Loading...
HomeMy WebLinkAbout11.13.23CITY OF ST. JOSEPH www.cityofstjoseph.com 75 Callaway Street East | Saint Joseph, Minnesota 56374 Email: cityoffices@cityofstjoseph.com | Phone: 320.363.7201 | Fax 320.363-0342 St. Joseph Planning Commission Monday, November 13th, 2023 6:00 PM St. Joseph Council Chambers 75 Callaway St E **The meeting will also be available through Zoom** 1.Call to Order 2.Pledge of Allegiance 3. Public Comment 4. Agenda Review and Adoption 5. Approval of October 9th, 2023 minutes 6.New Business a.Public Hearing – Rezone of 13 2nd Ave NW - House of Hern, LLC b.Public Hearing - Conditional Use Permit – Outdoor Storage - Manion’s Properties, LLC c.2024 Land Use Application Submittal Deadlines 7. Old Business a.Public Hearing – Zoning Amendment 502.12 - Landscape requirements in Industrial Zoned Properties 8.Other Business 9. Adjourn ZOOM INFORMATION Join Zoom Meeting https://us06web.zoom.us/j/87642407431?pwd=bXlkL3NlM2VKNXVMdmk2MC91blYxUT09 Meeting ID: 876 4240 7431 Passcode: 797162 One tap mobile +19292056099,,87642407431#,,,,*797162# US (New York) Dial by your location Find your local number: https://us06web.zoom.us/u/kblhxKat7W 1 October 9th, 2023 Page 1 of 2 Pursuant to due call and notice thereof, the Planning Commission for the City of St. Joseph met on Monday, October 9th, 2023, at 6:00 PM in the St. Joseph City Hall opening with the Pledge of Allegiance. Planning Commission Members Present: Commissioners, Keith Louwagie, Mark Thompson, Carmie Mick, John Hazen, Bob Loso Absent: Gina Dullinger, Isabella Margl Staff Present: Nate Keller, Community Development Director Public Comments: None. Agenda Review & Adoption: Hazen made a motion to approve Agenda Review & Adoption. The motion was seconded by Louwagie and passed unanimously by those present. Approval of August 28th minutes: Hazen made a motion to approve August 28th minutes. The motion was seconded by Louwagie and passed unanimously by those present. Approval of September 11th minutes: Hazen made a motion to approve September 11th minutes. The motion was seconded by Louwagie and passed unanimously by those present. Aye: Louwagie, Hazen, Mick, Thompson Motion Prevails 4:1 Abstain: Loso New Business: a.Public Hearing – Interim Use Permit – Heim-Kins, LLC Keller shared Heim-Kins, LLC is requesting renewal of their Interim Use permit. Heim-Kins is located at 219 Cedar Street East. The property is zoned B-2 Highway district. The IUP allows for an outdoor market, sale, and display of their merchandise. The IUP was originally issued in 2018. The Commission discussed parking. Parking spaces on the west side of the building are difficult to utilize when the parallel parking spots adjacent to the property are utilized. Mick opened the Public Hearing at 6:10PM. As no one wished to speak, Mick closed the Public Hearing at 6:11PM. Loso made a motion to Approve Resolution Adopting Findings of Fact recommending the City Council issue an Interim Permit renewal for five years. The motion was seconded by Hazen and passed unanimously by those present. b.Public Hearing – Conditional Use Permit – Summit Commons, LLC Summit Commons, LLC has submitted a Conditional Use Permit (CUP) for outdoor storage. If approved, the CUP would allow for outdoor storage of vehicles and recreation vehicles including boats, trailers, atv’s, etc. The applicant is proposing approximately 237 parking spaces. The site location is north of highway 75 and south of the Wobegon Trail. The city owns a parcel of land directly south of the subject site. The site does have a recorded access agreement with the city which allows for direct access. The proposed site boasts heavy vegetation throughout including many deciduous trees. The NE area of the site is more open and visible from the Wobegon Trail. Staff have recommended coniferous trees be planted in this area to reduce visibility of the site from the trail. City Code 502.12 Subd 12 Section B states the commercial/industrial uses allow for outside storage of equipment, materials, and inventory as a principal or accessory use. Keller provided an overview of the site features and proposed improvements, conditions of approval, and staff recommended conditions. The Commission had questions for the applicant regarding on-site management, amount of traffic, and parking space size. 2 October 9th, 2023 Page 2 of 2 Santiago Romero, Applicant: Santiago shared the property management team operates in St. Cloud; management will be mainly off-site. Santiago also noted his property management team also manages the mobile home park in St. Joseph. Santiago shared spaces will be rented monthly therefore they do not foresee a lot of traffic. Parking spaces do vary in size to accommodate large RV’s, pontoons, boats, etc. Louwagie inquired about access to the proposed site. As the road passes through the city owned portion, there is no delineation of a road. Keller shared the Public Works Director sat in on the meetings regarding this proposed project and had no concerns regarding traffic flow on the city owned property. There has been discussion with the applicant regarding directional signage and whether that may be necessary. Mick opened the Public Hearing at 6:36PM. As no one wished to speak, Mick closed the Public Hearing at 6:37PM. Hazen made a motion to Approve Resolution Adopting Findings of Fact with conditions and recommending the City Council issue a Conditional Use Permit. The motion was seconded by Louwagie and passed unanimously. Old Business: a. Landscape requirements in Industrial Zoned Properties There has been discussion on this topic at the past couple of PC meetings. Last month, direction was given to staff to blend options three and four of the staff drafted ordinance language. Options three and four allow a more flexible review and approval process for staff when administering landscape standards; removes minimum quantity of trees and shrubs, requires plantings to be more visible in the public right of way, front of buildings, and boundar y lines of parking lots. The Commission discussed and noted some minor verbiage changes and were otherwise agreeable to the newly drafted ordinance language. Hazen made a motion for staff to make changes as noted and draft a formal ordinance amendment. The motion was seconded by Thompson and passed unanimously by those present. Other Business: Keller updated the Commission on the following: • Keller has been fielding calls received on the Feed Mill for sale. The listing was recently updated which has sparked interest in the property. • At the October 2nd Council meeting a councilmember brought up the CUP for the Special Event Facility. After discussion, Council agreed to reconsider two of the conditions. One condition tied to the hours of operation and the other is tied to the accessory building matching the principal building. Staff were directed to work with the applicant on those items and bring back for action. • The former gas station site near downtown has been purchased. Adjourn: Hazen moved to adjourn the meeting at 6:48PM. The motion was seconded by Thompson and the motion carried. Minutes approved by: Nate Keller Community Development Director 3 Planning Commission Agenda Item 6a MEETING DATE: November 13th, 2023 AGENDA ITEM: Public Hearing – Rezone application – 13 2nd Ave NW ACTION REQUESTED: Approval of Rezone PREVIOUS PLANNING COMMISSION ACTION: None BACKGROUND INFORMATION: Rezone Request Applicant Information: House of Hern, LLC Existing Zoning: R-3 Multi-Family Proposed Rezone: B-1 Central Business District Future Land Use: Central Business District (B-1 Downtown Commercial) Location: 13 2nd Ave NW Access: The site has two existing accesses (2nd Ave NW and Minnesota St) House of Hern, LLC (applicant and owner) has submitted a rezone application. The applicant is proposing to rezone the property from R-3 Multi-Family to B -1 Central Business District (downtown zoning designation). The future land use map (from the Comprehensive Plan) guides the property for Central Business District. Applicants intent for the property is to build a Commercial building. The details are still being refined through a pro-active public engagement process launched by the applicant. Applicant has launched website at www.synergystjoseph.com The website provides folks the opportunity to voice what amenities/services they’d like to see in this future building. The feedback will continue to be obtained in the coming months and will refine/shape the overall vision of the property. Two likely scenarios are a building with multiple tenant spaces or a building with one main user. A parking proposal and potential variance for North side setback will likely come to Planning and Council in the coming months as the vision is refined and site plan developed. When evaluating a rezone, the 1st step is to determine if the rezone is in alignment with future land use guidance. The second step is to determine how the rezone is compatible or not compatible with surrounding land uses. This helps avoid “spot zoning”. Some details on property immediately adjacent to the subject site: Adjacent Property Existing Zoning Future Zoning To the North 2nd Ave Cuts Barbershop R-3 Multi-Family Current use is Barbershop Central Business District To the West R-3 Multi-Family. Current use is residential rental Central Business District 4 To the East across 2nd Ave NW B-1 Central Business District. Current use is rental residential on corner of MN and 2nd. 2nd property from corner is commercial. Central Business District To the South across Minnesota St R-1 Single Family. Two properties are rental residential. The third is residential however it just contains a garage and is mostly vacant Central Business District Overall the proposal to rezone is in alignment with future guidance and compatible with future uses of adjacent properties as all adjacent properties are guided for Downtown Commercial uses. 5 Map showing existing Zoning: 6 Map showing Future Land Use. Areas shown in red are future B-1 Central Business District. ATTACHMENTS: Rezone application Finding of Fact Resolution Resolution establishing the Rezone REQUESTED PLANNING COMMISSION ACTION: 1. Open and close Public Hearing 2. Motion to approve Finding of Fact Resolution 3. Motion to approve rezone resolution 7 8 9 10 11 RESOLUTION 2023-ABC RESOLUTION ADOPTING FINDINGS OF FACT RELATED TO A REZONING REQUEST FROM R3 MULTI-FAMILY TO B-1 CENTRAL BUSINESS DISTRICT WHEREAS, the City of St. Joseph received an application from House of Hern, LLC for the request to rezone property from R3 Multi-Family to B-1 Central Business District on the property legally described as follows: Lot 12, Block 7 of Townsite of St Joseph Parcel ID 84.53839.0000 “Subject Property” WHEREAS, on November 13th, 2023, the St. Joseph Planning Commission held a public hearing and reviewed the rezoning request and recommended approval; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ST. JOSEPH, STEARNS COUNTY, STATE OF MINNESOTA, finds the following facts: 1. That House of Hern, LLC, hereinafter referred to as “Applicant,” properly applied for the rezoning for the Subject Property. 2. That the requested rezoning designation for the Subject Property is B-1 Central Business District. 3. That the future land use plan within the City of St. Joseph Comprehensive Plan guides the Subject Property for Central Business District. 4. That the surrounding property is guided for Central Business District. 5. That Central Business District includes a range of retail, entertainment, office, and service commercial developments and the corresponding zoning district is B-1 according to the City of St. Joseph Comprehensive Plan. 6. That the purpose for the zoning establishment is to make the land use map and zoning designation consistent and conforming. 16 7. That the properties to the East are zoned B-1 Central Business District, properties to the North are zoned R3 Multi-Family, properties to the West are zoned R3 Multi-family, and properties to the South across Minnesota St are zoned R-1 Single Family. 8. That all adjacent properties to the South, West, and North have a future land use of B1 Central Business District and properties to the East have a current zoning designation of B1 Central Business District in accordance to the Comprehensive Plan. 8. That the B-1 District permitted uses includes commercial and retails uses and a building with this use would be compatible with the surrounding uses. 9. That the property is situated adjacent to a Community Collector Street (Minnesota St W) and access restrictions are in place. Whereupon said resolution was declared duly passed and adopted by the St. Joseph City Council this November 20th, 2023. CITY OF ST. JOSEPH Rick Schultz, Mayor ATTEST David Murphy City Administrator Document drafted by: City of St. Joseph 75 Callaway St E St. Joseph, MN 56374 17 RESOLUTION 2023-ABCD AN ORDINANCE ESTABLISHING THE ZONING ON CERTAIN PROPERTY FROM R3 MULTI-FAMILY TO B-1 CENTRAL BUSINESS DISTRICT WHEREAS, House of Hern, LLC has petitioned the rezoning request on the subject property located at 103 2nd Ave NW and legally identified as lot 12, block 7 of Townsite of St. Joseph; and WHEREAS, the proper publication in the city’s designated paper and mailed notice of the public hearing to properties within three hundred and fifty feet (350) considering this matter has been given; and WHEREAS, The Planning Commission conducted the public hearing on November 13th, 2023 at which all persons interested were given an opportunity to be heard; and WHEREAS, The Planning Commission reviewed the request on November 13th, 2023 and recommended approval of the rezoning; and WHEREAS, it was determined that the rezoning of the subject property is in the best interests of the City of St. Joseph; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ST. JOSEPH, STEARNS COUNTY, STATE OF MINNESOTA: That the rezone of the subject property is hereby amended from R-3 Multi-family District to B-1 Central Business District and this rezone will allow for the construction of uses allowed in the B-1 Central Business District as defined by Ordinance. Subject property legal description: Lot 12, Block 7 of Townsite of St. Joseph according to the recorded plat thereof, Stearns County, Minnesota Parcel ID: 84.53839.0000 BE IT FURTHER RESOLVED: That the clerk is hereby authorized to record such classification from the described property upon the official zoning map causing the same to be published. Whereupon said ordinance was declared duly adopted by the St. Joseph City Council this 20th day of November, 2023. CITY OF ST. JOSEPH Rick Schultz, Mayor ATTEST David Murphy City Administrator Document drafted by: City of St. Joseph 75 Callaway St E St. Joseph, MN 56374 18 Planning Commission Agenda Item 6b MEETING DATE: November 13th, 2023 AGENDA ITEM: Conditional Use Permit – Manion Properties, LLC (Public Hearing) STAFF RECOMMENDATION: Approval of Conditional Use Permit with conditions. PREVIOUS PLANNING COMMISSION ACTION: None BACKGROUND INFORMATION: Conditional Use Permit – Outdoor Storage Manion Properties, LLC (applicant + owner) has submitted a request for a Conditional Use permit to allow for outdoor storage on a parcel that abuts their current facilities and storage yard. Property is zoned I-1 Light Industrial and outdoor storage is a permitted accessory use via a Conditional Use permit. Manion Properties owns all three parcels that border the subject lot to the South. Two of the existing parcels also contain outdoor storage. No C.U.P. exists however because the property was annexed into the city after the use was existing. The subject parcel is about 10 acres. Approximately two plus acres will be preserved wetland area and serve as infiltration basins the remaining area will be storage. The storage area will be used to store lumber, and shingles. Applicant is proposing to enclose the storage yard with a chain link fence with barbed wire on top. The fence will match their existing fencing on their subject site. Code does not allow barbed wire except in agricultural districts. The Commission can however elect to allow this material. Given the existing fencing has barbed wire and fence will match existing staff does not see any big concerns. If no fence existed staff would recommend not to allow barbed wire. Findings of Fact Staff have prepared a Findings of Fact and Resolution. City Code 502.07 requires Planning Commission to conduct a Public Hearing and for the Council to adopt a Findings of Fact. The Findings are defined within 502.07 Subd. 1 Section C. The attached resolution specifies the findings required. The drafted resolution has conditions tied to: • Fencing • Lighting • Access • Surfacing • Clearly delineating the storage areas • Future roadway. The city shows potential roadway corridor adjacent to the site. Given the constraint of wetlands in the area its possible the corridor may need to go through NorthEast portion of the site. However the corridor location is undetermined and design cannot occur until its known how property to the North develops. The condition notes that if its determined road needs to go through the NE portion of site the city is not responsible for any relocation of the infiltration basin and applicant is constructing the basin in this location at their own risk. • Permitting, inspection, and amendment process • Stormwater standards and stormwater comments being addressed Staff have not included hours of operation in the restrictions. The storage yard is proposed to be used during a wide range of hours (as early as 4:30AM to as late as 2AM). The need to have early and later hours is due to night shifts loading and hauling materials along with materials being picked up earlier in the day. Some noise will be generated from the yard in the form of forklifts, and trucks loading/unloading materials. The property to the North is vacant land and Manion’s owns the remaining adjacent land to the South. Storage Yard surfacing request Part of the proposed request also includes surfacing the storage yard with gravel. Ordinance 502.12 Subd. B states: 4. The storage area is covered to control dust and storm water drainage with bituminous surfacing, concrete or a comparable substitute approved by the City. Therefore, the Planning Commission shall make a recommendation on the proposed surfacing substitute to the City Council. The ordinance allows the city to make this discretion without need for variance. A variance would apply if the proposal included a parking lot, however no parking lot or parking spots are included in this proposal. The C.U.P. Resolution specifies the proposed surfacing substitute therefore action on the resolution would approve the surfacing material. ATTACHMENTS: C.U.P. application On-site pictures of Manion’s property C.U.P. civils Transportation map exhibit Finding of Fact REQUESTED PLANNING COMMISSION ACTION: 1. Open and close Public Hearing for Conditional Use Permit after staff presentation 2. Motion on Finding of Fact Resolution (Commission can also add other reasonable conditions) Future Transportation plan shows potential roadway corridor on the Western boundary of site. Its possible the connection could also occur on the Eastern boundary of site. Final connection of roadway would be dependent on development of property to the North and final roadway design and wetland delineations. Applicant shall be aware that the infiltration basin in the NE corner of site may be within a potential future corridor and as such be constructing the infiltration basin at their own risk. Exhibit showing Eastern boundary of site and infiltration basin in NE corner (not to scale). Subject site FUTURE TRANSPORTATION MAP Exis�ng fence on Manion’s. 6-7’ tall with barbed wire on top. Exis�ng gravel within Manion’s. Expansion area proposed to be surfaced with same material. View looking North towards the proposed expansion area Typical wood storage area found in exis�ng Manion’s site. Shingle and lumber storage 21 22 EE X X X X X X X SITE BENCHMARK NAIL IN TREE ELEV.=1065.08 FL O O R E L E V . = 1 0 6 5 . 8 9 FL O O R E L E V . = 1 0 6 5 . 9 3 FL O O R E L E V . = 1 0 6 5 . 9 0 NORTH LINE OF HALL INDUSTRIAL PARK BUILDING 15 FT. DRAINAGE & UTILITY EASEMENT PER HALL INDUSTRIAL PARK DELINEATED WETLAND 25' SIDE YARD SETBACK 25' SIDE YARD SETBACK 20 ' R E A R S E T B A C K 30 ' F R O N T Y A R D S E T B A C K PR O P E R T Y B O U N D A R Y PROPERTY BOUNDARY PR O P E R T Y B O U N D A R Y PROPERTY BOUNDARY 50' WETLAND SETBACK 100' WETLAND SETBACK 76 T H A V E N U E X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXX 50' 27 7 . 5 8 ' 1047.25' 945.12' INFILTRATION BASIN INFILTRATION BASIN 350' SHINGLES 500' LUMBER 200' LUMBER 175' SHINGLES 150' SHINGLES 200' LUMBER 200' LUMBER200' LUMBER 175' SHINGLES 175' SHINGLES 50' 50' 75' 25 ' 40 ' 50'50'50'50'50' 50 ' 50 ' 50 ' 50 ' 54 ' 50'50' 50 ' 172' Common Ground Alliance Call 48 Hours before digging: 811 or call811.com ST O R A G E Y A R D ST . J O S E P H , M N MA N I O N ' S W H O L E S A L E 10.25.23 Pr o j e c t N u m b e r : S R E 2 3 0 0 1 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. Copyright Rice Companies, Inc. 2023. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 4201 38th St SW, Ste 209 ● Fargo, ND 58104 RICECOMPANIES.COM WRH REVISIONS NUMBER DATE .. . . . .. . . . 2531 N. Victory Drive ● Mankato, MN 56001 0'50'100'150' R: \ C I V I L E N G I N E E R I N G \ C I V I L E N G I N E E R I N G P R O J E C T S \ S R E 2 3 0 0 1 - M A N I O N ' S L O T \ C I V I L \ C A D \ E X H I B I T S \ M A N I O N S - S K 0 1 . D W G X001 LA Y O U T S K E T C H PROPERTY LINE SETBACK LINE EASEMENT LINE LOT LINE STORMWATER BASIN SITE LIGHTING EXISTING PROPOSED FENCEXX TRAFFIC SIGN POWER POLE BOLLARD / POST SITE LEGEND GRAVEL 23 Common Ground Alliance Call 48 Hours before digging: 811 or call811.com ST O R A G E Y A R D ST . J O S E P H , M N MA N I O N ' S W H O L E S A L E 10.18.23 Pr o j e c t N u m b e r : S R E 2 3 0 0 1 William R. Huston Lic. No. 44984 Date:10.18.2023 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2023. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 4201 38th St SW, Ste 209 ● Fargo, ND 58104 RICECOMPANIES.COM PE R M I T S E T MKW REVISIONS NUMBER DATE .. . . . .. . . . 2531 N. Victory Drive ● Mankato, MN 56001 R: \ C I V I L E N G I N E E R I N G \ C I V I L E N G I N E E R I N G P R O J E C T S \ S R E 2 3 0 0 1 - M A N I O N ' S L O T \ C I V I L \ C A D \ S H E E T S \ M A N I O N S - E X 0 1 . D W G C101 EX I S T I N G C O N D I T I O N S 24 EE X X X X X X X SITE BENCHMARK NAIL IN TREE ELEV.=1065.08 FL O O R E L E V . = 1 0 6 5 . 8 9 FL O O R E L E V . = 1 0 6 5 . 9 3 FL O O R E L E V . = 1 0 6 5 . 9 0 NORTH LINE OF HALL INDUSTRIAL PARK BUILDING 15 FT. DRAINAGE & UTILITY EASEMENT PER HALL INDUSTRIAL PARK DELINEATED WETLAND 25' SIDE YARD SETBACK 25' SIDE YARD SETBACK 20 ' R E A R S E T B A C K 30 ' F R O N T Y A R D S E T B A C K PR O P E R T Y B O U N D A R Y PROPERTY BOUNDARY PR O P E R T Y B O U N D A R Y PROPERTY BOUNDARY 50' WETLAND SETBACK 100' WETLAND SETBACK 76 T H A V E N U E X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXX 50. 0 0 ' 27 7 . 5 8 ' 1047.25' 913.50' INFILTRATION BASIN INFILTRATION BASIN MATCH EXISTING GRAVEL PAVEMENT (TYP.) 8' TALL CHAIN LINK FENCE (TYP.) 0'50'100'150' Common Ground Alliance Call 48 Hours before digging: 811 or call811.com ST O R A G E Y A R D ST . J O S E P H , M N MA N I O N ' S W H O L E S A L E 10.18.23 Pr o j e c t N u m b e r : S R E 2 3 0 0 1 William R. Huston Lic. No. 44984 Date:10.18.2023 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2023. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 4201 38th St SW, Ste 209 ● Fargo, ND 58104 RICECOMPANIES.COM PE R M I T S E T MKW REVISIONS NUMBER DATE .. . . . .. . . . 2531 N. Victory Drive ● Mankato, MN 56001 R: \ C I V I L E N G I N E E R I N G \ C I V I L E N G I N E E R I N G P R O J E C T S \ S R E 2 3 0 0 1 - M A N I O N ' S L O T \ C I V I L \ C A D \ S H E E T S \ M A N I O N S - S P 0 1 . D W G C201 SI T E P L A N 1. BACKGROUND INFORMATION FOR THIS PROJECT PROVIDED BY O'MALLEY & KRON LAND SURVEYORS, 09.27.2023. 2. LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS SHOWN ON THIS PLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND UTILITY LOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. IF ANY DISCREPANCIES ARE FOUND, THE ENGINEER SHOULD BE NOTIFIED IMMEDIATELY. 3. REFER TO BOUNDARY SURVEY FOR LOT BEARINGS, DIMENSIONS AND AREAS. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGGERS AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. PLACEMENT OF THESE DEVICES SHALL BE APPROVED BY THE CITY AND ENGINEER PRIOR TO PLACEMENT. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MNDOT STANDARDS. 5. PAVEMENT SECTIONS TO BE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER. 6. CONTRACTOR SHALL MAINTAIN FULL ACCESS TO ADJACENT PROPERTIES DURING CONSTRUCTION AND TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES. 7. SITE LIGHTING SHOWN ON PLAN IS FOR REFERENCE ONLY. REFER TO LIGHTING PLAN PREPARED BY OTHERS FOR SITE LIGHTING DETAILS AND PHOTOMETRICS. GENERAL SITE NOTES PROPERTY LINE SETBACK LINE EASEMENT LINE LOT LINE STORMWATER BASIN SITE LIGHTING EXISTING PROPOSED FENCEXX TRAFFIC SIGN POWER POLE BOLLARD / POST SITE LEGEND GRAVEL 25 EE X X X X X X X SITE BENCHMARK NAIL IN TREE ELEV.=1065.08 FL O O R E L E V . = 1 0 6 5 . 8 9 FL O O R E L E V . = 1 0 6 5 . 9 3 FL O O R E L E V . = 1 0 6 5 . 9 0 BUILDING DELINEATED WETLAND PR O P E R T Y B O U N D A R Y PROPERTY BOUNDARY PR O P E R T Y B O U N D A R Y PROPERTY BOUNDARY 76 T H A V E N U E X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXX 1 0 6 5 1065 106 5 10 6 5 1065 10 7 0 10 7 0 107 0 10 7 0 1 0 6 1 1 0 6 2 10 6 2 1063 1 0 6 3 106 3 10 6 3 1 0 6 3 106 4 10 6 4 106 4 1064 1 0 6 4 1 0 6 6 1066 10 6 6 106 6 106 7 10 6 7 1068 106 8 10 6 8 10 6 8 10 6 9 1069 106 9 106 9 1 0 7 1 1 0 7 1 107 1 10 7 1 1065 1069.99 1070.41 1070.97 1071.93 1071.44 1071.08 1071.04 1071.04 1067.59 1067.68 1067.58 1067.37 1067.63 1067.45 1068.24 1069.82 1063.341064.41 1064.31 1062.48 1062.27 1062.53 1067.19 1067.22 1071.90 1071.90 1071.90 1071.90 1068.05 1067.70 1067.70 1067.90 1067.60 1067.51 1067.50 E.O.F. 1067.20 E.O.F. 1066.30 1065 1 0 6 2 10 6 3 1064 10661067 1065 1066 1067 1068 106 510 6 5 10 7 0 10 7 0 10 6 4 106 4 106 6 10 6 6 10 6 6 1066 106 7 10 6 7 1067 10 6 7 10 6 8 106 8 106 9 10 6 9 107 1 10 7 1 10 7 0 10 7 0 1070 1 0 6 6 1 0 6 7 10 6 8 10 6 8 10 6 8 10 6 9 10 6 9 10 6 9 10 7 1 10 7 1 10 7 1 1 0 7 2 1070 1067106810691071 1070107110721073 1070 10681069 1071 1071107210731074 1067.50 TOP OF BERM 1068.10 TOP OF BERM 1067.90 1067.70 BASIN 103P HWL=1067.24 BOT=1065.5 BASIN 101P HWL=1067.48 BOT=1063.4 5' GRASS FLITER STRIP (BASIN PRETREATMENT) 5' GRASS FLITER STRIP (BASIN PRETREATMENT) 5.0 CU YD CLASS III RIP RAP 21.6 CU YD CLASS III RIP RAP 3:1 SLOPES ON TOPSOIL BERMS (TYP.) 0'50'100'150' Common Ground Alliance Call 48 Hours before digging: 811 or call811.com ST O R A G E Y A R D ST . J O S E P H , M N MA N I O N ' S W H O L E S A L E 10.18.23 Pr o j e c t N u m b e r : S R E 2 3 0 0 1 William R. Huston Lic. No. 44984 Date:10.18.2023 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2023. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 4201 38th St SW, Ste 209 ● Fargo, ND 58104 RICECOMPANIES.COM PE R M I T S E T MKW REVISIONS NUMBER DATE .. . . . .. . . . 2531 N. Victory Drive ● Mankato, MN 56001 R: \ C I V I L E N G I N E E R I N G \ C I V I L E N G I N E E R I N G P R O J E C T S \ S R E 2 3 0 0 1 - M A N I O N ' S L O T \ C I V I L \ C A D \ S H E E T S \ M A N I O N S - G D 0 1 . D W G C301 GR A D I N G P L A N PROPERTY LINE 982 980 RIDGE LINE EMERGENCY OVERFLOW EXISTING PROPOSED INDEX CONTOUR INTERVAL CONTOUR982 980 SPOT ELEVATION FLOW DIRECTION GRADING LEGEND 1. LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES AS SHOWN ON THIS PLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND UTILITY LOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND. 2. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF "STANDARD SPECIFICATIONS FOR TRENCH EXCAVATION AND BACKFILL/SURFACE RESTORATION" AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA. 3. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE FOUR INCHES OF TOPSOIL AND SOD OR SEED. THESE AREAS SHALL BE WATERED UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. SEE LANDSCAPE PLAN FOR PLANTING AND TURF ESTABLISHMENT. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. PLACEMENT OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER PRIOR TO PLACEMENT. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MNDOT STANDARDS. 5. ALL SLOPES SHALL BE GRADED TO 3:1 OR FLATTER, UNLESS OTHERWISE INDICATED ON THIS SHEET. 6. CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING AND PROVIDE A SMOOTH FINISHED SURFACE WITH UNIFORM SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN OR BETWEEN SUCH POINTS AND EXISTING GRADES. 7. SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS & GUTTER FLOW LINE UNLESS OTHERWISE NOTED. PROPOSED CONTOURS ARE TO FINISHED SURFACE GRADE. 8. SEE SOILS REPORT FOR PAVEMENT THICKNESSES AND HOLD DOWNS. 9. CONTRACTOR SHALL DISPOSE OF ANY EXCESS SOIL MATERIAL THAT EXISTS AFTER THE SITE GRADING AND UTILITY CONSTRUCTION IS COMPLETED. THE CONTRACTOR SHALL DISPOSE OF ALL EXCESS SOIL MATERIAL IN A MANNER ACCEPTABLE TO THE OWNER AND THE REGULATING AGENCIES. 10. ALL CONSTRUCTION SHALL CONFORM TO LOCAL, STATE AND FEDERAL RULES INCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS. 11. PRIOR TO PLACEMENT OF ANY STRUCTURE OR PAVEMENT, A PROOF ROLL, AT MINIMUM, WILL BE REQUIRED ON THE SUBGRADE. PROOF ROLLING SHALL BE ACCOMPLISHED BY MAKING MINIMUM OF 2 COMPLETE PASSES WITH FULLY-LOADED TANDEM-AXLE DUMP TRUCK, OR APPROVED EQUAL, IN EACH OF 2 PERPENDICULAR DIRECTIONS WHILE UNDER SUPERVISION AND DIRECTION OF THE INDEPENDENT TESTING LABORATORY. AREAS OF FAILURE SHALL BE EXCAVATED AND RE-COMPACTED AS SPECIFIED HEREIN. 12. EMBANKMENT MATERIAL PLACED BENEATH BUILDINGS AND STREET OR PARKING AREAS SHALL BE COMPACTED IN ACCORDANCE WITH THE SPECIFIED DENSITY METHOD AS OUTLINED IN MNDOT 2105.3F1 AND THE REQUIREMENTS OF THE GEOTECHNICAL ENGINEER. 13. EMBANKMENT MATERIAL NOT PLACED IN THE BUILDING PAD, STREETS OR PARKING AREA, SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTS OF THE ORDINARY COMPACTION METHOD AS OUTLINED IN MNDOT 2105.3F2. 14. ALL SOILS AND MATERIALS TESTING SHALL BE COMPLETED BY AN INDEPENDENT GEOTECHNICAL ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE GEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND INSPECTIONS WITH THE GEOTECHNICAL ENGINEER. 1. REMOVE SEDIMENT FROM EXCAVATED BASIN PRIOR TO FINAL GRADING AND SEEDING. 2. BASIN EXCAVATION SHALL BE WITH TOOTHED-BUCKETS TO SCARIFY THE BOTTOM. 3. PLACE SILT FENCE AROUND BASINS AS SHOWN ON EROSION CONTROL PLAN IMMEDIATELY AFTER BASIN CONSTRUCTION. 4. BASINS MUST BE TESTED FOR INFILTRATION RATE AFTER TOTAL SITE STABILIZATION. A DUAL RING INFILTROMETER OR MPD SHALL BE USED FOR TESTING. MINIMUM INFILTRATION RATES ARE 1.6-INCHES PER HOUR FOR BASIN 101P AND 0.2-INCHES PER HOUR FOR BASIN 103P. IF BASIN DOES NOT MEET INFILTRATION RATE, CONTRACTOR MUST TAKE CORRECTIVE ACTION UNTIL MINIMUM INFILTRATION RATE IS MET. ALL TESTING AND CORRECTIVE ACTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, AND SHALL BE INCIDENTAL TO THE CONTRACT, WITH NO DIRECT COMPENSATION MADE. GRADING NOTES FILTRATION/INFILTRATION BASIN NOTES 0.00% 900.00 E.O.F. 900.00 BENCHMARK NAIL IN TREE AT SOUTHEAST ENTRANCE ELEV.=1065.08 26 EE X X X X X X X SITE BENCHMARK NAIL IN TREE ELEV.=1065.08 FL O O R E L E V . = 1 0 6 5 . 8 9 FL O O R E L E V . = 1 0 6 5 . 9 3 FL O O R E L E V . = 1 0 6 5 . 9 0 BUILDING DELINEATED WETLAND PR O P E R T Y B O U N D A R Y PROPERTY BOUNDARY PR O P E R T Y B O U N D A R Y PROPERTY BOUNDARY 76 T H A V E N U E X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXX 1 0 6 5 1065 106 5 10 6 5 1065 10 7 0 10 7 0 107 0 10 7 0 1 0 6 1 1 0 6 2 10 6 2 1063 1 0 6 3 106 3 10 6 3 1 0 6 3 106 4 10 6 4 106 4 1064 1 0 6 4 1 0 6 6 1066 10 6 6 106 6 106 7 10 6 7 1068 106 8 10 6 8 10 6 8 10 6 9 1069 106 9 106 9 1 0 7 1 1 0 7 1 107 1 10 7 1 1065 1065 1 0 6 2 10 6 3 1064 10661067 1065 1066 1067 1068 106 510 6 5 10 7 0 10 7 0 10 6 4 106 4 106 6 10 6 6 10 6 6 1066 106 7 10 6 7 1067 10 6 7 10 6 8 106 8 106 9 10 6 9 107 1 10 7 1 10 7 0 10 7 0 1070 1 0 6 6 1 0 6 7 10 6 8 10 6 8 10 6 8 10 6 9 10 6 9 10 6 9 10 7 1 10 7 1 10 7 1 1 0 7 2 1070 1067106810691071 1070107110721073 1070 10681069 1071 1071107210731074 SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSF S F SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF S F S F S F REDUNDANT SILT FENCE AT WETLAND (SEE DETAIL) 0'50'100'150' ST O R A G E Y A R D ST . J O S E P H , M N MA N I O N ' S W H O L E S A L E 10.18.23 Pr o j e c t N u m b e r : S R E 2 3 0 0 1 William R. Huston Lic. No. 44984 Date:10.18.2023 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2023. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 4201 38th St SW, Ste 209 ● Fargo, ND 58104 RICECOMPANIES.COM PE R M I T S E T MKW REVISIONS NUMBER DATE .. . . . .. . . . 2531 N. Victory Drive ● Mankato, MN 56001 R: \ C I V I L E N G I N E E R I N G \ C I V I L E N G I N E E R I N G P R O J E C T S \ S R E 2 3 0 0 1 - M A N I O N ' S L O T \ C I V I L \ C A D \ S H E E T S \ M A N I O N S - E C 0 1 . D W G C501 ER O S I O N C O N T R O L P L A N PROPERTY LINE SILT FENCE STORMWATER BASIN EMERGENCY OVERFLOW EXISTING PROPOSED INDEX CONTOUR INTERVAL CONTOUR SF EROSION CONTROL LEGEND 1. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION SHALL NOT BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR ENGINEER OF DISCREPANCIES. 2. ALL SILT FENCE AND OTHER EROSION CONTROL FEATURES SHALL BE IN-PLACE PRIOR TO ANY EXCAVATION/CONSTRUCTION AND SHALL BE MAINTAINED UNTIL VIABLE TURF OR GROUND COVER HAS BEEN ESTABLISHED. EXISTING SILT FENCE ON-SITE SHALL BE MAINTAINED AND/OR REMOVED AND SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONTRACT. IT IS OF EXTREME IMPORTANCE TO BE AWARE OF CURRENT FIELD CONDITIONS WITH RESPECT TO EROSION CONTROL. TEMPORARY PONDING, DIKES, HAYBALES, ETC., REQUIRED BY THE CITY SHALL BE INCIDENTAL TO THE GRADING CONTRACT. 3. EROSION AND SILTATION CONTROL (ESC): THE CONTRACTOR SHALL ASSUME COMPLETE RESPONSIBILITY FOR CONTROLLING ALL SILTATION AND EROSION OF THE PROJECT AREA. THE CONTRACTOR SHALL USE WHATEVER MEANS NECESSARY TO CONTROL THE EROSION AND SILTATION INCLUDING BUT NOT LIMITED TO: CATCH BASIN INSERTS, CONSTRUCTION ENTRANCES, EROSION CONTROL BLANKET, AND SILT FENCE. ESC SHALL COMMENCE WITH GRADING AND CONTINUE THROUGHOUT THE PROJECT UNTIL ACCEPTANCE OF THE WORK BY THE OWNER. THE CONTRACTOR'S RESPONSIBILITY INCLUDES ALL IMPLEMENTATION AS REQUIRED TO PREVENT EROSION AND THE DEPOSITING OF SILT. THE OWNER MAY DIRECT THE CONTRACTOR'S METHODS AS DEEMED FIT TO PROTECT PROPERTY AND IMPROVEMENTS. ANY DEPOSITION OF SILT OR MUD ON NEW OR EXISTING PAVEMENT OR IN EXISTING STORM SEWERS OR SWALES SHALL BE REMOVED AFTER EACH RAIN EVENT. AFFECTED AREAS SHALL BE CLEANED TO THE SATISFACTION OF THE OWNER, ALL AT THE EXPENSE OF THE CONTRACTOR. ALL TEMPORARY EROSION CONTROL SHALL BE REMOVED BY THE CONTRACTOR AFTER THE TURF IS ESTABLISHED. 4. ALL STREETS DISTURBED DURING WORKING HOURS MUST BE CLEANED AT THE END OF EACH WORKING DAY. A CONSTRUCTION ENTRANCE TO THE SITE MUST BE PROVIDED ACCORDING TO DETAILS TO REDUCE TRACKING OF DIRT ONTO PUBLIC STREETS. 5. ALL UNPAVED AREAS ALTERED DUE TO CONSTRUCTION ACTIVITIES MUST BE RESTORED WITH SEED AND MULCH, SOD, EROSION CONTROL BLANKET OR BE HARD SURFACE WITHIN 2 WEEKS OF COMPLETION OF CONSTRUCTION. 6. THE SITE MUST BE STABILIZED PER THE REQUIREMENTS OF THE MPCA, NPDES, MNDOT, AND CITY. A. TEMPORARY (GREATER THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 22-111 AT 30.5-POUNDS PER ACRE. B. TEMPORARY (LESS THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 21-112 (FALL) OR 21-111 (SPRING/SUMMER) AT 100-POUNDS PER ACRE C. INFILTRATION/FILTRATION BASIN BELOW THE HWL SHALL BE MNDOT SEED MIX 33-261 AT 35-POUNDS PER ACRE. D. GENERAL SEEDING SHALL BE MNDOT SEED MIX 25-131 (COMMERCIAL TURF) AT 220-POUNDS PER ACRE. E. MULCH SHALL BE MNDOT TYPE 1 APPLIED AT 2-TONS PER ACRE. F. FOR AREAS WITH SLOPE OF 3:1 OR GREATER, RESTORATION WITH SOD OR BONDED FIBER MATRIX HYDROMULCH IS REQUIRED. 9. ALL TEMPORARY STOCKPILES MUST HAVE SILT FENCE INSTALLED AROUND THEM TO TRAP SEDIMENT. 10. ALL CONSTRUCTION SHALL CONFORM TO LOCAL AND STATE RULES INCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS. 11. THE SITE MUST BE KEPT IN A WELL-DRAINED CONDITION AT ALL TIMES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING OR OTHER MEANS REQUIRED TO INSURE PROPER DRAINAGE DURING CONSTRUCTION. LOW POINTS IN ROADWAYS OR BUILDING PADS MUST BE PROVIDED WITH A POSITIVE OUTFLOW. 12. PUBLIC STREETS USED FOR HAULING SHALL BE KEPT FREE OF SOIL AND DEBRIS. STREET SWEEPING SHALL BE CONCURRENT WITH SITE WORK. GENERAL EROSION CONTROL NOTES 982 980 982 980 E.O.F. CONSTRUCTION ENTRANCE EROSION CONTROL BLANKET WITH MNDOT SEED MIX 33-261 MNDOT SEED MIX 25-131 (HYDROMULCHED) MNDOT SEED MIX 33-261 27 ST O R A G E Y A R D ST . J O S E P H , M N MA N I O N ' S W H O L E S A L E 10.18.23 Pr o j e c t N u m b e r : S R E 2 3 0 0 1 William R. Huston Lic. No. 44984 Date:10.18.2023 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2023. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 4201 38th St SW, Ste 209 ● Fargo, ND 58104 RICECOMPANIES.COM PE R M I T S E T MKW REVISIONS NUMBER DATE .. . . . .. . . . 2531 N. Victory Drive ● Mankato, MN 56001 R: \ C I V I L E N G I N E E R I N G \ C I V I L E N G I N E E R I N G P R O J E C T S \ S R E 2 3 0 0 1 - M A N I O N ' S L O T \ C I V I L \ C A D \ S H E E T S \ M A N I O N S - E C 0 1 . D W G C502 SW P P P N A R R A T I V E SWPPP NARRATIVE THE SWPPP IS PREPARED IN ACCORDANCE WITH THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) REGULATIONS AS ESTABLISHED BY THE CLEAN WATER ACT. THE MINNESOTA POLLUTION CONTROL AGENCY'S CONSTRUCTION GENERAL PERMIT MN R100001 (CSGP) (EXPIRATION DATE: JULY 31, 2028) PROVIDES A FRAME WORK OF REQUIREMENTS FOR COMPLIANCE TO DISCHARGE STORMWATER FROM A CONSTRUCTION SITE. THE SWPPP IS FOR IMPLEMENTATION BY THE OWNER AND OPERATOR, AS LISTED BELOW, AT MANION'S WHOLESALE. THIS REPORT SHALL BE ON THE SITE AT ALL TIMES DURING CONSTRUCTION. THE OWNER MUST ALSO KEEP THIS SWPPP ON FILE FOR THREE YEARS AFTER SUBMITTAL OF THE NOTICE OF TERMINATION. THE FOLLOWING ARE OUTLINED IN THIS SWPPP: - CONTROL MEASURES FOR STORM WATER POLLUTION PREVENTION PRIOR TO AND DURING CONSTRUCTION - CONTROL MEASURES FOR STORM WATER POLLUTION PREVENTION AFTER CONSTRUCTION - SOURCES OF STORMWATER AND NON-STORMWATER POLLUTION - INSPECTION AND MAINTENANCE PROCEDURES THE GRADING AND EROSION CONTROL PLAN PREPARED FOR MANION'S WHOLESALE SHALL BE CONSIDERED PART OF THE SWPPP. PROJECT LOCATION THIS DOCUMENT PRESENTS A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR MANION'S WHOLESALE IN ST. JOSEPH, MN. THE SITE IS LOCATED IN THE AT THE END OF 76TH AVENUE. PROJECT CONTACT INFORMATION OWNER/DEVELOPER:CONTRACTOR: COMPANY NAME:LANDWEHR CONSTRUCTION, INC. CONTACT: ADDRESS:851 60TH STREET SOUTH ST. CLOUD, MN 56301 PHONE: E-MAIL: IDENTIFY PERSONNEL INVOLVED WITH THE PROJECT AND THEIR RELATED NECESSARY TRAINING COMMENSURATE WITH THEIR TASK PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES. SWPPP DESIGNER:SWPPP INSPECTION:BMP INSTALLER: COMPANY:RICE COMPANIES CONTACT:WILL HUSTON ADDRESS:1019 INDUSTRIAL DRIVE SOUTH SAUK RAPIDS, MN 56379 PHONE:320.252.0404 E-MAIL:WILL.HUSTON@RICECOMPANIES.COM TRAINING COURSE/ENTITY: UNIV. OF MN - DESIGN OF SWPPP EXPIRATION DATE: MAY 31, 2024 OWNER/OPERATOR RESPONSIBILITIES OWNER -DEVELOPMENT OF SWPPP PRIOR TO APPLICATION/NOI SUBMITTAL. -SUBMIT A COMPLETE AND ACCURATE APPLICATION FORM (NOI). -COMPLIANCE WITH ALL TERMS AND CONDITIONS OF CONSTRUCTION GENERAL STORMWATER PERMIT. -SWPPP SUBMITTAL FOR 30 DAY REVIEW FOR PROJECT GREATER THAN 50 ACRES & DISCHARGING TO SPECIAL/IMPAIRED WATERS WITHIN 1 MILE OF SITE DISCHARGE. -KEEPING PERMIT COVERAGE UP-TO-DATE (TRANSFER/SUBDIVISION). -SUBMIT NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS AFTER ALL PERMIT TERMINATION CONDITIONS AS LISTED IN SECTION 13 ARE COMPLETE. -SUBMIT NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS OF MEETING REQUIREMENTS OF FINAL STABILIZATION. -IDENTIFY WHO HAS LONG TERM OPERATION AND MAINTENANCE RESPONSIBILITY OF THE PERMANENT STORMWATER SYSTEM. -DEVELOP CHAIN OF RESPONSIBILITY WITH ALL OPERATORS TO ENSURE NPDES COMPLIANCE. -IDENTIFY TRAINED PERSONNEL TO DEVELOP THE SWPPP, INSTALL AND MAINTAIN BEST MANAGEMENT PRACTICES, AND OVERSEE THE SWPPP AND CONDUCT INSPECTIONS. -IMPLEMENT SWPPP. OPERATOR -COMPLETION OF AN ACCURATE NOI WITH THE OWNER -COMPLIANCE WITH CSGP SECTIONS 3, 4, 6-22, 24 AND ANY APPLICABLE REQUIREMENTS FOR CONSTRUCTION ACTIVITY IN SECTION 23 (MINN. R. 7090) -KEEPING THE PERMIT UP-TO-DATE WITH THE OWNER (PARTIAL, WHOLE, CONTRACTOR, BUILDER, ETC) -COMPLETE AND SIGN APPLICATIONS FOR PERMIT TRANSFER AND MODIFICATION AND NOTICE OF TERMINATION WITH OWNER AS NEEDED. -SHALL NOT DISTURB MORE LAND THAN CAN BE EFFECTIVELY INSPECTED AND MAINTAINED. PROJECT DESCRIPTION THE SITE IS APPROXIMATELY 10 ACRES. CONSTRUCTION WILL CONSIST OF, BUT IS NOT LIMITED TO, A GRAVEL OUTDOOR STORAGE YARD AND ASSOCIATED INFILTRATION BASINS. PRE-DEVELOPMENT SITE CONDITIONS THE EXISTING SITE IS A FARM FIELD. THERE IS A DELINEATED WETLAND IN THE NORTHEAST CORNER OF THE PROPERTY. THE SITE DISCHARGES TO A LARGE UNNAMED WETLAND TO THE EAST. THE ULTIMATE DISCHARGE IS THE SAUK RIVER. THERE ARE NO KNOWN SOURCES OF CONTAMIATION ON SITE. SOIL TYPES THE SITE CONTAINS MOSTLY HSG A SOILS, WITH SOME HSG C SOILS ON THE EAST SIDE, PER THE NRCS WEB SOIL SURVEY. POST-DEVELOPMENT SITE CONDITIONS THE SITE WILL BE A CONTINUATION OF THEIR EXISTING OUTDOOR STORAGE YARD TO THE SOUTH. TWO INFILTRATION BASINS WILL BE CONSTRUCTED (ONE ON EACH END) TO TREAT THE STORMWATER RUNOFF. THE STORMWATER DISCHARGE LOCATIONS AND PATTERNS WILL REMAIN THE SAME. STORM WATER MANAGEMENT PLAN THE TEMPORARY STORMWATER MANAGEMENT PLAN WILL CONSIST OF SILT FENCE, BLANKET, AND SEED/MULCH. THE PERMANENT STORM WATER MANAGEMENT PLAN WILL CONSIST OF TWO INFILTRATION BASINS ON SITE. THE PROPERTY OWNER WILL BE RESPONSIBLE FOR THE LONG-TERM MAINTENANCE OF THE BASINS AND THE PRE-TREATMENT AREAS. DRAINAGE AREA MAPS TO INCLUDE SURFACE WATERS AND EXISTING WETLANDS WITHIN 1 MILE OF PROJECT BOUNDARY THAT RECEIVE STORMWATER RUNOFF OR IDENTIFY THE DIRECTION AND DISTANCE TO SURFACE WATERS AND WETLANDS. REFER TO THE MANION'S WHOLESALE STORMWATER MANAGEMENT REPORT FOR MORE INFORMATION REGARDING THE PRE-DEVELOPMENT SITE CONDITIONS, POST-DEVELOPMENT SITE CONDITIONS, AND STORM WATER MANAGEMENT CALCULATIONS. THE SITE STORM WATER DETENTION FACILITY WILL BE CONSTRUCTED TO MEET OR EXCEED LOCAL, STATE AND FEDERAL REQUIREMENTS. TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMP'S ALONG WITH THE PROCEDURES TO BE USED TO ESTABLISHED ADDITIONAL TEMPORARY BMP'S AS NECESSARY FOR SITE CONDITIONS DURING CONSTRUCTION ARE IDENTIFIED ON THE SITE GRADING AND EROSION CONTROL PLAN PREPARED FOR THE DEVELOPMENT OF THIS PROJECT, AND WITHIN THE PROJECT STORM WATER POLLUTION PREVENTION PLAN. POTENTIAL STORM WATER POLLUTANTS POTENTIAL POLLUTANT SOURCES, INCLUDING CONSTRUCTION AND WASTE MATERIALS THAT ARE USED OR STORED AT THE SITE, ARE DESCRIBED IN THE SECTION. BY IMPLEMENTATION OF THESE BMPS, THE POTENTIAL POLLUTANT SOURCES ARE NOT REASONABLY EXPECTED TO AFFECT THE STORM WATER DISCHARGES FROM THE SITE. CONSTRUCTION MATERIALS, CHEMICALS AND WASTE MATERIALS THAT WILL BE USED OR STORED AT THE SITE: CONSTRUCTION SEQUENCE THE INTENDED SEQUENCING OF MAJOR SITE CONSTRUCTION ACTIVITIES IS AS FOLLOWS: 1. INSTALL PERIMETER CONTROL DEVICES (SILT FENCE, BIO-LOGS, ETC.) AND INLET PROTECTION TO EXISTING STRUCTURES AS SHOWN ON PLAN. ANY SEDIMENT CONTROL MADE OF SOIL MUST BE TEMPORARILY OR PERMANENTLY STABILIZED WITHIN 24 HOURS. 2. INSTALL TREE PROTECTION FENCE AS SHOWN ON PLAN. 3. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE. 4. CLEAR AND GRUB SITE. 5. STRIP AND STOCKPILE TOPSOIL. 6. ROUGH GRADE OF SITE. 7. STABILIZE DENUDED AREAS AND STOCKPILES. 8. INSTALL SANITARY SEWER, WATERMAIN, STORM SEWER AND SERVICES. 9. INSTALL INLET PROTECTION AROUND CATCH BASINS. 10. INSTALL STREET SECTION. 11. INSTALL CURB AND GUTTER. 12. INSTALL PAVEMENT. 13. INSTALL SMALL UTILITIES (GAS, ELECTRIC, PHONE, CABLE, ETC.) 14. FINE GRADE BOULEVARD, LANDSCAPE AREAS, SEED AND MULCH. 15. REMOVE ACCUMULATED SEDIMENT. 16. FINAL GRADE. 17. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR SOD AND LANDSCAPING, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL. CONSTRUCTION NOTES IT IS HIGHLY RECOMMENDED THAT THE CONTRACTOR MAINTAIN A STOCKPILE OF EROSION CONTROL DEVICES AND SEDIMENT CONTROL BMP'S ON SITE AT ALL TIMES FOR IMMEDIATE USAGE. IN THE EVENT OF AN ACCIDENTAL SEDIMENT DISCHARGE TO WATERS OF THE STATE, OR ANY DISCHARGE OF HAZARDOUS MATERIAL OF REPORTABLE QUANTITY, CONTACT THE MPCA STATE DUTY OFFICER AT 1-800-422-0798. TIMING OF BMP INSTALLATION THE EROSION PREVENTION AND SEDIMENT CONTROL BMP'S SHALL BE INSTALLED TO MINIMIZE EROSION FROM DISTURBED SURFACES AND CAPTURE SEDIMENT ON SITE. THE FOLLOWING LIST DEFINES THE TIMING OF EROSION PREVENTION AND SEDIMENT CONTROL MEASURES IN SPECIFIC AREAS. PRIOR TO START OF CONSTRUCTION: THE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE IMPLEMENTED PRIOR TO CONSTRUCTION: 1. INSTALL SILT FENCE OR OTHER SEDIMENT CONTROL AROUND THE PERIMETER OF AREAS TO BE GRADED AND ALL AREAS WHICH ARE NOT TO BE DISTURBED AS SHOWN ON THE GRADING AND EROSION CONTROL PLAN. 2. CONSTRUCT GRAVEL CONSTRUCTION ENTRANCES AT FIELD ENTRANCES TO THE SITE AS SHOWN ON THE CONSTRUCTION PLANS. 3. INLET PROTECTION IS TO BE INSTALLED AT ALL STORM WATER INLETS WHICH HAVE THE POTENTIAL TO RECEIVE STORM WATER RUNOFF FROM THE CONSTRUCTION SITE WITHIN 200 FEET OF LIMITS OF CONSTRUCTION. 4. INSTALL SILT FENCE OR OTHER SEDIMENT CONTROL AROUND ALL TEMPORARY INACTIVE STOCKPILES. ALL SILT FENCES FOR STOCKPILES SHALL BE INCIDENTAL TO GRADING CONTRACT IF STOCKPILES ARE PLACED OUTSIDE OF SILT FENCES SHOWN ON THE PLAN. DURING CONSTRUCTION: THE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE IMPLEMENTED DURING CONSTRUCTION: 1. PHASE GRADING WORK TO MINIMIZE THE DURATION THAT ANY DISTURBED SOIL IS EXPOSED. 2. ALL DISTURBED AREAS SHALL HAVE TEMPORARY PROTECTION OR PERMANENT COVER OVER EXPOSED SOIL AREAS IF NOT BEING ACTIVELY GRADED AND/OR IF NOT AT FINAL GRADE WITHIN 14 DAYS OF DISTURBANCE ACTIVITY TEMPORARILY OR PERMANENTLY CEASING. TEMPORARY SEED MIX 150, APPLIED AT A RATE OF 40 LBS/ACRE, SHALL BE USED PRIOR TO WINTER, IF SITE NOT SODDED. 3. STRIP AND STOCKPILE TOPSOIL FOR REPLACEMENT OF 6 INCHES OF TOPSOIL OVER TURF AREAS WHEN GRADING IS COMPLETE. 4. PLACE A MINIMUM OF 2 TONS/ACRE OF STRAW ON ALL AREAS AFTER REACHING FINAL GRADE WITH TOPSOIL AND ANCHOR STRAW WITH EITHER A STRAIGHT DISK, HYDROMULCH OR POLYMER. 5. STABILIZATION OF TEMPORARY OR PERMANENT DRAINAGE DITCHES THAT DRAIN WATER FROM THE CONSTRUCTION SITE MUST BE INITIATED WITHIN 24 HOURS OF CONNECTING THE DRAINAGE DITCH TO ANY CONVEYANCE SYSTEM THAT DISCHARGES TO SURFACE WATERS. THE FIRST 200 LINEAR FEET MUST BE STABILIZED WITHIN 24 HOURS. THE REMAINING DITCH SHALL BE STABILIZED WITHIN 14 DAYS. 6. INSTALL SILT FENCE AROUND ALL TEMPORARY INACTIVE STOCKPILES WHICH ARE NOT PLACED WITHIN EXISTING SILT FENCES OR OTHER PERIMETER CONTROLS. 7. TEMPORARY OR PERMANENT ENERGY DISSIPATION AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO BUT NO SOONER THAN 7 DAYS BEFORE APRON IS INSTALLED. RIPRAP SHALL BE INSTALLED UNDER APRON LIP ACCORDING TO THE STANDARD DETAIL. 8. SUFFICIENT PERSONNEL, EQUIPMENT, AND MATERIALS SHALL BE MOBILIZED WITHIN 24 HOURS OF A WRITTEN ORDER BY THE OWNER OR OWNER'S REPRESENTATIVE TO CONDUCT CORRECTIVE WORK AND INSTALL TEMPORARY EROSION CONTROL WORK IN THE CASE OF AN EMERGENCY. 9. REMOVE ANY SEDIMENT THAT HAS BEEN TRACKED ONTO PUBLIC STREETS AT THE END OF THE DAY OR WITHIN 24 HOURS OF DETECTION, OR MORE FREQUENT AT DIRECTION OF SITE INSPECTOR. 10. COLLECT ALL CONSTRUCTION DEBRIS IN DUMPSTERS AND ROLL-OFF BOXES, EMPTY WHEN DEBRIS REACHES TOP OF DUMPSTER 11. INSPECT POLLUTION CONTROL MEASURES AS SPECIFIED WITHIN SECTION 11 OF THE GENERAL PERMIT. INLET SEDIMENT CONTROL BMP REMOVAL: IF INLET SEDIMENT CONTROLS (WIMCO TYPE OR EQUAL) BMP'S ARE REMOVED FOR FLOODING / FREEZING CONCERNS UPON REQUEST OF THE MUNICIPALITY, WATERSHED DISTRICT OR OTHER AGENCY, DOCUMENTATION SHALL BE ATTACHED TO THE INSPECTION REPORTS AND THIS SWPPP OR BE AVAILABLE WITHIN 72 HOURS OF REQUEST. DOCUMENTATION SHALL BE A WRITTEN FORM OF CORRESPONDENCE VERIFYING THE NEED FOR REMOVAL. UPON COMPLETION OF CONSTRUCTION ACTIVITIES: PERMIT TERMINATION CONDITIONS ARE ACHIEVED FOR THE PROJECT WHEN PERMANENT EROSION CONTROL BMP'S ARE APPLIED TO THE SITE. THE PERMANENT EROSION CONTROL BMP'S MAY BE A COMBINED OF VEGETATIVE AND NON-VEGETATIVE COVER TYPES. ADDITIONAL REQUIREMENTS TO ACHIEVING FINAL STABILIZATION PERMIT TERMINATION CONDITIONS INCLUDE : 1. ALL SOIL DISTURBING ACTIVITY IS COMPLETED. ALL DISTURBED AREA WITHOUT PERMANENT IMPERMEABLE SURFACES ARE VEGETATED FOR FINAL STABILIZATION. 2. PERMANENT STORMWATER TREATMENT SYSTEM (IF REQUIRED) IS CONSTRUCTED AND ACCUMULATED SEDIMENT HAS BEEN REMOVED FROM CONSTRUCTION ACTIVITY. CLEAN OUT ALL SEDIMENT FROM CONVEYANCES AND FROM TEMPORARY SEDIMENT BASINS THAT ARE TO BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS. THE CLEAN OUT OF PERMANENT BASINS MUST BE SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY. 3. THE VEGETATIVE COVER FOR THE SITE IS AT A DENSITY, WITH UNIFORM PERENNIAL COVER OF 70% OF THE EXPECTED FINAL GROWTH DENSITY. 4. ALL TEMPORARY, SYNTHETIC BMP'S HAVE BEEN REMOVED. PERMANENT VEGETATION ESTABLISHMENT PERMANENT TURF SHALL FOLLOW THE RECOMMENDATIONS PER NOTES AND SPECIFICATIONS IN THE GRADING AND/OR LANDSCAPE PLAN. SEED THAT IS TO OCCUR AFTER OCTOBER 20TH SHALL CONFORM TO THE MNDOT SPECIFICATIONS FOR DORMANT SEEDING. SWPPP INSPECTIONS AND MAINTENANCE EROSION AND SEDIMENT CONTROL INSPECTIONS: CONSTRUCTION ACTIVITY, ALL SUPPORT ACTIVITIES, AND AREAS ADJACENT TO THE PROJECT MUST BE INSPECTED (USING MPCA CONSTRUCTION STORMWATER INSPECTION CHECKLIST OR AN ALTERNATIVE FORM) WITHIN THE PARAMETERS OF THE SCHEDULE BELOW. THE INSPECTOR SHALL BE A PERSON TRAINED AND FAMILIAR WITH THE REQUIREMENTS OF THIS SWPPPP AND THE MPCA MN R100001 PERMIT. ALTERNATES WILL INCLUDE INDIVIDUALS TO BE DESIGNATED BY THE OWNER AND MAY INCLUDE CONTRACTOR PERSONNEL OR OTHER QUALIFIED INDIVIDUALS AND SHALL BE LISTED IN THE PROJECT CONTACT INFORMATION SECTION OF THIS PLAN INSPECTION SCHEDULE: - PERMITTEES MUST ENSURE A TRAINED PERSON, AS IDENTIFIED IN ITEM 21.2.B, WILL INSPECT THE ENTIRE CONSTRUCTION SITE AT LEAST ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN ½ INCH IN 24 HOURS. - INSPECTIONS OF AREAS WITH PERMANENT COVER CAN BE REDUCED TO ONCE PER MONTH, EVEN IF CONSTRUCTION ACTIVITY CONTINUES ON OTHER PORTIONS OF THE SITE. - WHERE SITES HAVE PERMANENT COVER ON ALL EXPOSED SOIL AND NO CONSTRUCTION ACTIVITY IS OCCURRING ANYWHERE ON THE SITE, INSPECTIONS CAN BE REDUCED TO ONCE PER MONTH AND, AFTER 12 MONTHS, MAY BE SUSPENDED COMPLETELY UNTIL CONSTRUCTION ACTIVITY RESUMES. THE MPCA MAY REQUIRE INSPECTIONS TO RESUME IF CONDITIONS WARRANT. - WHERE CONSTRUCTION ACTIVITY HAS BEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS, INSPECTIONS MAY BE SUSPENDED. INSPECTIONS MUST RESUME WITHIN 24 HOURS OF RUNOFF OCCURRING, OR UPON RESUMING CONSTRUCTION, WHICHEVER COMES FIRST. - FOR PROJECTS WHERE A POLLINATOR HABITAT OR NATIVE PRAIRIE TYPE VEGETATED COVER IS BEING ESTABLISHED, INSPECTIONS MAY BE REDUCED TO ONCE PER MONTH IF THE SITE HAS TEMPORARY VEGETATION WITH A DENSITY OF 70% TEMPORARY UNIFORM COVER. IF AFTER 24 MONTHS NO SIGNIFICANT EROSION PROBLEMS ARE OBSERVED, INSPECTIONS MAY BE SUSPENDED COMPLETELY UNTIL THE TERMINATION REQUIREMENTS IN SECTION 13 HAVE BEEN MET. SCOPE OF INSPECTION SHALL INCLUDE: 1. DATE AND TIME OF INSPECTIONS; AND 2. NAME OF PERSONS CONDUCTING INSPECTIONS; AND 3. ACCURATE FINDINGS OF INSPECTIONS, INCLUDING THE SPECIFIC LOCATION WHERE CORRECTIVE ACTIONS ARE NEEDED; AND 4. CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE ACTIVITIES); AND 5. DATE OF ALL RAINFALL EVENTS GREATER THAN 1/2½ INCHES IN 24 HOURS, AND THE AMOUNT OF RAINFALL FOR EACH EVENT. PERMITTEES MUST OBTAIN RAINFALL AMOUNTS BY EITHER A PROPERLY MAINTAINED RAIN GAUGE INSTALLED ONSITE, A WEATHER STATION THAT IS WITHIN ONE (1) MILE OF YOUR LOCATION, OR A WEATHER REPORTING SYSTEM THAT PROVIDES SITE SPECIFIC RAINFALL DATA FROM RADAR SUMMARIES; AND 6. IF PERMITTEES OBSERVE A DISCHARGE DURING THE INSPECTION, THEY MUST RECORD AND SHOULD PHOTOGRAPH AND DESCRIBE THE LOCATION OF THE DISCHARGE (I.E., COLOR, ODOR, SETTLED OR SUSPENDED SOLIDS, OIL SHEEN, AND OTHER OBVIOUS INDICATORS OF POLLUTANTS); AND 7. ANY AMENDMENTS TO THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE DOCUMENTED AS REQUIRED IN SECTION 6 WITHIN SEVEN (7) CALENDAR DAYS; AND 8. ALL PHOTOGRAPHS OF DEWATERING ACTIVITIES AND DOCUMENTATION OF NUISANCE CONDITIONS RESULTING FROM DEWATERING ACTIVITIES AS DESCRIBED IN SECTION 10; AND 9. ALL INSPECTIONS SHALL BE DOCUMENTED WITHIN 24 HOURS AFTER COMPLETING THE FIELD INSPECTION AND AVAILABLE IN PAPER OR ELECTRONIC FORM ON SITE. MAINTENANCE OF EROSION AND SEDIMENT CONTROL DEVICES: THE OWNER/CONTRACTOR IS RESPONSIBLE FOR THE OPERATION, MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS AS WELL AS ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS, FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SITE. THE CONTRACTOR MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS AND POLLUTION PREVENTION MANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS DURING ALL ROUTINE AND POST RAINFALL EVENTS. ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WITH FUNCTIONAL BMPS BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS UNLESS ANOTHER TIME FRAME IS SPECIFIED BELOW. THE FOLLOWING GUIDELINES WILL BE USED TO DETERMINE IF THE EROSION AND SEDIMENT CONTROL DEVICES REQUIRE MAINTENANCE, REPAIR, OR REPLACEMENT: 1. ALL NON-FUNCTIONAL BMPS - OBSERVED CONDITION; SEDIMENT OVERTOPPING, UNDER WATER, SCOURED ENDS, UNDERMINED, DESTROYED, NON-FUNCTION AS DESIGNED, ETC. - SHALL BE MAINTAINED OR REPLACED BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY OR NOTIFICATION, OR AS SOON AS FIELD CONDITIONS ALLOW. 2. PERIMETER SEDIMENT CONTROL (SILT FENCE, FIBER LOGS, BERMS, ETC.) - OBSERVED CONDITION TO BE 1/2 FULL OF SEDIMENT, FLATTENED TO 1/2 HEIGHT, DRIVEN OVER, UNDERMINED, SCOURED, MOVED FOR ACCESS, ETC. - SHALL BE MAINTAINED, REPAIRED OR SUPPLEMENTATION OF PERIMETER SEDIMENT CONTROL SHOULD BE DONE WITHIN 72 HOURS OF DISCOVERY. 3. INLET PROTECTION BMPS, CONVEYANCES, SURFACE WATERS - OBSERVED CONDITION; SEDIMENT DEPOSITION, SEDIMENT DELTAS AN ACCUMULATION OF SEDIMENT MATERIAL, DEVICES APPEAR PLUGGED WITH SEDIMENT - REMOVAL/CLEAN OUT OF ACCUMULATED SEDIMENT AND DELTAS TO BE REMOVED WITHIN 7 DAYS, STABILIZE AS NEEDED IF SOILS ARE EXPOSED DURING REMOVAL/CLEAN OUT. 4. TEMPORARY SEDIMENT BASINS AND TRAPS/PERMANENT SEDIMENT BASINS - OBSERVED TO HAVE SEDIMENT DEPOSITION AND ACCUMULATION TO 1 2 OF THE STORAGE VOLUME - CLEAN OUT, REMOVE ACCUMULATED SEDIMENT MATERIAL WITHIN 7 DAYS OF OBSERVATION, OR AS FIELD CONDITIONS ALLOW ACCESS. 5. SITE EXIT LOCATIONS, ROCK EXIT PADS, OTHER ANTI-TRACKING PRACTICES - OBSERVED TO HAVE ACCUMULATED SEDIMENT IN ROCK OR OTHER ANTI-TRACKING BMP, TRACKING OF SEDIMENT FROM THE SITE ONTO PAVED SURFACES - TOP DRESS ROCK, MAINTAIN ROCK EXIT OR OTHER ANTI-TRACKING CONTROLS, SCRAP PAVED SURFACES, SWEEP PAVED SURFACES WITHIN 1 CALENDAR DAY OF DISCOVERY. 6. PAVED SURFACES AND ADJACENT STREETS - OBSERVED TO BE TRACKED WITH SEDIMENT AND SOIL MATERIAL FRO THE SITE HAULING OR ACCESS - SWEEP WITHIN 1 CALENDAR DAY OF DISCOVERY, ADDITIONAL AND/OR MORE FREQUENT SWEEPING MAY BE NEEDED TO MAINTAIN PUBLIC SAFETY OR PREVENT WASHING FROM FORECASTED RAINS. TERMINATION OF COVERAGE THE PROJECT PERMIT MAY BE TERMINATED IN ONE OF THE FOLLOWING SCENARIOS: 1. ALL CONSTRUCTION ACTIVITY IS COMPLETE, TEMPORARY SYNTHETIC BMP'S ARE REMOVED, ACCUMULATED SEDIMENT FROM CONSTRUCTION IS REMOVED, AND PERMANENT COVER HAS BEEN ACHIEVED WITH VEGETATIVE AND/OR NON-VEGETATIVE COVER. THE NOTICE OF TERMINATION FORM FROM THE PCA SHOULD BE COMPLETED WITHIN 30 DAYS OF MEETING THE CONDITIONS ABOVE. UPON MIDNIGHT OF THE POST MARKED DATE, THE PERMIT COVERAGE IS TERMINATED UNLESS OTHERWISE NOTIFIED BY THE MPCA. OR: 2. WITHIN 30 DAYS OF SELLING OR OTHERWISE LEGALLY TRANSFERRING OWNERSHIP OF THE SITE IN IT'S ENTIRETY (INCLUDING STREET SWEEPING AND STORMWATER INFRASTRUCTURE) FROM THE ORIGINAL OWNER TO ANOTHER PARTY TAKING RESPONSIBILITY OF OWNERSHIP. THE TERMINATION IS EFFECTIVE UPON MIDNIGHT OF THE SUBMISSION DATE OF THE NOT. IF A PORTION OF THE SITE IS TRANSFERRED (I.E. OUTLOTS, LOTS/BLOCKS) THAT PORTION OF THE SITE IS TERMINATED FROM THE ORIGINAL PERMIT COVERAGE AT MIDNIGHT OF THE SUBMISSION DATE. OR: 3. PERMIT COVERAGE CAN BE TERMINATED IF ALL OF THE FOLLOWING ARE MET: 3.a. CONSTRUCTION ACTIVITY HAS CEASED FOR 90 DAYS; AND 3.b. AT LEAST 90% OF THE AREA OF THE ORIGINALLY PROPOSED ACTIVITY HAS BEEN COMPLETED AND PERMANENTLY ESTABLISHED WITH VEGETATION OR NON-VEGETATIVE COVER; AND 3.c. WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE, PERMANENT COVER HAS BEEN ESTABLISHED; AND 3.d. THE SITE IS COMPLIANT WITH PERMIT SECTIONS 13.2 THROUGH 13.7. 4. WHERE THE PROJECT OBTAINED PERMIT COVERAGE BUT NEVER STARTED CONSTRUCTION ACTIVITY DUE TO CANCELLATION OR OTHER REASONS, DOCUMENTATION SHOULD BE SENT TO THE PCA WITH THE NOT FORM AND IS SUBJECT TO PCA APPROVAL. WHEN SUBMITTING THE NOT PERMITTEES MUST INCLUDE EITHER GROUND OR AERIAL PHOTOGRAPHS SHOWING THE REQUIREMENTS OF 13.2 HAVE BEEN MET. PERMITTEES ARE NOT REQUIRED TO TAKE PHOTOGRAPHS OF EVERY DISTINCT PART OF THE SITE, HOWEVER THE CONDITIONS PORTRAYED MUST BE SUBSTANTIALLY SIMILAR TO THOSE AREAS THAT ARE NOT PHOTOGRAPHED. PHOTOGRAPHS MUST BE CLEAR AND IN FOCUS AND MUST INCLUDE THE DATE THE PHOTO WAS TAKEN. POTENTIAL POLLUTANT LOCATION CONTROL MEASURE ANTIFREEZE VARIOUS SECONDARY CONTAINMENT / DRIP PAN DIESEL FUEL VARIOUS SECONDARY CONTAINMENT / DRIP PAN FERTILIZER LANDSCAPE CONTRACTOR SECONDARY CONTAINMENT GASOLINE IN EQUIPMENT/FUELING AREA SECONDARY CONTAINMENT / DRIP PAN GLUE/ADHESIVES CONTRACTOR SECONDARY CONTAINMENT HYDRAULIC OILS/FLUIDS CONTRACTOR SECONDARY CONTAINMENT PAINTS CONTRACTOR SECONDARY CONTAINMENT GREASE CONTRACTOR SECONDARY CONTAINMENT / DRIP PAN SANITARY WASTE PORTABLE BATHROOMS SERVICE PROVIDER TO SECURE UNITS FROM TIPPING OVER AND MAINTAINED SOIL AMENDMENTS VARIOUS SECONDARY CONTAINMENT LANDSCAPING MATERIALS LANDSCAPE CONTRACTOR CONTRACTOR RESPONSIBLE CONCRETE TRUCK WASHOUT WASHOUT AREA CONCRETE / MORTAR MOBILE MIXER S.C. / WASHOUT AREA PROJECT AREA = 10.0-AC DISTURBED AREA = 9.4-AC EXISTING IMPERVIOUS IN DISTURBED AREA = 0-AC PROPOSED IMPERVIOUS IN DISTURBED AREA = 6.9-AC SPECIAL AND/OR IMPAIRED WATERS WITHIN 1 MILE OF THE PROJECT SITE NAME: NONE (THE SAUK RIVER IS MORE THAN 1-MILE AWAY) IMPAIRMENT: DISTANCE AND DIRECTION FROM SITE: 28 ST O R A G E Y A R D ST . J O S E P H , M N MA N I O N ' S W H O L E S A L E 10.18.23 Pr o j e c t N u m b e r : S R E 2 3 0 0 1 William R. Huston Lic. No. 44984 Date:10.18.2023 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2023. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 4201 38th St SW, Ste 209 ● Fargo, ND 58104 RICECOMPANIES.COM PE R M I T S E T MKW REVISIONS NUMBER DATE .. . . . .. . . . 2531 N. Victory Drive ● Mankato, MN 56001 R: \ C I V I L E N G I N E E R I N G \ C I V I L E N G I N E E R I N G P R O J E C T S \ S R E 2 3 0 0 1 - M A N I O N ' S L O T \ C I V I L \ C A D \ S H E E T S \ M A N I O N S - E C 0 1 . D W G C503 SW P P P N O T E S SWPPP NOTES LISTED BELOW ARE ADDITIONAL BMP'S THAT MAY BE CONSIDERED FOR USE IF THE BMP'S IDENTIFIED IN THE EROSION CONTROL PLANS PROVE TO BE INSUFFICIENT. PAYMENT FOR THESE BMP'S MAY ONLY BE MADE IF PRIOR APPROVAL FROM AN OWNER HAS BEEN GIVEN. 4. DITCH PROTECTION (TEMPORARY OR PERMANENT) ·THE LAST 200 FEET OF ANY DITCH CONNECTING TO A SURFACE WATER SHALL HAVE TEMPORARY OR PERMANENT STABILIZATION MEASURES IN PLACE WITHIN 24 HOURS OF DIRECT CONNECTION TO A SURFACE WATER. DITCHES MAY BE KEPT IN A "SMOOTH" ROUGH GRADED CONDITION IN ORDER TO PROPERLY INSTALL EROSION CONTROL SEEDING, MULCH, MATS AND BLANKETS. ·PERMITTEES MUST NOT USE MULCH, HYDROMULCH, TACKIFIER, POLYACRYLAMIDE OR SIMILAR EROSION PREVENTION PRACTICES WITHIN ANY PORTION OF THE NORMAL WETTED PERIMETER OF A TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE SECTION WITH A CONTINUOUS SLOPE OF GREATER THAN 2 PERCENT. ·STABILIZATION METHODS FOR DITCH BOTTOM WETTED PERIMETER MAY INCLUDE ONE OF THE FOLLOWING OR COMBINATIONS OF EROSION CONTROL BLANKET, MATS, RIPRAP, BIO-ROLLS OR ROCK CHECK DAMS. THE METHOD CHOSEN WILL BE BASED ON AN ANALYSIS OF THE SLOPE AND VELOCITY OF THE RUNOFF. THESE ARE ADDITIONAL BMP'S WHICH MAY BE CONSIDERED FOR USE IF THE BMP'S IDENTIFIED IN THE EROSION CONTROL PLANS PROVE TO BE INSUFFICIENT. PAYMENT FOR THESE BMP'S MAY ONLY BE MADE IF PRIOR APPROVAL FROM AN OWNER HAS BEEN GIVEN. ·WHERE DITCH GRADES EXCEED 5%, ROCK CHECK DAMS OR EQUIVALENT BMP SHALL BE INSTALLED. CHECK DAMS TO BE SPACED SO THAT THE CREST OF THE DOWNSTREAM DAM IS AT THE ELEVATION OF THE TOE OF THE UPSTREAM DAM. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT. ·ABOVE THE WETTED PERIMETER, THE DITCH WILL BE STABILIZED BY SEEDING AND MULCH AND/OR EROSION CONTROL BLANKETS DEPENDING ON SIDE SLOPE STEEPNESS AND LENGTH. ·ALL DITCHES WILL BE STABILIZED WITHIN 14 DAYS. 5. WORK NEXT TO WETLANDS ·PRESERVE A 50' (100' FROM SPECIAL WATERS) NATURAL BUFFER, OR IF A BUFFER IS INFEASIBLE, PROVIDE REDUNDANT SEDIMENT CONTROLS PRIOR TO DISTURBANCE OF UP-GRADIENT AREAS. ·FILL SLOPES ADJACENT TO WETLANDS SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS OF COMPLETION OF WORK. INSTALL EROSION CONTROL BLANKET AS INDICATED ON THE EROSION CONTROL / GRADING PLAN. 9. LONG-STEEP CUT/FILL SLOPES ·THERE WILL BE NO UNBROKEN SURFACE SLOPE LENGTHS OF GREATER THAN 75 FEET FOR SLOPES WITH A GRADE OF 3:1 OR STEEPER WITHIN 200 FEET OF SURFACE WATERS. ALL EXPOSED AREAS WITH A CONTINUOUS POSITIVE SLOPE WITHIN 200 FEET OF A SURFACE WATER WILL HAVE A TEMPORARY OR PERMANENT COVER YEAR ROUND. THE EXPOSED SOILS SHALL BE STABILIZED WITHIN 14 DAYS ·PLANNED SLOPES OF 3:1 (H:V) OR STEEPER AND GREATER THAN 75 FT IN LENGTH WILL BE TEMPORARILY OR PERMANENTLY STABILIZED IN INCREMENTS NOT TO EXCEED 75 FT, PRIOR TO CONSTRUCTION OR DISTURBING A NEW INCREMENT. ·LONG SLOPES SHOULD BE BROKEN INTO SHORTER LENGTHS BY INSTALLING STRAW BIOROLLS IN INTERLOCKING HERRINGBONES AS SHOWN ON THE GRADING PLAN. IF TEMPORARY SEEDING AND MULCH CAN NOT BE USED ON SLOPES STEEPER THAN 3:1, THEN THE SLOPE MAY BE COVERED WITH TARPS OR PLASTIC SHEETING. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT. ·THE SOIL SURFACE ON RE-VEGETATED SLOPES WILL BE ROUGHENED USING ANY APPROPRIATE IMPLEMENT THAT CAN BE SAFELY OPERATED ON THE SLOPE, SUCH AS BULLDOZERS OR DISKS. THE GROOVES SHALL BE CREATED PERPENDICULAR TO THE SLOPE TO HELP ESTABLISH VEGETATIVE COVER, REDUCE RUNOFF VELOCITY, INCREASE INFILTRATION, AND PROVIDE FOR SEDIMENT TRAPPING. 13. TEMPORARY SEDIMENT BASINS ·TEMPORARY SEDIMENT BASINS WILL BE PROVIDED WHERE 10 OR MORE ACRES OF DISTURBED SOIL DRAIN TO A COMMON LOCATIONS. THE BASIN SIZE IS BASED ON RUNOFF FROM A 2-YEAR, 24 HOUR STORM, FOR EACH ACRE DRAINED TO THE BASIN. AT A MINIMUM, THE BASIN WILL PROVIDE 1800 CUBIC FEET OF STORAGE FOR EACH ACRE DRAINED TO THE BASIN. ·SEDIMENT BASINS WILL DETAIN WATER LONG ENOUGH TO SETTLE OUT AT LEAST 75 PERCENT OF THE SEDIMENT. THE USE OF FLOCS MAY BE NECESSARY. THE DISCHARGE QUALITY SHALL BE EQUAL TO OR BETTER THAN THE RECEIVING WATER. THE TEMPORARY BASIN MAY BE DRAWN DOWN WITH A PUMP TO INCREASE CAPACITY FOR THE NEXT RAIN EVENT. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT. ·THE SEDIMENT PONDS WILL BE EXCAVATED TO MAINTAIN THE NECESSARY SEDIMENT CAPACITY AND CONTAINMENT. ·TEMPORARY SEDIMENT FOREBAYS WILL BE CONSTRUCTED TO CAPTURE SEDIMENT BEFORE IT ENTERS THE POND, IF NECESSARY. ·THE SEDIMENT PONDS WILL BE MONITORED BY THE CONTRACTOR TO DETERMINE THE SEDIMENT LEVEL IN THE POND. ·WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE TEMPORARY BASIN REACHES ½ FULL (50% OF THE STORAGE VOLUME) THE BASIN SHALL BE DRAINED USING PUMPS AND ENERGY DISSIPATION AND SEDIMENT REMOVAL SHALL BE COMPLETED WITHIN 72 HOURS OF DISCOVERY OF THE BASIN BEING 1/2 FULL OF SEDIMENT, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT. ·TEMPORARY SEDIMENT BASINS WILL HAVE A STABILIZED EMERGENCY OVERFLOW AND CONTAIN ENERGY DISSIPATION AT BASIN OUTLET. 15. STOCKPILES (TEMPORARY AND PERMANENT) ·LOCATE STOCKPILES A MINIMUM OF 100 FEET FROM CATCH BASIN INLETS, PONDS, AND SITE DRAINAGE ROUTES ·PERIMETER CONTROLS SUCH AS SILT FENCE SHALL BE INSTALLED AROUND ALL STOCKPILES IF NOT PLACED WITHIN EXISTING SILT FENCES OR OTHER SEDIMENT CONTROL. ·PERIMETER CONTROLS SHALL BE INSTALLED PRIOR TO THE INITIATION OF STOCKPILING. ·TEMPORARY SEED AND MULCH SHALL BE USED TO STABILIZE THE STOCKPILES AND THE STOCKPILES SHALL BE SHAPED TO FACILITATE SEEDING AND MINIMIZE EROSION AND SHALL BE SEEDED WITHIN 7 DAYS. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT. ·IF TEMPORARY SEED AND MULCH CANNOT BE USED, THEN THE STOCKPILES SHALL BE COVERED WITH HYDROMULCH, TARPS OR PLASTIC SHEETING AS APPROVED BY THE OWNER. ·IF STOCKPILES MUST BE PLACED WITHIN A CONVEYANCE, A TEMPORARY BYPASS SHALL BE INSTALLED (I.E. PVC PIPE) TO ADEQUATELY CONVEY RUNOFF. TEMPORARY BYPASS BMPS SHALL BE INCIDENTAL TO THE CONTRACT UNLESS PREVIOUSLY APPROVED BY THE OWNER / ENGINEER 16. CONSTRUCTION DEWATERING ·DURING DEWATERING ACTIVITIES, THE SEDIMENT LADEN WATER CANNOT BE DIRECTLY DISCHARGED TO SURFACE WATERS. OPTIONS FOR REDUCING THE TURBIDITY OF THE WATER INCLUDE: (TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL): o CONSTRUCT A TEMPORARY SEDIMENT TRAP FOR TURBID WATER DISCHARGE. o USE A PORTABLE SEDIMENT TRAP SYSTEM. o APPLY NATURAL BASED FLOCCULENT TECHNOLOGY SUCH AS CHITOSAN IN SEDIMENT TRAPS OR A SERIES OF DITCH CHECKS TO CONTAIN SEDIMENT. o DISCHARGE THROUGH FIBERLOGS OR A ROCK WEEPER INTO A LARGE VEGETATIVE BUFFER AREA. o PUMP TO A TEMPORARY SEDIMENT BASIN. ·ENERGY DISSIPATION WILL BE PROVIDED AT ALL DISCHARGE POINTS. ·DEWATERING OR BASIN DRAINING ACTIVITIES WILL NOT CAUSE EROSION IN RECEIVING CHANNELS OR ADVERSELY IMPACT WETLANDS. ·ALL EROSION CONTROL OR SEDIMENT TRAPS REQUIRED FOR CONSTRUCTION DEWATERING SHALL BE CONSIDERED INCIDENTAL TO THE CONSTRUCTION ACTIVITY REQUIRING DEWATERING. ·TO THE EXTENT FEASIBLE, USE WELL-VEGETATED (E.G., GRASSY OR WOODED), UPLAND AREAS OF THE SITE TO INFILTRATE DEWATERING WATER BEFORE DISCHARGE. ·PERMITTEES ARE PROHIBITED FROM USING RECEIVING WATERS AS PART OF THE TREATMENT AREA. ·PERMITTEES MUST VISUALLY CHECK AND PHOTOGRAPH THE DISCHARGE AT THE BEGINNING AND AT LEAST ONCE EVERY 24 HOURS OF OPERATION TO ENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED AND NUISANCE CONDITIONS WILL NOT RESULT FROM THE DISCHARGE. DEWATERING DISCHARGES THAT ONLY LAST FOR MINUTES, AS OPPOSED TO HOURS AND DO NOT REACH A SURFACE WATER, DO NOT REQUIRE PHOTOGRAPHS OR DOCUMENTATION . ·IF NUISANCE CONDITIONS RESULT FROM THE DISCHARGE, PERMITTEES MUST CEASE DEWATERING IMMEDIATELY AND CORRECTIVE ACTIONS MUST OCCUR BEFORE DEWATERING IS RESUMED. NUISANCE CONDITIONS INCLUDES, BUT IS NOT LIMITED TO, A SEDIMENT PLUME IN THE DISCHARGE OR THE DISCHARGE APPEARS CLOUDY, OR OPAQUE, OR HAS A VISIBLE CONTRAST, OR HAS A VISIBLE OIL FILM, OR HAS AQUATIC HABITAT DEGRADATION THAT CAN BE IDENTIFIED BY AN OBSERVER. 17. CONSTRUCTION ENTRANCES ·A TEMPORARY CRUSHED ROCK OR WOOD CHIP PAD SHALL BE LOCATED WHERE VEHICLES LEAVE THE CONSTRUCTION SITE. ·THE CONSTRUCTION ENTRANCE PAD SHALL BE AT LEAST 50 FEET IN LENGTH. ·GEOTEXTILE FABRIC MAY BE PLACED UNDER THE CRUSHED ROCK OR WOOD CHIPS TO PREVENT MIGRATION OF MUD FROM UNDERLYING SOIL INTO THE CONSTRUCTION ENTRANCE MATERIAL. ·ROCK PADS SHALL BE CONSTRUCTED OF ROCK 1 TO 3 INCHES IN SIZE AND PLACED IN 6 INCH LAYERS. ·CONSTRUCTION ENTRANCES SHALL BE INSPECTED AT LEAST EVERY 7 DAYS AND MAINTAINED AS NEEDED. ·TRACKED SEDIMENTS SHALL BE REMOVED FROM PAVED SURFACES AT THE END OF EACH DAY USING PICK-UP TYPE STREET SWEEPER. ·IF TRACKING INTO ROADWAY BECOMES PROBLEMATIC THE ENTRANCE PADS SHALL BE LENGTHENED OR ANOTHER TECHNIQUE APPLIED. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT. ·THE CONSTRUCTION ENTRANCE SHALL BE MONITORED CLOSELY DURING WET CONDITIONS. IF TRACKING INTO ADJACENT ROADWAYS OCCURS, THE FREQUENCY OF STREET SWEEPING SHALL BE INCREASED. ·STREET SWEEPING SHALL NOT BE USED IN LIEU OF A CONSTRUCTION ENTRANCE. 18. VEHICLE MAINTENANCE ·ROUTINE MAINTENANCE OF VEHICLES AND EQUIPMENT SHALL OCCUR IN STAGING AREAS ONLY. ·VEHICLE WASHING SHOULD BE AVOIDED. IF WASHING IS NECESSARY, RUNOFF FROM THE WASHING WILL BE CONTAINED AND LIMITED TO A DEFINED AREA OF THE SITE. RUNOFF MUST BE CONTAINED AND WASTE PROPERLY DISPOSED OF. ·ENGINE DEGREASING SHALL BE AVOIDED. IF DEGREASING IS NECESSARY, RUNOFF FROM THE OPERATION WILL BE CONTAINED IN A LINED SEDIMENT TRAP AND PROPERLY DISPOSED OF AT A TREATMENT FACILITY. ·ALL REQUIRED SEDIMENT TRAPS AND CONTAINMENT FACILITIES AND PROPER DISPOSAL OF WASH WATER/DEGREASING AT A TREATMENT FACILITY SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT. 20. FUELING ·ANY FUEL TANK OR TRUCK STORED ON THE PROJECT SITE SHALL BE PROTECTED BY A SECONDARY CONTAINMENT SYSTEM. ·FUELING AREAS SHALL NOT BE WASHED OR RINSED WITH WATER SINCE THIS COULD CAUSE FUEL SPILLS TO BE DISCHARGED INTO STORM WATER SYSTEMS. ·ABSORBENT MATERIALS SHALL BE AVAILABLE ON SITE FOR USE IN CLEANING UP SMALL SPILLS. ·ALL REQUIRED FUEL CONTAINMENT AND CLEAN-UP MATERIALS AND THE PROPER DISPOSAL OF THE MATERIALS SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT. 21. HAZARDOUS MATERIALS ·HAZARDOUS MATERIALS SHALL BE PROPERLY STORED TO PREVENT VANDALISM OR UNAUTHORIZED ACCESS. ·CONTAINMENT UNITS SHALL BE INSTALLED IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS. ·MPCA STORING AND DISPOSAL REQUIREMENTS SHALL BE FOLLOWED FOR ALL HAZARDOUS WASTE. ·NO HAZARDOUS MATERIAL SHOULD BE STORED WITHIN 200 FEET OF AN IDENTIFIED CRITICAL AREA. ·ABSORBENT MATERIALS SHALL BE AVAILABLE FROM THE CONTRACTOR ON SITE FOR USE IN CLEANING UP SMALL SPILLS. ·IF BUILDING MATERIALS, CHEMICALS, OR GENERAL REFUSE IS BEING USED, STORED, DISPOSED OF, OR OTHERWISE MANAGED INAPPROPRIATELY, THE CONTRACTOR SHALL CORRECT SUCH DEFECTS WITHIN 24 HOURS OF DETECTION OR NOTIFICATION. ·ALL REQUIRED CONTAINMENT / STORAGE UNITS / ABSORBENT MATERIAL AND REQUIRED DISPOSAL SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT. 22. CHEMICAL CONTAINMENT ·GASOLINE, OIL, PAINT, SOLVENTS, AND OTHER CHEMICALS NECESSARY FOR CONSTRUCTION ARE NOT ALLOWED TO CONTACT THE GROUND SURFACE, BE EXPOSED TO GROUNDWATER OR BE RELEASED TO A SURFACE OR GROUNDWATER EXCEPT IN DE MINIMIS QUANTITIES. ·ALL PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINER, WITH ORIGINAL LABELS STILL ATTACHED, UNLESS THE CONTAINER IS NOT RESEALABLE. ·HAZARDOUS MATERIALS SHALL BE RETURNED TO THE HAZARDOUS MATERIAL STORAGE AREA AT THE END OF EACH DAY. ·AN EFFORT SHOULD BE MADE TO STORE ONLY ENOUGH PRODUCTS TO DO THE REQUIRED JOB. ·THE CONTRACTOR SHALL PROVIDE TANKS OR BARRELS TO COLLECT LIQUID BYPRODUCTS THAT POSE A POLLUTION HAZARD. ·THE POLLUTANTS SHALL BE REMOVED FROM THE SITE ON A WEEKLY BASIS AND DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS. ·ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY, IN ACCORDANCE WITH THE MANUFACTURE'S RECOMMENDED METHODS. ·ALL REQUIRED CONTAINMENT / STORAGE UNITS / ABSORBENT MATERIAL AND REQUIRED DISPOSAL SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT ·ALL STORAGE AREAS SHALL BE SECURED TO PREVENT UNAUTHORIZED ACCESS. 23. SOLID WASTE ·SOLID WASTE SHALL BE STORED IN APPROPRIATE CONTAINERS AND PROPERLY DISPOSED OF ON A REGULAR BASIS. ·CONTAINERS SHALL BE COVERED TO PREVENT WIND BLOWING THE WASTE AROUND THE SITE. ·MPCA DISPOSAL REQUIREMENTS WILL BE FOLLOWED FOR ALL SOLID WASTE. ·SOLID WASTE STORAGE CONTAINERS AND PROPER DISPOSAL SHALL BE CONSIDERED INCIDENTAL TO THE CONSTRUCTION CONTRACT. 24. DUST CONTROL ·THE CONTRACTOR SHALL USE A VARIETY OF DUST CONTROL INCLUDING BUT NOT LIMITED TO THE FOLLOWING: A. RAPID STABILIZATION METHODS ON SLOPES B. WATER ON ROADWAYS AND GRADED AREAS C. ALTERNATIVES: IN THE FORM OF VEGETABLE POLYMERS, WATER AND CALCIUM CHLORIDE PETROLEUM EMULSION RESINS, OR ACRYLIC COPOLYMERS MAY ALSO BE USED. ·ALL REQUIRED DUST CONTROL SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT AS PER SPECIFICATIONS. 25. WINTER STABILIZATION ·COVER EXPOSED SOILS ON OR AROUND NOV. 15TH AND/OR PRIOR TO TERMINATION OF CONSTRUCTION ACTIVITIES FOR WINTER ·ALL EXPOSED SOILS TO BE COVERED WITH 2 TONS TYPE 1 MULCH ·ALL EXPOSED SOILS TO BE SEEDED WITH MNDOT SEED MIX 150 ·ALL LOW POINTS IN ROADS TO BE ADEQUATELY DRAINED IN ACCORDANCE WITH NPDES DEWATERING REQUIREMENTS PART IV. CONSTRUCTION ACTIVITY REQUIREMENTS. SECTION D. DEWATERING AND BASIN DRAINING. ·PERIMETER SILT FENCE OR OTHER CONTROLS TO BE INSTALLED 3-5 FEET FROM THE BACK OF THE CURB AND OUT OF THE PLOWED SNOW AREA. ·PERIMETER CONTROLS AROUND PERMANENT STORMWATER BASINS TO BE INSTALLED AND MAINTAINED ·INLET CONTROLS TO BE REMOVED ACCORDING TO LEGAL REQUIREMENTS WITH DOCUMENTATION WITHIN 72 HOURS FROM LEGAL AUTHORITY. ·IF WORK HAS OCCURRED NEAR OR IN STREAMS OR OTHER SURFACE WATERS, THE EXPOSED SOILS SHALL BE STABILIZED TO PROTECT AGAINST FLOODING AND SPRING RUNOFF TO THE 100-YR FLOOD ELEVATION. ·ALL TEMPORARY AND PERMANENT STORMWATER BASINS AND SEDIMENT BASINS SHOULD HAVE OUTLETS AND STABILIZED EMERGENCY OVERFLOWS INSTALLED AS PER THE GRADING AND/OR UTILITY PLAN AND AT THE APPROVAL OF THE OWNER. 30. INFILTRATION/FILTRATION AREAS ·FENCE OFF AREA PRIOR TO BEGINNING CONSTRUCTION. ·EXCAVATION AREA SHALL TAKE PLACE AFTER CONTRIBUTING AREAS ARE AT FINAL GRADE AND STABILIZED. ·DO NOT USE HEAVY/WHEELED EQUIPMENT IN FILTRATION AREA. ·DIVERSIONS, REDUNDANT SEDIMENT AND EROSION CONTROLS MUST BE USED TO PROTECT AREA. ·ENSURE 8 FT MAINTENANCE ACCESS IS ADEQUATE FOR AREA. ·IF GRADING MUST OCCUR IN FILTRATION AREA, LEAVE GRADE 3 FT HIGH TEMPORARILY UNTIL AREA CAN BE FINAL GRADED AND STABILIZED SWPPP AMENDMENTS THIS PLAN AND THE ATTACHMENTS MUST BE AMENDED WITHIN 7-DAYS TO INCLUDE ADDITIONAL REQUIREMENTS OR MODIFIED REQUIREMENTS WHICH TAKE PLACE DURING CONSTRUCTION IF ONE OR MORE OF THE FOLLOWING OCCUR: 1. THERE IS A CHANGE IS DESIGN CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS THAT SIGNIFICANTLY IMPACTS THE DISCHARGE OF POLLUTANTS FROM THE SITE TO SURFACE OR GROUNDWATER. 2. INSPECTIONS OR INVESTIGATIONS BY THE SITE OWNER, OPERATOR, ENVIRONMENTAL PROTECTION AGENCY, MINNESOTA POLLUTION CONTROL AGENCY OFFICIALS INDICATE THIS PLAN IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING THE DISCHARGE OF POLLUTANTS. 3. THIS SWPPP IN NOT ACHIEVING THE GENERAL OBJECTIVES OF MINIMIZING POLLUTANTS IN STORMWATER DISCHARGES OR IF THIS PLAN IS NOT CONSISTENT WITH THE MN R1000011 CONSTRUCTION GENERAL PERMIT. 4. IF THE MPCA NOTIFIES THE OWNER AND/OR OPERATOR (i.e. PERMITTEES) THAT ADDITIONAL REQUIREMENTS ARE NEEDED, REQUIREMENTS ARE NOT BEING NET FOR TMDL OR OTHER WATER QUALITY STANDARDS, OR THAT THE SWPPP DID NOT INCORPORATE THE NECESSARY REQUIREMENTS. 5. CHANGES INVOLVING THE USE OF A LESS STRINGENT BMP MUST INCLUDE A JUSTIFICATION DESCRIBING HOW THE REPLACEMENT BMP IS EFFECTIVE FOR THE SITE CHARACTERISTICS. THE FOLLOWING TABLE SHOULD BE COMPLETED AS NECESSARY DURING CONSTRUCTION TO DOCUMENT CHANGES AND AMENDMENTS TO THIS DOCUMENT. AMENDMENTS MUST BE MADE BY ONE OF THE FOLLOWING INDIVIDUALS:THOSE PREPARING THIS DOCUMENT; THOSE OVERSEEING THE IMPLEMENTATION OF THE SWPPP; THOSE REVISING THE SWPPP; THOSE PERFORMING INSPECTIONS FOR THE PROJECT; AND/OR OTHER QUALIFIED INDIVIDUAL. PLACE THE AMENDMENT NUMBER NEXT TO ALL APPLICABLE CHANGES, REDLINES, AND INFORMATION IN THE DOCUMENT TO REFERENCE BACK TO THE CHANGES SUMMARIZED BELOW. AMENDMENT NO. DATE REASON, LOCATION, AND BRIEF DESCRIPTION OF CHANGE OR AMENDMENT REQUESTED BY PREPARED BY 29 ST O R A G E Y A R D ST . J O S E P H , M N MA N I O N ' S W H O L E S A L E 10.18.23 Pr o j e c t N u m b e r : S R E 2 3 0 0 1 William R. Huston Lic. No. 44984 Date:10.18.2023 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2023. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 4201 38th St SW, Ste 209 ● Fargo, ND 58104 RICECOMPANIES.COM PE R M I T S E T MKW REVISIONS NUMBER DATE .. . . . .. . . . 2531 N. Victory Drive ● Mankato, MN 56001 R: \ C I V I L E N G I N E E R I N G \ C I V I L E N G I N E E R I N G P R O J E C T S \ S R E 2 3 0 0 1 - M A N I O N ' S L O T \ C I V I L \ C A D \ S H E E T S \ M A N I O N S - E C 0 1 . D W G C504 SW P P P N O T E S VICINITY MAP/IMPAIRED WATERS MAP WEB SOIL SURVEY MAP SOIL MAP UNIT SYMBOL LEGEND INFEASIBILITY DETERMINATION (ITEMS 5.13, 5.14 AND 5.15) THE REQUIRED 50' BUFFER ZONE TO WETLANDS IS INFEASIBLE DUE TO STORMWATER TREATMENT CONSTRUCTION. REDUNDANT PERIMETER CONTROLS (SILT FENCE) WILL BE USED INSTEAD. SWPPP BMP QUANTITIES SILT FENCE 3,670 LF TEMPORARY SEED MIX 0.5 ACRES PERMANENT SEED MIX (25-131)1.4 ACRES PERMANENT SEED MIX (33-261)1.0 ACRES MULCH 0.6 ACRE EROSION CONTROL BLANKET 16,000 SF ROCK CONSTRUCTION ENTRANCE 1 EACH STREET SWEEPING AS NEEDED ANTICIPATED CONSTRUCTION SCHEDULE SITE GRADING FALL/WINTER 2023 FINAL COMPLETION SPRING 2024 30 Common Ground Alliance Call 48 Hours before digging: 811 or call811.com ST O R A G E Y A R D ST . J O S E P H , M N MA N I O N ' S W H O L E S A L E 10.18.23 Pr o j e c t N u m b e r : S R E 2 3 0 0 1 William R. Huston Lic. No. 44984 Date:10.18.2023 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. I hereby certify that this plan, specifications, or report was prepared by me or under my direct supervision and that I am a duly licensed Engineer under the laws of the State of Minnesota. Copyright Rice Companies, Inc. 2023. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 4201 38th St SW, Ste 209 ● Fargo, ND 58104 RICECOMPANIES.COM PE R M I T S E T MKW REVISIONS NUMBER DATE .. . . . .. . . . 2531 N. Victory Drive ● Mankato, MN 56001 R: \ C I V I L E N G I N E E R I N G \ C I V I L E N G I N E E R I N G P R O J E C T S \ S R E 2 3 0 0 1 - M A N I O N ' S L O T \ C I V I L \ C A D \ S H E E T S \ M A N I O N S - D T 0 1 . D W G C601 DE T A I L S LAST REVISED: 08/30/2022 PRE-ASSEMBLED SILT FENCE (LIGHT DUTY)GD01 TRENCH WITH NATIVE BACKFILL NOTES: 1.INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN ACCUMULATED TO 1/3 THE HEIGHT OF THE FABRIC OR MORE. 2. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED. 3.SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDS EFFICIENCY. 4. ALL ENDS OF THE SILT FENCE SHALL BE WRAPPED UPSLOPE SO THE ELEVATION OF THE BOTTOM OF FABRIC IS HIGHER THAN "PONDING HEIGHT". 5. SILT FENCE MAY BE INSTALLED WITH SLICING MACHINE IN FIELD. WOVEN FILTER FABRIC (36" HIGH) 2"X 2" WOOD POST FILTER FABRIC, ATTACH SECURELY TO UPSTREAM SIDE OF POST WITH 5-1" STAPLES PER POST FABRIC SLICED INTO SOIL WITH COMPACTED BACKFILL 5' HIGH MAX WOOD POST 12 " M I N . PONDING HEIGHT 8'-0" M A X . SPAC I N G FLOW FLOW RUNOFF STANDARD DETAIL NOTES: 1. FILTER FABRIC SHALL BE PLACED UNDER ROCK/WOOD CHIPS TO STOP MUD MIGRATION THROUGH ROCK/WOOD CHIPS. 2.WOODCHIPS USED FOR CONSTRUCTION ENTRANCES MUST BE 80% NOT LESS THAN 2-INCHES AND NOT MORE THAN 5-INCHES. NO CHIPPED-UP MANUFACTURED WOOD AND/OR CHEMICALLY TREATED IS ALLOWED. 3.ENTRANCES MUST BE MAINTAINED REGULARLY TO PREVENT SEDIMENTATION ON PUBLIC ROADWAYS. FUGITIVE ROCK OR WOODCHIPS WILL BE REMOVED FROM ADJACENT ROADWAYS DAILY OR MORE FREQUENTLY AS NECESSARY. 4.LENGTH AND WIDTH TO BE ADJUSTED FOR SITE CONDITIONS. HAR D S U R F A C E PUB L I C R O A D 1"-2" WASHED ROCK OR WOODCHIPS PER SPECIFICATIONS 18" MINIMUM CUT OFF TO MINIMIZE RUNOFF FROM SITE ROCK=12" MIN. WOODCHIPS=18" MIN. 20' M I N . WIDT H 50' M I N . LAST REVISED: 08/30/2022 CONSTRUCTION ENTRANCE GD05 2 MAXIMUM 1 SL O P E NOTES: 1. GROOVES WILL CATCH SEED, FERTILIZER, MULCH, RAINFALL AND DECREASE RUNOFF RATE. 2. USE SLOPE TRACKING FOR SLOPES 4:1 AND 50 FEET LONG OR STEEPER/LONGER. 3. USE TEMPORARY CONTOUR FURROWS FOR SLOPES 3:1 AND 75 FEET LONG OR STEEPER/LONGER. 25' 6" MIN. TEMPORARY CONTOUR FURROWS SLOPE TRACKING LAST REVISED: 08/30/2022 SURFACE ROUGHENING FOR ALL SLOPES GREATER THAN 4:1 GD09 FILTER CLOTH 4' ABOVE SOURCE OF WATER MI N . 4 " O V E R L A P BERM WATER TA B L E 00 5" 0 5" 1 4" 2 4" 3 6" 4 6" 5 5" 6 5" 7 5" NOTES: 1. MATS/BLANKETS SHOULD BE INSTALLED VERTICALLY DOWNSLOPE. 2. SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICK AND GRASS. 3. MATS/BLANKETS SHALL HAVE GOOD SOIL CONTACT. 4. LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. 5. DO NOT STRETCH. SLOPE RATIO 2:1 (H:V)> 2:1 - 1:1 STAPLES/YARD 1.2 STAPLES 1.7 STAPLES SPACING FOR STAPLESSTAPLE LENGTH CATEGORY OF BLANKET TYPICAL SLOPE SOIL STABILIZATION ISOMETRIC VIEW TAMP DIRT OVER MAT/ BLANKET VA R I E S NON-WOVEN GEOTEXTILE FILTER FABRIC UNDER TYPICAL TREATMENT GENERAL STAPLE PATTERN VA R I E S 4' VARIES 12 " WET SLOPE LINING VA R I E S LAST REVISED: 08/30/2022 TEMPORARY EROSION BLANKETS TURF REINFORCEMENT MATS FOR SLOPES GD21 GROUND SLOPE GROUND DISTURBANCE: ROAD, PARKING LOT, UTILITIES, ETC. WETLAND/STREAM/DITCH SILT FENCE BIOROLL PROFILE VIEW LAST REVISED: 08/31/2022 REDUNDANT SEDIMENT CONTROL OPTION 1 GD34 NOTES: 1. SEE PLAN FOR DISTURBANCE LIMITS AND LOCATIONS OF SECONDARY CONTROLS. 2.TO BE UTILIZED WHEN DISTURBANCE WILL BE WITHIN 509' OF WETLAND/ STREAM/ DITCH DELINEATIONS. 3.SEDIMENT CONTROLS TO BE AT EDGE OF DISTURBANCE, KEEPING AS MUCH BUFFER AS POSSIBLE BETWEEN DISTURBANCE AND WETLAND/ STEAM/ DITCH. 4.SEE DETAILS/ SWPPP FOR BIOROLL & SILT FENCE INFORMATION. LAST REVISED: 10/18/23 INFILTRATION BASIN WT02 MIX ON-SITE TOPSOIL INTO THE TOP 12" OF EXISTING GROUND. DO NOT COMPACT. HWL PER PLAN MNDOT SEED MIX 25-151 OR SOD ABOVE HWL. (TYP.) BASIN BOTTOM PER PLAN MNDOT SEED MIX 33-261 BELOW HWL OR MN NATIVE LANDSCAPES LOW GROW FESCUE BLEND (OR EQUAL) BELOW HWL SCARIFY SOILS BELOW BASIN INFILTRATION BASIN NOTES: 1. BASIN AND BERM SIDE SLOPES SHALL BE 3:1. 2. TOP OF BERM SHALL BE 10' WIDE. THE TOP SHALL BE CROWNED AND HAVE THE ELEVATION SHOWN ON THE PLANS. 31 RESOLUTION 2023-DEF A RESOLUTION ADOPTING FINDINGS OF FACT AND APPROVING A CONDITIONAL USE PERMIT FOR OUTDOOR STORAGE MANION PROPERTIES, LLC WHEREAS, Manion Properties, LLC applied for a Conditional Use Permit application for an Outdoor Storage on the Subject property described as: Parcel ID of property: 84.53300.0448 FINDINGS OF FACT WHEREAS, On November 13th, 2023 the St. Joseph Planning Commission conducted a public hearing to consider the application of Manion Properties, LLC., owner and applicant, for a Conditional Use permit for Outdoor Storage on the Subject Property; and WHEREAS, That the matter was duly published and notice was posted in the city designated newspaper and mailed notices were sent to the property owners within three-hundred and fifty (350) feet of the Subject Property; and WHEREAS, That the Subject Property is zoned I-1 Light Industrial and Outdoor Storage is allowed through a Conditional Use Permit; and WHEREAS, the St. Joseph Planning Commission recommended approval of the Finding of Fact Resolution at their November 13th, 2023 meeting; and NOW THEREFORE, BE IT RESOLVED THAT THE ST. JOSEPH CITY COUNCIL, hereby makes the following Findings of Fact: 1. That the surrounding land uses to the Subject Property are Rural Residential to the North, and I-1 Light Industrial to the South, West, and East; and 2. That the Comprehensive Plan guides all the properties that abut the subject property as I-1 Light Industrial; and 3. That the Conditional Use will be located on a majority of the Subject Property as depicted in Exhibit A; and 4. The Conditional use will not be detrimental to or endanger public health, safety, morals, comfort, or general welfare of the neighborhood and will be harmonious to the objectives of the Comprehensive Plan of the City; and 5. That the Conditional use will not involve activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property, or general welfare of traffic, noise, smoke, fumes, glare or odors; and 6. That an seven-foot chain link fence with barbed wire will be installed around the entire perimeter of the site to enclose the outdoor storage area as best as possible and that this fence matches the existing fence that borders the site; therefore, the conditional use will be designed, constructed, operated and maintained so as to be harmonious and appropriate in appearance with character of the area and is not hazardous or disturbing to existing or future neighboring uses; and 7. That no utilities and services are needed for the proposed use so the use will not create excessive or additional costs for services and/or be detrimental to the economic welfare of the community; and 8. That access and restrictions will be provided through the adjacent land owned by the same owner and applicant; and 9. The storage area will be surfaced with gravel; and 10. The facility will not result in the destruction, loss, or damage of a natural, scenic, or historic feature of major importance; and 11. The soil conditions are adequate to accommodate the proposed use; and NOW, THEREFORE BE IT RESOLVED THAT THE CITY COUNCIL OF ST. JOSEPH, MINNESOTA, HEREBY RECOMMENDS APPROVAL OF THE CONDITIONAL USE PERMIT BASED ON THE FOLLOWING CONDITIONS: 1. 1. The property owner is responsible for meeting all Federal, State, Local, and City requirements and obtaining any and all permits and licenses. 2. 3. 2. Additional City Requirements: That the applicant shall submit a Land Disturbance permit and all Engineering and Stormwater standards shall be addressed prior to issuance. 4. 5. 3. Lighting: All lighting shall meet City Ordinance. Lighting (wall and pole) shall be full-cut off style or hooded to prevent light pollution onto neighboring properties. A photometric plan along with light fixture details shall be submitted and approved prior to issuance of the Land Disturbance permit. 6. 7. 4. Storage areas: All storage areas for proposed materials (lumber, shingles, etc.) shall be clearly delineated, meet required setbacks and be stored within the areas identified in the site plan shown in Exhibit A. 5. The outdoor storage area shall be contained by a seven-foot chain link fence with barbed wire around the entire perimeter of the site as shown in Exhibit A. 6. The City shall have the right to inspect the premises for compliance and safety purposes at any time upon reasonable request. 7. The storage yard is proposed to be surfaced with gravel. The owner shall control any dust that is created within the site so as to not cause any dust to blow onto adjacent properties or be tracked onto city streets. 8. Access: Property does not directly abut a public street. Access is provided through the adjacent properties to the South. The direct access through adjacent property to a public street shall be maintained throughout the duration of the Conditional Use. 9. Future Roadway: The City’s Transportation Plan shows future roadway connection adjacent to the site. The proposed infiltration basin in the Northeast corner of the site is within one of the potential roadway corridors. At time of final design of the corridor its determined that the corridor has to be constructed through the infiltration basin in the Northeast corner of subject property the city is not responsible for any financial costs tied to relocation of the infiltration basin. 9. Amendment: This Conditional Use Permit and the terms and conditions therein, may be amended upon Owner’s application to an agreement by the City Council. 10. Revocation: The City Council shall revoke a conditional use permit when it determines that the terms and conditions of the permit as issued are no longer being complied with. A certified copy of an order of the City revoking a conditional use permit shall be filed with the County Recorder for recording. 11. Expiration: The conditional use permit shall expire if the authorized use ceases for any reason for more than one (1) year. WHEREAS said Finding of Fact and Decision was declared duly passed and adopted by the St. Joseph City Council on this 20th day of November, 2023 CITY OF ST. JOSEPH Mayor, Rick Schultz ATTEST David Murphy, City Administrator Document drafted by: City of St. Joseph 75 Callaway St E St. Joseph, MN 56374 EE X X X X X X X SITE BENCHMARK NAIL IN TREE ELEV.=1065.08 FL O O R E L E V . = 1 0 6 5 . 8 9 FL O O R E L E V . = 1 0 6 5 . 9 3 FL O O R E L E V . = 1 0 6 5 . 9 0 NORTH LINE OF HALL INDUSTRIAL PARK BUILDING 15 FT. DRAINAGE & UTILITY EASEMENT PER HALL INDUSTRIAL PARK DELINEATED WETLAND 25' SIDE YARD SETBACK 25' SIDE YARD SETBACK 20 ' R E A R S E T B A C K 30 ' F R O N T Y A R D S E T B A C K PR O P E R T Y B O U N D A R Y PROPERTY BOUNDARY PR O P E R T Y B O U N D A R Y PROPERTY BOUNDARY 50' WETLAND SETBACK 100' WETLAND SETBACK 76 T H A V E N U E X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXX 50' 27 7 . 5 8 ' 1047.25' 945.12' INFILTRATION BASIN INFILTRATION BASIN 350' SHINGLES 500' LUMBER 200' LUMBER 175' SHINGLES 150' SHINGLES 200' LUMBER 200' LUMBER200' LUMBER 175' SHINGLES 175' SHINGLES 50' 50' 75' 25 ' 40 ' 50'50'50'50'50' 50 ' 50 ' 50 ' 50 ' 54 ' 50'50' 50 ' 172' Common Ground Alliance Call 48 Hours before digging: 811 or call811.com ST O R A G E Y A R D ST . J O S E P H , M N MA N I O N ' S W H O L E S A L E 10.25.23 Pr o j e c t N u m b e r : S R E 2 3 0 0 1 NOTICE: This document ("Instrument of Service") was prepared by Rice Companies, Inc. ("RCI") specifically for the referenced project and is not intended for any other use. RCI retains all common law, statutory and other reserved rights, including copyrights. This Instrument of Service shall not be used on other projects, for additions to this project or for completion of this project by others without RCI's prior written consent. Any unauthorized use of this Instrument of Service shall be prohibited. Copyright Rice Companies, Inc. 2023. All rights reserved.c 320.252.0404 1019 Industrial Dr S ● Sauk Rapids, MN 56379 3301 11th St E ● Glencoe, MN 55336 4201 38th St SW, Ste 209 ● Fargo, ND 58104 RICECOMPANIES.COM WRH REVISIONS NUMBER DATE .. . . . .. . . . 2531 N. Victory Drive ● Mankato, MN 56001 0'50'100'150' R: \ C I V I L E N G I N E E R I N G \ C I V I L E N G I N E E R I N G P R O J E C T S \ S R E 2 3 0 0 1 - M A N I O N ' S L O T \ C I V I L \ C A D \ E X H I B I T S \ M A N I O N S - S K 0 1 . D W G X001 LA Y O U T S K E T C H PROPERTY LINE SETBACK LINE EASEMENT LINE LOT LINE STORMWATER BASIN SITE LIGHTING EXISTING PROPOSED FENCEXX TRAFFIC SIGN POWER POLE BOLLARD / POST SITE LEGEND GRAVEL EXHIBIT A 2024 Planning Submittal and Meeting Dates Phone 320-229-9425 Submittal Deadline Planning Commission By 12:00 pm December 15 1/08/24 January 19 2/12/24 February 16 3/11/24 March 15 4/8/24 April 19 5/13/24 May 17 6/10/24 June 14 7/8/24 July 19 8/12/24 August 16 9/9/24 September 20 10/14/24 October 18 11/11/24 November 15 12/09/24 December 20 1/13/25 A complete application must be submitted by the deadlines indicated above. No exceptions! After Planning Commission, the Council acts on the application. Council meets on the 1st and 3rd Monday of the month. 36 Planning Commission Agenda Item 7a MEETING DATE: November 13th, 2023 AGENDA ITEM: 7a – Public Hearing – Zoning Amendment – Landscape Requirements in Industrial Zoned Properties STAFF RECOMMENDATION: Approval of Ordinance amendment PREVIOUS PLANNING COMMISSION ACTION: Discussion occurred last three months. Direction given last month to bring draft back for formal ordinance amendment and public hearing. BACKGROUND INFORMATION: Direction was provided last month to bring formal ordinance amendment back this month for hearing and action. Draft includes allowing administrative exemption for the minimum number of trees and shrubs in Industrial zoned property. Drafted language also has verbiage tied to installing plantings along perimeters of parking lots, front of site, and borders of site along public right-of way and side lot lines. ATTACHMENTS: 1. Ordinance Amendment Resolution 2. Summary publication REQUESTED PLANNING COMMISSION ACTION: 1. Open and close public hearing 2. Recommendation on Ordinance amendment resolution 3. Recommendation on Summary publication 37 ORDINANCE 502.12 – ZONING ORDINANCE NO 2023-XYZ AN ORDINANCE AMENDING ORDINANCE 502.12 Subd 5 Section D IT IS HEREBY ORDAINED BY THE COUNCIL OF THE CITY OF ST. JOSEPH MINNESOTA: That Section 502.12 Subd 5 Section D: General Performance is hereby amended as follows. New language is in red and language being eliminated is shown as strikethrough: Section 502.12 Subd 5 Section D D. Performance Standards. A landscape plan must be submitted with each project and such plan must be prepared by an experienced landscape person. In order to achieve landscaping which is appropriate to scale with the site of a building and site, the minimum standards apply to all districts and projects that require Site Plan approval except A, R-1, R-2, R-4, and B-1. I-1 properties may be exempt from the minimum quantities of trees and shrubs required. 1. Trees: One tree for every one thousand (1,250) square feet of total building floor area or one tree for every one hundred feet (100’) of site perimeter, whichever is greater. A minimum of twenty-five percent (25%) of the trees required will be coniferous. 2. Ornamental Trees: One ornamental tree can be substituted for every six-tenths (6/10) overstory deciduous shade tree. In no case shall ornamental trees exceed fifty percent (50%) of the required number of trees. 3. Understory Shrubs: One understory shrub for every four hundred fifty (450) square feet of building or one shrub for every seventy-five feet (75’) of site perimeter, whichever is greater. 4. R-1, R-2, R-4, and R-5 Districts: Minimum standards set above apply to R-1, R-2, R- 4 and R-5 Districts in these instances: A. Double frontage lots. B. Anything other than a single-family home. 5. I-1 properties shall meet the following performance standards: a. Landscape Plan shall provide a mix of deciduous and coniferous trees. At least twenty-five percent (25%) of the trees shall be coniferous. b. Tree and shrub plantings shall be located along areas of the site which border the public right-of-way, front entrance of the building, perimeter of parking lot and side corners of the building area. c. Screening requirements shall be met and remaining land shall be seeded/sodded. This ordinance becomes effective from and after its passage and publication. Passed by the City Council of St. Joseph, Minnesota the 20th day of November, 2023. Rick Schultz, Mayor ATTEST David Murphy, City Administrator This amendment was published on ______________, 2023 Document drafted by: City of St. Joseph 75 Callaway St E St. Joseph, MN 56374 38 Resolution 2023XYZ SUMMARY PUBLICATION OF ORDINANCE NO. 2023-XYZ AN ORDINANCE AMENDING ORDINANCE 502.12 Subd. 5 Section D The following official summary of the ordinance referred to has been approved by the City Council of St. Joseph as clearly informing the public of the intent and effect of the amendments. Ordinance 502.12 Subd. 5 Section D The ordinance amendment modifies the landscape requirements for properties Zoned I-1 Light Industrial and for projects required to go through Site Plan approval in this zoning district. A printed copy of the entire ordinance is available for inspection by any person at the office of the City Clerk any Monday through Friday between the hours of 8:00a.m. and 4:30 p.m. or on the City website at www.cityofstjoseph.com This document hereby is made a part of this ordinance and is attached hereto. _____________________________ Rick Schultz, Mayor ATTEST: _____________________________ David Murphy, City Administrator SEAL PUBLISHED IN THE ST. CLOUD TIMES ON ________________, 2023 39