HomeMy WebLinkAbout[05f] Change Order No. 1 Council Agenda Item 5f MEETING DATE: October 21, 2019 AGENDA ITEM: Change Order No. 1 – Approve change order no. 1 for the 2019 Street Improvement Project SUBMITTED BY: Randy Sabart, City Engineer Terry Thene, Public Works Director BOARD/COMMISSION/COMMITTEE RECOMMENDATION: PREVIOUS COUNCIL ACTION: Awarded the construction contract BACKGROUND INFORMATION: Change Order No. 1: 2019 Bituminous Street and CIP Improvements Following the project award, an amended (reduced) unit price was negotiated with the general contractor for two pavement marking bid items on the base bid that resulted in a savings to the City. During construction of the new sanitary sewer at the intersection of Old Highway 52 and Cypress Drive, the existing water main on Cypress Drive was uncovered, and it was determined the water main would interfere with the proposed sanitary sewer alignment. Reconstruction of a section of the existing water main was necessary to facilitate the new sanitary sewer construction and to comply with the separation requirements as defined by the Recommended Standards for Wastewater Facilities and the Recommended Standards for Water Works 10-State Standards. Given the recent renovations of the former City Hall property on West Ash Street, the existing concrete walk and driveway apron west of College Avenue do not serve a purpose. The concrete walk and the driveway apron are not compliant with ADA standards; therefore, the existing concrete flatwork was removed and the boulevard will be restored with turf. BUDGET/FISCAL IMPACT: The construction contract amount will decrease by $2,587.75. ATTACHMENTS: Change Order 1 REQUESTED COUNCIL ACTION: Approve Change Order 1. STATE AID FOR LOCAL TRANSPORTATION Rev. February 2018 CHANGE ORDER SP/SAP(s) 233-102-002 ETAL MN Project No.: Change Order No. 1 Project Location St Joseph, MN Local Agency City of St Joseph Local Project No. STJOE 147693 Contractor Knife River Corp. Contract No. Address/City/State/Zip 4787 Shadow Wood Dr. NE, Sauk Rapids, MN 56379 Total Change Order Amount $ ($2,587.75) You are directed to make the following changes in the Contract Documents: Description: 1. Add the following Work: a. Remove 71-feet of 6-inch water main on Cypress Drive from Station 8+09 to Station 8+75 and reconstruct 64-feet of 6-inch water main and reconnect to the water main on Old Highway 52 approximately 16-feet left of the existing connection. b. Remove and replace 45-feet of curb & gutter, remove 12 square yards concrete driveway apron, and remove 21 square yards of concrete walk from Station 128+71 to Station 129+16 LT on W Ash Street. 2. Unit price change for the following bid items: a. Item No. 80 – 2582.503 - 4” Solid Line Multi Comp Gr In - $5.00 Per LF (-$2.75 Per LF Deduct). b. Item No. 82 – 2582.518 - Crosswalk Multi Comp Gr In - $12.50 Per SF (-$7.50 Per SF Deduct). Reason for Change Order: During construction of the new sanitary sewer at the intersection of Old Highway 52 and Cypress Drive, the Engineer determined the existing water main on Cypress Drive will interfere with the proposed sanitary sewer alignment. Reconstruction of a section of the existing water main is necessary in order to facilitate the new sanitary sewer construction and to comply with the separation requirements as defined by the Recommended Standards for Wastewater Facilities and the Recommended Standards for Water Works 10-State Standards. Given the recent renovations of the former City Hall property on W Ash Street, the existing concrete walk and driveway apron do not serve a purpose. The concrete walk and the driveway apron are not compliant with ADA standards; therefore, the Engineer determined the existing concrete flatwork should be removed and the boulevard restored with turf. Attachments (List of documents supporting change): Contractor’s Estimate for Work to be added. Estimate Of Cost: (Include any increases or decreases in contract items, any negotiated or force account items.) **Group/ + or – + or – Item No. Description Unit Unit Price funding Quantity Amount $ Category 1 2104.503 Remove Curb & Gutter LF $2.00 45 $90 1 2104.503 Sawing Concrete Pavement LF $3.50 6 $21 1 2104.503 Sawing Bituminous Pavement LF $2.50 79 $197.50 1 2104.504 Remove Bituminous Pavement SY $4.50 17 $76.50 1 2104.504 Remove Concrete Driveway Pavement SY $100.00 12 $1,200 1 2105.504 Remove Concrete Walk SY $3.00 21 $63 1 2231.604 Bituminous Patch Special (Street) SY $28.00 17 $476 1 2531.503 Concrete Curb & Gutter Design B618 LF $35.00 45 $1,575 Page 1 of 2