Loading...
HomeMy WebLinkAboutDec. 13th_PC_full packetCITY OF ST. JOSEPH www.cityofstjoseph.com 75 Callaway Street East | Saint Joseph, Minnesota 56374 Email: cityoffices@cityofstjoseph.com | Phone: 320.363.7201 | Fax 320.363-0342 St. Joseph Planning Commission Monday, December 13th, 2021 6:00 PM St. Joseph Council Chambers 75 Callaway St E **The meeting will also be available through Zoom** 1.Call to Order 2.Pledge of Allegiance 3. Agenda Review and Adoption 4. Approve Minutes – October 11th and October 25th, 2021 5.New Business a.Bad Habit – Building material request b. 2022 Meeting schedule c.2022 Chair and Vice Chair nomination d.Special meetings 6. Old Business 7.Other Business 8. Adjourn ZOOM INFORMATION Join Zoom Meeting https://us06web.zoom.us/j/81900011209?pwd=UGR6cnFvNVg0bGRTNTZ1TE92bXBSZz09 Meeting ID: 819 0001 1209 Passcode: 518443 One tap mobile +19292056099,,81900011209#,,,,*518443# US (New York) +13017158592,,81900011209#,,,,*518443# US (Washington DC) Find your local number: https://us06web.zoom.us/u/kckPYxmx6r 111 October 11th, 2021 Page 1 of 3 Pursuant to due call and notice thereof, the Planning Commission for the City of St. Joseph met On Monday, October 11th, 2021 at 6:01 PM. in the St. Joseph City Hall opening with the Pledge of Allegiance. Planning Commission Members Present: Commissioners Mike Osterman, Chad Hausmann, Carmie Mick, Mike Ross, Anne Jarrell, Bob Loso, Gina Dullinger Staff Present: Nate Keller Community Development Director Approval of the Agenda: Ross made a motion to approve the agenda. The motion was seconded by Jarrell and passed unanimously by those present. Approval of the Minutes: Loso made a motion to approve the minutes of September 13th, 2021. The motion was seconded by Ross and passed unanimously by those present. New Business: a. Public Hearing, Preliminary Plat Rivers Bend 4 Community Development Director Nate Keller stated that there is a request for a preliminary and a final plat for this project from the applicant CLC Partners. Existing zoning is R-4 and the property is located at off of College Ave (CR 121) and NW of River’s Bend 2 and Lanigan Way SE. The access will be off College Ave (CR 121). An access permit will be required from Stearns County. Formal engineering comments are pending. The developer will need to provide additional storm sewer inlet/pipe, another fire hydrant, higher street standard including deeper aggregate base, clarification on sub drainage, adjustments to some of the lot grading. There are wetlands on this property and they are not proposed to be disturbed. Hausmann opened the public hearing for the Preliminary and Final Plat Approval. Gary Nordmann, 9352 290th Street, St. Cloud, asked where the storm water would go. He also had questions about beaver dams in the location. The Commission pointed out that the diagram indicates there is a proposed storm water basin within this piece of property on the east corner. Keller verified that the storm water would be retained within the out lot through a storm water basin and should funnel over the ditches or through the storm sewer collection system. There was discussion on if the ditch was public or private. Potential issues with beaver dams are an issue at this location regardless of the proposed development. The conclusion was that these concerns would be noted in the comments to the engineer. Resident, inquired if the intent of these proposed building was to be owner occupied residential or are the planned to be rentals? She also asked about the price point for the units, the traffic in that area and the wetlands. Keller verified that any owner would have to obtain a rental license and that the intent for this development is rentals. Rick Poplinski (developer) stated that the development is planned to be high end rentals. Keller added that the County owns the Right of Way at CR 121 and they are reviewing the project and suggest any infrastructure changes. A sidewalk is planned to create a safe crossing. He also detailed some of the requirements that the developer is responsible for in relation to the wetlands. 222 October 11th, 2021 Page 2 of 3 Commission verified that a silt fence if used, would be the responsibility of the home builder to remove. The Commission explained the difference between what a developer and a home builder do and responsibilities for each. Tom Schuller, 320 Lanigan Way SE, spoke on concerns about traffic and what the future of Lanigan Way SE looks like. Keller explained Lanigan Way will eventually connect to the West across from Jade Rd. This will allow for traffic to have two ways in and out of that area. This proposed development will not have any connections made to Lanigan Way. Resident who lives on Lanigan Way SE, spoke on the drainage concerns and existing traffic near the site and by Kennedy. Commission replied and discussed the safety of the area near Kennedy School. They recognize the concerns. Keller stated that there is a plan to compile data and address the needs as they align with growth potential. The Commission also reiterated that safety work in this area would be a collaboration with the County. It was also verified that this area is zoned R4, which allows for up to six units an acre. Hausmann closed the public hearing for the Preliminary and Final Plat Approval. The Commission discussed the proposed drainage pond as it relates to the wetlands. It was verified that the existing wetlands would not be modified. The Commission also expressed concerns that engineering comments were not fully addressed yet. Keller explained that staff is reviewing the engineering with staff and the applicant. There was some discussion on the timeline of the project. Loso motioned to table the Preliminary and Final Plat Approval Request with the intent to call a special meeting in two weeks, pending engineer full review comments. Staff will give the appropriate notifications to the public; seconded by Dulllinger and passed unanimously. d. e. f. Public Hearing, Preliminary Plat and Final Plat, St. Joseph City Center Planning Commission recommended that disposal of the property is in conformance to the Comprehensive Plan at Feb. 8th, 2021 meeting. The subject property is the Fire Hall/Village Hall Building. The proposed plat will divide the property into two parcels. Administration is still working on the final details for developer’s agreement. That will be presented to the Council should this be approved. Hausmann opened the public hearing for the Preliminary and Final Plat Approval for the St. Joseph City Center. Hausmann closed the public hearing for the Preliminary and Final Plat Approval for the St. Joseph City Center as no one wished to speak. The Commission discussed future parking in the area prior to any motion. Dullinger motioned to approve the Resolution for the Preliminary Plat for the St. Joseph City Center; seconded by Loso and passed unanimously. Dullinger motioned to approve the Resolution for the Final Plat for the St. Joseph City Center; seconded by Loso and passed unanimously. Old Business: None Other Business: a. Home Occupation Discussion Staff have received a few questions on the pupil requirements as it relates to home occupations involving teaching. A couple specific inquiries were interested in allowing greater flexibility in the number of pupils.. 333 October 11th, 2021 Page 3 of 3 The intent of a home occupation is to maintain the residential character of the neighborhood while allowing uses that do not conflict with the character of the neighborhood. The Commission discussed a number of potential scenarios in which a special home occupation licenses would be issued. The consensus was that due to the variation in types of home occupations, hours of operation and required parking, the impacts to neighborhoods could be vastly different. It was determined that at this point, the home occupations be examined on a case by case basis with special conditions being required if the Commission felt necessary. Adjourn: Dullinger moved to adjourn the meeting at 7:30 PM. The motion was seconded by Loso and the motion carried. Nate Keller Community Development Director 444 October 25th, 2021 Page 1 of 1 Pursuant to due call and notice thereof, the Planning Commission for the City of St. Joseph met On Monday, October 25th, 2021 at 6:02 PM. in the St. Joseph City Hall opening with the Pledge of Allegiance. Planning Commission Members Present: Commissioners Mike Osterman, Carmie Mick, Mike Ross, Bob Loso, Gina Dullinger Planning Commission Members Absent: Anne Jarrell, Chad Hausman Staff Present: Nate Keller Community Development Director Approval of the Agenda: Loso made a motion to approve the agenda. The motion was seconded by Ross and passed unanimously by those present. New Business: none Old Business: a. Public Hearing, Preliminary Plat Rivers Bend 4 Keller provided an overview of the request for a preliminary and a final plat for this project from the applicant CLC Partners. Existing zoning is R-4 and the property is located off of College Ave (CR 121) and NW of River’s Bend 2 and Lanigan Way SE. Proposal includes twenty-eight (28) lots (townhome units). Dullinger opened the public hearing for the Preliminary and Final Plat Approval. Dullinger closed the public hearing upon no one wishing to speak. b. Preliminary Plat Rivers Bend 4 Mick motioned to approve the Preliminary Plat resolution for River’s Bend 4. The motion was seconded by Osterman and passed unanimously. c. Final Plat Rivers Bend 4 Loso made a motion to approve the Final Plat resolution for River’s Bend 4. The motion was seconded by Dullinger and passed unanimously. Adjourn: Dullinger moved to adjourn the meeting at 6:08 PM. The motion was seconded by Loso and the motion carried. Nate Keller Community Development Director 555 Planning Commission Agenda Item 5a MEETING DATE: December 13th, 2021 AGENDA ITEM: 5a. Bad Habit – Building material request SUBMITTED BY: Community Development STAFF RECOMMENDATION: Approve request for exceeding the maximum percentage for architectural metal. PREVIOUS PLANNING COMMISSION ACTION: When Bad Habit moved to the old City Hall location the Planning Commission and Council approved the original remodel to exceed the allowed architectural metal percentage (2017/2018) BACKGROUND INFORMATION: Applicant Information: Aaron Rieland, Owner of Bad Habit Brewery Existing Zoning: B-1 Future Land Use: Downtown Commercial Location: 25 College Ave N Civil: Attached Access: No change in proposed accesses Engineering: See attached site plan review letter WCA/Wetlands: N/A Ordinance: Building materials within the B-1 downtown district must adhere to the following requirements: Subd. 7: Building Materials. Building facades shall be designed to avoid a monolithic design and feature divisions in materials, textures and separate entrance treatments. The exterior surface of all buildings and structures must be constructed of one of, or a combination of, the following building materials. a) Brick or face brick including textured, burnished and colored block; b) Specially designed precast concrete units if the surfaces have been integrally treated with an applied decorative material or texture (excluding raw concrete block painted or unpainted or ceramic faced); c) Wood; d) Natural or cut stone; e) Glass or any combination thereof; f) Stucco; g) Pre-finished architectural metal panels when utilized for accent and/or architectural components of buildings such as the entry or entry appendage, a required enclosure or 666 screen or architectural roofing as an intended designed accent (not to exceed 15% of the exposed wall area on any two visible sides of the building). Applicant is proposing the new addition to have walls that consist of 61% architectural metal. The Commission must evaluate the request and provide a recommendation to City Council. h)Any other materials approved by the City Council after a review and recommendation by the Planning Commission, including but not limited to durable decorative synthetic material or concrete composite material found to be comparable or superior which mimic the appearance of other approved materials. i)Roof Materials. All roofs which are exposed to a view or are an integral part of a Building’s aesthetics will be constructed only of commercial grade asphalt shingles, wood shingles, standing seam metal, slate, tile or copper. The City Council may consider green roof options that reduce stormwater runoff and improve water quality. BUDGET/FISCAL IMPACT: None ATTACHMENTS: Civil plans Site plan review letter REQUESTED PLANNING COMMISSION ACTION: 1. Motion to approve proposed architectural metal building materials to exceed the 15% allowance. 777 CITY OF ST. JOSEPH www.cityofstjoseph.com December 3rd, 2021 Bad Habit Rice Companies 25 College Ave N 1019 Industrial Drive S St. Joseph, MN 56374 Sauk Rapids, MN 56379 Sent Via email: don.larsen@ricecompanies.com (applicant) andy.wilson@ricecompanies.com (applicant) CC: aaronrieland@gmail.com (owner) thaffer@cityofstjoseph.com Dear Mr. Larsen and Mr. Wilson, The City of St. Joseph has completed a review of your request for site plan approval for the development of an expansion at Bad Habit Brewery addressed as 25 College Ave N St. Joseph, MN 56374. In reviewing the site plan application, I offer the following review comments and corrections needed. Corrections shall be submitted before site plan is approved. Engineering Department: Comments are below: •Roof drainage, scuppers, and the like, shall not discharge to the alley or the alley boulevard. The alley pavement profile grade west of the existing catch basin in the center of the alley is irregular, and contributing additional drainage to the pavement surface shall be avoided. •Considering winter maintenance activity through the alley, considering selecting patio fence materials that will be stout enough to withstand plowed snow coming into contact with the fence. •Consider evaluating the condition of the existing vitrified clay pipe sanitary sewer service that originates from the alley, and consider upgrading the pipe materials to PVC pipe, accordingly. •Any emergency gate access from the patio on the southeast side shall be directed to the College Avenue sidewalk, and not the alley. Refuse Enclosure: The plan shows a trash enclosure on site but no details are provided. The existing trash area is not enclosed and does not meet the standards of the code. Ordinance: 502.50 Subd. 8 C Waste Handling Screening. All waste and recycling areas must be either stored in the principal building or stored in a four (4) sided enclosure at a minimum of five (5) feet in height constructed of brick, stone, decorative concrete material or a material comparable and compatible with the material of the principal building. Waste handling areas should be shared between lots and buildings to the extent possible to minimize their impact and must be located on the rear of sides of buildings to minimize visibility from roadways. Any changes to trash handling areas once a building is constructed must comply with this Ordinance and requires approval by the City. Corrections needed: Provide specs and details for the trash enclosure to ensure compliance with 502.50 Subd. 8 C Exterior Building materials: Ordinance: 502.50 Subd. 7 G does not allow more than 15% of the exterior building finish (exposed area) to be constructed of pre-finished architectural metal. The plan appears to propose 61% architectural metal. Corrections needed: A230 depicts architectural metal for the walls. Please verify the metal is pre finished architectural metal in accordance to code requirements and is not another non-compliant metal. 888 CITY OF ST. JOSEPH www.cityofstjoseph.com Any pre-finished architectural metal that exceeds 15% on a wall side must obtain Planning Commission recommendation and Council approval. Upon verification that the metal is pre-finished architectural metal the item will be added to the December 13th Planning Commission agenda and December 20th City Council agenda. Ordinance does not allow raw concrete block (painted or unpainted). Corrections needed: A230 shows sealed concrete is being proposed – please confirm no raw concrete block is being proposed (paint or unpainted) anywhere on the site. Lighting: Applicant is proposing string lights for the patio area to match existing patio lights. No details or specs are provided on the security or wall lights. Corrections needed: Submit the lighting details for the security (wall) lights to verify the type of light being proposed (no flood lights) Parking: Proposed addition includes: Warehouse space of 2,647 SF (Code requires 1 space per 1,000 SF) Event/bar space of 1,575 SF (Code requires 1 space per 100 SF) Existing Space includes: Warehouse space of 2,860 SF Bar space of 1,175 SF Total space = 5,507 SF (warehouse) and 2,750 SF (event/bar space) Total spaces needed: Thirty-three. Five for warehouse and twenty-eight for bar/event space The lot has forty-one spaces plus a potential six spaces could be added on the SW portion of the site. Parking requirements have been met so no further action or corrections are needed. Please don’t hesitate to contact me if you have any questions or concerns at 320.557.3524 or nkeller@cityofstjoseph.com Sincerely, Nate Keller Community Development Director 999 December 9, 2021 Nate Keller (via email) Community Development Director City of St. Joseph 75 Callaway Street East St. Joseph, MN 56374 RE: BAD HABIT PRODUCTION EXPANSION ST. JOSEPH, MN Dear Nate: We received your comments dated December 3, 2021 and we would like to address them individually below. Engineering Department ·Roof drainage, scuppers, and the like, shall not discharge to the alley or the alley boulevard. The alley pavement profile grade west of the existing catch basin in the center of the alley is irregular, and contributing additional drainage to the pavement surface shall be avoided. The runoff from the building will be directed to storm sewer and will tie into the catch basin in the alley. ·Considering winter maintenance activity through the alley, considering selecting patio fence materials that will be stout enough to withstand plowed snow coming into contact with the fence. Fence material selection will attempt to mitigate this. ·Consider evaluating the condition of the existing vitrified clay pipe sanitary sewer service that originates from the alley, and consider upgrading the pipe materials to PVC pipe, accordingly. This has been considered. We will review the pipe as excavation commences. ·Any emergency gate access from the patio on the southeast side shall be directed to the College Avenue sidewalk, and not the alley. We will attempt to make this connection. Building code may dictate that the emergency gate be in a different location. Refuse Enclosure: The plan shows a trash enclosure on site but no details are provided. The existing trash area is not enclosed and does not meet the standards of the code. Corrections needed: Provide specs and details for the trash enclosure to ensure compliance with 502.50 Subd. 8 C. A refuse location has been added to the plans. The owner will work with the City on materials. 1010 Title Date Page 2 of 2 Exterior Building materials: Ordinance: 502.50 Subd. 7 G does not allow more than 15% of the exterior building finish (exposed area) to be constructed of pre-finished architectural metal. The plan appears to propose 61% architectural metal. Corrections needed: A230 depicts architectural metal for the walls. Please verify the metal is pre finished architectural metal in accordance to code requirements and is not another non-compliant metal. Any pre-finished architectural metal that exceeds 15% on a wall side must obtain Planning Commission recommendation and Council approval. Upon verification that the metal is pre-finished architectural metal the item will be added to the December 13th Planning Commission agenda and December 20th City Council agenda. The prefinished architectural metal is in accordance with code requirements. We ask that the PC recommends and the Council approves it. Ordinance does not allow raw concrete block (painted or unpainted). Corrections needed: A230 shows sealed concrete is being proposed – please confirm no raw concrete block is being proposed (paint or unpainted) anywhere on the site. There is no exposed concrete block. Lighting: Applicant is proposing string lights for the patio area to match existing patio lights. No details or specs are provided on the security or wall lights. Corrections needed: Submit the lighting details for the security (wall) lights to verify the type of light being proposed (no flood lights) Lights to match existing. Enclosed are the revised Civil and Architectural plans for your review. Please let me know if you need anything else. Sincerely, William R. Huston, PE CC: Therese Haffner, City of St. Joseph (via email) Aaron Rieland, Bad Habit (via email) Andy Wilson, Rice Companies (via email) Don Larsen, Rice Companies (via email) 1111 SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN F M F M F M F M F M F M F M F M F M S S T O S T O S T O S T O S T O S T O STO STO STO STO STO STO S T O G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S GA S GA S GA S GA S GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS G A S TC = 1094.43 INV = 1089.83 TC = 1094.66 INV NW = 1087.46 INV SW = 1086.66 8" VCP 6 " C I 12" RCP 6" DI 1" COP TC = 1095.44 INV N = 1089.96 INV SW = 1090.06 W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T WAT WAT WAT WAT WAT TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TU G TU G TU G TU G TU G TU G TU G TU G TU G TU G T U G T U G T U G T U G TU G T U G T U G TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TU G TU G FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO F O F O F O F O FO FO FO F O F O F O FO F O F O F O PUG P U G P U G P U G P U G T X 10 9 5 1 0 9 5 1096 1095 1095 1 0 9 4 1094 10 9 4 1 0 9 5 10 9 5 1096 10 9 6 1094.54 1094.12 1095.58 1095.46 1095.36 1095.31 1095.13 1095.09 1095.07 1095.08 1094.63 1094.65 1094.48 1094.47 1094.46 1094.16 1094.73 1095.11 1094.44 1094.47 1096.14 1096.00 1095.94 1095.86 1095.71 1095.65 1095.50 1095.40 1095.50 1095.30 (B) 1095.30 (B) 1095.08 1095.30 1095.30 1095.31 2 . 9 6 % -1.83% -1.79% - 1 . 9 9 % - 1 . 9 9 % -0.27% -0.23% 1094.65 1095.40 1095.40 GRADE SHALLOW SWALES TO PROPOSED CURB CUT FFE=1095.50 REMOVE 11LF CURB. CONSTRUCT 5LF B618 CURB CUT WITH 3' BEAVERTAIL EACH SIDE. GUTTER FLOW LINE SHALL MATCH EXISTING. REMOVE 42LF CURB. CONSTRUCT 42LF B618 WITH VARIABLE CURB BACK HEIGHT TO MATCH PLANS. GUTTER FLOW LINE SHALL MATCH EXISTING. BEAVERTAIL CURB CONSTRUCT THICKENED EDGE SIDEWALK. EXTEND BOTTOM OF CURB TO BOTTOM OF EXISTING WALK AGGREGATE BASE. MATCH EXISTING CURB MATCH EXISTING SIDEWALK MATCH EXISTING CURB TAPER CURB BACK TO MATCH STOOP X X X X X X X X X X X X X 0'10'20'30' Common Ground Alliance Call 48 Hours before digging: 811 or call811.com ST . J O S E P H , M N BA D H A B I T B R E W I N G 11.29.2021 Pr o j e c t N u m b e r : S R . C . 2 1 . 0 3 8 R: \ C A D \ B A D H A B I T B R E W I N G \ 0 0 - C U R R E N T \ C I V I L \ C A D \ S H E E T S \ B A D H A B I T - G D 0 1 . D W G C301 REVISIONS NUMBER DATE .. .. .. .. .. William R. Huston Lic. No. 44984 Date:11.29.2021 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2021. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 901 Summit Ave ● Mankato, MN 56001 4141 38th St SW, Ste 1-E ● Fargo, ND 58104 RICECOMPANIES.COM GR A D I N G P L A N WRH 20 2 1 P R O D U C T I O N A D D I T I O N PROPERTY LINE 982 980 STO STORM SEWER DRAIN TILE WATER MAIN SANITARY SEWER EXISTING PROPOSED INDEX CONTOUR INTERVAL CONTOUR982 980 WAT SAN SPOT ELEVATION FLOW DIRECTION CURB AND GUTTER GRADING LEGEND 1. LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS SHOWN ON THIS PLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND UTILITY LOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND. 2. CONTRACTORS SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF VESTIBULE, SLOPED PAVEMENT, EXIT PORCHES, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS, EXACT BUILDING UTILITY ENTRANCE LOCATIONS, AND EXACT LOCATIONS AND NUMBER OF DOWNSPOUTS. BUILDING ADDITION LOCATIONS SHALL BE VERIFIED WITH THE EXISTING BUILDING AND ARCHITECTURAL DRAWINGS PRIOR TO CONSTRUCTION. 3. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF "STANDARD SPECIFICATIONS FOR TRENCH EXCAVATION AND BACKFILL/SURFACE RESTORATION" AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA. 4. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE FOUR INCHES OF TOPSOIL AND SOD OR SEED. THESE AREAS SHALL BE WATERED UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. SEE LANDSCAPE PLAN FOR PLANTING AND TURF ESTABLISHMENT. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. PLACEMENT OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER PRIOR TO PLACEMENT. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MNDOT STANDARDS. 6. ALL SLOPES SHALL BE GRADED TO 4:1 OR FLATTER, UNLESS OTHERWISE INDICATED ON THIS SHEET. 7. CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING AND PROVIDE A SMOOTH FINISHED SURFACE WITH UNIFORM SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN OR BETWEEN SUCH POINTS AND EXISTING GRADES. 8. SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS & GUTTER FLOW LINE UNLESS OTHERWISE NOTED. PROPOSED CONTOURS ARE TO FINISHED SURFACE GRADE. 9. SEE SOILS REPORT FOR PAVEMENT THICKNESSES AND HOLD DOWNS. 10. CONTRACTOR SHALL DISPOSE OF ANY EXCESS SOIL MATERIAL THAT EXISTS AFTER THE SITE GRADING AND UTILITY CONSTRUCTION IS COMPLETED. THE CONTRACTOR SHALL DISPOSE OF ALL EXCESS SOIL MATERIAL IN A MANNER ACCEPTABLE TO THE OWNER AND THE REGULATING AGENCIES. 11. ALL CONSTRUCTION SHALL CONFORM TO LOCAL, STATE AND FEDERAL RULES INCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS. 12. PRIOR TO PLACEMENT OF ANY STRUCTURE OR PAVEMENT, A PROOF ROLL, AT MINIMUM, WILL BE REQUIRED ON THE SUBGRADE. PROOF ROLLING SHALL BE ACCOMPLISHED BY MAKING MINIMUM OF 2 COMPLETE PASSES WITH FULLY-LOADED TANDEM-AXLE DUMP TRUCK, OR APPROVED EQUAL, IN EACH OF 2 PERPENDICULAR DIRECTIONS WHILE UNDER SUPERVISION AND DIRECTION OF THE INDEPENDENT TESTING LABORATORY. AREAS OF FAILURE SHALL BE EXCAVATED AND RE-COMPACTED AS SPECIFIED HEREIN. 13. EMBANKMENT MATERIAL PLACED BENEATH BUILDINGS AND STREET OR PARKING AREAS SHALL BE COMPACTED IN ACCORDANCE WITH THE SPECIFIED DENSITY METHOD AS OUTLINED IN MNDOT 2105.3F1 AND THE REQUIREMENTS OF THE GEOTECHNICAL ENGINEER. 14. EMBANKMENT MATERIAL NOT PLACED IN THE BUILDING PAD, STREETS OR PARKING AREA, SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTS OF THE ORDINARY COMPACTION METHOD AS OUTLINED IN MNDOT 2105.3F2. 15. ALL SOILS AND MATERIALS TESTING SHALL BE COMPLETED BY AN INDEPENDENT GEOTECHNICAL ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE GEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND INSPECTIONS WITH THE GEOTECHNICAL ENGINEER. GRADING NOTES 0.00% 900.00900.00 BENCHMARK TNH - NW QUADRANT OF COLLEGE AVENUE NORTH & ASH STREET EAST ELEV.=1094.16 101212 SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN F M F M F M F M F M F M F M F M F M F M F M F M F M F M F M FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM S S ST O ST O STO STO STO STO STO STO STO STO STO STO STO STO S T O S T O S T O S T O S T O S T O S T O S T O S T O S T O S T O S T O S T O S T O S T O S T O S T O STO ST O ST O STO STO STO S T O S T O S T O ST O ST O ST O ST O ST O STO STO STO S T O S T O S T O S T O S T O S T O S T O S T O S T O S T O S T O ST ST ST G A S G A S G A S G A S G A S G A S G A S GA S GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS BENCHMARK TOP NUT = 1094.16 TC = 1090.15 INV = 1087.55 TC = 1091.12 INV NW = 1086.12 INV SW = 1086.12 INV E = 1086.02 TC = 1090.79 INV = 1086.59 TC = 1091.41 INV = 1088.31 TC = 1091.80 INV = 1088.10 TC = 1092.08 INV SW = 1087.78 INV SE = 1087.78 INV S = 1085.68 INV W = 1085.08 INV E = 1083.38 INV N = 1083.18 TC = 1094.43 INV = 1089.83 TC = 1094.66 INV NW = 1087.46 INV SW = 1086.66 12" R C P 12 " R C P 12" RCP 8" DI 12" FM 1 2 " F M 8 " D I 8" VCP 6 " C I 12" RCP 2 4 " R C P 6" DI 1" COP 6" DI TC = 1095.44 INV N = 1089.96 INV SW = 1090.06 TC = 1093.31 INV N = 1088.19 INV S = 1088.22 WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT WAT W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T WAT WAT WAT TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TU G TU G TU G TU G TU G T U G T U G T U G T U G T U G T U G TUGTUG T U G TUG TUG TUG TUG TUG TUG TUG TU G FO FO FO FO FO FO FO FO FO F O F O F O F O F O F O FO FO FO F O F O F O FO PUG P U G P U G PUG T T T E X X X X X X X X X X X X X X X X X X X X NEW BUILDING ADDITION PATIO AREA 0'20'40'60' Common Ground Alliance Call 48 Hours before digging: 811 or call811.com ST . J O S E P H , M N BA D H A B I T B R E W I N G 11.24.2021 Pr o j e c t N u m b e r : S R . C . 2 1 . 0 3 8 R: \ C A D \ B A D H A B I T B R E W I N G \ 0 0 - C U R R E N T \ C I V I L \ C A D \ E X H I B I T S \ B A D H A B I T - S K 0 1 . D W G X001 REVISIONS NUMBER DATE .. .. .. .. .. NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. Copyright Rice Companies, Inc. 2021. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 901 Summit Ave ● Mankato, MN 56001 4141 38th St SW, Ste 1-E ● Fargo, ND 58104 RICECOMPANIES.COM IM P E R V I O U S C O V E R A G E S K E T C H WRH 20 2 1 P R O D U C T I O N A D D I T I O N TOTAL AREA = 37,204SF EXISTING IMPERVIOUS = 25,192SF PROPOSED ADDITIONAL IMPERVIOUS = 3,003SF TOTAL PROPOSED IMPERVIOUS = 28,195SF 111313 121414 P R O P E R T Y L IN E P R O P E R T Y L I N E PROPERTY LINE 10'-0" SETBACK 5'-0" SETBACK 5'-0" SETBACK EXISTING BUILDING MAIN LEVEL -4,100 SQ FT PROPOSED ADDITION 4,522 SQ FT A 1 2 EXISTING FENCE EXISTING FENCE 10' - 4 1/2" TRASH COLLECTION AREA 131515 AXXX X SIM XXX AXXX XAXXX X X X X X ROOM XXX X AXXX SIM X WS-XX SEE SHEET AXXX WT-XX ROOM NAME ROOM NUMBER DOOR NUMBER SECTION NUMBER SHEET SHOWN ON ELEVATION NUMBER SHEET SHOWN ON X NUMBER INDICATES REFERENCED CONSTRUCTION NOTE NUMBER INDICATES REFERENCED DEMOLITION NOTEDX DETAIL NUMBER SHEET SHOWN ON WINDOW TYPE REVISION NUMBER SYSTEM NUMBER SHEET SHOWN ON • EXTERIOR WALL SYSTEM:WS-XX • ROOF SYSTEM:RS-XX • FLOOR SYSTEM:FS-XX INTERIOR WALL TYPE 3-HOUR RATED WALL 2-HOUR RATED WALL 1-HOUR RATED WALL SMOKE RATED WALL INTERIOR EXTERIOR F. BUILDING HEIGHT I. ACTUAL 1 STORY II. PERMITTED BY CODE 4 STORIES G. OCCUPANT LOAD (SECTION 1004) F-2 OCC: 2,860 SF / 150 GROSS= 19 OCC. A-2 OCC: 5,825 SF/15 NET=388 OCC. S-2 OCC: 2,647 SF / 500 GROSS= 5 OCC. TOTAL:412 OCC. H. EXITING I. NUMBER OF EXITS REQUIRED: PROVIDED: 2 5 II. EXIT WIDTH REQUIRED: PROVIDED: (1005.3.2 DOORS): 412 x 0.15 =61.8"136" III. MAX. TRAVEL DISTANCE (TABLE 1017.2) (ADDITION ONLY)REQUIRED: PROVIDED: WITH AUTOMATIC SPRINKLER SYSTEM 250’ (A-2)57' 400' (F-2/S-2) 52' I. PLUMBING FIXTURES OCCUPANTS: F-2 OCCUPANCY:19/ 2 = 10 (M), 10 (F) A-2 OCCUPANCY:388/2 = 194 (M), 194 (F) S-2 OCCUPANCY:5/ 2 = 3 (M), 3 (F) REQUIRED W.C.: MEN WOMEN F-2 OCCUPANCY: 1:100 (M & W):0.10 0.10 A-2 OCCUPANCY: 1:40 (M); 1:40 (W)4.85 4.85 S-2 OCCUPANCY: 1:100 (M & W):0.03 0.03 4.98 4.98 TOTAL REQUIRED W.C.:5 5 PROVIDED W.C.:5 5 REQUIRED LAVS: MEN WOMEN F-2 OCCUPANCY: 1:100 (M & W):0.10 0.10 A-3 OCCUPANCY: 1:75 (M & W):2.58 2.58 S-1 OCCUPANCY: 1:100 (M & W):0.03 0.03 2.71 2.71 TOTAL REQUIRED LAVS:3 3 PROVIDED LAVS:4 4 DRINKING FOUNTAIN:REQUIRED PROVIDED 1 1 SERVICE SINK:REQUIRED PROVIDED 1 1 I. BUILDING INFORMATION A. AREAS: BUILDING AREA: BUILDING ADDITION A-2 OCCUPANCY (FIRST FLOOR):1,175 SF A-2 OCCUPANCY (PATIO): 780 SF S-2 OCCUPANCY:2,647 SF SUB-TOTAL:4,602 SF EXISTING F-2 OCCUPANCY:2,860 SF A-2 OCCUPANCY (FIRST FLOOR):1,575 SF A-2 OCCUPANCY (PATIO):2,295 SF SUB-TOTAL:6,730 SF GRAND TOTAL:11,332 SF EXISTING BASEMENT: (NOT INCLUDED IN ALLOWABLE ARE PER MNBC 506.1.3.) S-2 OCCUPANCY:4,079 SF II. BUILDING CODE ANALYSIS A. CODE 2020 INTERNATIONAL BUILDING CODE ENERGY CODE: ASHRAE 90.1 B. USE & OCCUPANCY CLASSIFICATION (Chapter 3 & 5) I. SPACE USE AND CLASSIFICATION A-2 II. OCCUPANCY SEPARATION (Section 508.3) Non-Separated C. CONSTRUCTION TYPE (Chapter 6) I. CONSTRUCTION TYPE V-B II. FIRE RESISTIVE REQUIREMENTS (TABLE 601 and 602) 1. STRUCTURAL FRAME:0 HR 2. BEARING WALLS:0 HR 3. EXTERIOR:0 HR 4. INTERIOR:0 HR 5. NON-BEARING WALLS AND PARTITIONS EXTERIOR (TABLE 602): 0 HR 6. NON-BEARING WALLS AND PARTITIONS INTERIOR 0 HR 7. FLOOR CONSTRUCTION INCLUDING SUPPORTING BEAMS AND JOISTS:0 HR 8. ROOF CONSTRUCTION INCLUDING SUPPORTING BEAMS AND JOISTS:0 HR D. FIRE SPRINKLING SPRINKLER SYSTEM PROVIDED:YES E. BUILDING AREA I. ALLOWABLE AREA PERMITTED BY CODE (At): (IBC TABLE 506.2)24,000 II. FRONTAGE INCREASE PERMITTED BY CODE: If= [F/P-0.25]W/30 (IBC EQUATION 5-5) 1f=100 [(264/410-0.25]30/30 =.64 III. AREA INCREASE PERMITTED BY CODE: Aa = At + [NS x If] (IBC EQUATION 5-1) Aa =24,000 + [(6,000)(.64)] =27,600 SF Don F. Larsen Reg. No. 45747 Date: I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of MN. SHEET INDEXPROJECT DIRECTORYSYMBOLS AB ANCHOR BOLT ACC ACCESSIBLE ACT ACOUSTICAL CEILING TILE ADDL ADDITIONAL ADDM ADDENDUM ADDN ADDITION ADJ ADJUSTABLE OR ADJACENT AFF ABOVE FINISHED FLOOR AHU AIR HANDLING UNIT ALUM ALUMINUM ALT ALTERNATE ANOD ANODIZED APPROX APPROXIMATELY ARCH ARCHITECT(URAL) AVG AVERAGE BD BOARD BDRY BOUNDARY BEL BELOW BITUM BITUMINOUS BLDG BUILDING BLK BLOCK BLKG BLOCKING BLVD BOULEVARD BOT BOTTOM BRG BEARING BRKT BRACKET BSMT BASEMENT BTWN BETWEEN BTM BOTTOM CIR CIRCLE CIP CAST-IN-PLACE CJ CONTROL JOINT CL CENTERLINE CLG CEILING CLR CLEAR CM CONSTRUCTION MANAGER CMU CONCRETE MASONRY UNIT COL COLUMN CONC CONCRETE CONF CONFERENCE CONN CONNECTION CONST CONSTRUCTION CONT CONTINUOUS CORR CORRIDOR CPT CARPET CT CERAMIC TILE CTR CENTER CTRL CONTROL CTRSK COUNTERSUNK OR COUNTERSINK DEF DEFINITION DEG DEGREE DEL DELETE DEMO DEMOLITION DEPT DEPARTMENT DET DETAIL DF DRINKING FOUNTAIN DIA DIAMETER DIAG DIAGONAL DIM DIMENSION DIST DISTANCE DOC DOCUMENT DN DOWN DR DOOR DSGN DESIGN DW DRYWALL DWG DRAWING E EAST EACH EA EIFS EXTERIOR INSULATI0N FINISH SYSTEM EJ EXPANSION JOINT ELEV ELEVATION ELEC ELECTRIC(AL) ENCL ENCLOSE(URE) ENGR ENGINEER EP ELECTRICAL PANEL EPS EXPANDED POLYSTYRENE BOARD (INSULATION) EPT EPOXY PAINT EQ EQUAL EQUIP EQUIPMENT ESMT EASEMENT EW EACH WAY EWC ELECTRIC WATER COOLER EXC EXCAVATE(D) EXH EXHAUST EXIST EXISTING EXP EXPANSION EXT EXTERIOR FD FLOOR DRAIN FDTN FOUNDATION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FIN FINISH(ED) FIN FLR FINISHED FLOOR FIXT FIXTURE FLR FLOOR FLG FLOORING FRMG FRAMING FR FIRE RESISTANT FT FOOT OR FIRETREATED FTG FOOTING FURR FURRING FURN FURNITURE FUT FUTURE GA GAUGE GALV GALVANIZED GB GRAB BAR GC GENERAL CONTRACTOR GEN GENERAL GL GLASS GR GRADE GYP BD GYPSUM BOARD ABBREVIATIONS HB HOSE BIBB HC HOLLOW CORE HCP HANDICAP(PED) HD HAND DRYER HDR HEADER HDW HARDWARE HGR HANGER HM HOLLOW METAL HORIZ HORIZONTAL HR HOUR HT HEIGHT HTR HEATER HVAC HEATING/ VENTILATION/ AIR CONDITIONING HWY HIGHWAY HW HOT WATER HYD HYDRANT IN INCH(ES) INCL INCLUDED INFO INFORMATION INSP INSPECTED INSUL INSULATION INT INTERIOR JAN JANITOR JST JOIST JT JOINT KIT KITCHEN LAM LAMINATED LAV LAVATORY LF LINEAR FOOT LIN LINEAR LTG LIGHTING LVL LAMINATED VENEER LUMBER LVR LOUVER MACH MACHINE MATL MATERIAL MAX MAXIMUM MECH MECHANICAL MEMB MEMBRANE MTG MEETING MTL METAL MEZZ MEZZANINE MFG MANUFACTURING MFR MANUFACTURER MIN MINIMUM MIRR MIRROR MISC MISCELLANEOUS MTD MOUNTED MTG MOUNTING MAU MAKEUP AIR UNIT MULL MULLION MULT MULTIPLE N NORTH NA NOT APPLICABLE NAT NATURAL NATL NATIONAL NO NUMBER NORM NORMAL NTS NOT TO SCALE OC ON CENTER OCC OCCUPY OH OVERHEAD OPNG OPENING OPP OPPOSITE OPT OPTIONAL ORD ORDINANCE ORIG ORIGINAL PAR PARALLEL PAT PATTERN PERIM PERIMETER PERP PERPEWNDICULAR PH PHASE PKG PACKAGE POR PORCELAIN TILE POS POSITIVE PL PLATE PLAM PLASTIC LAMINATE PLBG PLUMBING PLYWD PLYWOOD PNL PANEL POL POLISHED POLY POLYETHYLENE (PLASTIC) PR PAIR PREF PREFERENCE PREFIN PREFINISHED PRELIM PRELIMINARY PREP PREPARATION PREV PREVIOUS PROP PROPERTY PRKG PARKING PRV POWER ROOF VENTILATOR PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT PAINT PTD PAPER TOWEL DISPENSER PTDR PAPER TOWEL DISPENSER AND RECEPTACLE PTN PARTITION PTR PAPER TOWEL RECEPTICLE PVG PAVING PWR POWER QT QUARRY TILE QTY QUANTITY R RISER(S) OR RADIUS RB HK ROBE HOOK RD ROOF DRAIN RCP REFLECTED CEILING PLAN RECD RECEIVED REF REFERENCE REFL REFLECTED REF REFRIGERATOR REINF REINFORCE(D)(ING) REQD REQUIRED RESIL RESILIENT REV REVERSE RFG ROOFING RLG RAILING RM ROOM RND ROUND RO ROUGH OPENING ROW RIGHT OF WAY RT RIGHT RTG RATING RTU ROOF TOP UNIT S SOUTH SAN SANITARY SB SOIL BORING SCHED SCHEDULE SD SOAP DISPENSER SECT SECTION SEP SEPARATE SF SQUARE FEET SGL SINGLE SHT SHEET SHTHG SHEATHING SIM SIMILAR SLNT SEALANT SND SANITARY NAPKIN DISPENSER SNR SANITARY NAPKIN RECEPTACLE SQ SQUARE SS STAINLESS STEEL STD STANDARD STL STEEL STOR STORAGE ST STAIR STRUCT STRUCTURAL SUB SUBSTITUTE SUSP SUSPENDED SV SHEET VINYL SYMM SYMMETRICAL T TREAD(S) T&G TONGUE AND GROOVE TB TOWEL BAR CODE REVIEW TOC TOP OF CURB OR CONCRETE TECH TECHNICAL TEMP TEMPERATURE OR TEMPERED OR TEMPORARY THERM THERMAL THK THICK THRU THROUGH TKBD TACK BOARD TKS TACK STRIP TPD TOILET PAPER DISPENSER TPH TOILET PAPER HOLDER TRTD TREATED TYP TYPICAL UNO UNLESS NOTED OTHERWISE UR URINAL VAN VANITY VAR VARIATION OR VARIABLE VB VINYL BASE OR VAPOR BARRIER VCT VINYL COMPOSITE TILE VENT VENTILATE(ION) VRFY VERIFY VERT VERTICAL VEST VESTIBULE VIN VINYL W WEST OR WIDE W/ WITH W/IN WITHIN WC WATER CLOSET WD WOOD WDW WINDOW WHSE WAREHOUSE W/O WITHOUT WT WEIGHT WTR WATER WWF WELDED WIRE FABRIC XPS EXTRUDED POLYSTYRENE BOARD (INSULATION) YD YARD VICINITY MAP NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. Copyright Rice Companies, Inc. 2021. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 901 Summit Ave ● Mankato, MN 56001 4141 38th St SW, Ste 1-E ● Fargo, ND 58104 RICECOMPANIES.COM C: \ U s e r s \ d o n \ D o c u m e n t s \ R e v i t L o c a l F i l e s \ 2 0 2 1 B a d H a b i t P r o d u c t i o n E x p a n s i o n - C e n t r a l _ d o n . l a r s e n @ r i c e c o m p a n i e s . c o m . r v t 11 / 1 6 / 2 0 2 1 1 1 : 1 1 : 1 4 A M 2021 PRODUCTION ADDITION 25 COLLEGE AVE. N, ST. JOSEPH, MN BAD HABIT BREWING SR . C . 2 1 . 0 3 8 11.12.21 A001 DMW / AKP 20 2 1 P R O D U C T I O N A D D I T I O N 25 C O L L E G E A V E . N , S T . J O S E P H , M N BA D H A B I T B R E W I N G 11.15.21 GE N E R A L I N F O R M A T I O N GENERAL CONTRACTOR RICE COMPANIES, INC. 1019 INDUSTRIAL DRIVE SOUTH SAUK RAPIDS, MN 56379 PHONE: (320) 252-0404 FAX: (320) 252-0470 WEBSITE: www.ricecompanies.com ARCHITECT RICE COMPANIES, INC. 1019 INDUSTRIAL DRIVE SOUTH SAUK RAPIDS, MN 56379 PHONE: (320) 252-0404 FAX: (320) 252-0470 WEBSITE: www.ricecompanies.com CONTACT: Don Larsen, AIA EMAIL: don.larsen@ricecompanies.com STRUCTURAL RICE COMPANIES, INC. 1019 INDUSTRIAL DRIVE SOUTH SAUK RAPIDS, MN 56379 PHONE: (320) 252-0404 FAX: (320) 252-0470 WEBSITE: www.ricecompanies.com CONTACT: Ryan J. Seavert, P.E. EMAIL: ryan.seavert@ricecompanies.com OWNER BAD HABIT BREWING 25 COLLEGE AVE. NORTH ST. JOSEPH, MN 56374 PHONE: (320) 271-3108 WEBSITE: www.badhabitbeer.com CONTACT: AARON RIELAND ARCHITECTURAL A001 GENERAL INFORMATION D201 DEMOLITION PLAN A201 FLOOR PLAN A211 REFLECTED CEILING PLAN A220 ROOF PLAN A230 SCHEDULES A240 ENLARGED RESTROOM PLAN & RESTROOM ELEVATIONS A300 EXTERIOR ELEVATIONS A301 EXTERIOR ELEVATIONS A400 BUILDING SECTIONS A410 WALL SECTIONS A500 DETAILS STRUCTURAL S001 GENERAL NOTES S002 GENERAL NOTES S100 FOUNDATION PLAN S101 SLAB ON GRADE PLAN S201 ROOF FRAMING PLAN S300 EXTERIOR ELEVATIONS S400 BUILDING SECTIONS S410 WALL SECTIONS S500 DETAILS SITE CO RD 75 C O L L E G E A V E . NW MINNESOTA ST. E MINNESOTA ST. E ASH ST. W AS H ST . REVISIONS NUMBER DATE 141616 F.F.E. SE E D O O R S C H E D U L E SCHEDULE SEE DOOR A B SE E D O O R S C H E D U L E SCHEDULE SEE DOOR C SE E D O O R S C H E D U L E SCHEDULE SEE DOOR SE E D O O R S C H E D U L E SCHEDULE SEE DOOR D F.F.E. I 2" SCHEDULE SEE DOOR 2" 2" SE E D O O R S C H E D U L E F.F.E. BA C 1' - 0 " 7' - 2 " 8' - 2 " 2" 3' - 1 0 " 2" 2' - 1 0 " 2" 3' - 0" 2"2' - 8"2" 3' - 0 " 5' - 2 " 8' - 2 " 2" 4' - 1 0 " 2" 5' - 0" 2"4' - 8"2" 8' - 0 " 2' - 0 " 4' - 0" 2"3' - 8"2" 2" 1' - 8 " 2" 10 ' - 0 " FR-1 = DARK BRONZE ANODIZED ALUMINUM FRAME HM-1 = PAINTED HOLLOW METAL FRAME GL-1 = 1" INSULATED TEMPERED TINTED GLASS GL-2 = 1/4" TEMPERED CLEAR GLASS GLAZING INFORMATION FRAME INFORMATION D 3' - 0 " 5' - 2 " 6' - 0" 2"2' - 9" 2" 2' - 9"2" 8' - 2 " 2" 2' - 1 0 " 2" 1' - 1 0 " 2" GL-1 GL-1 GL-1 GL-1 GL-2 GL-2 GL-2 WT-04INTERIOR WALL •(1) LAYER 5/8" GYPSUM BOARD •2x4 WOOD STUDS @ 16" O.C. •FI BERGLASS BATT INSULATION •(1) LAYER 5/8" GYPSUM BOARD INTERIOR WALLWT-01 FURRING WALL •(1) LAYER 5/8" GYPSUM BOARD OR •2x4 WOOD STUDS @ 16" O.C. •FIBERGLASS BATT INSULATION WT-02 INTERIOR WALLWT-03 WT-06 INTERIOR WALL •LINER PANEL •REINFORCED POLY LINER •(1) LAYER 15/32" PLYWOOD •2x6 WOOD STUDS @ 16" O.C. •FIBERGLASS SOUND BATT INSULATION •(1) LAYER 5/8" GYPSUM BOARD WT-05 INTERIOR WALL •(1) LAYER 5/8" GYPSUM BOARD •2x6 WOOD STUDS @ 16" O.C. •FIBERGLASS BATT INSULATION •(1) LAYER 5/8" GYPSUM BOARD •LINER PANEL •REINFORCED POLY LINER •(1) LAYER 15/32" PLYWOOD •2x4 WOOD STUDS @ 16" O.C. •FIBERGLASS BATT INSULATION •(1) LAYER 5/8" GYPSUM BOARD •LINER PANEL •REINFORCED POLY LINER •(1) LAYER 5/8" PLYWOOD •EXISTING WALL WT-07 INTERIOR WALL •LINER PANEL •REINFORCED POLY LINER •(1) LAYER 15/32" PLYWOOD •2x6 WOOD STUDS @ 16" O.C. •FI BERGLASS SOUND BATT INSULATION •(1) LAYER 5/8" GYPSUM BOARD WS-01 WALL SYSTEM • FIELD APPLIED NICHIHA FIBER CEMENT REINFORCED PANEL • AIR & VAPOR MEMBRANE (CONT.) • 5/8" PLYWOOD SHEATHING • 2" RIGID INSULATION (R-7.5 MIN.) • 2x6 WOOD STUDS @ 16" O.C. • BATT INSULATION (R-19) • POLY VAPOR RETARDER (TYP.) • (1) LAYER 5/8" GYPSUM BOARD OR (1) LAYER 1/2" DENS DECK PRIME ROOF BOARD AT BACK OF PARAPET WALLS WS-02 WALL SYSTEM • FIELD APPLIED AL13 ALUMINUM COMPOSITE PANEL SYSTEM • AIR & VAPOR MEMBRANE (CONT.) • 5/8" PLYWOOD SHEATHING • 2" RIGID INSULATION (R-7.5 MIN.) • 2x6 WOOD STUDS @ 16" O.C. • BATT INSULATION (R-19) • POLY VAPOR RETARDER (TYP.) • (1) LAYER 5/8" GYPSUM BOARD OR (1) LAYER 1/2" DENS DECK PRIME ROOF BOARD AT BACK OF PARAPET WALLS WS-03 WALL SYSTEM • EDCO METAL PANEL • AIR & VAPOR MEMBRANE (CONT.) • 5/8" PLYWOOD SHEATHING • 2" RIGID INSULATION (R-7.5 MIN.) • 2x6 WOOD STUDS @ 16" O.C. • BATT INSULATION (R-19) • POLY VAPOR RETARDER (TYP.) • (1) LAYER 5/8" GYPSUM BOARD OR (1) LAYER 1/2" DENS DECK PRIME ROOF BOARD AT BACK OF PARAPET WALLS WS-04 WALL SYSTEM • 60 MIL EPDM ROOF SYSTEM OR ULTRAPLY TPO ROOF MEMBRANE, VERIFY W/ OWNER • 1/2" DENS DECK PRIME ROOF BOARD • 2" RIGID INSULATION (R-7.5 MIN.) • 2x6 WOOD STUDS @ 16" O.C. • BATT INSULATION (R-19) • POLY VAPOR RETARDER (TYP.) • (1) LAYER 5/8" GYPSUM BOARD OR (1) LAYER 1/2" DENS DECK PRIME ROOF BOARD AT BACK OF PARAPET WALLS RS-01 ROOF SYSTEM • BALLASTED 60 MIL EPDM ROOF SYSTEM OR ULTRAPLY TPO ROOF MEMBRANE, VERIFY W/ OWNER • RIGID ROOF INSULATION (R-30 MIN.) • 3/4" TONGUE & GROOVE DECKING • PRE-ENGINEERED ROOF TRUSSES, SEE STRUCTURAL MARK COLOR LOCATIONMANUFACTURERMATERIALSERIES DESCRIPTION SIZE NOTES PAINT --P-1 PAINT - - P-2 ACOUSTICAL CEILING TILE 24"x24"x5/8"SEE REFLECTED CEILING PLAN ON SHEET A211 VERIFY STYLE & BRAND WITH OWNERBLACKTBDACT-1 PAINT - - P-3 SC-1 SEALED CONCRETE CURECRETE CLEAR -ASHFORD FORMULA CT-1 CERAMIC TILE DALTILE IRON - CRAFT 12" x 24" CT-2 CERAMIC TILE CT-3 CERAMIC TILE VINYL BASE --VB-1 TYPICAL @ ALL WALLS ARCHITECTURAL WALL PANEL -EXTERIORGRAYNICHIHIAMODERN SERIES - ARCHITECTURAL BLOCKAWP-1 ARCHITECTURAL WALL PANEL -EXTERIORAL-13AWP-2 -EXTERIORONYXEDCO METAL PANEL PRISM BOARD AND BATTEN PREFINISHED METAL - METAL CAP FLASHING OVER AWP-2 - AL-13 MTL-1 PRE-FINISHED METAL FLASHING PANEL SYSTEM FINISH SPECIFICATIONS TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD DALTILE IRON - CRAFT DALTILE IRON - CRAFT 12" x 24" 12" x 24" TBD TBD TBD BY OWNER, VERIFY COLOR & LOCATION BY OWNER, VERIFY COLOR & LOCATION BY OWNER, VERIFY COLOR & LOCATION TBD TBD TBD TBD SD341 - CORNELL RED AWP-3 ARCHITECTURAL WALL PANEL - - - - - PREFINISHED METAL -- TAUPE (74)METAL SALES MTL-2 24ga PRE-FINISHED METAL FLASHING - PREFINISHED METAL -METAL CAP FLASHING OVER AWP-3 -DARK BRONZE (50)MTL-3 - SD341 - CORNELL RED METAL CAP FLASHING OVER AWP-1 METAL SALES 24ga PRE-FINISHED METAL FLASHING Don F. Larsen Reg. No. 45747 Date: I hereby certify that this plan, s specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of MN. NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. Copyright Rice Companies, Inc. 2021. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 901 Summit Ave ● Mankato, MN 56001 4141 38th St SW, Ste 1-E ● Fargo, ND 58104 RICECOMPANIES.COM C: \ U s e r s \ a u s t i n . p i n g e l . R B C \ O n e D r i v e - R i c e C o m p a n i e s \ D o c u m e n t s \ L o c a l F i l e s \ B a d H a b i t B r e w i n g \ 2 0 2 1 B a d H a b i t P r o d u c t i o n E x p a n s i o n - C e n t r a l _ a u s t i n . p i n g e l W K 3 6 6 . r v t 11 / 1 5 / 2 0 2 1 9 : 0 2 : 3 9 A M SR . C . 2 1 . 0 3 8 11.12.21 A230 DMW 20 2 1 P R O D U C T I O N A D D I T I O N ST . J O S E P H , M N BA D H A B I T B R E W I N G 11.15.21 SC H E D U L E S DOOR TYPES FRAME TYPES WINDOW TYPES DOOR SCHEDULE MARK DOOR HARDWARE FIRE RATING FRAME COMMENTSWIDTH HEIGHT THICKNESS MATERIAL FINISH TYPE MATERIAL FINISH TYPE 101A 3' - 0" 8' - 0" 1 3/4" ALUM DARK BRONZE ANOD. B 2 ALUM DARK BRONZE ANOD. I 101B 3' - 0" 7' - 0" 1 3/4" ALUM DARK BRONZE ANOD. B 2 ALUM DARK BRONZE ANOD. I 102A 10' - 0" 8' - 0" 2"--C --- BY OVERHEAD DOOR SUPPLIER 102B 3' - 0" 8' - 0" 1 3/4" ALUM DARK BRONZE ANOD. B 2 ALUM DARK BRONZE ANOD. I 102C 3' - 0" 7' - 0" 1 3/4"WD STAIN B HM PAINT I 103 3' - 0" 7' - 0" 1 3/4"WD STAIN A HM PAINT I 104 3' - 0" 7' - 0" 1 3/4"WD STAIN A HM PAINT I 105A 3' - 0" 7' - 0" 1 3/4"WD STAIN B HM PAINT I 105B 8' - 0" 8' - 0" 2"--D --- BY OVERHEAD DOOR SUPPLIER 105C 3' - 0" 7' - 0" 1 3/4"HM PAINT A HM PAINT I 105D 3' - 0" 7' - 0" 1 3/4"HM PAINT A HM PAINT I Y 4' - 6 3/4" 8' - 0" ROOM FINISH SCHEDULE ROOM NO.ROOM NAME FLOORS WALLS CEILING HEIGHT COMMENTSFINISHBASENORTHSOUTHEASTWESTFINISH 101 VESTIBULE CPT-1 VB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 10' - 0" 102 TAP ROOM PC-1 VB-1 PT-1 PT-1 PT-1 PT-1 EXPOSED STRUCTURE VARIES 103 WOMEN CT-1 CT-2 CT-2 / CT-3 / PT-1 CT-2 / CT-3 / PT-1 CT-2 / CT-3 / PT-1 CT-2 / CT-3 / PT-1 ACT-1 9' - 0" SEE INTERIOR ELEVATIONS 104 MEN CT-1 CT-2 CT-2 / CT-3 / PT-1 CT-2 / CT-3 / PT-1 CT-2 / CT-3 / PT-1 CT-2 / CT-3 / PT-1 ACT-1 9' - 0" SEE INTERIOR ELEVATIONS 105 HALL 106 WAREHOUSE EP-1 EP-1 PT-1 PT-1 PT-1 PT-1 EXPOSED STRUCTURE VARIES WALL TYPES WALL SYSTEMS ROOF SYSTEM REVISIONS NUMBER DATE 151717 2 A400 6 12 105C 105B NEW CONSTRUCTIONEXISTING 3 78 4 12 12 A NEW CONSTRUCTIONEXISTING 6 3 12 1 2 AWP-1; SEE FINISH SCHEDULE. AWP-2; SEE FINISH SCHEDULE. INSULATED STEEL OVERHEAD GARAGE DOOR, SEE DOOR SCHEDULE. STEEL FENCE; PAINTED. AWP-3; SEE FINISH SCHEDULE. EXTRUDED ALUMINUM STOREFRONT SYSTEM OR OVERHEAD DOOR; DARK BRONZE ANODIZED ALUMINUM. 3 4 5 6 CONSTRUCTION NOTES 7 8 PRE-FINISHED METAL CAP FLASHING; SEE FINISH SCHEDULE. 9 INSULATED HOLLOW METAL DOOR & FRAME; SEE DOOR SCHEDULE 10 EXTERIOR WALL PACK, LED LIGHT. OVER FLOW ROOF SCUPPER. 11 SIGNAGE, BY OWNER. 12 CONCRETE FILLED PIPE BOLLARDS, 2/A201 AND STRUCTURAL FOR DETAILS. PAINT TO MATCH AWP-2. 13 GUTTERS & DOWN SPOUTS, PAINT TO MATCH AWP-3. Don F. Larsen Reg. No. 45747 Date: I hereby certify that this plan, s specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of MN. NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. Copyright Rice Companies, Inc. 2021. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 901 Summit Ave ● Mankato, MN 56001 4141 38th St SW, Ste 1-E ● Fargo, ND 58104 RICECOMPANIES.COM C: \ U s e r s \ d o n \ D o c u m e n t s \ R e v i t L o c a l F i l e s \ 2 0 2 1 B a d H a b i t P r o d u c t i o n E x p a n s i o n - C e n t r a l _ d o n . l a r s e n @ r i c e c o m p a n i e s . c o m . r v t 11 / 1 6 / 2 0 2 1 1 1 : 1 5 : 0 7 A M SR . C . 2 1 . 0 3 8 11.12.21 A301 DMW 20 2 1 P R O D U C T I O N A D D I T I O N 25 C O L L E G E A V E . N , S T . J O S E P H , M N BA D H A B I T B R E W I N G 11.15.21 EX T E R I O R E L E V A T I O N S 1/4" = 1'-0"1 / A2011NORTHWEST ELEVATIONS 1/4" = 1'-0"1 / A2012NORTH ELEVATION REVISIONS NUMBER DATE 161818 2 A400 1 2 NEW CONSTRUCTION EXISTING 101A AA 102A AA 102B 1 6 2 11 6 11 3 5 5 5 4 4 1 A400 A C DB C C C C C C C B B BB C C C 3 6 9 9 9 1 131310 10 13 106 4 2 11 4 1 2 AWP-1; SEE FINISH SCHEDULE. AWP-2; SEE FINISH SCHEDULE. INSULATED STEEL OVERHEAD GARAGE DOOR, SEE DOOR SCHEDULE. STEEL FENCE; PAINTED. AWP-3; SEE FINISH SCHEDULE. EXTRUDED ALUMINUM STOREFRONT SYSTEM OR OVERHEAD DOOR; DARK BRONZE ANODIZED ALUMINUM. 3 4 5 6 CONSTRUCTION NOTES 7 8 PRE-FINISHED METAL CAP FLASHING; SEE FINISH SCHEDULE. 9 INSULATED HOLLOW METAL DOOR & FRAME; SEE DOOR SCHEDULE 10 EXTERIOR WALL PACK, LED LIGHT. OVER FLOW ROOF SCUPPER. 11 SIGNAGE, BY OWNER. 12 CONCRETE FILLED PIPE BOLLARDS, 2/A201 AND STRUCTURAL FOR DETAILS. PAINT TO MATCH AWP-2. 13 GUTTERS & DOWN SPOUTS, PAINT TO MATCH AWP-3. D 1 2 6 6 NEW CONSTRUCTION EXISTING 12 ' - 5 " 1/4" = 1'-0"1 / A2011EAST ELEVATION 1/4" = 1'-0"1 / A2012SOUTHEAST ELEVATIONS 1/4" = 1'-0"1 / A2013NORTHEAST ELEVATION Don F. Larsen Reg. No. 45747 Date: I hereby certify that this plan, s specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Architect under the laws of the State of MN. NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. Copyright Rice Companies, Inc. 2021. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 901 Summit Ave ● Mankato, MN 56001 4141 38th St SW, Ste 1-E ● Fargo, ND 58104 RICECOMPANIES.COM C: \ U s e r s \ d o n \ D o c u m e n t s \ R e v i t L o c a l F i l e s \ 2 0 2 1 B a d H a b i t P r o d u c t i o n E x p a n s i o n - C e n t r a l _ d o n . l a r s e n @ r i c e c o m p a n i e s . c o m . r v t 11 / 1 6 / 2 0 2 1 1 1 : 1 3 : 3 8 A M SR . C . 2 1 . 0 3 8 11.12.21 A300 DMW 20 2 1 P R O D U C T I O N A D D I T I O N 25 C O L L E G E A V E . N , S T . J O S E P H , M N BA D H A B I T B R E W I N G 11.15.21 EX T E R I O R E L E V A T I O N S REVISIONS NUMBER DATE 171919 182020 SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN F M F M F M F M F M F M F M F M F M S S T O S T O S T O S T O S T O S T O STO STO STO STO STO STO S T O G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S GA S GA S GA S GA S GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS G A S TC = 1094.43 INV = 1089.83 TC = 1094.66 INV NW = 1087.46 INV SW = 1086.66 8" VCP 6 " C I 12" RCP 6" DI 1" COP TC = 1095.44 INV N = 1089.96 INV SW = 1090.06 W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T WAT WAT WAT WAT WAT TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TU G TU G TU G TU G TU G TU G TU G TU G TU G TU G T U G T U G T U G T U G TU G T U G T U G TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TU G TU G FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO F O F O F O F O FO FO F O F O F O F O F O F O F O F O PUG P U G P U G P U G P U G T X 1095 1 0 9 5 1 0 9 5 1096 1095 1095 1 0 9 4 1094 10 9 4 1 0 9 5 10 9 5 1096 10 9 6 1094.54 1094.12 1095.58 1095.46 1095.36 1095.31 1095.13 1095.09 1095.07 1095.08 1094.63 1094.65 1094.48 1094.47 1094.46 1094.16 1094.73 1095.11 1094.44 1094.47 1096.14 1096.00 1095.94 1095.86 1095.71 1095.65 1095.50 1095.40 1095.50 1095.30 (B) 1095.30 (B) 1095.08 1095.30 1095.30 1095.31 2 . 9 6 % -1.83% -1.79% - 1 . 9 9 % - 1 . 9 9 % -0.27% -0.23% 1094.65 1095.40 1095.40 1094.42 -2.73% -2.93% 1094.65 -1 . 5 3 % GRADE SHALLOW SWALES TO PROPOSED CURB CUT FFE=1095.50 REMOVE 11LF CURB. CONSTRUCT 5LF B618 CURB CUT WITH 3' BEAVERTAIL EACH SIDE. GUTTER FLOW LINE SHALL MATCH EXISTING. REMOVE 42LF CURB. CONSTRUCT 42LF B618 WITH VARIABLE CURB BACK HEIGHT TO MATCH PLANS. GUTTER FLOW LINE SHALL MATCH EXISTING. BEAVERTAIL CURB CONSTRUCT THICKENED EDGE SIDEWALK. EXTEND BOTTOM OF CURB TO BOTTOM OF EXISTING WALK AGGREGATE BASE. (SEE DETAIL) MATCH EXISTING CURB MATCH EXISTING SIDEWALK MATCH EXISTING CURB TAPER CURB BACK TO MATCH STOOP X X X X X X X X X X X X X REMOVE AND REPLACE BITUMINOUS PAVEMENT AS NEEDED FOR STORM SEWER CONNECTION. MATCH EXISTING SECTION. MATCH EXISTING PAVEMENT TRASH ENCLOSURE BY OTHERS AND SHOWN FOR REFERENCE ONLY BEAVERTAIL CURB Common Ground Alliance Call 48 Hours before digging: 811 or call811.com ST . J O S E P H , M N BA D H A B I T B R E W I N G 12.07.2021 Pr o j e c t N u m b e r : S R . C . 2 1 . 0 3 8 REVISIONS NUMBER DATE .. .. .. .. .. William R. Huston Lic. No. 44984 Date:12.07.2021 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2021. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 901 Summit Ave ● Mankato, MN 56001 4141 38th St SW, Ste 1-E ● Fargo, ND 58104 RICECOMPANIES.COM WRH 20 2 1 P R O D U C T I O N A D D I T I O N 0'10'20'30' PROPERTY LINE 982 980 STO STORM SEWER DRAIN TILE WATER MAIN SANITARY SEWER EXISTING PROPOSED INDEX CONTOUR INTERVAL CONTOUR982 980 WAT SAN SPOT ELEVATION FLOW DIRECTION CURB AND GUTTER GRADING LEGEND 1. LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS SHOWN ON THIS PLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND UTILITY LOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND. 2. CONTRACTORS SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF VESTIBULE, SLOPED PAVEMENT, EXIT PORCHES, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS, EXACT BUILDING UTILITY ENTRANCE LOCATIONS, AND EXACT LOCATIONS AND NUMBER OF DOWNSPOUTS. BUILDING ADDITION LOCATIONS SHALL BE VERIFIED WITH THE EXISTING BUILDING AND ARCHITECTURAL DRAWINGS PRIOR TO CONSTRUCTION. 3. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF "STANDARD SPECIFICATIONS FOR TRENCH EXCAVATION AND BACKFILL/SURFACE RESTORATION" AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA. 4. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE FOUR INCHES OF TOPSOIL AND SOD OR SEED. THESE AREAS SHALL BE WATERED UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. SEE LANDSCAPE PLAN FOR PLANTING AND TURF ESTABLISHMENT. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. PLACEMENT OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER PRIOR TO PLACEMENT. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MNDOT STANDARDS. 6. ALL SLOPES SHALL BE GRADED TO 4:1 OR FLATTER, UNLESS OTHERWISE INDICATED ON THIS SHEET. 7. CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING AND PROVIDE A SMOOTH FINISHED SURFACE WITH UNIFORM SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN OR BETWEEN SUCH POINTS AND EXISTING GRADES. 8. SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS & GUTTER FLOW LINE UNLESS OTHERWISE NOTED. PROPOSED CONTOURS ARE TO FINISHED SURFACE GRADE. 9. SEE SOILS REPORT FOR PAVEMENT THICKNESSES AND HOLD DOWNS. 10. CONTRACTOR SHALL DISPOSE OF ANY EXCESS SOIL MATERIAL THAT EXISTS AFTER THE SITE GRADING AND UTILITY CONSTRUCTION IS COMPLETED. THE CONTRACTOR SHALL DISPOSE OF ALL EXCESS SOIL MATERIAL IN A MANNER ACCEPTABLE TO THE OWNER AND THE REGULATING AGENCIES. 11. ALL CONSTRUCTION SHALL CONFORM TO LOCAL, STATE AND FEDERAL RULES INCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS. 12. PRIOR TO PLACEMENT OF ANY STRUCTURE OR PAVEMENT, A PROOF ROLL, AT MINIMUM, WILL BE REQUIRED ON THE SUBGRADE. PROOF ROLLING SHALL BE ACCOMPLISHED BY MAKING MINIMUM OF 2 COMPLETE PASSES WITH FULLY-LOADED TANDEM-AXLE DUMP TRUCK, OR APPROVED EQUAL, IN EACH OF 2 PERPENDICULAR DIRECTIONS WHILE UNDER SUPERVISION AND DIRECTION OF THE INDEPENDENT TESTING LABORATORY. AREAS OF FAILURE SHALL BE EXCAVATED AND RE-COMPACTED AS SPECIFIED HEREIN. 13. EMBANKMENT MATERIAL PLACED BENEATH BUILDINGS AND STREET OR PARKING AREAS SHALL BE COMPACTED IN ACCORDANCE WITH THE SPECIFIED DENSITY METHOD AS OUTLINED IN MNDOT 2105.3F1 AND THE REQUIREMENTS OF THE GEOTECHNICAL ENGINEER. 14. EMBANKMENT MATERIAL NOT PLACED IN THE BUILDING PAD, STREETS OR PARKING AREA, SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTS OF THE ORDINARY COMPACTION METHOD AS OUTLINED IN MNDOT 2105.3F2. 15. ALL SOILS AND MATERIALS TESTING SHALL BE COMPLETED BY AN INDEPENDENT GEOTECHNICAL ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE GEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND INSPECTIONS WITH THE GEOTECHNICAL ENGINEER. GRADING NOTES 0.00% 900.00900.00 BENCHMARK TNH - NW QUADRANT OF COLLEGE AVENUE NORTH & ASH STREET EAST ELEV.=1094.16 R: \ C A D \ B A D H A B I T B R E W I N G \ 0 0 - C U R R E N T \ C I V I L \ C A D \ S H E E T S \ B A D H A B I T - G D 0 1 . D W G C301 GR A D I N G P L A N BITUMINOUS PAVEMENT CONCRETE PAVEMENT CONCRETE SIDEWALK 2221 SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN F M F M F M F M F M F M F M S S T O S T O S T O S T O S T O STO STO STO STO STO S T O G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S GA S GA S GA S GA S GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS G A S TC = 1094.43 INV = 1089.83 TC = 1094.66 INV NW = 1087.46 INV SW = 1086.66 8" VCP 6 " C I 12" RCP 6" DI 1" COP TC = 1095.44 INV N = 1089.96 INV SW = 1090.06 W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T W A T WAT WAT WAT WAT TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TU G TU G TU G TU G TU G TU G TU G TU G TU G TU G T U G T U G T U G T U G TU G T U G T U G TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TU G TU G FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO F O F O F O F O FO FO F O F O F O F O F O F O F O F O PUG P U G P U G P U G P U G T X 1095 1 0 9 5 1 0 9 5 1096 1095 1095 1 0 9 4 1094 10 9 4 1 0 9 5 10 9 5 1096 10 9 6 1094.54 1094.12 1095.58 1095.46 1095.36 1095.31 1095.13 1095.09 1095.07 1095.08 1094.63 1094.65 1094.48 1094.47 1094.46 1094.16 1094.73 1095.11 1094.44 1094.47 1096.14 1096.00 1095.94 1095.86 1095.71 1095.65 1095.50 1095.40 1095.50 1095.30 (B) 1095.30 (B) 1095.08 1095.30 1095.30 1095.31 2 . 9 6 % -1.83% -1.79% - 1 . 9 9 % - 1 . 9 9 % -0.27% -0.23% 1094.65 1095.40 1095.40 1094.42 -2.73% -2.93% 1094.65 -1 . 5 3 % FFE=1095.50 X X X X X X X X X X X X X 35 LF-8 " P V C @ 1 . 0 4 % 1 6 L F - 8 " P V C @ 1 . 0 4 % 23 LF-8 " P V C @ 1 . 0 4 % EX CB-101 RE=1094.43 IE=1089.83 (E) CORE DRILL AND CONNECT TO EXISTING CB IE=1090.43 (NW) CONTRACTOR TO VERIFY EXISTING SIZE, ELEVATION, LOCATION, AND TYPE. PROVIDE DOWNSPOUT CONNECTION PER DETAILS. VERIFY DOWNSPOUT LOCATIONS. 18 LF-8" PVC @ 1.04% 8"-90° BEND Common Ground Alliance Call 48 Hours before digging: 811 or call811.com ST . J O S E P H , M N BA D H A B I T B R E W I N G 12.07.2021 Pr o j e c t N u m b e r : S R . C . 2 1 . 0 3 8 REVISIONS NUMBER DATE .. .. .. .. .. William R. Huston Lic. No. 44984 Date:12.07.2021 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2021. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 901 Summit Ave ● Mankato, MN 56001 4141 38th St SW, Ste 1-E ● Fargo, ND 58104 RICECOMPANIES.COM WRH 20 2 1 P R O D U C T I O N A D D I T I O N 0'10'20'30' R: \ C A D \ B A D H A B I T B R E W I N G \ 0 0 - C U R R E N T \ C I V I L \ C A D \ S H E E T S \ B A D H A B I T - U T 0 1 . D W G C401 UT I L I T Y P L A N 1. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION SHALL NOT BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR ENGINEER OF DISCREPANCIES. 2. ALL STORM SEWER MATERIAL AND INSTALLATIONS SHALL BE PER CITY REQUIREMENTS, MINNESOTA PLUMBING CODE, AND IN ACCORDANCE WITH THE CURRENT EDITION OF "STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION AND SANITARY SEWER AND STORM SEWER INSTALLATION" AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA. 3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE NECESSARY FEDERAL, STATE AND LOCAL PERMITS FOR THE PROPOSED WORK OR VERIFY WITH THE OWNER OR ENGINEER THAT PERMITS HAVE BEEN OBTAINED. PERMIT FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE ARRANGED WITH THE OWNER. 4. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND DIMENSIONS OF DOORWAYS, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY CONNECTION LOCATIONS. 5. ALL PRIVATE UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFICATIONS OF THE APPROPRIATE UTILITY COMPANY. THE CONTRACTOR SHALL COORDINATE THE SERVICE LINE CONSTRUCTION WITH THE UTILITY COMPANIES. 6. CONTRACTOR SHALL OBTAIN ALL NECESSARY CITY PERMITS FOR UTILITY CONNECTIONS, AND UTILITIES SHALL BE INSPECTED AND APPROVED BY THE CITY. THE CITY SHALL BE NOTIFIED 48-HOURS PRIOR TO COMMENCING WITH THE UTILITY CONSTRUCTION OR ANY REQUIRED TESTING. CONTRACTOR SHALL NOT OPERATE, INTERFERE WITH, CONNECT ANY PIPE OR HOSE TO, OR TAP ANY WATER MAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE TO BE THE RESPONSIBILITY OF THE CONTRACTOR. 7. A MINIMUM VERTICAL SEPARATION OF 18 INCHES IS REQUIRED AT ALL WATER LINE CROSSINGS WITH STORM SEWER. THE WATER LINE SHALL NOT HAVE JOINTS OR CONNECTION WITHIN 10-FEET OF THE CROSSING. INSULATE CROSSINGS WITH STORM SEWER. 8. STORM SEWER PIPE: A. PVC STORM SEWER PIPE AND FITTINGS SHALL BE PER ASTM D3034 (SDR 26 AND 35) OR ASTM F794 (SCH 40). PVC PIPE SHALL BE INSTALLED PER ASTM D2321. B. ALL STORM SEWER JOINTS AND STRUCTURE CONNECTIONS SHALL BE GASTIGHT OR WATERTIGHT AS REQUIRED BY MINNESOTA PLUMBING CODE, PART 707.3. STORM SEWER SHALL BE TESTED PER MINNESOTA PLUMBING CODE, SECTION 712, EXCEPT AS PROVIDED IN SECTION 1107. 9. ALL NONCONDUCTIVE PIPE SHALL BE INSTALLED WITH A LOCATE (TRACER) WIRE PER MINNESOTA PLUMBING CODE, PART 604.9. 10. AFTER CONSTRUCTION IS COMPLETED, THE CONTRACTOR SHALL PROVIDE THE OWNER WITH AN AS-BUILT RECORD OF UTILITY CONSTRUCTION. THE AS-BUILT SHALL INCLUDE LOCATION AND LENGTH DEVIATIONS OR CHANGES TO THE PLAN. CONTRACTOR TO VERIFY WITH OWNER OR ENGINEER WHETHER A PLAN WITH POST-CONSTRUCTION ELEVATIONS IS REQUIRED. GENERAL STORM SEWER NOTES STORM SEWER LEGEND PROPOSED SANITARY SEWER STORM SEWER WATER MAIN EASEMENT LINE PROPERTY LINE HYDRANT GATE VALVE DRAIN TILE FLARED END SECTION (WITH RIPRAP) LIGHT POLE GAS UNDERGROUND ELECTRIC UNDERGROUND TELEPHONE OVERHEAD ELECTRIC OVERHEAD TELEPHONE TELEPHONE FIBER OPTIC CABLE TELEVISION SANITARY SEWER FORCE MAIN CURB AND GUTTER GAS PUG TUG POH TOH FO CTV FM EXISTING SAN STO WAT WAT GAS PUG TUG POH TOH FO CTV FM S DT 2322 Planning Commission Agenda Item 5 b, c, d MEETING DATE: December 13th, 2021 AGENDA ITEM: 5b – 2022 meeting schedule 5c – 2022 Chair and Vice Chair nomination 5d – Special meetings SUBMITTED BY: Community Development STAFF RECOMMENDATION: Approve item 5b and provide recommendation on item 5c PREVIOUS PLANNING COMMISSION ACTION: None BACKGROUND INFORMATION: 5b – attached is the proposed meeting schedule for 2022. No changes on the proposed time and day of month from 2021. All meetings will occur on the 2nd Monday at 6PM. 5c – staff is looking for nominations for 2022 Chair and Vice Chair. 5d – Staff will provide a brief verbal update pertaining to best practices for calling a Special meeting BUDGET/FISCAL IMPACT: None ATTACHMENTS: 2022 meeting schedule REQUESTED PLANNING COMMISSION ACTION: 5b – Motion to approve the 2022 schedule as proposed 5c – Motion on nominations for 2022 Chair and Vice Chair 5d – No formal action needed 192124 2022 Planning Submittal and Meeting Dates Phone 320-229-9425 Submittal Deadline Planning Commission By 12:00 pm December 20 1/10/22 January 21 2/14/22 February 18 3/14/22 March 18 4/11/22 April 15 5/09/22 May 20 6/13/22 June 17 7/11/22 July 15 8/8/22 August 19 9/12/22 September 16 10/10/22 October 21 11/14/22 November 18 12/12/22 December 16 1/09/22 A complete application must be submitted by the deadlines indicated above. No exceptions! After Planning Commission, the Council takes action on the application. Council meets on the 1st and 3rd Monday of the month. 25