Loading...
HomeMy WebLinkAbout[04e] Changer Order 2 Council Agenda Item 4e MEETING DATE: May 4, 2020 AGENDA ITEM: Change Order #2, 2019 Street Improvements SUBMITTED BY: Randy Sabart, City Engineer Terry Thene, Public Works Director BOARD/COMMISSION/COMMITTEE RECOMMENDATION: PREVIOUS COUNCIL ACTION: Awarded the construction contract BACKGROUND INFORMATION: Change Order No. 2: 2019 Bituminous Street and CIP Improvements In the course of executing the water main reconstruction work ordered by Change Order #1, the Contractor uncovered the existing water service for #309 Cypress Dr, and the water service needed to be reconstructed in conjunction with the water main relocation. The existing water service was originally constructed deeper than it would normally be, and beneath the existing concrete driveway. Reconstruction required additional time and effort to complete as needed. Additionally, a 2-inch water service was replaced to #300/#304 Old Highway 52 in the same intersection vicinity with the water main relocation and new sanitary sewer construction. With the realignment of the sanitary sewer between Cypress Dr and Old Highway 52, the existing sanitary sewer manhole behind #301 Birch Street could be abandoned with the sanitary sewer. The abandonment of the manhole was added to the change order work. BUDGET/FISCAL IMPACT: The construction contract amount will increase by $5,520.90. ATTACHMENTS: Change Order 2 REQUESTED COUNCIL ACTION: Approve Change Order 2. 05/01/2020 C&LEXCAVATING,INC. POBOX99 DAILYREPORTOFEXTRAWORK STJOSEPHMN56374 Date:10/17/2019 WorkFor:#1911St.Joe Location:#309CypressDrive(OldHwy52) WhatDone:Installednew1"copperlinetoHouse#309(Existingcopperwasremovedwheninstallingnew 6"watermainthatwasrelocated)*fittingslocatedbelow Waterserviceis14'deep.Usedsheetingtoinstallcorp/box Sawcutdriveway(25'x10.5'panel,12.5'x9.5'panel,12'x10'panel4"thick).1/2hrtosawcutpanels Installationwasfrom7am9:45amBackfilleduntil11Usedjumpingjacksondriveway Labor HoursRate EricSuchy495.00$$380.00 EricBieniek493.00$$372.00 JordanLahr493.00$$372.00 BrandonPanek488.00$$352.00 JoeManuel485.00$$340.00 HunterMurdock485.00$$340.00 Equipment E19HITACHI470G3120.00$$360.00 E6CAT315260.00$$120.00 L21CAT950K486.00$$344.00 CP7CATCP56163.00$$63.00 Material ItemCost 6"x1"Saddle1 1"Corp1 1"Curbstop/Boxextradepth1 1"Copper40' TOTAL$3,043.00 InspectorsSignature OwnersSignature