Loading...
HomeMy WebLinkAbout11.25.21 www.cityofstjoseph.com St. Joseph Planning Commission th Monday, October 25, 2021 6:00 PM St. Joseph Council Chambers 75 Callaway St E **The meeting will also be available through Zoom** 1.Call to Order 2.Pledge of Allegiance 3.Agenda Review and Adoption 4.New Business a.None 5.Old Business a.Public Hearing – Preliminary Plat Rivers Bend 4 b.Preliminary Plat – Rivers Bend 4 c.Final Plat – Rivers Bend 4 6.Other Business 7.Adjourn ZOOM INFORMATION https://us06web.zoom.us/j/84064649893?pwd=QnVmSlFwTUh6dGE0Q0I5ZFhSSWltQT09 Meeting ID: 840 6464 9893 Passcode: 931838 One tap mobile +19292056099,,84064649893#,,,,*931838# US (New York) +13017158592,,84064649893#,,,,*931838# US (Washington DC) Dial by your location +1 929 205 6099 US (New York) +1 301 715 8592 US (Washington DC) +1 312 626 6799 US (Chicago) +1 669 900 6833 US (San Jose) +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) Meeting ID: 840 6464 9893 Passcode: 931838 Find your local number: https://us06web.zoom.us/u/kbuUl1Gaqi 75 Callaway Street East | Saint Joseph, Minnesota 56374 1 Email: cityoffices@cityofstjoseph.com | Phone: 320.363.7201 | Fax 320.363-0342 Planning Commission Agenda Item 5a-c MEETING DATE: October 25, 2021 AGENDA ITEM: 5a. Public Hearing, Preliminary Plat- River’s Bend 4 5b. Preliminary Plat – Rivers Bend 4 5c. Final Plat – River’s Bend 4 SUBMITTED BY: Community Development STAFF RECOMMENDATION: Approve Preliminary Plat and Final plat per resolutions. PREVIOUS PLANNING COMMISSION ACTION: None BACKGROUND INFORMATION: Applicant Information: CLC Partners LLC Existing Zoning: R-4 Future Land Use: Medium Density (2-6 units per acre allowance per Comprehensive Plan) Location: East of College Ave (CR 121) and NW of River’s Bend 2 and Lanigan Way SE Civil:Attached Access: Access will be off College Ave (CR 121). Anaccess permit will be required from Stearns County. Engineering: See attached WCA/Wetlands:There are wetlands on the property. No proposed impacts to delineated wetlands will occur as a result of the plat. Minimum lot area: Subd. 5: Lot Area Requirements. Land Use Minimum LotMinimum LotMinimum Lot AreaWidthDepth b)Townhouse, group or row houses 12,000 75’ 120’ ***The minimum lot area per townhouse, group or row house unit shall be four thousand square feet (4,000 sq. ft.) *** Overall Plat Information: 28 lots – townhomes 1 outlot = 100,660 S.F. (2.31 acres) Total sizeof plat = 479,533 S.F. (11 acres). Drainage and Utility Easements: Utility easements are proposed per attached plat. BUDGET/FISCAL IMPACT: All public infrastructure and costs will be responsibility of developer. 2 ATTACHMENTS: Preliminary Plat Preliminary Plat resolution Final Plat Final Plat resolution Developers Agreement R-4 Zoning ordinance REQUESTED PLANNING COMMISSION ACTION: 1.Open and close Public Hearing for Preliminary plat 2.Motion on Preliminary plat resolution 3.Motion on Final plat resolution 3 RIVER'S BEND PLAT 4 ALL SHEETS SITE PROJECT NUMBER: 0033620.00 REVISION (NOT TO SCALE) INITIAL SUBMITTAL DATE: 09/20/21SHEET: 1 OF 10 Vicinity Map ST. JOSEPH, MINNESOTA FOR GRADING, SANITARY SEWER, WATERMAIN,STORM SEWER AND STREETS FOR RIVER'S BEND PLAT 4 PRELIMINARY PLANS .................. DATE 110/20/21CITY COMMENTS NO. TNH - SOUTH SIDE OF C.S.A.H. NO 121, ACROSS FROM PROJECT SITE - ELEVATION=1075.49 (NGVD 88). BM-1 BENCHMARKS Sheet List Table TURN LANE PLAN SHEET TITLE COVERSITE, LIGHTING, AND SIGNAGE PLANSANITARY SEWER & WATERMAIN PLAN & PROFILESITE, GRADING, & EROSION CONTROL DETAILSSTORM SEWER DETAILS 1 234GRADING PLAN56STREET & STORM SEWER PLAN & PROFILE7STORM SEWER PLAN & PROFILE8EROSION CONTROL PLAN9 11 10SANITARY & WATERMAIN DETAILS SHEET NUMBER SHEET INDEX 4 (320) 253-94953701 12th Street North, Suite 206(800) 270-9495 PhoneFax(320) 358-2001St. Cloud, MN 56303 CONTACT: CORY EHLERT CLC PARTNERS CONTACT: JOHN S. BLENKER ST. JOSEPH, MINNESOTA GRADING, SANITARY SEWER, WATERMAIN,ST. JOSEPH, MINNESOTA PREPARED FOR:PO BOX 99PHONE: 320-420-1052EMAIL: CORYEHLERT@KW.COMPREPARED BY:PROJECT NUMBER: 0033620.00 STORM SEWER AND STREETS FORFOR RIVER'S BEND PLAT 4 PRELIMINARY PLANS N:\\0033620.00\\DWG\\CIVIL\\0033620.00CV01.DWG RIVER'S BEND PLAT 4 10 OF 150' 10/20/21 Common Ground Alliance 2 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 100' T A W N A S 50' T A W PRELIMINARY N A S 0' T A W PROJECT NUMBER: 0033620.00 N A S T A W SIGNAGE PLAN N A S SITE, LIGHTING, AND T A W N A S T A W N A S T A T A W W BASIN T A W STORMWATER TN A W A S T A W T A W T A WT A W N A S ' 9 1 (800) 270-9495 X ' 7 3 Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303 VERIFY WITH UTILITY COMPANY ANDCOORDINATE WITH MAILBOX LOCATION STREET LIGHTLOCATION SHOWNFOR REFERENCE ONLY.(TYP) WETLAND SETBACK X 9 1 X 8 1 7 1 X 6 3 . 9 8 + 6 ' 0 5 R X 6' 0 0 . 1 0 5 6 ' 8 2 R 5 X 1 NORTHEAST CORNER OF THE ' 8 2 R ST. JOSEPH, MINNESOTA X SE1/4-SW1/4 SEC. 15, TWP. 124, RNG 29 30 RIVER'S BEND PLAT 4 30 4 DIS E 1 HT SI X 0 3 AP IKR GN 2 1 ON5 1 5 2 X WETLAND SIGN PLACEDON LOT LINE (TYP.) (SEE DETAILS) 2 2 .. 2 1 R7-13A12" x 18" 54832 T X R 1 & GUTTER B618 CURB 1 INV=1066.18 U O F O C O T S 1 X LICENSE NO. E 3 4 2 N O 0 O F T S O 1 4 T 2 S X 10/20/2110/20/2110/20/21 Y DIS E 9 E WETLAND SETBACK T SIH K O JOHN S. BLENKER..DATE: FI HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA 1' AP KR GNI X 5' 5 ON 2 60' . .W R.O 8 6 O F 3 2 X 7 R7-13A12" x 18" 30 0 3 ' 00. 05 ' 18 6' 1 O F X 7 2 ' 34 6 F-F 8 2 X O F 5 1 2 X PO BOX 99 O F CO. RD. 121 KEYSTONE COURT STREET NAME SIGN ST. JOSEPH, MINNESOTA ' 4 0 CLC PARTNERS X 5 2 R O O F T S S T O P 3 ' 0 3 R X 0 3 O F 1 0 3 ON RELOCATION OF POWER POLE 24" x 24" R1 2 PREPARED FOR: X COORDINATE WITH UTILITY COMPANY ON LOT LINE EASEMENTS WILL BE PROVIDED OVER ALL PUBLIC UTILITIES AND UP TO 1 FOOT ABOVE THEHIGH WATER LEVEL OF ALL PONDS. O F RIGHT TURN LANE 2.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT.3.STREET NAMES ARE SUBJECT TO APPROVAL BY THE CITY.4.DRAINAGE AND UTILITY EASEMENTS SHALL BE PROVIDED AS REQUIRED. DRAINAGE AND UTILITY 1.ALL LOT DIMENSIONS ARE ROUNDED TO THE NEAREST FOOT.5.STREET WIDTHS ARE SHOWN FROM FACE OF CURB TO FACE OF CURB. DEVELOPMENT NOTES 1 (TYP.) (SEE DETAILS) '03R X WETLAND SIGN PLACED 0 O 0 . F 0 0 + 0 (SEE TURN LANE PLAN FOR DETAIL) X O F O F X ON RELOCATION OF POWER POLE (TYP) COORDINATE WITH UTILITY COMPANY O F X STREET LIGHT AND PEDESTAL O F LOCATION SHOWN X FOR REFERENCE ONLY. WETLAND SETBACK LINECURB AND GUTTERTIP-OUT CURB AND GUTTERSIGN (SINGLE POST)STREET LIGHT PROPERTY LINELOT LINEEASEMENT LINEPOND NORMAL WATER LEVEL CITY COMMENTS.... WITH PEDESTRIAN RAMP O F 09/20/21 O F VERIFY WITH UTILITY COMPANY AND TO RELOCATE FIBER HAND HOLE BOX8' BITUMINOUS TRAIL CONNECTION.... COORDINATE WITH UTILITY COMPANY COORDINATE WITH MAILBOX LOCATION 110/20/21 INITIAL ISSUE:REVISIONS: O F PROPOSED O F 50' JSBJSBJSB O F EXISTING SITE LEGEND NORTHWEST CORNER OF OUTLOT G DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0033620.00\\DWG\\CIVIL\\0033620.00SP01.DWG RIVER'S BEND PLAT 4 OF 60' 10/20/21 Common Ground Alliance Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 40' 20' PRELIMINARY 0' PROJECT NUMBER: 0033620.00 TURN LANE PLAN (800) 270-9495 Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303 ST. JOSEPH, MINNESOTA 6 LICENSE NO. JOHN S. BLENKER..DATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA PO BOX 99 ST. JOSEPH, MINNESOTA AND LAYOUT.TOPOGRAPHICAL FEATURES WITH THE OWNERS AND FIELD-VERIFY PRIOR TO CONSTRUCTION.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES ORVARIATIONS FROM PLAN. UNLESS OTHERWISE NOTED. 4.ALL CONSTRUCTION SHALL CONFORM TO LOCAL RULES. 2.REFER TO THE SITE PLAN/RECORD PLAT FOR MOST CURRENT HORIZONTAL SITE DIMENSIONS3.THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF EXISTING UTILITIES AND5.POSITIVE DRAINAGE FROM THE SITE MUST BE PROVIDED AT ALL TIMES. 1.ALL CONTOURS AND SPOT ELEVATIONS ARE SHOWN TO FINISHED SURFACE/GUTTER GRADES WETLAND LINE PROPERTY LINESOIL BORING LOCATIONINDEX CONTOURINTERVAL CONTOURSPOT ELEVATIONHIGH/LOW POINTPROPOSED GRADEEMERGENCY OVERFLOWPROPOSED STREET PROFILE GRADESTORM SEWERPOND NORMAL WATER LEVEL CITY COMMENTS.... .... 02 88 900.00900.00 HP/LP110/20/21 99 INITIAL ISSUE:REVISIONS: X.XX% 0.00% PROPOSED E.O.F. 20' JSBJSBJSB 02 88 900.00 99 EXISTING DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0033620.00\\DWG\\CIVIL\\0033620.00TL01.DWG RIVER'S BEND PLAT 4 10 OF 150' 10/20/21 Common Ground Alliance 4 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 100' T A W N A S 50' T A W PRELIMINARY N A S 0' T A W PROJECT NUMBER: 0033620.00 N A S T A W GRADING PLAN N A S T A W N A S T A W N A S T A T A W W T A TOP=1069.25EOF=1068.50BOT=1061.50 W HWL=1068.45NWL=1065.50 TN A STORMWATER BASIN W A S T A W T A W T A WT A W N A S (800) 270-9495 X 20' WIDE Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303 POND ACCESS BENCH % 9 . 0 X . 9 G 1 . O . S X 8 1 0 7 . 1 7 0 7 % 1 1 9 . 1 % 8 . X 2 6 % 31 .. 1 9 1 8 + 6 % 0 . 2 X 2 6 . 0 7 6 0 .%9.1 1 2 . G . 2 7 O6 . 4 0 S2 . 1 5 1 X 7 1 % 5 NORTHEAST CORNER OF THE 4 . 1 .2 %0 .2 %5 ST. JOSEPH, MINNESOTA 5 X 8 . SE1/4-SW1/4 SEC. 15, TWP. 124, RNG 29 1 7 30 RIVER'S BEND PLAT 4 30 4 0 .1%8.1 0 . G . 3 7 O . 0 X S 0 1 3 2 1 0 2 . 5 . 20 7 3G .. 1 3 %0.2 %1.2 O 7 2 . %2.27 S 0 X 1 2 2 0.. 2 .1.2 1% 6 5 . G 5 . 3. 54832 2 7 O . 7 X 0 S 1 1 .2 %9 2 1%0.INV=1066.18 O F 0.2 O % T S %2.2 1 X 0 LICENSE NO. 3 9 . . 4 0 2 2 0 7G . . 4 O 0 2 O %1.O F T . 7 S 0 2 .1%0. S 0 1 . G 4 1 . 4 2 7 O . X 0 S 10/20/2110/20/2110/20/21 1 %7.3 9 0.2 % 5 2 . 3 O 7 JOHN S. BLENKER..DATE: FI HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA 0.2 % 3 %0. X % 5 0 . 0 2 7 . 6G .. 0 4 %3.2 O 8. 7 0 .%9.1 S 0 6 0 . G 6 O 1 .6 F 4. 3 2 3 7 O X . 7 0 S 1 %6.5 7 .2 %0 30 0 3 2 %0.O F 3 X%2. 7 5 9. .0 2 3 1 G . . 7 5 2 %3.O 6. 7 0 .1 %9. S 0 1 . G 8 1 . 5 2 O7 . X O 0 F S 1 5 0 3 . 1 24 7 X PO BOX 99 O F % .0 2 % .8 2 ST. JOSEPH, MINNESOTA 5 6 . 0 4 % 4 9 . 617 CLC PARTNERS X . .O 5 F 7 G . 0 O1 . S 3 2 7 X. 0 4 3 O 7 F 1 % % 0 03 . 2 3 8 . %1 9 . 5 1 7 2. 2 PREPARED FOR: X 0 5 . AND LAYOUT.TOPOGRAPHICAL FEATURES WITH THE OWNERS AND FIELD-VERIFY PRIOR TO CONSTRUCTION.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES ORVARIATIONS FROM PLAN. UNLESS OTHERWISE NOTED. 4 7 O 7 F . 0 1 G . % 1 . 2O 2.REFER TO THE SITE PLAN/RECORD PLAT FOR MOST CURRENT HORIZONTAL SITE DIMENSIONS3.THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF EXISTING UTILITIES AND4.ALL CONSTRUCTION SHALL CONFORM TO LOCAL RULES. GRADING & DRAINAGE NOTES 1.ALL CONTOURS AND SPOT ELEVATIONS ARE SHOWN TO FINISHED SURFACE/GUTTER GRADES5.POSITIVE DRAINAGE FROM THE SITE MUST BE PROVIDED AT ALL TIMES. . 1 S X 0 O 0 . F 0 0 + 0 X O F O F X O F X O F X WETLAND LINE SOIL BORING LOCATIONSPOT ELEVATIONSTORM SEWER PROPERTY LINEINDEX CONTOURINTERVAL CONTOURHIGH/LOW POINTPROPOSED GRADEEMERGENCY OVERFLOWPROPOSED STREET PROFILE GRADEPOND NORMAL WATER LEVEL CITY COMMENTS.... O F 09/20/21 O F .... 02 88 110/20/21 900.00HP/LP900.00 99INITIAL ISSUE:REVISIONS: X.XX% 0.00% O F PROPOSED E.O.F. O F 50' JSBJSBJSB O F 02 88 900.00 99 EXISTING GRADING LEGEND NORTHWEST CORNER OF OUTLOT G DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0033620.00\\DWG\\CIVIL\\0033620.00GD01.DWG RIVER'S BEND PLAT 4 10 OF 150' 108510801075107010651060105510501045 10/20/21 3 Common Ground Alliance 5 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 100' N I A M R E T A W F RO E P 50'V O O T C ' O 8T M U MI N I M SANITARY SEWER SERVICESANITARY SEWER SERVICE WYE LOCATION ONSERVICE STOP BOX INVERT ELEVATION @ EASEMENT LINEMAIN LINE FROM DOWNSTREAM MANHOLEDENOTES ELEVATION OF THE TOP OF WATER PRELIMINARY 2 EXISTING 8" DIP 0' XXX.XXXX.X X.X' RISER WYE = X+XXOUTSIDE DROPS. GENERAL NOTES 2.EXTEND RODS ON DEEP VALVES.3.ALL DROP MANHOLES TO BE CONSTRUCTED USING 1.FLAG HYDRANTS. LEGEND PROJECT NUMBER: 0033620.00 PROPOSED CL GRADE PROFILE EXISTING CL GRADE 1 SANITARY SEWER & WATERMAIN PLAN & 232 LF 8" DIP 0 WATERMAIN EXTENSION 10851075106510551045 1080107010601050 (800) 270-9495 Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303 109510901085108010751070106510601055 9 BASIN T A PROPOSED W AND EXTEND AS SHOWN.SIZE, AND INVERT) REMOVE AND SALVAGE TEMPORARY(FIELD VERIFY LOCATION, MATERIAL, STORMWATER T A W T A W 8 T A W 250' HYDRANT RADIUS P I DDEPTH=11.44 " 8 ST. JOSEPH, MINNESOTA IE=1057.16 (SE) IE=1057.26 (NW) RIVER'S BEND PLAT 4 RE=1068.60 ' 2 SANITARY MH-1 1 X P X I 7 D 8 " 8 SEE RIGHT FORCONTINUATION OFWATERMAIN PROFILE 9 1 .. X 8 1 54832 7 1 X 6 3 . DEPTH=12.10 9 8 + LICENSE NO. 6IE=1059.02 (SE) IE=1059.12 (W) 6 P I RE=1071.12 D 1.14% " X 8 SANITARY MH-2 6 SDR 35 @ 1 10/20/2110/20/2110/20/21 154 LF-8" PVC 6 5 X JOHN S. BLENKER..DATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA 1 SIZE, AND INVERT) AND EXTEND AS SHOWN. X 30 30 4 5 CONSTRUCT SANITARY MANHOLE OVER EXISTING 8" SANITARY STUB 1 (FIELD VERIFY LOCATION, MATERIAL, X 0 3 2 1 5 1 2 EXISTING CL GRADE X P I % PROPOSED CL GRADE 4" PVC SERVICE 1" COPPER W/ CURB STOP(TYP)1 D 6 ". 2 0 8 2 2 1 @ 5 3 X R 1 D4 1 S PO BOX 99 C ' 12 V P " 4" PVC SERVICE (TYP) 1" COPPER W/ CURB STOP 1 8 X ST. JOSEPH, MINNESOTA - 3 F 4 L 2 N IA M RE TA W CLC PARTNERS F O P O T 9 OT 9 0 R EV O C ' 8 M U3 MI NI M 1 4 2 X KEYSTONE COURT 9 608 LF 8" DIP 3 X 5 2 PREPARED FOR: 8 6 3 2 X 7 30 0 3 DEPTH=12.65 X 7 IE=1061.57 (E) 2 IE=1061.67 (SW) 6 RE=1074.22 2 8 SANITARY MH-3 2 X O F% 1 5 6 . 0 1 2 @ 5 INV=1068.42 3 X O R F D S C V P " 4 8 X - P I O O F F T L D S " 1 8 DEPTH=12.00 8 1 3 1 INV=1068.92 IE=1062.40 (NE) CITY COMMENTS.... RE=1074.40 09/20/21 X 0 SANITARY MH-4 3 O F 1 0 3 .... 2 X 110/20/21 O F INITIAL ISSUE:REVISIONS: 24" RCP 1 X 0 0 O 031 LF 6" DIP . F 0 050' JSBJSBJSB 10' 8" x 6" REDUCER + 0 X O F O F X 10951085107510651055 1090108010701060 DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: O F X N:\\0033620.00\\DWG\\CIVIL\\0033620.00UT01.DWG RIVER'S BEND PLAT 4 10 OF 150' 10/20/21 GUTTER ELEVATION Common Ground Alliance 6 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 100' 900.00 PROPOSED 50' PRELIMINARY 900.00 0' EXISTING 0.05 FEET. RIM ELEVATIONS SHOWN ON THE PROFILES REFLECTTHE SUMPED ELEVATIONS. FROM SURMOUNTABLE CURB & GUTTER.FEET. MANHOLE CASTINGS IN PAVED AREAS SHALL BE SUMPED GENERAL NOTES 2.ALL RCP SHALL BE CLASS 3, UNLESS OTHERWISE NOTED.3.ALL CATCH BASIN CASTINGS IN CURB SHALL BE SUMPED 0.15 1.RADIUS TO BE B618 CURB & GUTTER WITH 10' TRANSITIONS LEGEND PROJECT NUMBER: 0033620.00 PLAN & PROFILE 109510901085108010751070106510601055 9 STREET & STORM SEWER BASIN T A W STORMWATER T A W T A W 8 T A W X (800) 270-9495 X 7 IE=18" (NE) 1066.76 Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303 9 IE=18" (N) 1066.76 1 RE=1069.82 X 8 1 0)CBMH-201 (48" 7 . 1070.62 1 7 0 7 1068.4 1 1 X 6 3 . 9 % 8 3 + 62 % . 0 % 0 1071.24 .1 8 1 - -4 . 1069.0 16 - X 2 6 . 0 7 6 0 1 % 2 3 . 0 . 2 1 -% 76 42 0 29 .. 1 5 1071.85PVI ELEV = 1071.85 1 0 X 7- 1 1069.4 PVI STA = 5+50.00 5 X 8 . 1 6" DRAINTILE 7 1072.20 30 0 3 4 1070.5 05 1 0 . 3 ST. JOSEPH, MINNESOTA 7 0 X 0 1 3 2 1 SUMP HOSECONNECTION (TYP)RIVER'S BEND PLAT 4 0 2 . 5 2 0 7 31072.55 . 1 3 1070.4 2 7 0 X 1 2 2 0 2 1 6 5 . 9 5 3. 2 7 7 X 01072.90 1 1 1071.0 4 1 FINISHED GRADE .. 54832 1 X 0 3 9 . 4 0 2 2 107510701065 70 .1073.25 4% 0 0 71071.4 0 1 07 1 . . 4 1 24" FES-301 IE=1069.280 4 - 2 7 LICENSE NO. X KEYSTONE COURT 0 1 9 EXISTING GRADE 5 2 . 3 7 1073.60 1071.6 3 X 10/20/2110/20/2110/20/21 5 FINISHED GRADE 0 2 SUMP HOSECONNECTION (TYP) 6 . 4 8 JOHN S. BLENKER..DATE: 7 I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA 0 0 6 0 . 6 1 6 4. 3 2 3 7 X 7 01073.95 1 7 1071.7 0 3 30 EXISTING GRADE @ 0.54% X 7 5 9 0 .2 3 1 . 7 84 LF-24" RCP 1074.30 5 6 7 0 1071.8 2 0 1 . 8 1 5 2 7 X O 0 F 1 5 0 10751065 1070 IE=1069.74 3 . 1 6" DRAINTILE 24 24" FES-300 7 1074.65 ELEV = 1074.68 1071.5 X O F PVT = 1+45.00 5BEAVERTAIL LAST 3-FEET OF CURB 6 . 0 4 TO DITCH DAYLIGHT DRAINTILE 4 67PO BOX 99 X . 5 O O 1074.72 F T 7 S 0 1071.01 1 3 ST. JOSEPH, MINNESOTA 90.00' VC K = 35.56 CLC PARTNERS 2A.D. = -2.53% 7 . X 0 4 3 PVI STA = 1+00.00 7 O H.P. STA = 1+20.11 H.P ELEV = 1074.77PVI ELEV = 1075.00 F 1 ELEV = 1074.18 0 1074.08 3 PVC = 0+55.00 1069.9 % 5 3 PVI ELEV = 1073.82 7 .8 2 2 . X 0 5. 1 4 7PVI STA = 0+35.55 O 7 F 0 1 24" RCP 1 PREPARED FOR: X 0 1075.6 0 O 0 F. 0 0 + 0 ??? X O F TO DITCH O F X 10951085107510651055 1090108010701060 DAYLIGHT DRAINTILE & FLARED END SECTIONS REMOVE EXISTING CULVERT O F X CITY COMMENTS.... 09/20/21 .... 110/20/21 INITIAL ISSUE:REVISIONS: 50' JSBJSBJSB 10' DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0033620.00\\DWG\\CIVIL\\0033620.00ST01.DWG RIVER'S BEND PLAT 4 10 OF 150' 10/20/21 GUTTER ELEVATION Common Ground Alliance 7 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 100' 900.00 PROPOSED 50' PRELIMINARY 900.00 0' EXISTING 0.05 FEET. RIM ELEVATIONS SHOWN ON THE PROFILES REFLECTTHE SUMPED ELEVATIONS. FROM SURMOUNTABLE CURB & GUTTER.FEET. MANHOLE CASTINGS IN PAVED AREAS SHALL BE SUMPED GENERAL NOTES 2.ALL RCP SHALL BE CLASS 3, UNLESS OTHERWISE NOTED.3.ALL CATCH BASIN CASTINGS IN CURB SHALL BE SUMPED 0.15 1.RADIUS TO BE B618 CURB & GUTTER WITH 10' TRANSITIONS LEGEND PROJECT NUMBER: 0033620.00 PROFILE STORM SEWER PLAN & 108510801075107010651060105510501045 1 24" FES-100 IE=1064.50 1 56 LF-24" STMSWR @ 0.50% EXISTING GRADE FINISHED GRADE 24 LF-12" STMSWR @ 12.77% IE=24" (SE) 1064.78 IE=12" (W) 1065.50 RE=1068.00 )OCS-101 (48" 0 (800) 270-9495 POND OUTLET Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303 PIPE END IE=12" 1062.50 10851075106510551045 1080107010601050 BASIN T A W STORMWATER ST. JOSEPH, MINNESOTA RIVER'S BEND PLAT 4 108510801075107010651060105510501045 1 10 .. 15" FES-400 IE=1066.00 54832 EXISTING GRADE FINISHED GRADE BASIN STORMWATER LICENSE NO. 0 T A W T A W FES-401 10/20/2110/20/2110/20/21 SWR @ 5.04% 25 LF-15" STM IE=15" 1067.25 JOHN S. BLENKER..DATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA FES-401 - FES-400 108510801075107010651060105510501045 X X PO BOX 99 ST. JOSEPH, MINNESOTA CLC PARTNERS 108510801075107010651060105510501045 PREPARED FOR: 2 BASIN T A W STORMWATER T A 18" FES-200 IE=1065.50 W 2 T A W T A W X FINISHED GRADE 1 X 9 1 EXISTING GRADE @ 0.66% CITY COMMENTS.... X 8 1 09/20/21 7 192 LF-18" RCP 1 10 LF-18" RCP@ 0.50% IE=18" (NE) 1066.76 IE=18" (N) 1066.76 X.... 6 3 . RE=1069.82 9 8 +110/20/21 )CBMH-201 (48" %6 INITIAL ISSUE:REVISIONS: 0 0 % 0 CBMH-201 - FES-200 . 8 1 - 4 . 1 IE=18" (S) 1066.81 - X RE=1069.94 6 CB-201A (2' x 3') 1 % 3 50' 0JSBJSBJSB .10' 1 -% 6 2 9 . 5 0 X- 1 108510801075107010651060105510501045 X 6" DRAINTILE DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: CONNECTION (TYP) N:\\0033620.00\\DWG\\CIVIL\\0033620.00ST01.DWG RIVER'S BEND PLAT 4 10 OF 150' 10/20/21 Common Ground Alliance 8 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 100' T A W N A S 50' T A W PRELIMINARY N A S 0' T A W PROJECT NUMBER: 0033620.00 N A S T A W C S R N A S CSR T A SC R W C S C R S EROSION CONTROL PLAN R N A S T A W C S C R S R N A S T A T A W W C BASIN C S ST A W R R STORMWATER TN A W A S T A W T A W C ST A RWT A W C N S A R S 2 CC SS R R (800) 270-9495 X Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303 C S R C X S R 1 . 9 G 1 . O . S X 8 1 C 0 S 7 . R 1 7 0 7 RSC 1 1 X 6 3 . 9 8 C S + R 6 C S 0 R X 6 0 . 1 2 C . G S . R 2 7 O6 . 0 S 1 5 X 1 RSC NORTHEAST CORNER OF THE C S R ST. JOSEPH, MINNESOTA X SE1/4-SW1/4 SEC. 15, TWP. 124, RNG 29 C RIVER'S BEND PLAT 4 S 4 R 0 .1 0 . G . 3 7 O . C 0 XS S 0 R 1 3 2 1 5 . 0 3G .. C 1 S 3 O R 2 .11 7 S 0 X 1 C S R 2 2 0 2 . 1 6 . G . 3 54832 7 O . X 0 S C 1 1 S R 1 O F O T S 1 X LICENSE NO. 3 . 4 0 2 F 0 G .S . C 4 SO 0 O O F T R. 7 S 0 .1 S 0 1 . G 4 1 . 4 2 7 O . X 0 S 10/20/21 1 9 FO JOHN S. BLENKERDATE: SFI HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA C S R X 5 . 0 2 6G .. 4 O 8. 7 0 . S 0 6 . G 6 O 1 . F 4 3 2 7 O F X . S 0 C S S 1 R 7 O F X 7 .F 0 2 S 1 G . . C 5 O S 6. 7 0 R . S 0 1 . G 8 1 . 5 2 O7 . X O 0 F S 1 5 F S 1 2 C S INV=1068.42 R X PO BOX 99 O F F S ST. JOSEPH, MINNESOTA 0 4 6 CLC PARTNERS X . .O 5 O CF T 7 S G S . R 0 O1 . S 3 INV=1068.92 F S X O F 1 RSC 3.1.TWO ROWS OF SILT FENCE (SEPARATED BY 8 FEET); OR3.2.SILT FENCE AND A TOPSOIL BERM (STABILIZE BERM WITH MULCH); OR3.3.SILT FENCE AND FIBER LOGS; OR3.4.TOPSOIL BERM AND FIBER LOGS (STABILIZE BERM WITH MULCH). 5 7 2. PREPARED FOR: X 5 COVER HAS BEEN ESTABLISHED. EXISTING SILT FENCE ON-SITE SHALL BE MAINTAINED AND ORSHALL BE INCIDENTAL TO THE GRADING CONTRACT.WORKING DAY. A ROCK ENTRANCE TO THE SITE MUST BE PROVIDED ACCORDING TO DETAILSTO REDUCE TRACKING OF DIRT ONTO PUBLIC STREETS.WITHIN 50 FEET OF SURFACE WATERS. REDUNDANT SEDIMENT CONTROLS COULD INCLUDE:OF THE SURFACE WATER. EXCAVATION/CONSTRUCTION AND SHALL BE MAINTAINED UNTIL VIABLE TURF OR GROUNDREMOVED AND SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONTRACT. IT IS OFEXTREME IMPORTANCE TO BE AWARE OF CURRENT FIELD CONDITIONS WITH RESPECT TOEROSION CONTROL. TEMPORARY PONDING, DIKES, HAY BALES, ETC., REQUIRED BY THE CITY 7 O F . 0 1 G . O 2.ALL STREETS DISTURBED DURING WORKING HOURS MUST BE CLEANED AT THE END OF EACH3.REDUNDANT PERIMETER SEDIMENT CONTROLS ARE NECESSARY WHEN SOIL DISTURBANCE IS4.REDUNDANT SEDIMENT CONTROLS MUST BE INSTALLED PRIOR TO DISTURBING WITHIN 50 FEET 1.ALL SILT FENCE AND OTHER EROSION CONTROL FEATURES SHALL BE IN-PLACE PRIOR TO ANY .EROSION CONTROL NOTES 1 S RSC X 0 O 0 . F 0 0 + 0 X O F F S FS F S O F X O F X O F X WETLAND LINE STORM SEWERGRADING LIMITSSILT FENCE PROPERTY LINEINDEX CONTOURINTERVAL CONTOUREMERGENCY OVERFLOWREDUNDANT SEDIMENT CONTROLINLET PROTECTIONROCK CONSTRUCTION ENTRANCEEROSION CONTROL BLANKETPOND NORMAL WATER LEVEL CITY COMMENTS.... O F 09/20/21 O F .... 02 88 110/20/21 SF 99 GL INITIAL ISSUE:REVISIONS: RSC O F PROPOSED E.O.F. O F 50' JSBJSBJSB O F 02 88 99 EXISTING EROSION CONTROL LEGEND NORTHWEST CORNER OF OUTLOT G DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0033620.00\\DWG\\CIVIL\\0033620.00EC01.DWG RIVER'S BEND PLAT 4 10 OF 10/20/21 Common Ground Alliance 9 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: PRELIMINARY SI31 04/20/21 GD43 08/15/17 LAST REVISED:LAST REVISED: PROJECT NUMBER: 0033620.00 DETAILS BEAVERTAIL WETLAND/STREAM/DITCH A SITE, GRADING, & EROSION CONTROL GROUND SLOPE 3' BIOROLL NO SCALENO SCALE SEE DETAIL SI01 PERSPECTIVESECTION A-A B6 STYLE CURB PROFILE VIEW BEAVERTAIL CURB 5' A SEE DETAIL/SWPPP FOR BIOROLL & SILT FENCE INFORMATION REDUNDANT SEDIMENT CONTROL OPTION 1 GROUND DISTURBANCE: ROAD, PARKING LOT,UTILITIES, ETC. SILT FENCE 2.TO BE UTILIZED WHEN DISTURBANCE WILL BE WITHIN 50' OF WETLAND/STREAM/DITCH DELINEATIONS.3.SEDIMENT CONTROLS TO BE AT EDGE OF DISTURBANCE, KEEPING AS MUCH BUFFER AS POSSIBLE BETWEEN DISTURBANCE AND WETLAND/STREAM/DITCH NOTES:1.SEE PLAN FOR DISTURBANCE LIMITS AND LOCATIONS OF SECONDARY CONTROLS. (800) 270-9495 SI26 08/15/1708/15/17 GD25 12' LAST REVISED:LAST REVISED: EASEMENT 1' DRAINAGE & UTILITY Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303 CONCRETE SIDEWALKW/ AGG. BASE 5' E P WALKOUT/LOOKOUT (0.7'AT GARAGE DOOR LOT CORNER ELEVATIONREAR GROUND GRADE ATBELOW BASEMENT FLOORELEVATION FOR WALKOUT)MINIMUM BASEMENTFLOOR ELEVATIONLOT NUMBERFRONT GROUND GRADE O L 1' S (MIN.) % 2 5.5'1 : 2 / 1 989.6 6.089 1 : 1 DRIVEWAY G TYPICAL LOT 00 .. 31 30' 89 R/W 99 6' 983.099 WO VARIES PARKING 0.089989.2 E 18' P O L S 12' % 2 TO PROPOSED GRADE. ELEVATIONS AND HOUSE STYLES SHOWN ARE ENGINEERS SUGGESTED INDICATES A CUSTOM HOUSE PAD WHICH HAS NOT BEEN COMPLETELY GRADED OR PREPAREDDESIGN FOR CUSTOM LOTS AND SHOULD BE VERIFIED WITH THE DEVELOPER. ST. JOSEPH, MINNESOTA DRIVE LANE TO FRONT GROUND GRADE AT GARAGE DOOR. NUMBER OF BLOCKS THAT THE GARAGE IS DROPPED. EACH BLOCK=8". R = RAMBLER, GRADED FOR 7.7' OF DIFFERENCE FROM BASEMENT FLOOR ELEVATION TO FRONT GROUND GRADE AT GARAGE DOOR. GRADE AT THE LOOKOUT TO THE FRONT GROUND GRADE AT THE GARAGE DOOR.WO = FULL BASEMENT WALKOUT, GRADED FOR 8.4' OF DIFFERENCE FROM THE REAR GROUND GRADE AT THE WALKOUT TO FRONT GROUND AT GARAGE DOOR.NOTE:1.THE NUMBER IN THE PARENTHESIS INDICATES THE R(1) = RAMBLER, GRADED FOR 7.0' OF DIFFERENCE FROM BASEMENT FLOOR ELEVATIONLO = FULL BASEMENT LOOKOUT GRADED FOR 5.0' OF DIFFERENCE FROM THE REAR GROUNDSOG = SLAB ON GRADE UNIT. RIVER'S BEND PLAT 4 DRAINAGE ARROW CUSTOM GEOTEXTILE FABRICCOMPACTED SUBGRADE MNDOT SPEC. 2357 BITUMINOUS TACK COAT2-1/2" MnDOT SPEC. 2360 SPNWB230C BASE COURSE8" MnDOT SPEC. 3138 CLASS 5 AGGREGATE BASE24" MnDOT SPEC 3149.2B GRANULAR BORROW 1-1/2" MnDOT SPEC. 2360 SPWEA240C WEARING COURSE L C 60' R/W TYPICAL STREET SECTION 12 E 12'P 08/15/17 GD09 O LAST REVISED: L REFER TO PLAN SHEET FOR DIMENSIONS S TYPICAL STREET SECTION DRIVE LANE % 2 16' 54832 4' 6" MIN. 30' R/W PEDESTRIAN LICENSE NO. 1 : 1 1 : 2 / 1 10/20/21 1 (TYP.) (TYP.)1' SLOPE TRACKING (MIN.) JOHN S. BLENKERDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA E P 2 O E L P BACK OF CURB MAXIMUMS O L TEMPORARY CONTOUR FURROWS S%(SEE DETAIL ST07) B618 CURB & GUTTER 26" DRAINTILE (TYP) SLOPES GREATER THAN 4:1 2 ROLLS OF SOD AT SURFACE ROUGHENING FOR ALL (TYP.) ' IN ROW 5 2 12' 5" MINIMUM TOPSOIL EASEMENT DRAINAGE & UTILITY NOTES:2.USE SLOPE TRACKING FOR SLOPES 4:1 AND 50 FEET LONG OR STEEPER/LONGER.3.USE TEMPORARY CONTOUR FURROWS FOR SLOPES 3:1 AND 75 FEET LONG OR STEEPER/LONGER. 1.GROOVES WILL CATCH SEED, FERTILIZER, MULCH, RAINFALL AND DECREASE RUNOFF RATE. PO BOX 99 08/15/17 GD08 LAST REVISED: ST. JOSEPH, MINNESOTA CLC PARTNERS VARIES CONCRETE ROAD ACCESS IMPERMEABLE LINER WASHOUT SIGN SILT FENCE PREPARED FOR: 15' MIN. SECTION A-A 12' MIN. SILT FENCE CONCRETE WASHOUT AREA EARTH BERM 1.5' MULCH & SEED MIN. A CONCRETE WASHOUT WATER FROM INFILTRATING/CONTACTING WITH SOIL. NOTES:2.IMPERMEABLE LINER INCLUDES 10 MIL POLY LINER OR COMPACTED CLAY LINER.3.WASHOUT SYSTEMS CAN BE USED AS ALTERNATE WASHOUT AREAS. 1.CONCRETE WASHOUT AREAS WILL HAVE AN IMPERMEABLE LINER TO PREVENT A 04/20/21 GD44 LAST REVISED: SILT FENCE CITY COMMENTS.... WETLAND/STREAM/DITCH 09/20/21 5' TOP SOIL BERM .... GROUND SLOPE 110/20/21 INITIAL ISSUE:REVISIONS: PROFILE VIEW 3' MIN. 1' MIN. JSBJSBJSB GROUND DISTURBANCE: ROAD, PARKING LOT,UTILITIES, ETC. REDUNDANT SEDIMENT CONTROL OPTION 2 SEE DETAIL/SWPPP FOR TOP SOIL BERM & SILT FENCE INFORMATION BETWEEN DISTURBANCE AND WETLAND/STREAM/DITCH NOTES:2.TO BE UTILIZED WHEN DISTURBANCE WILL BE WITHIN 50' OF WETLAND/STREAM/DITCH DELINEATIONS.3.SEDIMENT CONTROLS TO BE AT EDGE OF DISTURBANCE, KEEPING AS MUCH BUFFER AS POSSIBLE 1.SEE PLAN FOR DISTURBANCE LIMITS AND LOCATIONS OF SECONDARY CONTROLS.DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0033620.00\\DWG\\CIVIL\\0033620.00DT01.DWG RIVER'S BEND PLAT 4 10 OF 10/20/21 Common Ground Alliance Call 48 Hours before digging:10 811 or call811.com DATE: SHEET NUMBER: PRELIMINARY PROJECT NUMBER: 0033620.00 DETAILS SANITARY & WATERMAIN (800) 270-9495 Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303 ST. JOSEPH, MINNESOTA RIVER'S BEND PLAT 4 13 54832 LICENSE NO. 10/20/21 JOHN S. BLENKERDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA PO BOX 99 ST. JOSEPH, MINNESOTA CLC PARTNERS PREPARED FOR: CITY COMMENTS.... 09/20/21 .... 110/20/21 INITIAL ISSUE:REVISIONS: JSBJSBJSB DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0033620.00\\DWG\\CIVIL\\0033620.00DT01.DWG RIVER'S BEND PLAT 4 10 OF 10/20/21 Common Ground Alliance 11 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: PRELIMINARY PROJECT NUMBER: 0033620.00 STORM SEWER DETAILS (800) 270-9495 Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303 ST. JOSEPH, MINNESOTA RIVER'S BEND PLAT 4 14 54832 LICENSE NO. 10/20/21 JOHN S. BLENKERDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA E ST09 P 08/10/17 I VARIES P LAST REVISED: 9" T E 5" L A N I 1/4" x 1" FLAT BAR(ROLLED TO PROVIDEOUTER RING) " 2 1068.00 1 #5 SMOOTH BAR @ 4" O.C. EACH WAY(PROVIDE 3 1/4" x 3 1/4"OPENING) PO BOX 99 4' PLAN INV.=1065.50 6" HIGH WATER LEVEL SECTION A-A INV.=1064.78 ST. JOSEPH, MINNESOTA E P CLC PARTNERS I P T A E L w/ CLIPS T 8" U TO FLAT BAR = 1" O OUTSIDE MH WALL " 4 2 ANCHOR BOLTS GRATE IN 2 SECTIONS PROVIDE 4 1/2" SS OCS-101 AHOT DIPPED GALVANIZED PREPARED FOR: 12" PLAN ELEVATION A RIPRAP CLASS 3 MIN. 2 CU YARDS ST07 08/10/17 PAVEMENT SECTION LAST REVISED: VARIES PER d/2 d/2 CITY COMMENTS.... d 09/20/21 3' .... d/2 110/20/21 INITIAL ISSUE:REVISIONS: DRAINTILE N I A R JSBJSBJSB (MnDOT 3733) D COURSE FILTER O T NOTCH SUB-GRADE E D FOR PIPE PLACEMENT A R G GEOTEXTILE FABRIC-TYPE V AGGREGATE MnDOT 3149.2H 6" PERFORATED PVC, OR DUAL WALL SMOOTH INTERIOR CORRUGATED PE PIPE. DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: NOTES:1.CENTERLINE OF DRAINTILE TO BE AT OR BELOW BOTTOM OF SUBBASE2.OPENINGS IN STRUCTURE FOR DRAINTILE TO BE FABRICATED OR CORE DRILLED. N:\\0033620.00\\DWG\\CIVIL\\0033620.00DT01.DWG ST. JOSEPH CITY COUNCIL RESOLUTION 2021 - _____ A RESOLUTION OF APPROVALREGARDING RIVERS BEND 4 PRELIMINARY PLAT WHEREAS, CLC Partners referred to as “applicant” and “owner” has properly applied for Preliminary plat approval; and WHEREAS,the subject property is legally describedin Exhibit A; and WHEREAS,the Planning Commission conducted public hearings on the Preliminary plat at their thth October 11, 2021 and October 25, 2021 meeting; and WHEREAS,the Planning Commission reviewed the Preliminary Plat and recommended approvalat th their October 25, 2021 meeting; and NOW THERFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ST. JOSEPH, MINNESOTA,THATTHE RIVER’S BEND 4 PRELIMINARY PLAT IS APPROVEDWITH THE FOLLOWING CONDITIONS General 1.Final plat approval will be required prior to any construction. st 2.Final plat shall be submitted within one year or by November 1, 2022. If Final plat is not submitted by this time the Preliminary plat will become void unless otherwise specified. 3.Developers’ agreement will be required at time of final plat approval. Whereupon said resolution was declared duly passed and adopted by the St. Joseph City Council this 1st day of November, 2021 CITY OF ST. JOSEPH By Rick Schultz, Mayor By Therese Haffner, City Administrator 15 Exhibit A Legal Description That part of OutlotG, RIVERS BEND, according to the recorded plat thereof, Stearns County, Minnesota, described as follows: Beginning at the northwest corner of said Outlot G; thence South 36 degrees 03 minutes 37 seconds East, record bearing, along the southwesterly line of said Outlot G, a distance of 106.62 feet; thence southeasterly and continuing along said southwesterly line, a distance of 710.82 feet along a tangential curve concave to the northeast having a radius of 1382.39 and a central angle of 29 degrees 27 minutes 41 seconds; thence South 65 degrees 31 minutes 17 seconds East tangent to said curve and continuing along said southwesterly line, a distance of 19.28 feet to the northwest corner of Block 1, RIVERS BEND PLAT 2, according to the recorded plat thereof, said Stearns County; thence North 67 degrees 25 minutes 16 seconds East, along the northerly line of said Block 1, a distance of 220.77 feet; thence North 60 degrees 48 minutes 45 seconds East, along said northerly line, a distance of 325.20 feet; thence South 83 degrees 52 minutes 25 seconds East, along said northerly line, a distance of 198.06 feet to the northeast corner of said Block 1; thence North 01 degrees 07 minutes 03 seconds West, a distance of 335.93 feet to the north line of said Outlot G; thence South 88 degrees 52 minutes 57 seconds West, along said north line, a distance of 450.46 feet; thence South 89 degrees 16 minutes 51 seconds West, along said north line, a distance of 852.86 feet to said northwest corner of Outlot G and the point of beginning. 16 Sheet 1 of 1 Sheets 1 8 . 5 4 3 2 AND UTILITY EASEMENT OUTLOT A 6 . 0 8 6 ALL OF OUTLOT A IS IS DRAINAGE4 . 7 2 9 1 9 1 .4 71 8 3 .5 2 6 7 3 6 4 . 7 2 6 T .6 5 1 6 0 N . E 9 4 M 1 E S 2 A .0 1 9 E Y 19 T I L I T 5 U 6 . D 8 18 N 3 A E G A 7 3 N I 9A 1 R . 6 5 9D 5.1 2 2 9 17= L 3 14 . 5 8 = 2L . 0 4 2 0 . 4 = 73 6L72 .5 . 1 6 9 5 6 9 1 8 4 20 . 3 2 5 06 00. 5 . T 7 N 4 E D M NE 8 90.7 S A 0 A 03E .E 9 20 G 4. 00Y .3 5.A 4 T 4 160I 4 7. =1 N L 266I 6I .8= R . 0AT L =7 21 R LU 10.20 04 = D 9L . NORTHEAST CORNER OF THE 2 4 6 68.68 3 . 9 1 1 0 SE1/4-SW1/4 SEC. 15, TWP. 124, RNG 29 5 . 7 30 20 3330 5 . 7 0 33 0 89 66.6 . . 0 6 2 3 3 7 . = = 0 4 L R 5 3 . 7 3 3 6 5 13141516 .5 . 7 6 30 1 2 0 4.68. 5 5 2 2 0 5 . 7 4 3 3 9 . 5 . 1 79 2 12 5 38 . 68 42.8 2 4 0 5 . 7 2 39 . 3 2 5 . 2 79 35 . 85 50.69 0 9 3 1. 5 . 7 7 1 1 2 3 0 9 5. DRAINAGE AND UTILITY EASEMENT. 8 7 8 3 3 3 5 5 . 1 . 7 1 3 6 4 4 .58 580 = .0 L 45 2 . 0 77 3 0 37 . 5 19.28 . 4 7 = 3 L 3 2 5 . 3 . 7 3 3 4 6.58 4 0 5 = 5 L . 2 7 3 0 17 5 . 7 33 50 891011 . 1 . 7 4 3 4 6 8 58.4 0= L 5 .2 7 03 5 . 7 3 7 330 0 3 5 9 . 9 7. 1 3 4 80 70.3 7 = 0 . L 5 2 3 0 8 0 . 3 . 5 3 3 2 6 0 . 5 3 8 04.0 5 4 . 2 0 6 1 . 6 3 = 28 L RIVERS BEND PLAT 4 2 0 0 8 . 3 7 . 3. 0 7 6 7 52 .37 6 .1 71 36= = L 8 L = 1 L 1 = 004 .5L 9 7. 0 7 .2 506 . 51 9 02 5= 5 45 L .1= 7R = 3 H 2 = C L 9 8 . 3 . 0 2 1 8 7 3 4= 0 1 L 6 . 3 6 = 4 2 .9 R 7 25 . 3 0 3 = 0 L= 3 L 0 3 9 . 8 7 3 4 3 7 . . 0 2 3 4 = = L L 1 8 1 . 1 8 2 9 3 . 9 7 1 2 3 . 8 5 7 5 . 2 0 3 12 = L 6 (NO SCALE) 6 ARE SHOWN THUS: 1 12 0 . DRAINAGE AND UTILITY EASEMENTS 0 2 1 LINES AND 12 FEET IN WIDTH ADJOINING STREET LINES UNLESS OTHERWISE INDICATED ON THE PLAT. EASEMENTS BEING 6 FEET IN WIDTH ADJOINING LOT 150 100 NORTHWEST CORNER OF OUTLOT G 50 Bearings shown are based upon the Northline of the Southeast Quater of the SouthwestQuarter of Sec. 15, Twp. 124, Rng. 29. 0 0.33 AC 0.67 AC 0.37 AC 0.37 AC 0.32 AC 0.20 AC 0.21 AC 0.21 AC 0.21 AC 0.21 AC 0.21 AC 0.20 AC 0.20 AC 0.20 AC 0.23 AC 0.38 AC 0.43 AC 0.09 AC 0.58 AC 0.59 AC 0.13 AC 0.26 AC 0.21 AC 0.20 AC 0.18 AC 0.16 AC 0.13 AC 0.28 AC 2.31 AC BLOCK 1 0.95 AC LOT 7 =9,163 S.F. 11.00 AC R/W = 41,555 S.F. LOT 6 = 8,599 S.F.LOT 8 = 9,110 S.F.LOT 9 = 9,058 S.F. LOT 3 =16,104 S.F.LOT 15 =9,990 S.F. LOT 1 = 29,370 S.F.LOT 2 = 16,086 S.F.LOT 4 = 14,383 S.F.LOT 5 = 14,026 S.F.LOT 10 = 9,005 S.F.LOT 11 = 8,952 S.F.LOT 12 = 8,900 S.F.LOT 13 = 8,847 S.F.LOT 14 = 8,795 S.F.LOT 18 = 3,889 S.F.LOT 21 = 5,427 S.F.LOT 23 = 9,106 S.F.LOT 24 = 8,574 S.F.LOT 25 = 7,793 S.F.LOT 26 = 6,953 S.F.LOT 27 = 5,677 S.F. LOT 16 = 16,578 S.F.LOT 17 = 18,992 S.F.LOT 19 = 25,116 S.F.LOT 20 = 25,558 S.F.LOT 22 = 11,260 S.F.LOT 28 = 11,978 S.F. TOTAL = 479,543 S.F. OUTLOT A = 100,660 S.F. ST. JOSEPH CITY COUNCIL RESOLUTION 2021 - _____ A RESOLUTION OF APPROVAL REGARDING RIVER’S BEND 4 FINAL PLAT WHEREAS, CLC Partners LLC referred to as “applicant” and “owner” have properly applied for Preliminary and Final plat approval; and WHEREAS,the subject property is legally describedin Exhibit A; and WHEREAS, the subject property is zoned as R-4 Townhouse/Patio home; and WHEREAS, the proposed plat will result in twenty-eight(28) lots; and WHEREAS, the intent of the platis to facilitate twenty-eight (28) townhome sites; and th WHEREAS, Planning Commission conducted public hearings on October 11, 2021 and at their th , 2021 meeting and has reviewed the Preliminary Plat and recommended approval at the October 25 th October 25, 2021 meeting; and th WHEREAS, the Planning Commission recommended approval on the Final Plat at their October 25, 2021 meeting; and NOW THERFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ST. JOSEPH, MINNESOTA,THATTHE RIVER’S BEND 4 FINAL PLAT IS APPROVED WITH THE FOLLOWING CONDITIONS: General 1.All conditions and requirements outlined in the Developers Agreement are met. Engineering 1.All comments depicted in the Developers agreement are addressed by the applicant Whereupon said resolution was declared duly passed and adopted by the St. Joseph City Council this 1st day of November, 2021 CITY OF ST. JOSEPH By Rick Schultz, Mayor By Therese Haffner, City Administrator 18 Exhibit A Legal Description That part of Outlot G, RIVERS BEND, according to the recorded plat thereof, Stearns County, Minnesota, described as follows: Beginning at the northwest corner of said Outlot G; thence South 36 degrees 03 minutes 37 seconds East,record bearing, along the southwesterly line of said Outlot G, a distance of 106.62 feet; thence southeasterly and continuing along said southwesterly line, a distance of 710.82 feet along a tangential curve concave to the northeast having a radius of 1382.39 and a central angle of 29 degrees 27 minutes 41 seconds; thence South 65 degrees 31 minutes 17 seconds East tangent to said curve and continuing along said southwesterly line, a distance of 19.28 feet to the northwest corner of Block 1, RIVERS BEND PLAT 2, according to the recorded plat thereof, said Stearns County; thence North 67 degrees 25 minutes 16 seconds East, along the northerly line of said Block 1, a distance of 220.77 feet; thence North 60 degrees 48 minutes 45 seconds East, along said northerly line, a distance of 325.20 feet; thence South 83 degrees 52 minutes 25 seconds East, along said northerly line, a distance of 198.06 feet to the northeast corner of said Block 1; thence North 01 degrees 07 minutes 03 seconds West, a distance of 335.93feet to the north line of said Outlot G; thence South 88 degrees 52 minutes 57 seconds West, along said north line, a distance of 450.46 feet; thence South 89 degrees 16 minutes 51 seconds West, along said north line, a distance of 852.86 feet to said northwest corner of Outlot G and the point of beginning. 19 RIVER’S BEND 4 DEVELOPMENT AGREEMENT CITY OF ST. JOSEPH, MINNESOTA THIS AGREEMENT made effective the day of , 2021, by and between theCity of St. Joseph, a municipal corporation of the State of Minnesota (the “City”), and CLC Partners, LLC, a Minnesota Limited Liability Company (“Developer”). RECITALS A.The Developer has the right to develop the property situated in the City of St. Joseph and legally describedon the attached EXHIBIT A(the “Subject Property”). B.The City approved the preliminary plat of River’s Bend 4with twenty-eight (28) lotsto facilitate townhome development with R-4 zoning standards, and one Outlot on the Subject Property on st November 1, 2021. st C.On November 1, 2021the City approved the final plat on the Subject Property known as River’s Bend 4(the “Plat”) with twenty-eight (28) lots, which approval is contingent on the terms and conditions of this Agreement, including the Developer and the City entering into this Agreement. D.The Developer acknowledges that Developer is responsible for all costs incurred by it or the City in conjunction with the development of this Plat, including, but not limited to construction of improvements, legal, planning, engineering and inspection expenses incurred in connection with approval and acceptance of the Plat, the preparation of this Agreement, and all costs and expenses incurred by the City in monitoring and inspecting development of the Plat and improvements therein, unless otherwise provided herein. NOW, THEREFORE, in consideration of the covenants and agreements contained herein, the City and Developer agree as follows: 1 20 PLAT Recording. The Developer will record the Plat and this Development Agreement with the County at Developer’s expense within ninety (90) days of final plat approval, and will forward confirmation of the recording of the documents to the City. In the event that technical or clerical revisions are needed in this document or if for any reason the County Recorder deems the Development Agreement unrecordable, the Developer and Citywill cooperatein the execution or amendment of any revised Development Agreement. If, for any reason, the Plat is not recorded by the County, Developer agrees to hold the City harmless for any costs incurred. It is expressly understood that Developer will have no claim for breach of this Agreement in the event the Plat is not recordable or revisions are required in the Plat. If the Plat is not recorded prior to the assignment of assessments, the Developer shall be responsible for all costs incurred in the dividing of assessments at a later date.An electronic copy of the recorded, final plat shall be submitted to the City Engineer in AutoCAD and Adobe PDF formats. Monuments. The Developer will install Plat monuments for the Subject Property within one year after recording the Plat. No Certificate of Occupancywill be issued for the Subject Property in the Plat until the lot monuments have been installed and certified by a registered land surveyor. Monuments will need to be relocated and/or replaced if they become buried or removed during the excavation/development of the property. Permits. The Developer shall be responsible for obtaining all permits, approvals, licenses or other documents from any and all necessary governmental agencies, as applicable,(including but not limited to the City, Stearns County, the Pollution Control Agency, the Department of Health,and the Department of Natural Resources, Watershed District, and Northern Natural Gas) so as to enable the development of the Subject Property. Right to Proceed. Within the Plat,or within the public rights of way,the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: (a) this Agreement has been fully executed by both parties and filed with the County. (b) Developer has deposited all escrows required by this Agreement. IMPROVEMENTS The Developer agrees to construct at their expense the following improvements: Private Utilities. All private utilities (e.g. electric, telephone, cabletelevision and natural gas) must be installed underground serving the Subject Property. Hard Surfaced Private Driveways and Parking Areaswith Lighting. Hard surface access private drive(s)and parking lots located on the Subject Property in accordance with the plans approved by the City with the building permit are a requirement and must be installed prior to the Certificate of Occupancy being issued or as soon thereafter as possible, weather permitting. Public Improvements.Construction of the public improvementsmeeting city specifications, including construction of 34 feet wide urban bituminous street of, curb, gutter, street lighting, six foot concrete sidewalk, regulatory signage, storm sewer and storm water treatment, sanitary sewer, and water 2 21 main will be at the expense of the developer/owner at the time the public improvements are made as determined by the City. The Developer, and its successors and assigns, waive all procedural objections to the improvements and special assessments that the proper notices have not been given, and that the method of spreading the assessment is erroneous. Record Drawings. Before issuance of the Certificate of Occupancy, the Developer shall provide all record drawings for the sewage force main and the private driveway constructed within the public right of way and public drainage and utility easements included in the Development Plan, and they must be approved by the City Engineer. Record base drawings of the privateimprovements shall be submitted to the City Engineer in electronic (AutoCAD) format. ADDITIONAL CONDITIONS OF APPROVAL The Developer agreeswith the following conditions: A.The site plans must conform to R-4 Zoning standards for development, and city ordinances. B.Building permitapproval is required prior to constructionand no permit shall be approved until evidence of the plat being recorded by Stearns County and conditions of this Developer’s agreement have been met. C.All comments from Stearns County depicted in Exhibit D shall be resolved. COMMENTS FROM STEARNS COUNTY PENDING. Items like access permit, turn lanes, etc. may be required D.All City Engineer comments as depicted in Exhibit Cshall be resolved to the satisfaction of the city. E.Civil plans, including but not limited to hydrology/hydraulic computations must be submitted for review and approval by the City Engineer. F.Each proposed townhome unit shall be located on its own parcel id. G.Concrete sidewalk of at least six (6) feet in width shall be constructed within the development on at least one side of the street and shall be approved by city Engineer. Sidewalks shall be st installed by October 31, 2022. H.Street A shall be named in accordance to the city’s addressing policy. The street name shall start with the letter “K”. I.Existing tree vegetation located along the northern boundary of this plat, and southern boundary between lots 1-5, block 1 of River’s Bend Plat 2 shall not be removed unless approved by the city. J.A property maintenance and party wall agreement shall be submitted and approved by the City attorney prior to execution of this agreement. K.Facilities constructed within thePlat are required to connect to city utilities, including water, sanitary sewer, and storm sewer.Each individual townhome shall have separate water and sewer services. L.All financial guarantees and development feesdepicted in this agreement shall be paid prior to releasing the plat for recording. M.Recording of plat shall occur within one hundred and eight (180) days. N.Outlot A is considered a non-developable parcel. Engineering comments: 1.FORMAL COMMENTS PENDING. Items which will be commented on include: additional fire hydrants needed, more storm sewer inlets and pipes needed, current wetland delineation will need to be verified, lot grading corrections, street standards will need to be increased (deeper aggregate/base needed), and sub drainage will need to be addressed. 3 22 DEDICATION Developer hasprovided to the City any and all necessary easements and/or dedications or deeding to ensure that the City has the ability to maintain, repair, replace or modify the roadways, trails, sewer, and water mains, storm sewers, holding and sedimentation ponds and other public improvements located in the Plat. STORM WATER TREATMENT AREASAND STORMWATER PIPES Cleaning of Stormwater Facilities. At such time as the City determines that construction on the Subject Property has been sufficiently completed so as not to cause significant erosion which will contaminate the storm water treatment areasservicing the Subject Property, the Developer will clean/dredge all storm water treatment areasand storm water pipes on the Subject Property. In the event the treatment areas require cleaning/dredging prior to the completion of all such construction, the City may request that the Developer complete more than one cleaning of the treatment areas. Developer is responsible for all permits relating to cleaning and dredging of treatment areasand pipes, including permits required by the Department of Natural Resources and the Army Corps of Engineers, as applicable. Buffer Area Adjacent to Ponds. All storm water ponds servicing the Subject Property, whether such ponds are located on City owned property, easements running in favor of the City, or on private property, must maintain a minimum of an 8-foot natural buffer from the high-water mark. Notwithstanding the above, one access to each pond may be required by the City in a location determined by the City in its sole discretion. Maintenance of Stormwater Improvements. Prior to issuance of a building permit, the Developer shall enter into a storm water facility maintenance agreement. The Developer shall be responsible for maintaining the stormwater facilitiesand for observing all drainage laws governing the operation and maintenance of the stormwater facilities. The Developer shall provide the City with a schedule that isreasonably acceptable to the City for the periodic inspectionof the stormwater facilitiesby the Developer. The Developer shall make all such scheduled inspections, keep records of all inspections and maintenance activities, and submit such records annually to the Cityupon its request. The cost of all inspections and maintenance, including but not limited to skimming and cleaning the stormwater facilities, shall be the obligation of the Developer and its successors. Stormwater Management. Prior to issuing the Certificate of Occupancy, the following must be completed: A.Submittal of as-built record drawings of the stormwater facilities. B.Submittal of post-construction infiltration field-test, if applicable. C.Certification by a qualified engineer or hydrologist verifying the facility has been constructed in accordancewith the storm water plans and specifications submitted and approved by the City with the issuance of the building permit. D.Final site inspection by City staff or City representative. EROSION AND LANDSCAPING 4 23 Erosion Control. The Developer shall comply with all requirements of the “General Storm Water Permit for Construction Activity” issued by the Minnesota Pollution Control Agency and with all requirements of the Sauk River Watershed District permit, if applicable, for construction activities and with the tasks on Exhibit B designated as the Developer’s responsibility. In addition, the City may impose additional erosion control requirements if in the opinion of the City Engineer such requirements are necessary to retain soil and prevent siltation of streams, ponds, lakes, or other adjacent properties, or of City utility systems. The Developer shall comply with the erosion control plans and with any such additional instruction it receives from the City. All areas disturbed bythe excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. Seed shall include rye grass or other fast-growing seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be mulched and disc-anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. SITE GRADING Site grading shall meet all the requirements set forth in the City’s Development Manual, and in the General Storm Water Permit for construction. When the site grading has been completed: A.The Developer shall verify by field survey that the site grading has been completed in accordance with the city approved grading plan. The Developer shall submit the record site grading plan to the City for approval prior to the issuance of the Certificate of Occupancy. B.Elevations shall be taken on all lot corners, all building pads, and on drainage breaks, ponding sites, ditches, and swales. Arrows shall show how the lot is to drain. C.No permanent material stockpile of any sort will be permitted on the Subject Property. Temporary stockpiles shall be placed outside of the public right of ways and easements, and shall be limited to suitable grading and construction materials generated from within the Subject Property and for use in the grading of the present Project. Excess materials not reserved for the present development, as defined by the City accepted grading plan, shall be removed from the site. Temporary stockpilesshall be limited to a maximum of twelve (12) feet in height and for a duration not to exceed eighteen (18) months. Hold Harmless Agreement. The Developer acknowledges that its failure to control erosion for its work may cause flooding and/or damage to adjoining property owners. In such event, the Developer agrees to hold the City harmless and indemnify the City from claims of all third parties of the Developer for flooding and/or damages arising out of such failure. Further,after giving five (5) days advanced notice to Developer and Developer does not comply within said five (5) days the City may undertake any corrective actions to prevent or minimize any such flooding and/or damage, the Developer agrees to hold the City harmless and indemnify the City from claims of all third parties for damages arising out of said corrective action by the City, and agrees to reimburse the City for all out of pocket expenses incurred by the City arising out of the corrective action including, but not limited to any costs necessary to re-landscape disrupted soils located with the Plat. CITY FEES Sanitary Sewer Trunk Charge. The Plat is subject to the County Road 121 trunkcharge. The residential charge for this trunk is $150 per unit. Therefore $4,200 shall be payable at time of execution of this Agreement and prior to the release of the mylars. Outlot A will be subject to future sewer trunk charges at time of final plat. 5 24 Water Trunk Charge. The Plat is subject to water trunk charges. The trunk charge is $150 per unit. Therefore $4,200 shall be payable at time of execution of this Agreement and prior to the release of the mylars. Outlot A will be subject to future water trunk charges at time of final plat. Park Dedication Fee. Theplat is subject to park dedication fees. Park dedication fees are calculated at a rate of $975 per unit. There are twenty-eight (28) tracts (units) proposed. Therefore,the park dedication fee is: $27,300 and shall be payable prior to recording of the final plat. Outlot A will be subject to future park dedication fees at time of final plat. SAC/WAC. The Developer acknowledges that sewer and water access charges will be payable at then current rates at the time building permits are issuedfor construction on the Subject Property. Developer agrees to make buyers and/or future tenants of the Plat aware that such charges will be payable at time of issuance of building permits. Storm Water Development Fee. The plat is subject to stormwater fees of $0.134 per square foot. in the amount of $51,291.72 (337,318 SF which does not include outlots and R/W x 0.134) . This fee is to be payable at time of execution of this Agreement and prior to the release of the mylars. MISCELLANEOUS Representations. The Developer represents, to the best of its knowledge,that the Plat complies with all city, county, state, and federal laws and regulations, including but not limited to: subdivision ordinances, zoning ordinances, and environmental regulations and permits thereto related. Prior to recording of the Plat, if the City determines that the Plat does not comply, the City may refuse to allow construction work in the Plat until compliance is achieved. Assignment. This Development Agreement cannot be assigned or transferred without the written consent of the Citywhich shall not be unreasonably withheld or delayed. A breach of the terms of this Agreement by the Developer, including the unauthorized assignmentor transfer of the Agreement, will be grounds for denial of the issuance of any building permit. Waivers. The rights of the City under this Agreement are in addition to any other rights under statute, ordinance or any other agreement. The action or inaction of the City will not constitute a waiver or amendment under the provisions of this Agreement. To be binding, amendments or waivers will be in writing, signed by the parties and approved by the City Council. The City's failure to promptly take legal action to enforce this Agreement will not be a waiver or release. There is no intent to benefit any third parties and third parties will have no recourse against the City under this Agreement. Reimbursement. The Developer will reimburse the City for all costs incurred by the City in the defense or enforcement of this Agreement, or any portion thereof, including court cost and reasonable engineering and attorneys’ fees. The Developer shall be responsible for the cost of acquiring and installing street signage consistent with that used in other recent developments within the City. To ensure reimbursement of the City’s costs, the Developer shall deposit with the City $5,000. The City will provide the Developer with a detailed statement each month illustrating any cost deducted from the escrow account. In the event the escrow is not sufficient the City will invoice the Developer for the additional costs and payment shall be made within 14days of the date Developer receivedthe City’s notice of costs. If such reimbursement is not made, the City may place a hold on all construction or other work related to the Subject Property, or refuses the issuance of building permits until all costs are paid in full. 6 25 License to Enter Land. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the Subject Property to perform all work and/or inspections deemed appropriate by the City during the development of the Subject Property. Violation of This Agreement. If the Developer fails to perform any of the terms of this Agreement in the manner required by the City, the City shall have grounds for denial of building or occupancy permits for the Subject Property. Agreement Binding. The terms and provision hereof shall be binding upon, and inure to the benefit of the heirs, representatives, successors and assigns of the parties hereto and shall be binding upon all future owners of all or any part of the Subject Property and shall be deemed covenants running with the land. Indemnification. The Developer will have no claim against the City and its officers and employees for damages sustained or costs incurred resulting from plat approval and developmentundertaken by the Developer. The City and its officers, agents and employees will not be personally liable or responsible in any manner to the Developer, contractor or subcontractors, suppliers, laborers, or to any other person or persons whomsoever, for any claims, demands, damages, actions, or causes of action of any kind or character whatsoever arising out of or by reason of the execution of this Agreement, or the design, performance, and completion of the work and the improvements to be provided by Developer pursuant to this Agreement. The Developer will hold the City harmless from claims by third parties, including but not limited to other property owners, contractors, subcontractors and suppliers, for damages sustained or costs incurred resulting from plat approval and the development of the Property. The Developer agrees to indemnify, defend and hold harmless the City, its agents and employees from any claim, demand, suit, action or other proceeding whatsoever by any person for any loss or damage to property or any injury to or death of any person resulting from any actions by the Developer, or its agents or contractors. Insurance. Until all of Developer’s obligations under this Agreement are fulfilled, the Developer will provide and maintain commercial general liabilityinsurance covering personal injury, including death, and claims for property damage of others which may arise. Limits for commercial general liability claims covering bodily injury, deathor third-party property damageswill not be less than $500,000per occurrence and $1,000,000 in aggregate. Limits for property damage will not be less than $500,000 per claim. The City will be named as an additional named insured on said policy and the policy shall provide that it may not be cancelled without 30 days prior written notice to the City except in the event of non- payment of premium which shall not be less than 10 days. The Developer will file a copy of the insurance coverage with the City upon execution of this Agreement. The insurance policy obtained by the Developer is subject to City approval. In the event that the City is held liable to a third party by a court of competent jurisdiction for damages and the insurance obtained by Developer for any reason fails to cover the City, the Developer will be liable under this Agreement for any and all costs incurred or damages claimed against the City. Certificate of Occupancy. The City will not issue the certificate of occupancy for the Subject Property’s building until the building has been connected to sanitary sewer and water, complied with the grading, building and site plans, and the private accessdriveway for the Subject Propertyhas been constructed with bituminous in accordance with the plans approved by the City with the building permit. Invalidityof Any Section. If any portion, section, subsection, sentence, clause, paragraph or phase of this Agreement is for any reason held to be invalid by a court of competent jurisdiction, such decision shall not affect or void any of the other provisions of this Agreement. 7 26 DEFAULT ON AGREEMENT Events of Default. The following shall be “Events of Default” under this Agreement and the term “events of default” shall mean, whenever it is used in this Agreement (unless the context otherwise provides) any one or more of the following events: A.Failure by the Developer to observe and substantially perform any covenant, condition, obligation, or agreement on its part to be observed or performed hereunder. B.If the Developer shall admit in writing its inability to payits debts, generally as they become due, or shall file a petition in bankruptcy, or shall make an assignment for the benefit of its creditors, or shall consent to the appointment of a receiver of itself or of the whole or any substantial part of the Subject Property. C.If the Developer does not pay the assessments due on the Subject Propertypursuant to the provisions of Minnesota Statutes Chapter 429. If the Developer fails to cure the Event of Default within ten (10) days of the date of notice sent to Developer by regular first class U.S. mail, Developer agrees that the City is hereby granted the right and privilege to declare any amounts expended by the City then due and payable as liquidated damages in full, and the City may immediately bring legal action against the Developer to collect such sums expended by the City; the Developer shall be personally responsible for payment of such sums; in addition, the City shall have a lien against the Subject Property. In addition to any other remedy provided in this Agreement, and without waiver of any such right, the City may avail itself of any or all of the following remedies: 1.Halt all Plat development work and construction of Improvements. 2.Refuse to issue building permits or occupancy permits until such time as the Event of Default is cured. 3.Apply to a court of competent jurisdiction to enjoin continuation of the Event of Default. 4.Terminate this Agreement by written notice to the Developer. Addresses. The address of the Developer for the purposes of this Development Agreement is: CLC Partners,LLC PO Box 99 St. Joseph, MN 56374 The address of the City for the purposes of this Development Agreement is: City of St. Joseph 75 Callaway St. E St. Joseph, MN 56374 8 27 IN WITNESS WHEREOF,the parties have hereunto set their hands. CITY OF ST. JOSEPH By: ____________________________ Date: _________________________ Rick Schultz, Mayor By: ____________________________ Therese Haffner, City Administrator STATE OF MINNESOTA ) ) ss. COUNTY OF STEARNS ) The foregoing was acknowledged before me the _____ day of ____________, 2021, by Rick Schultz and Therese Haffner, the Mayor and City Administrator, respectively, of the City of St. Joseph. ___________________________ Notary Public DEVELOPER CLC PARTNERS, LLC By: ____________________________ Date: _________________________ Kevin Cox, President STATE OF MINNESOTA ) ) ss. COUNTY OF STEARNS ) The foregoing was acknowledged before me the _____ day of ____________, 2021, by Kevin Cox, the President of CLC Partners, LLC. ___________________________ Notary Public Drafted By: City of St. Joseph, 75 Callaway St. E St. Joseph, MN 56374 9 28 EXHIBIT A LEGAL DESCRIPTION That part of Outlot G, RIVERS BEND, according to the recorded plat thereof, Stearns County, Minnesota, described as follows: Beginning at the northwest corner of said Outlot G; thence South 36 degrees 03 minutes 37 seconds East, record bearing, along the southwesterly line of said Outlot G, a distance of 106.62 feet; thence southeasterly and continuing along said southwesterly line, a distance of 710.82 feet along a tangential curve concave to the northeast having a radius of 1382.39 and a central angle of 29 degrees 27 minutes 41 seconds; thence South 65 degrees 31 minutes 17 seconds East tangent to said curve and continuing along said southwesterly line, a distance of 19.28 feet to the northwest corner of Block 1, RIVERS BEND PLAT 2, according to the recorded plat thereof, said Stearns County; thence North 67 degrees 25 minutes 16 seconds East, along the northerly line of said Block 1, a distance of 220.77 feet; thence North 60 degrees 48 minutes 45 seconds East, along said northerly line, a distance of 325.20 feet; thence South 83 degrees 52 minutes 25 seconds East, along said northerly line, a distance of 198.06 feet to the northeast corner of said Block 1; thence North 01 degrees 07 minutes 03 seconds West, a distance of 335.93 feet to the north line of said Outlot G; thence South 88 degrees 52 minutes 57 seconds West, along said north line, a distance of 450.46 feet; thence South 89 degrees 16 minutes 51 seconds West, along said north line, a distance of 852.86 feet to said northwest corner of Outlot G and the point of beginning. 10 29 EXHIBIT B EROSION CONTROL PROCESS Task Responsible PartyAction By Prepare SWPPP and obtain General Storm-Water Developer (private) or City Developer’s Engineer if private Permit from MPCA.(public) project. project, City Engineer if public project. Establish erosion/sediment control and mass Developer (private) or City Contractor grade the site.(public) project. Place topsoil, seed, mulch except on boulevards Developer (private) or City Contractor and front yard utility easements. Bring (public) project. transformer pads to grade. Wait for private utilities. After curb and gutter is in, install private utilities Developer.Private Utility companies. in easement area. After utilities are in, construct sidewalk. Developer (private) or City Contractor (public) project. Place topsoil, seed, and mulch on remaining Developer (private) or City Contractor disturbed areas.(public) project... Complete “as-built” survey for all site gradingfor Developer (private) or City Developer’s Engineer if private Subject Property. This now becomes the (public) project. project, City Engineer if public “Development Plan”project. Place silt fence behind curb (or sidewalk) Developer (private) or City Contractor throughout development.(public) project. Set Property Irons.DeveloperDeveloper’s Surveyor Transfer permit to Developer when construction Developer (private)or City Developer’s Engineer if private is complete.(public) project project, or City Engineer if public project Submit building permit application. Include site Developer.Contractor survey. Issue building permit. CityBuilding Inspector Construct 24’ wide opening in silt fence at Developer.Contractor driveway and place rock entrance. Place additional silt fence as necessary to keep soil on lot. Maintain silt fence and other erosion/sediment Developer.Contractor control items. Sweep streets as required.DeveloperDeveloper, or City if agreement to back charge Developer. Submit certified lot survey showing final Developer.Developer’s Surveyor structures and lot elevations. Issue Certificate of Occupancy.City City Submit “Notice of Termination” to MPCA within DeveloperDeveloper 30 days of final site stabilization and removal of all non-builder silt fence and other erosion/sediment control items. 11 30 EXHIBIT C INSERT CITY ENGINEER COMMENTS 12 31 EXHIBIT D STEARNS COUNTY ENGINEER COMMENTS 13 32 14 33 34 35 36 37 MEMORANDUM TO:Therese Haffner, Administrator Nate Keller, Community Development Director FROM:Randy Sabart, PE City Engineer DATE:September 28, 2021 RE:2021 Rivers Bend 4 Subdivision, St. Joseph, Minnesota Preliminary Plat and Preliminary Site and UtilityPlanReview SEH No. STJOE GEN G200 14.00 I reviewed the preliminary Civil drainage and gradingplan and preliminary plat dated September20, 2021, from WestwoodProfessional Services and have the following comments: Preliminary Drainageand Utility Plan 1.Please provide the current wetland delineation report. 2.Thepreliminaryplat and plan should be referred to the Stearns County Highway Department for review and determination of right/left turn lane requirements along County Road 121 (College Ave).The preliminary plan in 2005 identified turn lane improvements. 3.Construction of sidewalk is not proposed in the plan. The City should determine requirements for sidewalk improvements and connection to the trail along CR 121. 4.A street light should be provided at the intersection with CR 121.Consider adjusting placement of proposed lights to include the cul-de-sac that will illuminatethe end of the street. 5.The proposed water main and connection to Rivers Bend 2 subdivision should be modelled to confirm adequate pressures/flows can be maintained within the subdivision without connection to the trunk water main along CR 121. 6.It appears the development may accommodate duplex homes; however, only one set of utility service laterals is proposed. Separate utility services should be provided for each occupied unit. 7.Provide an additional fire hydrantto ensure a minimum of 500 LF spacing/coverage between hydrants. 8.Due to performance concerns with the pavement design in the first subdivision, the structural section was increased with River’s Bend 3, to include 8 inches of aggregate base (crushed concrete), and 30-32 inches of select granular borrow. It’s anticipated that similar challenging soilswill be encounteredin the proposed subdivision, and a similar (minimum) structural section is advisable.The use of a geogrid should also be evaluated. 9.Given the need to provide suitable street subgrade drainage (and housefoundation drains), a minimum 6- inch perforated subgrade drain shall be provided, similar to the previous subdivision. If drains will be provided to the individual lots/house pads, suitable locatable connection points shall be provided. Subgrade drains should connect to the storm drain system at an appropriate frequency. 10. The top of casting elevation for MH-1 shall be set high enough so that the structure is not subject to surface drainage, and it is accessible to public works staff. 11.Minimum swale grades shall be at least 2.0% (in the heavy soils as anticipated). 12.Provide/grade amaintenance access road/bench to the proposed storm water pond per the City’s storm water treatment pond standards (Sec. 9.6.4). 13.Given the proposed street width (34 feet), it’s appropriate to restrict on-street parking to one side as proposed. Engineers | Architects | Planners | Scientists Short Elliott Hendrickson Inc., 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 SEH is 100% employee-owned | sehinc.com | 320.229.4300 | 800.572.0617 | 888.908.8166 fax 38 2021 Rivers Bend 4 Subdivision September 28, 2021 Page 2 14. See drawings for miscellaneous comments. Preliminary/Final Plat 15. Provide a curve at cul-de-sac throat right of way to ensure a suitable boulevard width is maintained. 16. If sidewalk will be provided in the cul-de-sac, the diameter of the cul-de-sac right of way dedication may require adjustment to accommodate the walk, 17. Adjust (widen) the drainage and utility easement width south of Tract C, Lot 9 to accommodate the proposed municipal utility alignments and required permit pipe-to-pipe offsets. 18. Center the drainage and utility easement south of the cul-de-sac along the proposed sanitary sewer alignment. 19. A minimum, “usable” 6 feet of drainage and utility easement in the rear yard should be dedicated outside of the wetland boundary. rjs/mrb c: Ryan Wensmann, City of St. Joseph \\\\sehinc.com\\panzura\\pzprojects\\pt\\s\\stjoe\\common\\general numbers\\g200 2021 rivers bend 4 sudv\\1-genl\\14-corr\\2021.09.29 m city prelim plat plan review.docx 39 ORDINANCE 502 – ZONING ORDINANCE Section 502.42: R-4: TOWNHOUSE/PATIO HOMERESIDENTIAL DISTRICT Subd. 1: Intent: It is the intent of the R-4 Townhouse/Patio Home District to accommodate a variety of single-family housing types, including patio homes and single-family common wall attached housing units such as townhouses or rowhouses at low to moderate residential densities. The R-4 District is intended for those areas designated as medium and/or high density residential areas or residential planned unit developments under the Comprehensive Plan. The R-4 District shall be developed by Planned Unit Development in accordance with the provisions of this Ordinance except that the provision requiring a minimum of twenty (20) acres will not apply. For the purpose of this ordinance, the following definitions will apply: a) Patio home: A single-family attached or detached unit consisting of one level living area with open space setbacks on two (2) sides and the ability to have a bonus room above the garage. b) Bonus Room: A single room in a house that is created from constructing a garage, which can be used as a multi-purpose area, such as a family room, sewing or hobby room, game room, theater room, office, or den. A bonus room is not a separate dwelling unit or accessory apartment and cannot include kitchen facilities. c) Dwelling Unit: A residential accommodation including complete kitchen and bathroom facilities, which is arranged, designed, used or intended for use exclusively as living quarters for one family. b) Rowhouse: One of a series of essentially identical single family residential structures situated side by side and joined by common walls. c) Townhouse: A single-family dwelling in a row of at least three (3) such units in which each unit has its own front and rear access to the outside, no unit is located over another unit, and each unit is separated from any other unit by one or more common fire resistant walls. d) Twin Home: Two dwelling units each located upon separate, abutting lots; each attached side to side but not having a side yard setback from one lot line; each sharing only one common, unpierced from ground to roof wall; and separated from any other building or structure by space on all sides. Subd. 2: Permitted Uses: a) Patio homes. 502.42-1 40 ORDINANCE 502 – ZONING ORDINANCE b) Townhouses c) Row Houses d) Twin Home Subd. 3: Conditional Uses: The following uses shall require a Conditional Use Permit based on the procedures set forth in this Ordinance. a) Governmental and public utility buildings and structures necessary for the health, safety, and general welfare of the community. b) Public or semi-public recreational buildings and community centers. c) Licensed day-care centers serving 13 or more persons d) Licensed residential group care facilities with seven or more boarders. e) Nursing Homes and Board and Care Homes, provided that adequate parking is provided and the site is accessible to commercial service areas. f) Public Libraries g) Public or private schools. h) Religious Institutions, including churches, synagogues, chapels and temples, including those related structures located on the same site which are an integral part of church proper, convents or homes for persons related to a religious function on the same site. i) Nurseries and greenhouses. j) Bed and Breakfast k) Uses which in the judgment of the Planning Commission and City Council are similar to those listed in this zoning district. l) Manufactured Home Parks, in accordance with this Ordinance. Subd. 4: Permitted Accessory Uses. a) Private garages, parking spaces and carports for passenger cars, trucks, recreational vehicles and equipment. b) Home Occupations per Section 502.16. 502.42-2 41 ORDINANCE 502 – ZONING ORDINANCE c) Houses and similar buildings for storage of domestic equipment and non- commercial recreational equipment. d) Swimming Pools, tennis courts, and detached screen porch or gazebo, provided that the maximum lot coverage requirement is not exceeded. All swimming pools must be fenced around the perimeter. The fence must meet the requirements of this Ordinance. e) Fences f) Accessory building (s) and/or private garage (s), either attached or detached, shall be subject to the general requirements of this Ordinance, except that up to fifteen (15) percent of the total lot area may be used for accessory buildings for townhouse, group or row house development. Subd. 5: Lot Area Requirements. Land UseMinimum LotMinimum Lot Minimum Lot Area Width Depth a)Detached Patio Home 6,000 60’ 100’ b) Townhouse, group or row houses 12,000 75’ 120’ c) Churches, chapels, temples, synagogues 22,000 100’ d) Public Buildings 40,000 100’ e) Day care facilities serving 15 or more persons and residential facilities 9,000 75’ 120’ serving more than 6 persons f) Schools 22,000 100’ 120’ g) The minimum lot area per townhouse, group or row house unit shall be four thousand square feet (4,000 sq. ft.) h) The net housing density within the district is six (6) units per acre of net buildable area of the subdivision. Net buildable area shall be the total area less public street right-of-way, wetlands, drainage ways, water bodies and slopes greater than twelve (12) percent. Subd. 6: Setback Requirements. Land UseFront Yard Interior Side Street Side Rear setback Yard setback Yard setback Yard 502.42-3 42 ORDINANCE 502 – ZONING ORDINANCE setback a) Patio Home* 30’ 10’ 20’ 20’ b) Townhouse, group or row houses 30’ 10’ 25’ 20’ c) Churches, chapels, temples, synagogues 30’ 20’ 30’ 35’ d) Day care facilities serving 15 or more persons and 30’ 10’ 25’ 35’ residential facilities serving more than 6 persons e) All other uses 50’ 50’ 50’ 50’ f) Accessory Uses Same as Same as Same as principal principal principal 10’ *Attached patio homes would be relieved from the setback requirements where attachments occur at the lot line. Subd. 7: Building Requirements. a) Building Height shall not exceed two (2) stories or 35 feet as measured from the average grade. b) No more than 8 dwelling units shall be constructed within one structure. c) Each dwelling unit shall have two or more individual, separate entrances. d) All dwelling units shall have a minimum roof pitch of 4:12 as defined by the building code. e) All dwelling units shall have a frost free foundation as defined by the building code, or an engineered concrete slab with concrete above-grade exterior foundations walls. f) The exterior of townhouse and rowhouse dwelling units shall include a variation in building materials, which are to be distributed throughout the building facades and coordinated into the architectural design of the structure to create an architecturally balanced appearance. The permitted materials are: brick, stucco, stone, steel/vinyl/aluminum, wood, and fiber-cement siding. In addition, a minimum of 25 percent of the combined area of all building facades of a structure shall have an exterior finish of brick, stucco and/or natural or artificial stone. For the purpose of this section, the area of the building façade shall not include the area devoted to windows, entrance doors, garage doors or roof areas. 502.42-4 43 ORDINANCE 502 – ZONING ORDINANCE g) Buildings shall be designed to prevent the appearance of straight, unbroken lines in their horizontal and vertical surface. There shall be no more than two contiguous townhouse dwelling units without a break in the horizontal and/or vertical elevations of at least thirty-two (32) inches. h) Where more than one (1) principal use building is to be located upon the same site, the separation between buildings shall not be less than forty (40) feet. i) All dwelling units shall have a minimum floor area of 676 square feet. j) Provisions for shelter in the event of severe weather for each dwelling unit shall be demonstrated either in the form of the construction of a free-standing severe weather structure, a reinforced concrete safe room within each dwelling unit and/or basement/crawl space sufficient to house four (4) adults per dwelling unit. 1. The entrance to a development shall be one that abuts a collector or arterial road. Subd. 8: Parking Provisions. All driveways and parking areas shall be hard surfaced and each dwelling unit shall be provided with a minimum of two parking spaces one of which shall be in an attached garage. Subd. 9: Site Coverage. On lots developed for townhouse or rowhouse or attached patio home units, no structure or combination of structures shall occupy more than 50% of the lot area. On lots developed for detached patio home units, no structure or combination of structures shall occupy more than 35% of the lot area. Subd. 10: Signs as regulated within this Ordinance. Subd. 11: Yard Cover. Every yard on a premise on which a dwelling stands shall, within 3 months of issuance of the certificate of occupancy, be provided with lawn or combined lawn cover of vegetation, gardens, hedges, shrubbery, and related decorative materials and such yards shall be maintained consistent with prevailing community standards. Motor vehicles may not be left parked or unattended on or within a yard. Grass shall be maintained so as not to exceed a height of 6 inches. Subd. 12: Additional Requirements. Uses may be subject to additional requirements contained in this Ordinance including, but not limited to the sections governing parking, home occupation, floodplain, signs. Subd. 13: Common Areas. All common areas within an R-4 development, including but not limited to, open space, wetlands, greenways, drainage ponds, driveway, parking areas, play areas, etc., shall be owned and maintained by a condominium, association, cooperative or other common interest community created pursuant to Minnesota Statute, Chapter 515B and approved by the City Attorney. The agreement shall provide for all exterior building maintenance, 502.42-5 44 ORDINANCE 502 – ZONING ORDINANCE approval of any exterior architectural modifications, landscaping, snow clearing and regular maintenance of private driveways and other areas owned in common. 502.42-6 45