Loading...
HomeMy WebLinkAbout[15e] Public Works Report TERRY THENE PUBLIC WORKS DIRECTOR 75 Callaway Street East St Joseph, MN 56374 tthene@cityofstjoseph.com PUBLIC WORKS REPORT TO: HONERABLE MAYOR AND CITY COUNCIL DATE: June 12, 2020 SUMMARY The City has been working on COVID related issues. Staff has distributed 38 picnic tables borrowed from the Sisters and CSB. The tables were well received by the businesses and used immediately by there customers. Staff has continued to disinfect restrooms, play equipment and buildings. Staff has assisted CSB on there irrigation at the Athletic complex until their irrigation system was repaired. STAFF Staff have been disinfecting buildings and equipment on a daily basis, staff is operating with COVID 19 safety recommendations. Park amenities have been opened by staff with a disinfecting schedule. Staff has been mowing, picking up trash, repairing sod damage. patching pot holes, flushing sanitary sewers. Operations and Maintaining utilities have been a priority during these fluid times. UPCOMING MEETINGS & EVENTS I have continued work on the 2021 budget. The 2019 street project has been completed and the paving in the industrial park expansion has been paved in its entirety. Midco will be installing their cable into the industrial park next week. Seeding and signage will be completed the following week. I have been working with two vendors on receiving quotes on the Mn St Paver replacements/repairs hoping to have something for the council. The Millstream parking expansion and the base ball parking area have been prepped for concrete and paving. -Terry