negotiated if need be. Hausmann asked what the perimeter easement is on the property and how much easement would be needed once construction was completed. Sabart stated the perimeter easement would be six (6) feet and would include the berm going around the entire property. The Baker Street Lift Station and CR121 lift station have a dedicated footprint of 125x150 foot. Cox stated the lift station had been discussed numerous times and it was the final boundary size that was not addressed. Batzer shared that he hired Westwood Professional Services to delineate the wetland in order to provide an access to the Outlot. With that access point, there would be no need to relocate the pond. Batzer asked if that access point could be a consideration for the City to use. Dullinger does not believe the ponding and lift station access discussions were a part of the preliminary plat approval process. Hausmann asked why one property should have to dedicate almost a half-acre of easement for a lift station that would benefit many other properties. Cox stated the lift station would service the entire Industrial Park area, as well as the Batzer property and it seemed the location of the lift station was forced. Sabart stated before the property became an Outlot, it was recognized that there was only so much of the Industrial Park that could be developed and that the city would eventually need to locate a lift station which was why there was a forty (40) foot easement along the southern boundary of the Outlot. Cox stated they were not opposed to having the lift station on the property; however, it’s the size of the easement that was not discussed. Olson said he believed there was a better location for the lift station. Sabart stated there were two possible locations for the main lift station. The one presented and an alternate one to the East. The issues with the second location include having to add piping to the east, as well as obtain right of way to that property. Cox stated the applicants were willing to grant a temporary construction easement for the lift station that would accommodate for construction. Once construction is completed, then the easement would revert to a smaller size. Dullinger made a motion recommending to the City Council approval of the preliminary and final plat for Batzer Second Addition including the following items: a permanent six (6) foot utility drainage and utility easement around the perimeter of the property and a permanent forty (40) foot sanitary sewer easement along the southerly boarder of the property to the eastern most part of the where the proposed main lift station will be located. The motion was seconded by Hausmann and passed unanimously by those present. Discussion: Hausmann questioned how the main lift station will be built with only a forty (40) foot easement. Dullinger stated her motion was to extend the permanent sanitary sewer easement to the eastern most side of the proposed main lift station. July 29, 2019 Page 3 of 6 Public Hearing, Conditional Use Permit - Batzer Second Addition/Astech Corporation: Haffner stated the conditional use permit request was to allow for the storage of equipment and aggregate material on Outlot A. Dullinger opened the public hearing for the Conditional Use Permit request. Will Huston, Westwood Professional Services: Huston stated the request is to extend their outdoor storage as the property owner has outgrown their existing space. As no one else present wished to speak, Dullinger closed the public hearing. Haffner stated that the ordinance requires trees on the berm along the perimeter of the property. Hausmann made a motion adopting the findings of fact and recommending to the City Council approval of the conditional use permit with the conditions as established in the conditional use permit resolution. The motion was seconded by Theisen and passed unanimously by those present. Public Hearing, Variance Request – Caribou Coffee: Haffner stated a variance and conditional use permit request from John Fahning and Tom Opatz LLC was submitted proposing the development of a Caribou Coffee on the property owned by the City of St. Joseph located at the southeast corner of CSAH 75 and CR 133, east of Scherer Trucking. The applicant has requested a nine (9) foot variance. The City requires a minimum setback of fifteen (15) feet from the property line where that property is adjacent to residential. Dullinger opened the public hearing for the variance request. Haffner received a phone call from Cynthia Ringling, property owner at 1308 MN St E who was opposed to the project citing safety and traffic concerns. An email was also received from Venna Tschida. Her email stated the intersection is a high traffic area and adding another business to the intersection would impede traffic flow. Tschida added the coffee shop at the intersection would put the safety of the residents at risk and take away from the small town atmosphere. Lastly, Tschida indicated that there was a Caribou Coffee located in the Coborn’s Store across the street. John Fahning, 2485 Acorn Run, Victoria: Fahning, the applicant, stated there was a purchase agreement between the City and developer for the property. The building would be a drive-thru only building. The property has a number of challenges in order to develop it. Joel Ostendorf, 1215 MN St E: Ostendorf shared concerns with the traffic at that intersection and someone hitting his house. Al Brandenburger, 1315 MN St E: Brandenburger shared the he has owned his home for forty-five (45) years and over the years there has been increasing traffic due to new businesses on the northern side of CSAH 75. Brandenburger added that the request was to only have a six (6) foot buffer from the neighboring residential properties. If the project was approved, Brandenburger requested a fence and additional buffering/landscaping to minimize the impacts of having a business that close to residential properties. Another concern was the additional traffic at that intersection. Janice Mensinger, 1307 MN St E: Mensinger stated her partner was riding his bike and he was almost run over. Mensinger shared her concern about the lack of privacy that will be created by the construction of the Caribou. Creating more traffic will result in more accidents. Mensinger believes the lot is too small for a Caribou; however, if it does get passed she would like to have input on the types of barriers that go along the southern side of the property. Mensinger questioned where the snow will go in the winter. July 29, 2019 Page 4 of 6 Jane Reber, 1314 MN St E: Reber said that she has owned her home since 1956 and shared concerns with the traffic and accidents that could occur in that intersection. Reber shared concerns with the stacking of the vehicles into and out of the Caribou Coffee. Al Kalla, 1302 MN St E: Kalla asked if there was a traffic study completed near that intersection. There was an accident that occurred recently and there will be more if the Caribou is approved. Kalla stated he lives on the corner and observes the traffic every day. Mensinger asked how the home values would be affected by the Caribou coming in. Cindy Ringling, 1308 MN St E: Ringling was present in support of her neighbors’ concerns. Ringling asked if there was any outdoor seating as the plans appear to show more than the operation of just a drive-thru building. Ringling questioned the outdoor parking. Tom Opatz, applicant, responded that the proposal was just for a drive-thru and the parking was for employees. As no one else present wished to speak, Dullinger closed the public hearing. Haffner stated the ordinance requires a fifteen (15) foot setback and the applicant is requesting a nine (9) foot variance. Stearns County has approved access off of County Road 133. Hausmann asked for an estimated trip generation during peak hours of operation. Fahning stated a traffic study was not completed. Caribou did a traffic count and the counts fell within what was allowed by the County. Additionally, the site plan was designed to allow for the optimum amount of car for stacking. Sabart presented an exhibit showing trip generation for a coffee shop with a drive-thru and no indoor seating. Nine different sites were sampled. The trip generation ranged from ten (10) trips per hour to sixty (60) trips per hour. Hausmann stated a developer has the right to purchase and develop the property, even if it isn’t ideal. Hausmann added it is reasonable to require the developer to put in a fence along the southerly boundary of the property where it abuts residential properties. Olson said he believes the parcel shouldn’t be developed due to traffic concerns. Schaefer stated the fencing should be a requirement of the variance request. The property is zoned commercial and the access has already been approved by the County. Dullinger believes the request is a reasonable use of the property and there are extenuating circumstances as to why the variance request was submitted. Looking at the site plan, Dullinger stated the developer has used every square inch of the property as best as they could. Dullinger made a motion to adopt the findings of fact and recommend approval to the City Council of the variance of nine (9) feet along the southern property line. The motion was seconded by Hausmann. Discussion: Hausmann stated the variance should require the developer to construct a maintenance free fence along the southern property line. Dullinger made a motion to amend the previous motion to state the following: adopt the findings of fact and recommend approval to the City Council of the nine (9) foot variance along the southern property line contingent with the conditions as established in the resolution and upon the installation of a maintenance free fence eight (8) feet in height. The motion was seconded by Hausmann. Aye: Theisen, Dullinger, Hausmann, Schaefer Motion Carried: 4-2 July 29, 2019 Page 5 of 6 Nay: Olson, Ross Public Hearing, Conditional Use Permit Request – Caribou Coffee: Haffner reported that the conditional use permit was to allow for a drive-thru coffee shop. A coffee shop is a permitted use and a drive-thru is a permitted conditional use in the B-2 zoning district ordinance Dullinger opened the public hearing for the Conditional Use Permit request. Mensinger stressed her concerns about the noise that will be generated from vehicles using the drive- thru. Fahning stated the site was drafted to have the drive-thru on the northern side of the property, away from the residential property. Fahning added the traffic noise from CSAH 75 will probably be louder than the drive-thru. Margaret Kalla, 1302 MN St E: Kalla shared concerns about the traffic and having the access so close to the street light intersection. As no one else present wished to speak, Dullinger closed the public hearing. Dullinger stated the city did not request the applicant to conduct a traffic study and asked if the city could request of that of the applicant. Sabart responded that Stearns County did not request a traffic impact study and that portion of the road is within the County’s jurisdiction. Additionally, the developer’s proposed access is where the County had required. Ross asked if there was a way to force the applicant to conduct a traffic impact study at the site. Ross was concerned about the access proximity to the intersection. Ross added that cars are stacked six cars deep at some points waiting at the stoplight. Sabart stated there would be no room for a median in the intersection due to Scherer Trucking th having their access onto 12 Avenue SE as well. Modeling with vehicle movement could be completed th which analyzes the amount of traffic turning onto 12 Ave SE from CSAH 75. Dullinger stated that noise complaints should be directed to the City. Dullinger made a motion adopting the findings of fact contingent with the conditions as established in the resolution, amending condition 1 to include an eight foot height fence along the southern and eastern boundaries of the property and recommending to the City Council approval of a conditional use permit for a drive-thru coffee shop. The motion was seconded by Theisen. Discussion: Olson stated he was concerned about the location of the project and does not see how the increased traffic will be beneficial to the area. Aye: Theisen, Hausmann, Schaefer Motion Failed: 3-3 Nay: Olson, Dullinger, Ross Reasons for Denial: Olson stated there are massive traffic issues at that intersection and the use is not harmonious to the area. Dullinger stated the drive-thru is detrimental to the general welfare as it is hazardous to vehicular and pedestrian traffic. Ross also stressed traffic concerns as his reason for denial. Haffner stated the Planning Commission is a recommending body and their recommendations will go to the City Council for approval or denial on August 5, 2019. July 29, 2019 Page 6 of 6 Rentai Ordinance Review Update: Haffner stated the planning commission had previously requested a task form be formed to review the rental ordinance. The city council did not approve the request and wanted the Planning Commission to conduct the review. Council Liaison Report: Theisen reported on the following: . Kris Ambuehl was hired as the new City Administrator and will start August 12tn Adiourn: Dullinger moved to adjourn the meeting at 8:22 PM.The motion was seconded by Theisen and passed unanimously by those present. .i���� Therese Haffner Community Development Director